Loading...
HomeMy WebLinkAboutVERIZON FTC PARKWOOD TELECOMMUNICATION FACILITY (WTF) - FDP180012 - - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College AvenuePO Box 580Fort Collins, CO 80522970.221.6689970.224.6134 faxfcgov.com/developmentreviewJune 12, 2020Pinnacle Consulting Inc3 Inverness Drive East Suite 200Englewood, CO 80112RE: Verizon FTC Parkwood Telecommunication Facility, FDP180012, Round Number 6Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Verizon FTC Parkwood Telecommunication Facility. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Todd Sullivan via phone at 9702216695 or via email at tsullivan@fcgov.com. Comment Summary:Department: Planning ServicesContact: Jason Holland, 9702246126, jholland@fcgov.comTopic: GeneralComment Number: 22 Comment Originated: 06/10/202006/10/2020: Please add notes/callouts to the plan set clarifying how the project will meet LUC 3.8.13(C)(1) Setbacks. During the discussions with Brendan Thomson when the plans were originally submitted, he indicated that the structure could be made to "collapse rather than topple" per the standard below. Please indicate how this will be achieved on the plans. This is an issue because the tower height is 65' and the setback from the new ROW is 59' 3". The code section states: "Setbacks. With respect to a wireless telecommunication facility that is a tower or a monopole, the setback of the facility from the property lines shall be one (1) foot for every foot of height. However, to the extent that it can be demonstrated that the structure will collapse rather than topple, this requirement can be waived by the Director. "Resolution: The tower has been moved to meet a 1:1 setback requirement from the ROW. See page A-1 For detailsComment Number: 23 Comment Originated: 06/10/202006/10/2020: There appear to be corrections needed to the plat per the redlines. Most of these appear to be minor however the cover page references title work that may yet need to be completed. Please work with staff to resolve these redlines prior to hearing.Resolution: Plat has been revised. See revised plat for details. Department: Engineering Development ReviewContact: Marc Virata, 9702216567, mvirata@fcgov.comTopic: GeneralComment Number: 9 Comment Originated: 06/08/202006/08/2020: information only:Will want to see how the minor amendment under review might potentially align with the finalizing and recording of the development plan and the associated plat.Resolution: N/ADepartment: Light And PowerContact: Tyler Siegmund, 9704162772, tsiegmund@fcgov.comTopic: GeneralComment Number: 5 Comment Originated: 11/21/201811/21/2018: Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project:http://www.fcgov.com/utilities/business/buildersanddevelopers/plantinvestmentdevelopmentfeesResolution: N/AComment Number: 6 Comment Originated: 11/21/201811/21/2018: A commercial service information form (C1 form) and a one line diagram for all commercial meters will need to be completed and submitted to Light & Power Engineering for review. A link to the C1 form is belowhttp://www.fcgov.com/utilities/business/buildersanddevelopers/developmentformsguidelinesregulationsResolution: One line diagram is provided on page E-2, detail 1. Commercial service information form willBe provided by the electrical contractor prior to construction start. Comment Number: 7 Comment Originated: 11/21/201811/21/2018: The new transformer and electric meter will need to be placed outside the enclosure for future maintenance.Resolution: Transformer and meter have been located outside the Verizon enclosure compound. Comment Number: 8 Comment Originated: 11/21/201811/21/2018: Please contact Tyler Siegmund with Light & Power Engineering if you have any questions at 970.416.2772 Please reference our policies, construction practices, development charge processes, electric service standards, and use our fee estimator at http://www.fcgov.com/utilities/business/buildersanddevelopersResolution: N/AComment Number: 9 Comment Originated: 03/10/202003/10/2020: FOR APPROVALIf the proposed electric transformer is to be located as shown on the plans then the new 10ft Verizon utility easement will need to be a utility easement dedicated to the City. If this is not desired, we can place the new transformer in the utility easement along Midpoint Dr but the private secondary service run will lengthen from the transformer to the meter location. Please contact me to discuss this easement and transformer location.Resolution: Transformer will remain as shown in the plans. Per Tyler Siegmund, the easement can be a Non exclusive easement so both the city and other utilities (Verizon) can be routed within it. See revised plat for language on non exclusive City of Fort Collins Easement and non exclusive easement for Verizon Wireless.Department: ForestryContact: Molly Roche, 2246161992, mroche@fcgov.comTopic: Landscape PlansComment Number: 4 Comment Originated: 11/19/20186/8/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment5/19/2020: FOR FINAL APPROVAL UNRESOLEVED:Continued with Minor Amendment9/24/2019: FOR FINAL APPROVAL – UNRESOLVED:Continued:This question has not been addressed. Please clarify the distance between the edge of the utility easement and the proposed evergreen tree. The scale is not clear. City Forestry would like to see at least 15’ separation between the tree and the easement. Can the trees be shifted north of the easement to meet this separation suggestion?11/19/2018: Please clarify the distance between the edge of the utility easement and the proposed evergreen tree. The scale is not clear. City Forestry would like to see at least 15’ separation between the tree and the easement. Perhaps this tree can be shifted north of the utility easement.Comment Number: 6 Comment Originated: 11/19/20186/8/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment5/19/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment9/24/2019: FOR FINAL APPROVAL – UNRESOLVEDContinued:Forestry still has concerns regarding the handwatering note. Will the new trees receive irrigation via an automatic irrigation system? Please refer to note 2 under the City of Fort Collins General Landscape Notes.11/19/2018: City Forestry has concerns with the development’s plan to handwater until root system is established. Typically, trees need 23 years of a steady watering regimen to properly establish. Please address additional means to irrigating proposed plantings.Comment Number: 7 Comment Originated: 09/24/20196/8/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment5/19/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment9/24/2019: FOR FINAL APPROVALRegarding required offsite mitigation payment in lieu, please provide the following note on the landscape plan as well as in the Development Agreement:AT TIME OF BUILDING PERMIT, THE DEVELOPER MUST FULFILL TREE MITIGATION REQUIREMENTS IN THE FORM OF A PAYMENT IN LIEU OF PLANTING UPSIZED MITIGATION TREES ONSITE. THE FOLLOWING METHOD MUST ACCOUNT FOR THE 4 MITIGATION TREES NOT SHOWN TO BE PLANTED ON THE PLAN. PAYMENT IS MADE TO THE CITY OF FORT COLLINS FORESTRY DIVISION TO PLANT 4 MITIGATION TREES ON CITY PROPERTY. PAYMENT SHALL BE $450 PER UPSIZED MITIGATION TREE (TOTAL OF $1800)The fee will cover the cost of future street tree planting by the City when the future sidewalk is installed or if the need arises. An alternative location within a quarter mile of the site might also be considered for tree planting.Comment Number: 8 Comment Originated: 09/24/20196/8/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment5/19/2020: FOR FINAL APPROVAL – UNRESOLVED:Continued with Minor Amendment9/24/2019: FOR FINAL APPROVALPlease include the existing tree inventory and mitigation plans and table to the site/landscape plans set. City Forestry has a copy of the redlined tree inventory and table that Dan Bernth provided on 2/9/19 and 8/8/2019.Resolution: Existing tree inventory has been included on page L-1.Department: Internal ServicesContact: Katy Hand, , khand@fcgov.comTopic: Building Insp Plan ReviewComment Number: 1 Comment Originated: 09/24/201909/24/2019: will address codes at building permit. no comments at this time.Department: Technical ServicesContact: Jeff County, 9702216588, jcounty@fcgov.comTopic: GeneralComment Number: 2 Comment Originated: 04/27/201806/08/2020: FOR FINAL APPROVAL UPDATED:Please revise the legal description as marked. See redlines.05/19/2020: FOR FINAL APPROVAL UPDATED:Please check to make sure this matches the Subdivision Plat. Plat redlines were not addressed.03/12/2020: FOR FINAL APPROVAL UPDATED:Please revise the legal description as marked. See redlines. The Subdivision Plat has changed, and we are requiring that the name on the new Plat be changed. Please match what is shown on the revised Subdivision Plat.09/19/2019: FOR APPROVAL UPDATED:Please revise the legal description as marked. See redlines.11/19/2018: FOR APPROVAL:Please revise the legal description as marked. See redlines.04/27/2018: Please revise the legal description to match the replat submitted with this project.Topic: PlatResolution: See revised Plat included with this submittal. Comment Number: 1 Comment Originated: 04/27/201806/08/2020: FOR FINAL APPROVALUPDATED:Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter.05/19/2020: FOR FINAL APPROVALUNRESOLVED:None of the Plat redlines have been addressed. Please see the 3/12/2020 redlines.03/12/2020: FOR FINAL APPROVALUPDATED:Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter.09/23/2019: FOR FINAL APPROVAL:Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter.11/19/2018: FOR APPROVAL:Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter.04/27/2018: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter.