Loading...
HomeMy WebLinkAboutPOUDRE VALLEY HOSPITAL A-WING REPLACEMENT - PDP - PDP140019 - PLANS - ELEVATIONS (3)FIRST FLOOR - EXISTING 0" ROOF 30' - 0" THIRD FLOOR 15' - 0" FIFTH FLOOR 38' - 10 1/2" FIRST FLOOR - ED -10" TOP OF BUILDING 47' - 8 5/16" 14' - 0" 3' - 6" 3' - 3 1/4" TOP OF ROOF SLAB TO TOP OF COPING 34' - 1 1/4" 48' - 6 5/16" 19' - 1 1/4" 16' - 2" +/- 17' - 0" +/- 1 2 4 8 10 12 10 13 9 11 4 14 1 2 4 10 12 10 13 8 16 14 14 8 8 7 EXISTING BRIDGE EXISTING HOSPITAL BEYOND 6 17 18 1 14 2 4 14 1 FIRST FLOOR - EXISTING 0" ROOF 30' - 0" THIRD FLOOR 15' - 0" FIFTH FLOOR 38' - 10 1/2" FIRST FLOOR - ED -10" TOP OF BUILDING 47' - 8 5/16" 1 2 4 6 EXISTING BRIDGE & SUPPORT EXISTING HOSPITAL BEYOND HELISTOP 15 14' - 0" 3' - 8" 4' - 8 5/32" LEGEND CUSTOM CAST STONE PANEL (LARGE) KEYED NOTES - EXTERIOR MATERIALS 1 RED BRICK, STANDARD SIZE, RUNNING BOND, TO MATCH EXISTING 2 DARK RED BRICK, STANDARD SIZE, RUNNING BOND CAST STONE HORIZONTAL BANDING 3 CAST STONE VERTICAL INSERT 4 ALUMINUM PANEL FASCIA WITH FORMED ALUMINUM COPING - COLOR TO MATCH CAST STONE 5 ALUMINUM / GLASS AUTOMATIC ENTRANCE 6 7 GLASS, TINTED TO MATCH EXISTING 8 VISION GLASS, TINTED, REFLECTIVE WHITE GLAZED BRICK, STANDARD SIZE, RUNNING BOND 9 10 FORMED ALUMINUM COLUMN COVERS 11 H.M.DOOR, INSULATED, PAINTED TO MATCH RED BRICK 12 GLASS, CLEAR 13 CUSTOM CAST STONE PANEL (SMALL, SAME PATTERN AS LARGE) SPANDREL GLASS PANELS 14 ALUMINUM COPING CLEAR ANODIZED ALUMINUM STOREFRONT SYSTEM 15 LED DOWN LIGHTS IN CANOPY CEILING STRUCTURAL STEEL CANOPY TIE-BACK - COLOR TO MATCH CAST STONE 16 17 BACKLIT ACRYLIC SIGNAGE 18 ALUMINUM / GLASS (CLEAR) SKYLIGHT BHA Design Incorporated 1603 Oakridge Drive Fort Collins, Colorado 80525 voice: 970.223.7577 fax: 970.223.1827 PROJECT DEVELOPMENT PLAN REVISIONS DATE NOVEMBER 12, 2014 POUDRE VALLEY HOSPITAL, A-WING REPLACEMENT FORT COLLINS, COLORADO PDP Resubmittal #1 01/21/2015 EXTERIOR ELEVATIONS A2 3/32" = 1'-0" WEST ELEVATION UNDER CANOPY 3/32" = 1'-0" WEST ELEVATION