Loading...
HomeMy WebLinkAboutGrading Plans - 06/30/2016Pr o p o s e d d e t a c h e d g a r a g e 64 0 s q f t im p e r v i o u s a r e a a d d e d Ex i s t i n g g r a d e d r a i n s t o s t r e e t Pe r m e a b l e b e d 16 ' 8 " x 1 4 ' & 1 1 ' 1 0 " x 1 7 ' 6 " x 2 4 " d e e p ; 5 0 % v o i d 17 ' Existing House Sw a l e d r a i n s t o p e r m e a b l e b e d Drain Drain Sw a l e d r a i n s t o pe r m e a b l e b e d Ro o f See spreadsheet Proposed Grade ≥6" from foundation tops 4" permeable pavers ≥2" Bedding Layer Crushed #8 Rock ≥12" Layer #2 Rock Sub-base ≥ 4" Layer #57 Rock Base Undisturbed Soil ≥30-mil HDPE Impervious Membrane Surfaces slope ≥¼” per foot towards street; 19" rise from curb to rear of addition. Surfaces slope ≥¾” per foot towards line of underdrain. Underdrains at property line on S and mid-line on N. Swale Detail Proposed detached garage is constructed of shipping containers and will not be augmented with a traditional roof. It therefore will not have gutters. The indicated swale is intended to carry storm water away from foundation and to provide opportunity for storm water to percolate into soil. Dr a i n s t o a l l e y Drain 4" Underdrain Grading Plan for 137 2nd St Building Permit #B1602025 Owners: Existing Impervious Area: House: 722 sf drains to street Garage: 360 sf drains to alley New Impervious Area: Garage: 640 sf drains to street New Permeable Area: Driveway: 440 sf tested to drain <32 mpi Net Impervious Area: 541 sf – only existing garage and north half of existing house produce runoff Existing grade to storm drain cu r b 4 " p e r m e a b l e p a v e r s ≥1 2 " L a y e r # 2 R o c k S u b - b a s e ≥ 4 " L a y e r # 5 7 R o c k B a s e ≥ 2 " B e d d i n g L a y e r C r u s h e d # 8 R o c k ≥2 4 " L a y e r # 2 R o c k S u b - b a s e St e e l f l a s h i n g w e l d e d to c o n t a i n e r ; ¾” f l a n g e s e a l e d i n sa w k e r f i n f o u n d a t i o n Su r f a c e s l o p e s ≥ ¼ ” p e r fo o t t o w a r d s s t r e e t Su r f a c e s s l o p e ≥⅔ ” p e r f o o t to w a r d s s t r e e t 5' Existing grade to storm drain Graph illustrates permeable bed exceeds rainfall on south half of house, proposed garage, north half of neighboring house and surface of swales and permeable bed; accumulation <21". Un d i s t u r b e d S o i l Pe r m e a b l e B e d D e t a i l 13 3 2 nd S t 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 PM 3:00 PM 6:00 PM 9:00 PM 12:00 AM ga l l o n s o f w a t e r hours of rainfall 100 year rainfall influx percolation Lot 12 Blk 9 Buckingham Place Grading plan accepted 6/30/2016 DM Testing and analysis of soil at proposed building site In cooperation with: 137 2nd St  133 2nd St Fort Collins CO 80524 Fort Collins CO 80524 Owners: Owners:               Areas draining to permeable bed: sf N‐SE‐W 231 8'3" x 28' swale between 133 2nd St & proposed garage 86 7'2" x 12'    rear portion extends 1'1" to north 200 5' x 40' swale between 137 2nd St & proposed garage 105 21' x 5' transition area from E face of garage towards permeable bed 361 9'6" x 38' S portions of 137 2nd St (drains to permeable bed} 689 13' x 53' N portions of 133 2nd St (drains to S swale} 640 16' x 40' proposed garage 233 16'8" x 14' permeable bed (2 rectangular sections) 207 11'10" x 17'6" 7:00 AM 100 year rainfall drainage area permeable retention depth 1:58 PM Δ min per in 12:00 AM 2,752 440 25" 5:05 PM 8" 23.4 1:00 AM 2" 3,432 524 21 1/8" 7:54 PM 7" 24.1 2:00 AM 2 3/8" 4,075 1,048 22" 9:43 PM 5" 21.8 3:00 AM 2 1/2" 4,289 1,571 19 6/8" 8:43 AM 6:00 AM 3" 5,147 3,143 14 5/8" 9:23 AM 2 3/4" 14.5 12:00 PM 3 1/2" 6,005 6,286 0" 10:35 AM 3 3/8" 21.3 11:59 PM 4" 6,863 12,571 0" 12:35 PM 4 1/2" 26.7 3:20 PM 5 3/4" 28.7 5:10 PM 4" 27.5 annual 16" 27,281 8:37 PM 7" 29.6 31.4 average of last 3 measurements plus 10% gallons Percolation tested via "bucket test" ‐ 5 gallon bucket with bottom removed placed in hole dug in proposed  permeable bed area; top rim of bucket level with existing grade. Bucket filled to top at times indicated in table;  distance from bucket top to water level measured at end of each interval shown. Testing continued for 37 hour  period. The average of last 3 measurements plus 10% used to project accumulation in permeable bed. 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 PM 3:00 PM 6:00 PM 9:00 PM 12:00 AM ga l l o n s  of  wa t e r hours of rainfall 100 year rainfall influx percolation