HomeMy WebLinkAboutStormwater - D53 - BIORETENTION POND (PDF) -1.CONTRACTOR SHALL INSTALL BIORETENTION BASINS ACCORDING TO THE APPROVED PLANS AND/OR CONSTRUCTION SPECIFICATIONS. 2.PRE-CONSTRUCTION 2.1.CONTRACTOR SHALL AVOID COMPACTION OF THE BIORETENTION BASIN AREA TO PRESERVE EXISTING INFILTRATION RATES. 2.2.CONTRACTOR SHALL CALL FOR CITY INSPECTIONS AT THE INTERVALS STIPULATED IN THE "DURING CONSTRUCTION INSPECTION CHECKLISTS". 3.DURING CONSTRUCTION: 3.1.CONTRACTOR SHALL PROVIDE CONSTRUCTION OBSERVATION DURING CONSTRUCTION OF THE BIORETENTION BASIN TO ENSURE COMPLIANCE WITH THE APPROVED PLANS AND DESIGN SPECIFICATIONS. 3.2.LOOSE MATERIALS SHALL NOT BE STORED ON THE BIORETENTION AREA. 3.3.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS AND DIRT FROM ANY SOURCE FROM ENTERING THE BIORETENTION SYSTEM. 4.GEOTEXTILE LINERS: 4.1.WHERE USED, GEOTEXTILE LINERS (PERMEABLE OR IMPERMEABLE AS PER PLAN) SHALL BE INSTALLED ALONG PERIMETER OF CROSS-SECTION OF THE BIORETENTION CELL. 4.2.WHERE USED, GEOTEXTILE LINERS SHALL BE PLACED IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDATIONS. ALL SEAMS AND OPENINGS IN THE LINER SHALL BE SEALED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS. 4.3.WHERE USED, IMPERMEABLE GEOMEMBRANE SHEET / LINER SHALL BE 40 MIL THICK, HIGH-DENSITY POLYETHYLENE DESIGNED SPECIFICALLY FOR FLEXIBLE GEOMEMBRANE APPLICATIONS. ADJACENT STRIPS OF IMPERMEABLE LINER SHALL OVERLAP A MINIMUM OF 18", OR PER MANUFACTURER'S SPECIFICATION. 4.4.WHERE USED, CONTRACTOR TO PLACE LINER IN A WAY THAT ENSURES ENOUGH SLACK IN THE LINER TO ALLOW FOR BACKFILL AND SETTLING WITHOUT TEARING THE LINER. 5.AGGREGATES AND BSM: 5.1.ALL AGGREGATES SHALL BE ANGULAR, CRUSHED, WASHED ROCK, CLEAN OF DEBRIS AND WITH NO MORE THAN 1% FINES. 5.2.RESERVOIR AGGREGATE SHALL BE GRADATION ASTM #57 OR #67. 5.3.DIAPHRAGM AGGREGATE SHALL BE "PEA GRAVEL", WITH GRADATION ASTM #8, #89 OR #9. 5.4.THE BIORETENTION SOIL SHALL MEET THE CITY BIORETENTION SAND MEDIA ("BSM") SPECIFICATION FOUND AT:https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/ NOTES: 12" MAX1 MAXIMUM ALLOWABLE PONDING DEPTH IS 12" FROM THE TOP OF THE MULCH 4 MAX PONDING DEPTH MUST NOT EXCEED FLOWLINE ELEVATION OF ADJACENT GUTTER8" MIN DEPTH THICKENED CURB ADJACENT TO VEHICULAR PAVEMENTS OVERFLOW RISER OPTION (AS PER PLAN) 8" MIN DEPTH THICKENED CURB ADJACENT TO VEHICULAR PAVEMENTS STANDARD CROSS-SECTION 1 2 WALLED CROSS-SECTION PONDING DEPTH MUST NOT EXCEED FLOWLINE ELEVATION OF ADJACENT GUTTER 18" MIN 4" 12" MAX 30" MIN 36" MIN BASIN WIDTH COVER PLATE 8" SIDEWALK CHASE 18" MIN OVERFLOW RISER OPTION (AS PER PLAN) REINFORCED CONCRETE WALLS (AS PER PLAN) 4" MIN DEPTH OF DIAPHRAGM AGGREGATE 8" MIN DEPTH OF RESERVOIR AGGREGATE 18" MIN DEPTH OF BIORETENTION SAND MEDIA MAXIMUM ALLOWABLE PONDING DEPTH IS 12" FROM THE SURFACE OF THE MULCH 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 6.UNDERDRAIN: 6.1.UNDERDRAIN PIPE TO BE PERFORATED OR SLOTTED. PERFORATIONS OR SLOTS TO BE SMALLER THAN SURROUNDING AGGREGATE TO ENSURE AGGREGATE DOES NOT FALL INTO OR CLOG THE OPENINGS. 6.2.DO NOT WRAP UNDERDRAIN WITH GEOTEXTILE OR SOCK. 6.3.UNDERDRAIN PIPE MUST OUTFALL BY GRAVITY AND MUST TIE INTO A STORMWATER PIPE, INLET OR SYSTEM AND THE LOCATION MUST BE APPROVED BY THE CITY. THE UNDERDRAIN TIE-IN SHALL MEET ALL REQUIRED PIPE SIZE, TYPES, AND COVER REQUIREMENTS THAT MAY APPLY TO PIPING THAT EXTENDS BEYOND THE LIMITS OF THE BIORETENTION CELL AND ENCROACHES INTO PUBLIC RIGHT-OF-WAY OR OTHER PROPERTY. 7.OVERFLOW INLET: 7.1.A 100-YEAR OVERFLOW SPILLWAY OR INLET MUST BE PROVIDED. 7.2.ALL OVERFLOW INLETS SHALL BE CAPPED WITH A DOME-SHAPED GRATE, OR PER PLAN. 7.3.IN ALL CASES, AN EMERGENCY OVERFLOW ROUTE SHALL BE PROVIDED AND THE LOCATION SHALL BE IDENTIFIED ON THE PLANS (THIS MAY BE COINCIDENT WITH THE 100-YEAR OVERFLOW SPILLWAY). 8.CLEANOUTS: 8.1.PROVIDE CLEANOUTS (AS PER PLAN) TO ALLOW INSPECTION (BY CAMERA) OF THE UNDERDRAIN SYSTEM DURING AND AFTER CONSTRUCTION. 8.2.CLEANOUTS SHALL BE PROVIDED AT EACH BEND GREATER THAN OR EQUAL TO 90° AND EVERY 100' ALONG A STRAIGHT RUN. CLEANOUT SHALL BE INSTALLED PER THE APPROVED PLANS. 8.3.CLEANOUTS SHALL BE A SOLID WALL PVC STRUCTURE FOR ALL VERTICAL SECTIONS WITH FITTINGS TO CONNECT TO DISTRIBUTION AND UNDERDRAIN PIPING MATERIALS, AS REQUIRED. 9.FOREBAY: 9.1.THE FOREBAY SHALL BE EASILY ACCESSIBLE WITH A HARD SURFACED BOTTOM FOR MAINTENANCE PURPOSES. 9.2.THE FOREBAY SHOULD NOT EXTEND INTO THE SAND MEDIA TO PREVENT ANY SETTLING OF THE FOREBAY. 10.LANDSCAPE MATERIALS 10.1.CONTRACTOR SHALL NOT PLACE WEED BARRIER ANYWHERE WITHIN THE BIORETENTION BASIN. IF MULCH IS PLACED IN THE BIORETENTION BASIN, IT MUST BE NON-FLOATABLE. 10.2.IF MULCH OR COBBLES ARE PLACED IN THE BIORETENTION BASIN, THE MAXIMUM ALLOWABLE WATER DEPTH OF 12" AND REQUIRED BASIN VOLUME MUST BE MEASURED FROM THE TOP SURFACE OF THE MULCH OR COBBLE. 10.3.ROLLED TURF OR SOD IS NOT AN ALLOWABLE LANDSCAPE MATERIAL FOR BIORETENTION BASINS. LOW WATER CONSUMPTION LANDSCAPE PLANTINGS ARE PREFERRED FOR BIORETENTION BASINS. 10.4.LANDSCAPE PLANTINGS SHALL NOT BE PLACED TO IMPEDE DRAINAGE INTO OR OUT OF THE BIORETENTION BASIN. 10.5.TEMPORARY IRRIGATION MAY BE INSTALLED TO ESTABLISH LANDSCAPING OR SEED IN THE BIORETENTION BASIN.2" MIN 8" MIN 4" FLAT FOREBAY IS REQUIRED TO BE PLACED AT CONCENTRATED INFLOW LOCATIONS; PER PLANS AND SITE SPECIFIC DETAILS LANDSCAPING TO BE INSTALLED PER APPROVED LANDSCAPING PLAN 6"-12" 4" MIN DEPTH OF DIAPHRAGM AGGREGATE 8" MIN DEPTH OF RESERVOIR AGGREGATE 8" MIN 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 2" MIN 30" MIN GEOTEXTILE FABRIC OR LINER (AS PER PLAN)18" MIN DEPTH OF BIORETENTION SAND MEDIA NATIVE SOIL ZONE RUNDOWN OR SCOUR PROTECTION NEEDED ON SLOPES 8" FLAT AREA - SEE DESIGN PLANS FOR EXTENTS OF BIORETENTION FLAT SURFACES APPROVED: DRAWN BY:DETAILS CONSTRUCTION DATE REVISED: DETAILSTORMWATER BIORETENTION JUNE 2023 SAA D-53