Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - PDP190020 - - RESPONSE TO STAFF REVIEW COMMENTS1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview March 13, 2020 Ken Merritt JR Engineering 2900 S College Ave Suite 3D Fort Collins, CO 80525 RE: Guardian Self Storage, PDP190020, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Guardian Self Storage. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email at tbeane@fcgov.com. Comment Summary: Department: Stormwater Engineering Contact: Matt Simpson, (970)416-2754,masimpson@fcgov.com Topic: General Comment Number: 33 Comment Originated: 03/09/2020 03/09/2020: FOR HEARING: *UPDATED COMMENT* Thank you for providing the hydraulic analysis of the proposed storm pipe system, which were requested in the PDP Round 1 comments. This pipe analysis included the existing downstream culvert which is the outlet for the proposed system. This pipe hydraulic analysis is not always required for PDP, but can be, in cases where the City wants confirmation of pipe size and flow capacity before Hearing. The stormwater management concept for this site does not appear to be feasible as currently proposed. There are many items that are not meeting Fort Collins Stormwater Criteria. I am recommending a stormwater focused meeting with Stormwater staff and the applicant’s engineers to discuss concepts and requirements for this site. These items include: - Conveyance of onsite flows to Fossil Creek – in order to qualify for no 2 detention, with the ‘Beat the Peak’ policy, the site must convey its undetained 100-yr flows to the receiving water (Fossil Creek). The submitted design and analysis shows that the existing cross culvert does not have 100-year capacity and therefore cannot be used to accept undetained flows from this site. Options may include: upsizing the existing Fossil Creek Parkway culvert, providing a dedicated outlet pipe for this development’s stormwater, or providing detention for the current site. -Offsite Flow Analysis – Thank you for providing the documentation for the offsite flow analysis in the PDP round 2 submittal. Based on the size of the drainage area, this analysis needs to be performed in SWMM and not with the Rational Method (see the Fort Collins Stormwater Criteria Manual, Ch 5 Hydrology, section 2.0). The calculated offsite flows appear to be quite large and may be over-conservative. - Conveyance of Offsite Flows - The site must accept and pass existing offsite flows with no adverse impact to adjacent property owners. This means that (100yr) stormwater flows which would overtop the existing berm, on the east side of the site, may not increase. - Utility and Tree Separation issues – There appear to be multiple locations were the minimum separation is not being provided. The stormwater criteria requires 10-feet of separation between trees, other utilities, and the proposed storm drain pipe. For pipes larger than 24-inches, the separation needs to be 10-feet clear from edge of pipe – not pipe centerline. Please contact the Development Review Coordinator to setup this meeting. I am looking forward to meeting with you and assisting with figuring out a path forwards for this site and your development. Response to Comment: After meetings and discussions with the City we have revised the storm system including: analyzing the offsite flow with SWMM, routing the offsite stormwater around the site, moving storm pipe and waterline to have 10’ separation from the edge of pipe, and adding an addition outfall pipe to Fossil Creek. Department: Water-Wastewater Engineering Contact: Matt Simpson, (970)416-2754,masimpson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/07/2020 01/07/2020: FOR INFORMATION: This project site is located within the Fort Collins Loveland Water District and the South Fort Collins Sanitation District for water and sewer service. Please contact them at (970) 226-3104 for development requirements. Response to Comment: Noted. Comment Number: 2 Comment Originated: 01/07/2020 01/07/2020: FOR INFORMATION: The City water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards Response to Comment: Noted. 3 Department: Erosion Control Contact: Chandler Arellano Topic: Erosion Control Comment Number: 1 Comment Originated: 03/06/2020 03/06/2020: Erosion Control report and escrow calculation will need to be submitted at final. Response to Comment: Erosion Control Report and ESCROW will be provided at final. 01/02/2020: INFORMATION ONLY: The site disturbs more than 10,000 sq. ft. and/or meets the criteria for a need for Erosion and Sediment Control Materials to be submitted. The erosion control requirements are located in the Stormwater Design Criteria in Chapter 2 Section 6.0 a copy of the requirements can be found at www.fcgov.com/erosion For FINAL Please submit an Erosion Control Plans to meet City Criteria. FOR FINAL: Please submit an Erosion Control Escrow / Security Calculation based upon the accepted Erosion Control Plans to meet City Criteria. FOR FINAL: Thank you for submitting an ESC plan at PDP level. The plan is acceptable for this development review stage. At Final please provide an ESC report and a cost estimate and a calculation for total disturbed area by this project. Also at Final, please update the plan to add more specific ESC notes. A note should be added specifying that the sand filter will be build at the end of the construction sequence in order to prevent that facility from being contaminated with sediment during site construction activities. Other notes specific to this site should also be added as needed. Response to Comment: Erosion Control Report , cost estimate, necessary calculations, and notes will be provided at final. Comment Number: 32 Comment Originated: 03/06/2020 03/06/2020: Information only: Based upon the area of disturbance, State permits for stormwater will be required since the site is over an acre and should be pulled before Construction Activities begin. Response to Comment: Noted Department: Floodplain Contact: Claudia Quezada, (970)416-2494,cquezada@fcgov.com Topic: Floodplain Comment Number: 34 Comment Originated: 03/10/2020 03/10/2020: FOR HEARING: Please see included redlines. Response to Comment: comments addressed on redlines 4 Department: Engineering Development Review Contact: Morgan Stroud, 970-416-4344,mstroud@fcgov.com Topic: General Comment Number: 2 Comment Originated: 01/07/2020 03/10/2020: 'For Hearing - Updated: Thank you for providing additional boring samples. It appears that some ground water mitigation will be needed for the Snead right-of-way. Please provide information on what measures will be made to mitigate the ground water levels. Response to Comment: An underground dewatering system is being proposed, see groundwater variance and underdrain information from Terracon. 01/07/2020: For Hearing: It is unclear from the soils report that was submitted about what the soil conditions are near the Snead Drive right-of-way. Could you provide information about the condition of the soils near the right-of-way? Response to Comment: An underground dewatering system is being proposed, see groundwater variance and underdrain information from Terracon. Comment Number: 5 Comment Originated: 01/07/2020 01/07/2020: For Hearing: Please see my redlines for more/minor comments. Response to Comment: comments addressed on redlines Comment Number: 6 Comment Originated: 01/08/2020 01/08/2020: For Information: There is a repayment will be due for the construction of Fossil Creek Parkway, the final number can be determined once plans and quantities are finalized. Response to Comment: Noted Department: Light And Power Contact: Cody Snowdon, 970-416-2306,csnowdon@fcgov.com Topic: General Comment Number: 4 Comment Originated: 12/31/2019 03/09/2020: FOR FINAL: The proposed streetlight along Sneed Drive will need to be coordinated with Xcel and the existing gas line and easement. The proposed streetlight along Fossil Parkway can be removed due to an existing streetlight located on the other side of the roadway. Response to Comment: Addressed, street light along Fossil Creek parkway removed. 12/31/2019: FOR HEARING: Streetlights will need to be installed along Snead Drive. A 40 feet separation on both sides of the light is required between canopy trees and streetlights. A 15 feet separation on both sides of the light is required between ornamental trees and streetlights. Please coordinate the light placement with Light & 5 Power and add streetlight locations to the Utility and Landscape Plan. A link to the City of Fort Collins street lighting requirements can be found below: https://www.larimer.org/sites/default/files/ch15_2007.pdf Response to Comment: Addressed, adequate separation provided between trees and street lights Comment Number: 6 Comment Originated: 12/31/2019 12/31/2019: FOR FINAL: A commercial service information form (C-1 form) and a one-line diagram for all commercial meters will need to be completed and submitted to Light & Power Engineering for review prior to Final Plan. A link to the C-1 form is below: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf Response to Comment: Noted, to be provided at final Comment Number: 12 Comment Originated: 03/09/2020 03/09/2020: FOR HEARING: The proposed transformer is in conflict with the proposed storm inlet and will need to be relocated to allow adequate separation. Response to Comment: Addressed Comment Number: 13 Comment Originated: 03/09/2020 03/09/2020: FOR HEARING: The proposed water curb stop shown in the parkway will be in conflict with the electric primary. Please relocate the curb stop outside of the parkway area. Response to Comment: Addressed Comment Number: 14 Comment Originated: 03/09/2020 03/09/2020: FOR FINAL: Please show our primary line along Sneed Drive from the existing vault to the north routing to the existing switch cabinet to the south. Please see redlines for the proposed routing. Response to Comment: Addressed Comment Number: 15 Comment Originated: 03/09/2020 03/09/2020: FOR FINAL: Please show the proposed electrical primary on the Storm Sewer Plan and Profile to ensure adequate separation. Response to Comment: Addressed, electric routed around storm inlet. Department: Environmental Planning Contact: Kelly Smith,ksmith@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/09/2020 3/10/2020: FOR APPROVAL: Please add a table to the site plan that includes the following: - amount of buffer area that would be required by a 50' buffer from the wetlands 6 - amount of buffer area provided on these plans - minimum buffer distance shown - maximum buffer distance shown - average buffer distance Response to Comment: Addressed Comment Number: 2 Comment Originated: 01/09/2020 3/10/2020: FOR APPROVAL: If any trees will be removed, please add the following note to the landscape plans: NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. Response to Comment: Noted on each page Comment Number: 3 Comment Originated: 01/09/2020 3/10/2020: FOR APPROVAL: Please clarify specific turf species proposed and the blend percentages to ensure the project water budget chart gets adequately calculated. Response to Comment: Revised to turf type tall fescue Comment Number: 4 Comment Originated: 01/09/2020 3/10/2020: FOR APPROVAL: Please demonstrate light fixtures have a color temperature of less than 3000k and demonstrate this on the plans. Response to Comment: addressed Comment Number: 5 Comment Originated: 01/09/2020 3/10/2020: DCP: Language for the Natural Resources section of the Development Agreement will be provided to Engineering. The following items must be submitted prior to the issuance of a Development Construction Permit (but ideally prior to the recording of the Development Agreement): 1. A cost estimate for landscaping in the Natural Habitat Buffer Zone (including plant material, labor and irrigation) 2. A cost estimate for three years of monitoring and annual reporting of landscape establishment in the Natural Habitat Buffer Zone 3. A bond, letter of credit, or escrow warranting the landscape installation, establishment, monitoring, and reporting for the Natural Habitat Buffer Zone (125% of cost estimates) 4. A weed management plan 5. An annual monitoring and reporting plan I can provide examples and additional detail for any of these items if needed. Please contact me if you have any questions. Response to Comment: these items will be provided prior to development construction permit 7 Comment Number: 6 Comment Originated: 03/10/2020 03/10/2020: FOR APPROVAL: Work with your ECS consultant to ensure the wetland plan does not require State augmentation fees. Response to Comment: Noted Department: Forestry Contact: Nils Saha,nsaha@fcgov.com Topic: General Comment Number: 15 Comment Originated: 03/10/2020 03/10/2020: FOR FINAL Please see redlines for comments regarding tree placement. Response to Comment: tree relocations revised and dimensioned Comment Number: 16 Comment Originated: 03/10/2020 03/10/2020: FOR FINAL Red maples are not suitable for the alkaline soil in our region. They are prone to severe chlorosis and have relatively short life spans. Please substitute another shade tree. Response to Comment: revised to sugar maple Comment Number: 17 Comment Originated: 03/10/2020 03/10/2020: FOR FINAL Please update sheet 5 and 6 of the utility plans to indicate that the cottonwood tree along College will be removed. Response to Comment: Addressed Comment Number: 18 Comment Originated: 03/10/2020 03/10/2020: FOR FINAL Please provide an updated Tree Removal Feasibility Letter that includes the cottonwood tree on College. Response to Comment: Addressed Topic: Landscape Plans Comment Number: 4 Comment Originated: 01/06/2020 3/9/2020: FOR HEARING - UPDATED Please see redlines. 01/06/2020: FOR HEARING Is there a stop sign proposed on Snead Drive? Please note that Traffic Operations has requested that trees be placed at least 50 feet from stop signs to prevent clearance issues. Please adjust tree placement accordingly, if applicable. Response to Comment: Completed Comment Number: 9 Comment Originated: 01/06/2020 03/09/2020: FOR FINAL-UNRESOLVED 8 Please see redlines. 01/06/2020: FOR FINAL There is a tree on Snead that is closer than 4’ to a gas line. Please see redlines and adjust. Response to Comment: Completed, note southern most tree of Fossil is 6’ from storm, all others a 10’ minimum Comment Number: 12 Comment Originated: 01/06/2020 03/09/2020: FOR FINAL - UNRESOLVED Please see redlines. 01/06/2020: FOR FINAL There are a lot of line over text issues with the plans. Please see redlines. Response to Comment: Noted Department: Planning Services Contact: Pete Wray, 970-221-6754,pwray@fcgov.com Topic: General Comment Number: 3 Comment Originated: 01/03/2020 BY HEARING: Section 3.2.5 - Trash and Recycling Enclosures - Please show location at lower level (south facade of Bldg.) and upper level (north facade) for trash and recycling enclosures and how accessed form drive isles. Iinside facilities need to be shown on plans for location, doors, both trash and recycling containers, access for truck haulers. - Include details to show compliance with requirements. Response to Comment: Addressed, note added to cover sheet. Department: PFA Contact: Jim Lynxwiler, 970-416-2869,jlynxwiler@poudre-fire.org Topic: General Comment Number: 6 Comment Originated: 03/09/2020 03/09/2020: INFORMATION ONLY PRIOR COMMENTS - Prior PFA comments have been satisfactorily resolved for hearing. Other outstanding comments may defer to Final Development Plan approval (eg. fire lane signage locations and alternative methods request). Language in the DA agreement shall confirm that no fencing is allowed on the north side of property and that landscaping in this area shall never allow for the planting of trees. Response to Comment: Noted Department: Building Services Contact: Katy Hand,khand@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 01/13/2020 01/13/2020: INFORMATIONAL: Please visit our website for a list of current adopted building codes and local amendments: https://www.fcgov.com/building/codes.php Response to Comment: Noted, The “2018 IBC – International Building Code” shall 9 be used and referenced for all building permit drawings as well as any/all required local amendments. Comment Number: 2 Comment Originated: 01/13/2020 01/13/2020: FOR BUILDING PERMIT: The building will need to be insulated to code or other approved energy path method. Contact Brad Smith brsmith@fcgov.com for additional information on this requirement. Response to Comment: The building will be insulated to the requirements of the 2018 IECC Energy Code and all required local amendments. Comment Number: 3 Comment Originated: 01/13/2020 01/13/2020: FOR BUILDING PERMIT: An air tightness test will be required (0.25 CFM50 /sf of surface area of building envelope). Contact Brad Smith brsmith@fcgov.com for additional information on this requirement. Response to Comment: An air tightness test will be conducted and will need to preform within the requirements of Section C402.5 of the IECC Local Amendments Comment Number: 4 Comment Originated: 01/13/2020 01/13/2020: An NFPA13 sprinkler system will be required. Response to Comment: An NFPA13 sprinkler system will be designed and installed for the facility Contact: Russell Hovland, 970-416-2341,rhovland@fcgov.com Topic: Building Insp Plan Review Comment Number: 5 Comment Originated: 01/13/2020 01/13/2020: If the basement does not meet the building code definition of basement, the proposed project would be 4 stories and must be of construction type that allows 4 stories. Response to Comment:The bottom level of this building meets the requirements by code to be classified as a basement. This maintains a 3 story above ground structure. Department: Environmental Services Contact: Linda Hardin,lhardin@fcgov.com Topic: Landscape Plans Comment Number: 6 Comment Originated: 02/24/2020 02/24/2020: INFORMATIONAL: A Construction Waste Management Plan will be required with application for building permit. See: https://www.fcgov.com/recycling/constructiondebris. Contact Linda Hardin, lhardin@fcgov.com, or 970-416-2701 with questions. Response to Comment:A Construction Waste Management Plan will be supplied to the township for approval. Department: Technical Services Contact: Jeff County, 970-221-6588,jcounty@fcgov.com Topic: General Comment Number: 2 Comment Originated: 01/06/2020 10 03/06/2020: FOR FINAL APPROVAL-UPDATED: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Response to Comment: Addressed 01/06/2020: FOR FINAL APPROVAL: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Response to Comment: Addressed Comment Number: 3 Comment Originated: 01/06/2020 03/06/2020: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. 01/06/2020: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. Response to Comment: Noted Department: Water Conservation Contact: Eric Olson, 970-221-6704,eolson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/05/2020 03/05/2020: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Response to Comment: acknowledged, irrigation plans will be provided at final Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887,mwilkinson@fcgov.com Topic: General Comment Number: 4 Comment Originated: 03/10/2020 03/10/2020: READY FOR HEARING Response to Comment: Noted Department: Outside Agencies Contact: Don Kapperman, 970-567-0245, Don_Kapperman@comcast.com, Topic: General Comment Number: 4 Comment Originated: 03/12/2020 03/12/2020: Comcast does not have any issues at this time. Response to Comment: Noted 11 Contact: Gloria Hice-Idler, 970-381-8629, gloria.hice-idler@state.co.us, Topic: General Comment Number: 1 Comment Originated: 01/02/2020 01/02/2020: CDOT has no comment regarding this proposal. Response to Comment: Noted Contact: Megan Harrity, Larimer County Assessor, 970-498-7065, Topic: General Comment Number: 2 Comment Originated: 01/10/2020 01/10/2020: The ownership in our records for the two parcels for this preliminary plat are as follows: SCOTT STANLEY The plat is showing a signature block for: Guardian Storage Fort Collins LLC. If a deed comes through to change the individual name to the LLC then that is fine. But right now, we would be looking for a signature from Stanley Scott. Response to Comment: Guardian Storage Fort Collins LLC is shown and the signatory because they will own the property soon after approval from planning and zoning. Contact: Nate Ensley, Fort Collins Loveland Water District, nensley@fclwd.com, Topic: General Comment Number: 3 Comment Originated: 03/03/2020 03/03/2020: See attached comments/redlines. Response to Comment: Addressed