HomeMy WebLinkAboutPOUDRE VALLEY PLAZA PUD - PRELIMINARY - 30-95A - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGf kA4el check. I ne-k-C, i_l� L#IA w d (i 6e,
a a �k{ni5 WX y wu V-Ute-*
t
sz/
n
vJGvaT t v "VV' '
'-NEIGHBORHOOD INFORMATION -MEETING
ri n-No iflcation
of -this -meeting? —
Cadres.
Name Address Zip
Yes -
No
Yes
No
�, j ���� q/ 3 �r�� ✓E' , �'r�z�
X
DAVIZ PcrelinCL- Ytry V,, C XioC-q-Cy- �cL�2-,C
90 (
��{�-L R01 $05z
V/
NEIGHBORHOOD INFORMATION MEETING
Project:
Meeting Location
Date
Attendees: Please sign this sheet. The information will be used to
update the project mailing list and confirm attendance at neighborhood
meetings. Contact the Planning Department (221-6750) if you wish to
receive minutes of this meeting.
Did You Receive
Written NotificationAddress?
of this meeting?
Correct
Name Address Zip
Yes
No
Yes
No
V0 �9404 2104G
Fo 7 1i
s� 34— LA�(z� L.,.j goE--z6
red,ItzYgios:
cu PstlS14— C°�.��
L
!� JJ- 3 / YY , a Fe- 2
�
x
(, iv ! a -9 l Co.Qo��� t3 Al �
Pov N TA AJfi%g40 j LG GZ UJ
Lj - ` Q Go go 5�.3
E �o"r Uo
,lE2L'
o e Alrle—
1y3 rd8
Sa ����� FC. OS-2-k%�
X
Page 3.
17. Do you think the City will use their oversizing money to
improve the area near Richmond Dr., which is still in the
county? This is the time for the City to take a serious
look at this situation.
A. The possibility is there. This is something that you might
want to take up at a Planning & Zoning meeting with the City
Counsel members and get this issue addressed.
18. Do you have a projection about the operating hours of
businesses in this proposed project?
A. The banking hours, will be from 7:30 AM until 6:00 PM and it
will also be open on Saturdays. Poudre Valley Bank is the
institution looking at the bank site.
19. I feel your concerns as neighbors to this proposed site
should be the lighting, traffic impact, etc. We want this
to work and fit nicely into your neighborhood. We are also
thinking of relocating our Wheeler offices to this business
center.
20. Is there a demand for residential units to be built on this
site?
A. We're still exploring that. We're looking at possibly three
bedroom units, two -stall garages with each unit and a
maximum of twenty units in total.
21. Could there be a security problem by building part of the
structure underground?
A.
22. I truly hope you intend, as a developer, to put a lot of
thought into this proposed project. So many areas seem to
be just thrown up and not much thought gone into them.
Page 2.
5. Are you able to discuss at this time any further development
that might be going in near this project?
A. I'm not aware of any at the moment.
6. There is a new daycare center being built at Horsetooth and
Shields and this will further add to the traffic impact.
7. There is a group that meets concerning traffic issues around
this Four Seasons area. Anyone interested in getting
involved can contact me after the meeting.
8. A.full access intersection might be built off of Shields St.
and Troutman Pkwy.
9. Entrances into the residential part of this project will be
off of Century Drive. We have also designed one particular
entrance to reach the commercial part of this development by
driving under a part of the residential units.
10. The bank structure will be built with the first level
slightly subterranean. Buffing and berming will be done all
around the project.
11. There are lots of people who will not be able to negotiate
all the. stairs and steps you are proposing in this design.
A. We will have proper ramps and elevators to access all the
service areas.
12. Do you know what restaurants will be going in this project?
A. Not at this time. We know they will be family oriented,
sit-down types, not fast food establishments.
13. None of the structures will be more than two -stories high.
14. Is this Mediterranean type of design shown on your artist's
renderings what will actually be built?
A. This is what we are proposing.
15. Will Arbor Ave. be extended?
A. I do not know at this time, but it could be a possibility.
16. I do not think the single lanes down further on Horsetooth
Rd. and also on Shields.St. will handle all the extra
traffic. They get bogged -up, now.
A. The traffic study will also take this into consideration.
NEIGHBORHOOD MEETING MINUTES
PROJECT: Wheeler Project
DATE: April 27, 1995
APPLICANT: Fred Croci, Wheeler Reality
CONSULTANT: Jim Sell, Jim Sell Design
PLANNER: Steve Olt
The potential developer is proposing to develop a business/office
park that will include a bank, two sit down restaurants, small
retail/commercial, office, and an element of residential uses.
The property being considered for development is approximately 6
to 7 acres located at the southeast corner of South Shields
Street and West Horsetooth Road.
QUESTIONS, CONCERNS, COMMENTS
1. I'm concerned about the traffic impact on Horsetooth Road.
It is very difficult at high peak hours to try and make a
left-hand turn onto Horsetooth Rd. from Century Drive.
A. A traffic study will be done to include the streets
surrounding this proposed project. It will also determine
off -site street improvements.
2. How much say do we, as homeowners, really have?
A. Your input is very important and will be evaluated and
considered.
3. Are there any plans for any further parks with this proposed
project?
A. Parks & Recreation have a program that they are working on
over time, however, no park will be designed within this
project.
4. I think they are putting the cart before the horse. There
are presently only one -lane turn lanes (right and left
lanes) on Horsetooth Rd. and Shields Street.
A. I'm sure there will be more turn.lanes added.