Loading...
HomeMy WebLinkAboutPROSPECT AND COLLEGE HOTEL - PDP190014 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSPROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 COVER SHEET PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C1.0 JET 18111_COVER.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 PROSPECT AND COLLEGE HOTEL VICINITY MAP NORTH SCALE: NTS CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 GENERAL CONSTRUCTION NOTES PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C1.1 JET 18111_NOTES.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 “ ” “ ” “ ” “ ” “ ” CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE CP#996 CP#5004 CP#284 CP#120 CP#124 0 30 SCALE: 1:30 30 15 60 NORTH PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 EXISTING CONDITIONS & DEMOLITION PLAN PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C2.1 JET 18111_EX_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 EXISTING PLAN NOTES DEMO AREA LINETYPES FIBER OPTIC GAS PIPELINE UNDERGROUND POWER SANITARY SEWER STORM DRAIN TELEPHONE TELEVISION/CABLE WATER CONTOUR CURB AND GUTTER EDGE OF ASPHALT EDGE OF GRAVEL EXISTING ELECTRIC JUNCTION BOX STORM DRAIN MANHOLE CATCH BASIN SIGN 0 30 SCALE: 1:30 30 15 60 PROJECT DEVELOPMENT PLAN NORTH FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 SITE PLAN PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C3.1 JET 18111_SITE_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 PLAN NOTES 1 NEW ASPHALT PAVING NEW CONCRETE WALK NEW ACCESSIBILITY RAMP NEW 4" PAINTED YELLOW STRIPE AT 3' O.C. (TYP.) NEW PAINTED INTERNATIONAL DISABLED SYMBOL NEW 4" PAINTED YELLOW PARKING STRIPE (TYP.) NEW CONCRETE DRIVE APPROACH PER CDOT STANDARDS NEW PRE-CAST PIN DOWN CONCRETE PARKING STOP NEW ADA SIGNAGE IN FRONT OF ALL ADA SPACES (TYP.) NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS) 2 3 4 5 6 7 8 9 10 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: 0 30 SCALE: 1:30 30 15 60 PROJECT DEVELOPMENT PLAN NORTH FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 OVERALL GRADING PLAN PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C4.1 JET 18111_GRADING_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. 0 30 SCALE: 1:30 30 15 60 PROJECT DEVELOPMENT PLAN NORTH FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 OVERALL UTILITY PLAN PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C5.1 JET 18111_UTILITY_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. 0.89 OS-1 0.90 1.00 0.37 B-2 0.77 0.97 0.32 B-5 0.95 1.00 0.58 B-1 0.84 1.00 0.35 OS-2 0.86 1.00 0.28 B-3 0.86 1.00 0.30 B-6 0.54 0.67 0.16 B-4 0.89 1.00 PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 DRAINAGE PLAN PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C6.1 JET 18111_DRAINAGE_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 EROSION CONTROL NOTES PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C7.1 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 “ ” “ ” CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 EROSION CONTROL DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C7.2 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 EROSION CONTROL DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C7.3 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 EROSION CONTROL DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C7.4 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 CONSTRUCTION DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C8.1 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 CONSTRUCTION DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C8.2 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 BEIN REIRENS -1 RAIC RAE CEANO -15 A-O ANOE -5 SANAR ANOE -3 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 CONSTRUCTION DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C8.3 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 CONSTRUCTION DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C8.4 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 CONSTRUCTION DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C8.5 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PROJECT DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION FORT COLLINS, COLORADO 80525 CONSTRUCTION DETAILS PROSPECT AND COLLEGE HOTEL 1623 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO C8.6 JET 18111_DETAILS_PROD.DWG ICS/LMH 2019/09/16 FIRST PDP SUBMITTAL 2020/02/26 - - - - - SECOND PDP SUBMITTAL - - - - - - - 18111 - - - 18111 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE 0 30 SCALE: 1:30 30 15 60 NORTH C2 C100 BASIN # AREA C2 = 2 YR RUNOFF COEFFICIENT C100 = 100 YR RUNOFF COEFFICIENT CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE 11 NEW BIKE RACKS 12 COURT YARD TRANSFORMER PAD GENERATOR SET AREA LUGGAGE OFF LOADING SPACE VINE FENCE 13 14 15 16 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. 17 CONCRETE DRAIN PAN 18 PARKING WHEEL STOP 19 NEW CURB AND GUTTER 20 NEW STRIPED PEDESTRIAN CROSSING 21 COLORED CONCRETE 22 FIRE LANE, NO PARKING SIGNS 23 LIGHT POLES POWER POLE WATER VALVE FIRE HYDRANT FOUND CORNER MONUMENT AS NOTED LEGEND TYPICAL SET CORNER MONUMENT, REBAR WITH CAP BOLLARD CURB STOP FIBER OPTIC PEDESTAL GAS METER IRRIGATION VALVE LIGHT POLE POWER METER ROOF DRAIN SANITARY SEWER MANHOLE TELEPHONE PEDESTAL CONIFEROUS TREE DECIDUOUS TREE CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE VERTICAL CURB “ ” CONTROL POINT