Loading...
HomeMy WebLinkAboutPEDERSEN AUTO PLAZA - PDP - 26-97 - CORRESPONDENCE - DRAINAGE REPORT4. Please provide a more detailed erosion control discussion. Please refer to ;the attached sheet from the Erosion Control Manual for what should be included in the discussion. RESPONSE: 5. Water quality treatment measures are recommended for this site. Pollution due to the oil and grease from this site is a concern. RESPONSE: Please refer to the redline report and plans for additional review comments. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: October 15, 1997 DEPT: Stormwater PROJECT: #26-97 Pedersen Auto Plaza Subdivision, (A Replat of a Portion of Tract B, Fossil Creek Commercial Plaza) - Type II (LUC) PDP/FC PLANNER: Steve Olt All comments must be received no later than the staff review meeting: Wednesday, November 12, 1997 1. The required storages for ponds 1 and 2 are inadequate according to calculations completed by stormwater. Please recalculate the required storage volumes for the ponds using the FAA method, which is the method approved by Stormwater. RESPONSE: 2. The adjacent half street should be detained. If it is not possible to detain the half street, then compensate for this undetained release by detaining off -site flows or reducing the release rate. RESPONSE: 3. Emergency spillways are needed for both detention ponds. The finished floor elevation of the adjacent building should be one foot above the overflow elevation for the spillway. The spillways should be sized for the 100-year inflow to the pond. RESPONSE: Date: // -a- 3- HE HERE IF YOU WISH TO RECEIVE COPIES 0 REVISIONS ✓U'" � %R� Uhidy Gc : Sl�ri h/9 r+i o lc SYr VC o It /Lorin E„y — Odiff Ft.1WVon qt� VU� Ci�of Fort Collins