Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 15 - PDP - 28-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: ate 9f Date: Fr Planner: sleve� o/f Traffic Operations: Engineer: /710,-k o,�-e IE1,q Other Items Being Returned Other: Note: All redlined items should be returned with the resubmittal/ revisions. Site Land Plat pt Other Items Required Redlined Items Being Returned Site [and PlatU61ity Drainage RptEngineering✓Srormwater,i���✓Water/Wastewate✓ Traffic Operations Trans. PlaInT Transfort Natural RePark Plann Totals Routing eet PROJECTRevisions nn■i ENGINEERING: PAVEMENT nin inninninnn nnnn • ®n©®nnnnnnnnn BUILDING INSPECTION nnnnnnnnnnnnnn • nnnnnnnnnnnnn MAPPING / DRAFTING nnnnnnnnnnnnn ' nnnnnnnnnnnnn FCLWD/ELCO/BOXELDER nnnnnnnnnnnnn . �mm mmninmmmm • nnnnnnnnnnnnm ' �nnnnninnnnnnnn ' nnnnnnnnnnnnn ' • nnnnnnnnnnnnn WATER CONSERVATION nnnnnnnnnnnnn • nnnnnnnnnnnnn nnnnnnnnnnnnn PUBLIC SERVICE nnnnnnnnnnnnn SCHOOLS:• , nnnnnnnnnnnnn nnnnnnnnnnnnn STATE HIGHWAY DEPARTMENT nnnnnnnnnnnnn COMPANYDITCH nnnnnnininnnnnn RAILROAD: UP or : nnnnnnninnmmmm • D• PRPA nnnnnnnnnnnnn nnnnnnnnnnnnn e. 11 . _ _ ©n�Annnnnnnnnn nnnnnnnnnnnnn nnnnnnnnnnnnn nnnnnnnnnnnnn nn mom nnnnnnnn nnnnnnnnnnnnn nnnnnnnnnnnnn nr�n nnnnnnnnn