DRAINAGE MEMO
East %Z of Lot 9, Bloci< 145, Fort Collins S�
(a.lc.a. 330 East Mrytle Street), Fort Coll
To Whom It May Concern,
5803 Lockheed Avenue Loveland,
Colorado 80538
Grading/Stormwater Plan Accepted �
(Building Permit Released)
Accepted by: Dan Mogen
�ion 09/01/2021
The purpose of the grading plan for the address referenced above is to protect the proposed
two-story wood framed residence structure on the lot and adjoining lots from stormwater
runoff. The existing subdivision for Fort Collins was established around approximately 1880.
The lot is located in an area that was recently revised to Moderate Flood Risl<. According to
Claudia Quezada, City of Fort Collins Floodplain Management, since this lot is now located in a
Moderate Flood Rislc zone, the City cannot require new construction at or above the BFE but
highly recommends the TOF be held as high as possible. The grading for the area in this
subdivision will never be able to meet the current drainage and grading standards. This lot is
configured as a"Type A" grading which allows for drainage to flow from the rear of the lot to
the front of the lot. The newly adopted BFE for this lot is 5089.42(NAVD88) and the proposed
Plot Plan shows the Top of Foundation (T.O.F.) elevation to be either 5089.83 for 5% side-yard
slope or 5090.08 for 10% side-yard slope both of which are above the BFE.
The existing side lot lines on the east and west of the lot are relatively flat. The previous historic
drainage for the house that was razed along the west lot line flowed to the front of the lot with
the west lot line at an appr•oximate 0.77% grade and the east lot line at an approximate 0.68%
grade. These are existing established drainage patterns along the lot lines. These grades cannot
be changed without impacting other residences and the adjoining lots. These grades were held
in the attached proposed lot line grades. It is recommended gutters be installed on the proposed
structure with down spouts at the corners. The roof ridge line will run north and south which
would split the flows evenly to the east and west side of the lot. Downspouts should have
extensions and be required to discharge slightly inward to the north at the rear and slightly
inward at south the front of the structure, in the direction of historic storm-water flows.
This Drainage Memo will address the Stormwater Depar-tment concerns. The current lot is
9,500 sq. ft. with an allowed floor area of 3,375 sq. ft. The proposed house has a footprint of
approximately 1,815 sq. ft., with a bacic covered porch of approximately 236.66 sq, ft., a front
covered porch of approximately 177.0 sq. ft. for a total of approximately 2,228.66 sq, ft., leaving
approximately 7,271.34 sq. ft. as landscaped. The razed house had an approximate impervious
area of 1,395 sq. ft. The increased impervious area is approximately 833.66 sq, ft. which is less
than the allowed 5,000 sq. ft, in Old Town basin, so no detention is required. Attached are
copies of the runoff calculations for the previous (historic) site and the new (proposed) site
imperviousness. The calculations determined the historic 100-year runoff to be 0.725 cubic feet
per second (cfs) and the proposed 100-year runoff to be 0.775 cfs. These calculations use the
City of Fort Collins 1.25 multiplier. Thus, the additional 100-year runoff equates to
approximately 0.05 cfs. Based on the relatively flat configuration of the lot, it is anticipated that
this flow will be approximately equal down the two side lot lines. Therefore, the approximate
additional 100-year runoff of 0.025 cfs would flow on the east and west lot lines.
Doug Bennett at Stratton Homes
Drainage Memo — 330 E. Myrtle Street
Fort Collins, Colorado
Project No. STRATH-20H8C-11-321
Page 2 of 2
The existing lot currently has a low spot located in the southeast corner that allows
for historic drainage to flow onto and across the adjacent lot. As Agreed to by Mr.
Bennett, a landscape berm will be placed along the front east lot line to divert this
flow to the street as has historically occurred. This should reduce, if not eliminate,
flow onto the lot to the east. Even though the calculated change in 100-year runoff is
relatively small it is suggested to install a 4-inch diameter pvc pipe in the east and west lot line
swale. Shallow swales should be used on the lot to direct the run-off flows to these pvc drains.
In addition, the downstream end of the pipes shall have a bend installed to divert flows toward
the center of the lot and discharge into the grass/landscape area in the front of the house.
Assuming no head and minimal slope (0.4%) on the 4-inch pvc the approximate capacity would
be 0.91 cfs. Assuming a split flow for the entire lot the total 100-year flow per side of the lot
would be approximately 0.39 cfs. This is a conservative number since it includes the runoff from
the fr•ont yard that is already there as well as and the runoff from the rear yard. Therefore, the
capacity of the 4-inch pipes is approximately 3 times the calculated 100-year flow for half of the
lot going down each side. The ends of the drainpipes should discharge on the front
grass/landscaped area to allow for the flows to pass through the landscaped area before entering
the Old Town drainage basin to provide water quality.
Based on this relatively insignificant additional flow, it is our Professional Opinion any impact
would be negligible. In fact, with the installation of the 4-inch pipe the side yar-d dr-ainage will
now discharge in front of and beyond the proposed new structur-e as well as the structure to
the east. This will probably improve the drainage for both these lots.
Therefore, based on the areas and information provided above, the proposed structure should
not substantially change the historic drainage of the surrounding properties. The site drainage
should not impact the proposed structure and should reduce the historic impact on the adjacent
properties. Stormwater runoff from the yard, will follow the historic drainage paths and flow
around the proposed structure on either side or discharge directly to the front of the proposed
structure and will reach the historic discharge location in East Myrtle Street. The site
stormwater flow will discharge to the street as has historically occurred. The top of foundation,
adjacent finish grades, and spot grades and elevations shown on the Site Plan and the information
in this memo should be used to perform the final grading for the site. If you have any questions,
please feel free to contact our office.
Sincerely,
LANDMARK ENGINEERING, LTD.
�
, �, � ����
Rodney . Har•r, P.E.
Direc r of Engineering
attachements
.,``�1� t 1 I I � I!!1�'l,
����eRE�J
.' a,�, '.l'r f, f��`�!
% F .e..o C�
��''� �s�� N A L `�����
�'';�ii�iiii�������`
Area-Weighting for Runoff Coefficient Calculation
Project Title: 330 East Myrtle Street, Fort Collins, CO
Catchment ID: Lot - Historic
II lustration
s�a'�e°�
,,,.J#� � � Flow Direc[ion
S���e9 7` 1
Subazea 3 Cazchm ent
EmfnAuy
Instructions: For each catchment subarea, enter values tor A and C.
Area-Weighted Runoif Coefficient (sum CA/sum A) = 12.08
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
Copy of UD-Rational v1.02a Historic.xls, Weighted C 7/23/2021, 2:29 PM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title: 330 East Myrtle Street, Fort Collins, CO
Cafchment ID: Lot - Historic
I. Catchment Hydrologic Data
Catchment ID = Lot-Hisl
Area= 022 Acres
Percent Imperviousness = 12.08 °/
NRCS Soil Type = C A, B, C, or D
II.Rainfallinformation I(inch/hr)=C1*P11(C2+Td�"C3
�esign Storm ReWm Period, Tr = 10 years (input reWm period for design storm)
Ci = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0786 (input lhe value of C3)
P1= 1.40 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Calchment
Runoff CoeKcient, C = 0.31
Overide Runoff Coefficient, C= (enter an overide C value if desired, or leave blank to accept calculated CJ
5-yc Runoff Coeffcient, C-5 = 0.22
Overide 5-yr. Runoff Coefficient, C= (enter an overide G5 value if desired, or leave blank to accept calculated G5 J
Illustration
ooerland
Reach 1 }]a�
Reaeh 2
�
ReachJ
LEGEND
� Hegimiing
Flmv Directio
�—
Catclunent
Bowda.y
Paved Areas &
1 Shallow Paved Swales
Type II Meadow II Field II Pasture/
Lawns
Calculations:
�
Slope Length
S L
ff/ft ft
input input
1.0067 189
Sum 789
Bare �� Swales/
5-yr NRCS Flow Flow
Runoff Canvey- Velocity Time
Coeff ance V Tf
G5 fps minules
Regional Tc
User-Entered Tc
IV. Peak Runoff Prediction
Rainfall Intensity at Compuled Tc, I= 2.45 inch/hr
Rainfall Intensity at Regional Tq I= 3.64 inch/hr
Rainfali Intensity at User-Defined Tc, I= 3.64 inch/hr
Peak Flowrate, Qp = 0.17 cfs
Peak Flowrate, Qp = 025 cfs
Peak Flowrate, Qp = 025 cfs
Copy of UD-Rational v7.02a Historic.xis, Tc and PeakQ 7/23/2027, 2:28 PM
ICALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD I
Project Title: 330 East Myrtle Street, Fort Collins, CO
Catchment ID: Lot - Historic
I. Catchment Hydrologic Data
Catchment ID = Lot-Hist
Area = 0.22 Acres
Percent Imperviousness = 12.08 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I(inchlhr) = C1 ' P1 1(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.83 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Ccefficient, C = 0.54
Overide Runoff Coe�cient, C= (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Caefficient, C-5 = 0.22
Overide 5-yr. Runoff Coefficient, C= (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
Calculations
Reach Slope
ID 5
wh
input
Overland 0.0067
1
2
3
4
Length 5-yr
L Runoff
Coeff
ft C-5
NRCS Flow Flow
Convey- Velocity Time
ance V Tf
fps minutes
input output output
Suml 189
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I= 4.94 inchlhr
Rainfall Intensity at Regional Tc, I= 7,35 inch/hr
Rainfall Intensity at User-Defined Tc, I= 7.35 inch/hr
Copy of UD-Rational v1.02a Historic.xls, Tc and PeakQ
Regional Tc = 11.05
User-Entered Tc = 11.05
Peak Flowrate, Qp = D.58 cfs
Peak Flowrate, Qp = 0.86 cfs
Peak Flowrate, Qp = 0.86 cfs
��g � �' ` a � �
�
7/23/2021, 2:27 PM
Area-Weighting for Runoff Coefficient Calculation
Project Title: 330 East Myrtle Street, Fort Collins, CO
Catchment ID: Lot - Proposed
Illustration
Instructions: For each catchment su6area, enter values for A and C.
EGETID:
lojs• Direction
�
�atchment
3ound�•y
Area-Weighted Runoff CoeTficient (sum CA/sum A) = 23.21
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
Copy of UD-Rational v1.02a Historic.xls, Weighted C 7/23/2021, 11:21 AM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title: 330 East Myrtle Street, Fort Collins, CO
Catchment ID: Lot - Historic
I. Catchment Hydrologic Data
Catchment ID = Lot-Hist
Area = 0.22 Acres
Percentimperviousness= 2321 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I(inchlhr) = C7 * P1 /(C2+Td)^C3
Design Storm Retum Period, Tr = 10 years
C1 = 28.50
C2= 10.00
C3= 0.786
P1= 1.40 inches
(input reWrn period for design siorm)
(input ihe value of C1)
(input the value of C2)
(input the value of C3)
(inpui one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff CoeKcient, C = 0.36
Overide Runoff Coeffcient, C= (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yc Runoff Coeffcient, C-5 = 027
Overide 5-yr. Runoff Coeffcient, C= (enter an overide G5 value if desired, or leave blank to accepl caiculaled G5.)
Illustmlion
Reach 1
Reuh7
NRCSPIand Heavy
T e Meadow
Conveyance 2.5
CalCula�ions: Reach
ID
Overland
averland LEGIND
llmv
Q Begimting
FRV�V D11ECti0]
C9{fi1P1PTt
S L Runoff
Coeff
H/N ft G5
nput inpul outpul
0067 189 0.:
Convey- Velocity Time
ance V Tf
fps minutes
Regional Tc
User-Entered Tc
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I= 2.53 inchlhr
Rainfall Intensity at Regional Tc, I= 3.64 inch/hr
Rainfall Intensiry ai User-Defined Tc, I= 3.64 inch/hr
Peak Flowrete, Qp = 020 cfs
Peak Flowrate, Qp = 028 cfs
Peak Flowrate, Qp = 0.28 cfs
Copy of UD-Rational v1.02a Historicxis, Tc and PeakQ 7/23/2021, 1120 AM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title: 330 East Myrtle Street, Fort Collins, CO
Catchment ID: Lot - Proposed
I. Catchment Hydrologic Data
Catchment ID = Lot-Hist
Area = 0.22 Acres
Percent Imperviousness = 23.21 °/a
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I(inchlhr) = C1 * P1 /�C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.83 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.56
Overide Runoff Coefficient, C= (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.27
Overide 5-yr. Runoff Coefficient, C= (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
CaICUlationS: Reach Slope Length
ID S L
wh n
input input
Overiand 0.0067 189
1
2
3
4
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I=
Rainfail Intensity at Regional Tc, I=
Rainfall Intensity at User-Defined Tc, I=
5-yr NRCS Flow
Runoff Convey- Velocity
Coeff ance V
C-5 fps
output input output
0.27 N/A 0.13
Computed Tc
Regional Tc
User-Entered Tc
Flow
Time
Tf
minuces
output
23.38
11.05
11.05
5.12 inch/hr Peak Flowrate, Qp = 0.62 cfs
7.35 inch/hr Peak Flowrate, Qp = 0.89 cfs
7.35 inch/hr Peak Flowrate, Qp = 0.89 cfs
d�� �- L ��� �`S
� 1
Copy of UD-Rational v1.02a Historic.xls, Tc and PeakQ 7/23/2021, 11:46 AM
PLOT PLAN
EAST 1/2 OF LOT 9, BLOCK 145, FORT COLLINS
330 EAST MYRTLE STREET, FORT COLLINS, COLORADO
S89' 59' 23"E 50.28� ALLEY
I
I
� � — — � — — — — — — � LOT SIZE-9,500 SQ FT
�� � � ALLOWED FLOOR AREA-3,375 SQ FT
�� I j I
� o i i � DS = DOWN SPOUT
��� I i I
N �„-� �
N ��
Q �
Q
wwco
Q��
Q r!j
� N �
� �
� Q
>>�
��z
wwQ
��_
� � U
�o�
W J W
Z O Z
BFE=89.42
�
�
ai
�
3
N
�i-
O
O
O
N
5.1
89 29/ �
38' OF 4" �RAIN PIPE
Wlhi 0.47 SIOPE
DAYLIGHTING WTO
VEGETATIVE LANDSCAPE
INV IN
89.21
O
�
0
�
�HX=�VtSy.JtS
MIN=5089.33
22.5'
BEND
IN V. OUT
89.05
�
�
N
�
�
I
—EXISTING �
FLOODPLAIN �
I
�INEFFECTIVE I
AREA �
�
�
�0 1�16.1
� 15.
20.00' � iri
N
r �
1.67'
PROPOSED HOUSE �I
I, � T.O.F.=5090.08 �
3 a OR 5089.83
-� N F.G.=5089.33 I
OR 5089.58 �
\
1.67' g.00' � �
� N 13.00'
c�v `� COVERED 6.1
'— i � nn' 00 PORCH _
rn
�
3
N
d-
O
O
O
�
6'
�88 Ss
I�, SIDEYARD
SWALE
�
INV IN
88.51
25' OF 4" PVC �
0.40% SIOPE,
DAYLIGHTING INTO
VEGETATIVE
LANDSCAPE
s.o7
SPOT
� �
� � �
� �
I I '
1
OUT
S89' 59' 23"E 50.28'
aah��y EAST MYRTLE ST ��8838
�
ti
�x h
�� � �W�
h �
hN
�Z� o ��
[ ��' �, hqW
� O
h �'w ai a�'�
�Wp h �'��
� `� � 2tih
� �� w ���
� �E h �22
� �� � �p�
o'"v� W 0.'�W
� �� ti ���
� �q
Cti �C F, U p
�" �� � �yN
� v�ih v�i w��Y
q � � h
wo
q �ZS � qqN
� Oti F' q�ry,
a w� a ��� �
p �w h �q O
h Q[��, w �w� �
� o� � ��2 �
o N� a �ww 2
G+ 'J ti W � �i O
� � p 'w,y�+ 'J. �sl �U GL
2 �� h ti�r� h
O �a' q �N� b
W�x � �xwy�
U] F' � N
��2 � �����
��� � ��owq
��� o �� �w
Nh�2� U�o~o
� � � � � � h � V �
ohwwti Zhwti�
�LUw�'Wv'�op.�0.,
iri��Z�o�W�F'�Wv�
tiF2�qQ�����Q
0 .� � � O � .'l.
2.;ots��i��+i�vv��i
STRATTON CUSTOM HOMES
Snyder Land Surveying Inc, n�'
SITE PLAN
Profess�onal LanO Surveyor
Erik JaY Snyder: PL$ �H555
0:970-686-5157 pA�:
C: 74��992-9754
.µ��s�;:�e�� �ds��Y°;$:�"m� 3/31 /2021
JOB
"o: STRA-20-06-017
SCALE:
1 "= 20'