HomeMy WebLinkAboutGrading Plans - 07/01/2021July 01, 2021
Dan Mogen, EI, CFM
Development Review Engineer
Stormwater Engineering & Development Review Division
City of Fort Collins Utilities
Re: Drainage for 232 Lyons Street Proposed Garage
Dear Dan,
Grading/Stormwater Plan Accepted
(Building Permit Released)
Accepted by: Dan Mogen
Date: 07/01/2021
Reclamation Village Lot 25
B2102780
As discussed, the plan is to convey all the roof runoff from the garage to the proposed rain garden on
the south side of the garage. The additional sand and gravel included with the rain garden installation
per the attached detail will alleviate any concerns about the roof area not increasing the runoff to the
alley or the adjoining properties. The increased roof runoff will be conveyed into the rain garden and
percolate through the sand and gravel over time. I have corrected the imperviousness and rational
calculations to account for the gravel apron at the garage door and the gravel at the west side between
the garage and the patio.
You have in your file two rational calculation files showing that the increase in runoff from entire lot
(6000 sf) for the 2-year and 100-year events would only be 0.01 and 0.03 cfs respectively. In fact, the lot
runoff is split east and west about the middle of the existing house. The second spreadsheet only deals
with the eastern portion of the property (East basin), (4000 sf), which includes the new garage. This
calculation shows that the increase will only be 0.01 and 0.04 cfs for the two design storms.
In conclusion, it is my professional opinion that the rain garden constructed per the detail provided with
the building permit application sans the underdrain, which is not topographically impossible, will contain
the negligible increase runoff from the new garage roof thereby not causing any damage to the
adjoining properties (234 & 232 Lyons and 231-235 McKinley) and alley between these lots.
Sincerely
� Y `^"` �� �.y� �
Mark Oberschmidt, P.E.
P.E. 35721
��PDo Llc�
c,��.�•�BERS�; �`�'�`
.a
:�� y .
:� 35721 �;
� : o�-ol-zozi ; �
.�
:�
����`�•S,S/........��
ONAL �
235 Lyons Street moberschmidt@�mail.com (970) 980 3557
June 26, 2021
Dan Mogen, EI, CFM
Development Review Engineer
Stormwater Engineering & Development Review Division
City of Fort Collins Utilities
dmogen@fcgov.com
Re: Drainage for 232 Lyons Street Proposed Garage
Dear Dan,
Thanks for taking the time to talk with me on Wednesday about this project. As discussed, the plan is to
convey all the roof runoff from the garage to the proposed rain garden on the south side of the garage.
The additional sand and gravel included with the rain garden installation per the attached detail should
alleviate any concerns about the roof area not increasing the runoff to the alley. The roof runoff will be
directed into the rain garden and percolate through the sand and gravel over time. I have corrected the
imperviousness and rational calculations to account for the gravel apron at the garage door and the
gravel at the west side between the garage and the patio.
You also asked that I include detention calculations using the City of Fort Collins 0.35 cfs per acre release
rate for this basin even though I contend that they are irrelevant since the roof runoff is not being
detained and released off site as in a traditional detention pond design but conveyed directly into the
soil below the rain garden. I have provided the requested detention calculations using a historic 2-year,
historic 100-year and the 0.35cfs /acre release rate for your records. The rain garden sizing
recommendations remain the same as before.
Attached please find the following documents requested by the City for the proposed garage at 232
Lyons Street.
• Revised Site Plan with rain garden notes
• Detention calculations
• Imperviousness and rational calculations updated to reflect the gravel on the east and west
sides of the garage.
• Rain garden cross section
Please feel free to contact me if you have any questions.
Sincerely
c�,� �� �
Mark Oberschmidt, P.E.
P.E. 35721
��PD o L,c�
� �s
�o.��;oBERs�y �"o
�� 35721 v:
� �. 06/26/2021 � �
�°.�.ss�........���'
ONA1- �
235 Lyons Street moberschmidt@�mail.com (970) 980 3557
Drainage Calculations
Site 232 Lyons Street
City Fort Collins West Vine Basin Sub basin 71
State CO
Lot Dimensions
Length Width Area Area
ft ft sf ac
120 50 �
Percent Imperviousness
Existing Lot Areas sf
Roof Concrete Lawn Gravel Total Percent Existing Concrete Area sf
Impervious
90% 100% 2% 50% Patio 34.3 19.7
1038 Front Walk 3.0 21.0
Total
Proposed New Surface Gravel
Roof Concrete Lawn Gravel Total apron 5.0 20.0
0 0 180 west 3.0 20.0
Total
Resultant New Lot Areas
Roof sf Concrete Lawn Gravel Total
Notes
1 The existing building is less than 1022 sf but used the square dimensions from the
site plan for the purposes of the imperviousness calculations
2 No change to the western end of the site
3 Garage Dimensions 221�x � 20 �sf
4 existing 4x4 sheet adjacent to SE corner of house increases existing roof area by 16 sf
5 patio area is based on field measures and calculated as a rectangle
Conclude: The assumed imperviousness for the West Vine Basin sub basin 71 is 45%. Therefore, the
addition of the garage roof and other impervious areas will not significantly increase the drainage
runoff from the property to the alley or adversely the basin, the adjacent properties, or alley way
from a drainage standpoint.
Roof
Overall Lot area 0.138 acres
Area draining to Alley 0.092 acres see assumption below
Existing Lot Areas sf
Concrete Lawn Gravel Total C C C C Comp. Q2 Q100
roof concrete gravel lawn C cfs cfs
,,, 0.95 0.95 0.5 0.2 <� V
Q = CCfIA
Comp C = C2
Roof Concrete Lawn
1478 738 3604
Resultant New Lot Areas
Gravel Total C C C C Comp. Q2 Q100
roof concrete gravel lawn C cfs cfs
180 6000 0.95 0.95 0.50 0.20 0.66 0.172 0.751
Assume 12 11100 Cf Cf Comp Comp
Tc iph iph 2 yr 100 yr C2 C100
min
� 5 2.8511 9.95 V 1 1.25 ��I u
Assume
1 2/3 of lot slopes to the east and the alley
2 1/3 of the lot slopes to the west and Lyons Street
3 rainfall intensities from Fort Collins stormwater manual
4 Cf from Fort Collins stormwater manual
Lot Setback Front of Delta Delta/
depth (SB) ft House to (LD-SB- Lot
(LD) Ridge FH) Depth
ft beam ft
(FH)
� 120 25 15 � 67% of lot slopes to east
Delta Delta
Q2 Q100
cfs cfs
�� �
Conclude the increase in flow off the roof for both storms is barely measurable
therefore the rain garden will adequately capture the runoff from the roof. Direct
roof runoff into rain garden via pipes
Table 3.2-2. Surface Type - Runoff Coefficients
Surface T Runoff Coefficients
Hardscape or Hard Surface
Asphalt, Concrete 0.95
RooRop 0.95
Recycled Asphalt 0.80
Gravel 0.50
Pavers 0.50
Landscape or Pervious Surface
Lawns, Sandy Soil, Flat Slope < 29'0 0.10
Lawns, Sandy Soil, Avg Slope 2-7% 0.15
Lawns, Sandy Soil, Steep Slope >7% 0.20
Lawns, Clayey Soil, Flat Slope < 296 0.20
Lawns, Cla e Soil, Av Slo e 2-7% 0.25
Lawns, Clayey Soil, Steep Slope >7% 0.35
7able 3.2-3. Frequency Adjustment Factors
Storm Return Period Frequency Adjustment
(years) Factor (C,)
2, 5, 10 1_00
25 1.10
SO 1.20
100 1.25
— v -
�
� � U
Q �
i
Lfl
� L �
v O O
� +�
'� U
Q1 �
� �
U �
d`
4J
m 7
�
�
L �
a--�
Q
Q `�
�
�
� `�
�
� � v �
fB i i V
OC lD Q � I
� U
t
�
C �n � �
4J C
� O (7
� � �
c
� a� t
.� � �
co �
C
� 0 � �
J
�
�
(6
a v
N �
O
O
i
0
0 0
O n
N �
�
�
Q
+�
� � � �
L � � �
� �
•� � � v O �
OJ (7 Q C '6
� � � �
� �
� � O �
Q � � N �
o `" � c��o i
� N f0 �
ci1 U �
co
N
Q
0
�
�
�
v
C
N
t
�
0
0
�I
.�
�
N
Q
C
N
�
�
�
C
.�
�
(
z
S
(
4
<
t
(
(
C
<
S
N �
z i
Q 4
Q (
l
(
<
4
u
<
�
�
1
.0
S
� �
> (
t
w i
+� �
O t
o c
s
4
. �
<
i
s
c
<
S
�p S
+� (
�
� S
<
N Z
� �
� C
U S
C ,
V �
3 �
3 �
) � �
' m 0
� Z �
3 N N
�
3 � Q-
iA Q
� � i
41 N
� �
_ •� �
) �
C �
' � �
a. a-.+
� � U
3 � ��
T
� � �'
J � ,�
1 Q �
- � �
� � �
iO L
3 � G�p
= a� �
_ � '�
_ N L
' � Q1
3 U �
) �
� O
7 N �
3 `� O
iA >' �
� a� �
+� �
� �C �
G �
) 'X �
3 � v
� Q >
_ (O �
3 � U
)
� — T
, � L
� � �
- N �
- C �
co
� � C 7
3 � O O
3 •� � Q
�
�0 � v �
3 t .� O
_ H � �
Detention Calculation Summary
Release Rate Area Release Volume
Description ac rate Required
cfs cf
Historic 2-yr 0.09 0.17 315
Historic 100-yr 0.09 0.72 12
0.35 cfs/ac 0.09 0.03 783
Proj No: 1552-01-98 Shear Engineering Corporation POND CUHP
6/26/2021
ention Volume Required For 100 -Yr Storm
Jason Jones Back Yard
Release Rate is the historic CUMULATIVE RLTNOFF METHOD
Q2 from the site FOR
SIZING DETENTION PONDS
Design Ston1� 100 year Runoff Coefficient 0.82
Release Rate 0.17 cfs Area 0.09 acres
Initial Time 5.00 Minutes Time Increment 5.00 Minutes
Inflow Inflow Release Storage Storage Max
Time ntensit Rate Volume Volume Voluine Volume Volume
min iph cfs cf cf cf ao-ft ***
5.00 9.95 0.76 228 51 177 0.00
10.00 7.72 0.59 353 102 251 0.01
15.00 6.52 0.50 447 153 294 0.01
20.00 5.60 0.43 512 204 308 0.01
25.00 4.98 0.38 570 255 315 0.01 '�**
30.00 4.52 0.34 620 306 314 0.01
35.00 4.08 0.31 653 357 296 0.01
40.00 3.74 0.29 685 408 277 0.01
45.00 3.46 0.26 712 459 253 0.01
50.00 3.23 0.25 739 510 229 0.01
55.00 3.03 0.23 763 561 202 0.00
60.00 2.86 0.22 785 612 173 0.00
65.00 2.72 0.21 809 663 146 0.00
70.00 2.59 0.20 830 714 116 0.00
75.00 2.48 0.19 851 765 86 0.00
80.00 2.38 0.18 871 816 55 0.00
85.00 2.29 0.17 891 867 24 0.00
90.00 2.21 0.17 910 918 -8 0.00
95.00 2.13 0.16 926 969 -43 0.00
100.00 2.06 0.16 943 1020 -77 0.00
105.00 2.00 0.15 961 1071 -110 0.00
ll0.00 1.94 0.15 976 ll22 -146 0.00
115.00 1.89 0.14 995 1173 -178 0.00
120.00 1.84 0.14 1010 1224 -214 0.00
Detention Volume Required = 315 cf
Detention Volume Required = 0.01 ac-ft
Page 2 of 4
Proj No: 1552-01-98 Shear Engineering Corporation POND CUHP
6/26/2021
ention Volume Required For 100 -Yr Storm
Jason Jones Back Yard
Release Rate is the historic CUMULATIVE RLTNOFF METHOD
Q 100 from the site FOR
SIZING DETENTION PONDS
Design Ston1� 100 year Runoff Coefficient 0.82
Release Rate 0.72 cfs Area 0.09 acres
Initial Time 5.00 Minutes Time Increment 5.00 Minutes
Inflow Inflow Release Storage Storage Max
Time ntensit Rate Volume Volume Voluine Volume Volume
min iph cfs cf cf cf ao-ft ***
5.00 9.95 0.76 228 216 12 0.00 �`**
10.00 7.72 0.59 353 432 -79 0.00
15.00 6.52 0.50 447 648 -201 0.00
20.00 5.60 0.43 512 864 -352 -0.01
25.00 4.98 0.38 570 1080 -510 -0.01
30.00 4.52 0.34 620 1296 -676 -0.02
35.00 4.08 0.31 653 1512 -859 -0.02
40.00 3.74 0.29 685 1728 -1043 -0.02
45.00 3.46 0.26 712 1944 -1232 -0.03
50.00 3.23 0.25 739 2160 -1421 -0.03
55.00 3.03 0.23 763 2376 -1613 -0.04
60.00 2.86 0.22 785 2592 -1807 -0.04
65.00 2.72 0.21 809 2808 -1999 -0.05
70.00 2.59 0.20 830 3024 -2194 -0.05
75.00 2.48 0.19 851 3240 -2389 -0.05
80.00 2.38 0.18 871 3456 -2585 -0.06
85.00 2.29 0.17 891 3672 -2781 -0.06
90.00 2.21 0.17 910 3888 -2978 -0.07
95.00 2.13 0.16 926 4104 -3178 -0.07
100.00 2.06 0.16 943 4320 -3377 -0.08
105.00 2.00 0.15 961 4536 -3575 -0.08
ll0.00 1.94 0.15 976 4752 -3776 -0.09
115.00 1.89 0.14 995 4968 -3973 -0.09
120.00 1.84 0.14 1010 5184 -4174 -0.10
Detention Volume Required = 12 cf
Detention Volume Required = 0.00 ac-ft
Page 3 of 4
Proj No: 1552-01-98 Shear Engineering Corporation POND CUHP
6/26/2021
ention Volume Required For 100 -Yr Storm
Jason Jones Back Yard
Q release is based on 0.35 CUMULATIVE RLTNOFF METHOD
cfs/acre release rate in this FOR
basin per FC SIZING DETENTION PONDS
Design Ston1� 100 year Runoff Coefficient 0.82
Release Rate 0.03 cfs Area 0.09 acres
Initial Time 5.00 Minutes Time Increment 5.00 Minutes
Inflow Inflow Release Storage Storage Max
Time ntensit Rate Volume Volume Voluine Volume Volume
min iph cfs cf cf cf ao-ft ***
5.00 9.95 0.76 228 9 218 0.01
10.00 7.72 0.59 353 19 334 0.01
15.00 6.52 0.50 447 28 419 0.01
20.00 5.60 0.43 512 38 475 0.01
25.00 4.98 0.38 570 47 522 0.01
30.00 4.52 0.34 620 57 564 0.01
35.00 4.08 0.31 653 66 587 0.01
40.00 3.74 0.29 685 76 609 0.01
45.00 3.46 0.26 712 85 627 0.01
50.00 3.23 0.25 739 95 644 0.01
55.00 3.03 0.23 763 104 659 0.02
60.00 2.86 0.22 785 113 672 0.02
65.00 2.72 0.21 809 123 686 0.02
70.00 2.59 0.20 830 132 697 0.02
75.00 2.48 0.19 851 142 709 0.02
80.00 2.38 0.18 871 151 720 0.02
85.00 2.29 0.17 891 161 730 0.02
90.00 2.21 0.17 910 170 740 0.02
95.00 2.13 0.16 926 180 746 0.02
100.00 2.06 0.16 943 189 754 0.02
105.00 2.00 0.15 961 198 762 0.02
ll0.00 1.94 0.15 976 208 769 0.02
115.00 1.89 0.14 995 217 777 0.02
120.00 1.84 0.14 1010 227 783 0.02 �`**
Detention Volume Required = 783 cf
Detention Volume Required = 0.02 ac-ft
Page 4 of 4
� � L � Jo��� � ��-.
�` s.� �
� . - -- ,
�:; R_ ; .
,,� � ,
��
5 �3 --� �-
GRAVEL RAMP
k -- - __zj"-." --- �
�. - -- �
�;s~t_ � �
� �
�� ��'`� �V<•I���
. � � t �c , P< <�
`. EK , s �,-,; � � _
r C� C f C�'C. � �"'("' �
i='r . -? � ..'. I i
'� -��: ���c � 1 1 .�i �� r 1�: ri
� �� ��E ���
� - -- . - - — - �
,\�
,.
4x �
_- <v� � �f . . -- �
' � � �,�;�, L,�; ,,�' 1 r�
r a � ' ✓ -' �'� �1 > ��Ol,�� fyr5'C� l;�
� �
GRAVEL BETWEEN
GARAGE AND
PAT I O
Cr X ��}�c�
,
l_ _. ' E X'
i� ' � ��=�-- ,
l �,'
;
,
\
� � �I �� ��
�
i
�
__ ,
Approximate location of
Rain Garden
,
.-�,-�_
� �
'r.
�,
�� �
s S Se`} �,e�
E�. � � � . :.�-' {.: ,, .:_,'t
�` - .
Revised 06/26/2021
Alternate 1
1- Install rain garden along
south side of garage.
Minimum 5-ft from
foundation
2 - Minimum required rain
garden area is 30.8 sf.
3a - Downspouts from roof
gutters have piping connnect
that conveys stormwater
from roof to rain garden.
Alternate 2
See 1 and 2 above
3b - Install rain barrels at
NW and SW corner and
connected to downspouts.
Rain barrels have piping to
convey stormwater to rain
garden. See rain garden
section attached.
��
a
� K
� w o
�
o ^
o a
� o oz
` ° j o0
d a � E�
� �u
'o �
m � °z
��
w O ,,
1- F Z ��
o � w o0
� �
� a�
� m a F
¢g
o w � �
F p w
` G o0
z o r
~ �a
m o ^- �
o a �G
z �W o�
� ° os �3
O�uj 0 V OZ
�° ° �° �a
_� w g
�� wazZ C¢
-�W �K� t�VZi
Q� O O v�
����U F�w
�O
'^OC F¢gn¢� O�O
/ � �n t- d r- v, r
� �� �ozoo zom
Ooo �u
z � �, � m
J CL
m w
¢ a
Q N
O a
�=l.,
Z J Z
0�3
z � a
Z
�
U
�,.�^..�
V/
Vl
�
�
�
_ ��ll+y�
l
��� _. ---::_-i, ,
.. :...:.-=�
- j"�
zZ K_.,
o �_
pag -.r
JOn
K W a
> � '^ _`"_
Oaa j\
Q w= w=_
� aNLL�
Q ��o�
Qa
�a O '�
Z Qo� -
w
� E��' �_:..
z �
� x 0 Q
Q Z
K
�a u- �
F- �
w z
� Z U �
E3a ���'
a '- —�
zOa
a LL LL ' �
wp0 _��
� w Z . -
w -��_
Z X O2—'��
pw Q W.--�
Z I- w � _- _ _�-
0���
a ZwC�
�
� o�
o kO �
a oz
o a� �� o
- �o �z
�u
�a u�
�� a`u
x¢LL
- �� ��nu
_ � o ,an S
a am '�� �
- fi ma
z aC �
�� �w
C�
�£
�iui ?�a �
� _
� azo ��� r
�u z_ �m,
o� �zU �o �
nz� a
�� a w��
f
�m m°o �°z
w s�� w�Q
�� Qo o�a w
�o �QQ i��� a
w o
`o N'o
�G �� <o� o
F�, �¢o �z= ,
W� w w�� Y
�� OZN �'Qw
, �u �O� `^ z� O
z�0 �z� �2�
i6
��F �£Q
w ?�
tt£ wpZ �L� c
� c 3e£ 3a� 3
o'
� a a e a
£�
�4
Nw .
F�2
�<LL
���
aN
o �
�"o
00
=a
°��
� �
u-�
o £Ew
00
oE�
� faw
� � L�
C �e�Q
O
� 9` 2
� o � z
z o _
o `d z�o
� �a
v h m�v�i
a � �a
o J � 9 w
a � ��¢
°
" _' m
m ya
�
"'a
a W °�
4 �
ww a�
Q��
� 4 w 3 �
z
� w 3 3
O � m � O
^tw
o saa
� � o
� � �, °
o .
o i�
4z
00
d�
m�
0
o�
�O
�o
=o�
c�o
O=
� �
w
z
Jz O
w W
J
� d � W
z
F a ¢ O
O z N
w � ��a
� �tl �
- o
„�� M
i
�'I- 'i`qi k z .�
. =Q �4wac � ..
�X-� h'x�� � c co .�
=<Q ' ,��,y .�,�,c f ii:
_ � �ci 'Y; , �,�;�F��.A'�r�;
c~�il�
O �
S ¢
� �
a z
w
� O
Z ~
� w
m �
~ m
LL W tt W
OQ Oa
�" w F W
a� a�
� � � �
Z Q Z Q
� E E �
_ (�
d � � O
_ �
a w
Q �
w
o �
� V
W �'
� p Z
aFa
�¢o
zoW
��o
va�
Z
E
Z
�
�
��.
�s°caC� �I �
�-7 J Z
� U z U E
p w .. W
�zaw>
� W � � a
°J U a
x
r
02QE0>
t-OSOI-Q
m
� LL � � Z W
� z � � J O
dQzo�
� F � � LL
�oaEw
W g OZC7
za �
OW
m
��
w�
�o
�o
'oF
¢F
�F
��
s�
oa
�o
OQ
��
z � `^
fa a
��' w
��� F
z o
o�� o
�a= z
�o
0
wo
Fo�
fa�
o -� � o
�d� Q
Q� 0 j
Ow� w
m � t
wp ' 0
F 'p' F £ 6
z v�ia? o 0
w o
o f�w � a o
z x
o ¢ao ° � 'o
� ��u o
� �¢o
o ��Q
i� m £ J
k a=z 'o
� �No
c �'z p LL
� '^w� o
o EF� � �
�O z � o
� 6Qm .+ 3
< z � wg g z
3 �oLL zz � c
�=o
z owk LLo � w
�
o �r='7 se a ¢
� � �� � „
r
w z
Z
w
� �i ^�
=Oa
a LL '+-
wp0
�wz
N QWoW� w
= Q O J �
U a Z W l7
Y
J
Q
J 3
W
a �
� N
� , ------
OU
\'_"_
z
�
U
W
�
� _
� F
O z �
� � �
U ;� �
Q m Q
W CO
J
J
Q
�
� Z
wg
�
� d
�
Oa
�a
w "
00
a
O
�
�
�
'o
u
� �
z E �
a �
o �
a o
z o a
¢ �
� o
0
0 0
�
G
� � ry
G g o
0
o w u �
o � c
� � a
� 3
a ` �
� z m o
., o �
� £ z =
o £
G ° w £
� £ m x
Q K w �
m
� 2
� ~
� Q � Z
~ m
¢ � �i w
p � w Om
FO
w s 3
a wo
G = ou
� 3
� rx
a z�
� o
a �w
� 3 g<
o u
o j 5
w �
¢� z �o
�a mr
o£
�N N �NJ �
m ��� �LL
�Q w £�o
o� p w<� ��
dF�
aa�F �oz fe
u£�, pu LL£
� a g~ ..
�
�
=UO
w � ~ � Z
� w w � w
z Y U U E
��a=>
- = o w Q
o��-a>a
.a.
�
�
�
Z
� �
a�
� Z
zW
F
E�
�m
w
Q
�
W
LL �
O�
�
x¢
w�
� �
z=
� a
a
�o
�
J M
H �
i
� 0
w
0
_
z
W �
Z QU�
O ��Q
F- � f-- ~
Z �(n�
w �z
w cn �
Q �
� � mo
E..�. � V I
aF�o '
w3wzH
F
w5ao�
0
� �m
C
�
�'L^r
li
Q
H
w
�
0
J
w J
Q �
(7
W w
O � �
a
0o O
z�
�w
�
=w
� � � U
�—'' F a
, i � �oZ
Q
� Q �
��w
1y� � � �
IXl ]k--- I V a �
' � 3 O I y�
I
— 3'.1 � �.. �"1 . ,.. '�o
J I
r� I Z
-X x�.;i' � I�� E
_Q eSt -
�E ° �' �� ��� N
x N rk� :.� x «� c r- z
'-'-' s�i` �'-�^ �
_ r v W
W = LL =
m 'i � J
W
� N Q E
�
w
J d � _
awN�
� �
� Z �
X � E
� O�a'
a �
� � �
W Q z
5
� J �
z ¢ w
2 a
w
K F
w
z
O
U
Drainage Calculations
Site 232 Lyons Street
City Fort Collins West Vine Basin Sub basin 71
State CO
Lot Dimensions
Length Width Area Area East Basin = Area ac
ft ft sf ac 2/3 of
overal site
sf
120� 50� � � � ��� �� 4000 0.��
Percent Imperviousness
Existing East Basin Area sf
Roof Concrete Lawn Gravel Total Percent Existing Concrete Area sf
Impervious
90% 100% 2% 50°/o Patio 34.3 19.7
519 Front Walk 3.0 21.0
Total
Proposed New Surface Area sf Gravel
Roof Concrete Lawn Gravel Total apron 5.0 20A '
440 0 0 180 west 3.0 20.0
Total
Developed East Basin Area sf
Roof sf Concrete Lawn Gravel Total
Assume
Tc
min
5
C
roof
0.95
C
roof
0.95
12 11100 Cf
iph iph 2 yr
2.85 9.95 1
Existing East Basin
C concrete C C Comp.
gravel lawn C
0.95 0.5 0.2
Developed East Basin
C concrete C C Comp.
gravel lawn C
0.95 0.5 0.2
Cf
100 yr
1.25
Area Q2
ac cfs
Area Q2
ac cfs
Q100
cfs
Q100
cfs
Conclusion Delta Delta
Q2 cfs Q100 cfs
Increase in Q is negligble