Loading...
HomeMy WebLinkAboutMULBERRY CONNECTION - FDP200030 - - SUPPLEMENTAL INFORMATION 309 South Summit View Drive, Unit 6 | Fort Collins, Colorado 805241 | p. 303.629.6000 | www.ninyoandmoore.com October 3, 2019 Project No. 501710003 Mr. Josh Heiney Comunale Properties 1855 South Pearl Street, Suite 20 Denver, Colorado 80210 Subject: Supplemental Geotechnical Evaluation Percolation Testing Mulberry Connection Redman Drive & NW Frontage Road Fort Collins, Colorado Reference: Ninyo & Moore, 2019, Geotechnical Evaluation, Proposed Poudre Valley Development, Redman Drive & NW Frontage Road, Fort Collins, Colorado, dated July 2. Dear Mr. Heiney: In accordance with your authorization, we have performed a supplemental geotechnical evaluation for the proposed Mulberry Connection industrial project located at the northwest corner of Redman Drive and Northwest Frontage Road in Fort Collins, Colorado (Figure 1). The purpose of our supplemental geotechnical evaluation was to assess the percolation rate within the proposed stormwater detention ponds (Figure 2). This report presents the results of the percolation testing. Our referenced report dated July 2, 2019 presented our methodology, findings, conclusions, and limitations regarding the geotechnical conditions and our geotechnical recommendations for the proposed development. Recommendations and limitations provided in the referenced report remain valid, except where superseded herein. PROPOSED CONSTRUCTION As a part of the proposed development, detention basins will be constructed to the south, west, and east of the proposed structures. We understand the basins will require excavations ranging from less than 1 foot to up to approximately 3 feet below existing site grades. PERCOLATION TESTING Percolation testing was performed by hand-excavating 12, approximately 8- to 10-inch diameter, percolation holes that ranged from approximately 30 to 37 inches below the existing site grades. Borings performed as a part of our subsurface exploration in the vicinity of the detention basins Ninyo & Moore | Mulberry Connection Percolation Tests, Fort Collins, Colorado | 501710003 | October 3, 2019 were utilized for determination of soil profiles in the area. Along the eastern and southeastern portion of the site, subsurface conditions generally consisted of approximately 2 to 4 feet of clay loam underlain by clay alluvial soils to depths of approximately 9 to 9.5 feet below ground surface (bgs). Sandy alluvial deposits were encountered below the clay alluvial deposits. Along the western and southwestern portion of the site, approximately 4 feet of clay loam was encountered underlain by sandy alluvial deposits. Groundwater was observed in our borings at depths of approximately 8.5 to 12 feet bgs. Our percolation testing procedures consisted of excavating the percolation holes with an electric auger. Once excavated, the sides of the holes were roughening, as needed, and the percolation holes were pre-soaked. Approximately 2 inches of sand was added to the bottom of the holes prior to the holes being pre-soaked for approximately 24 hours. In accordance with Larimer County Health and Environment percolation testing requirements, each percolation test was conducted over a 4-hour period with measurements obtained at 30-minute intervals. The water level drop in the final 30-minute interval was used to calculate the percolation rate. The results of the percolation testing are presented in Appendix A. In order to account for the site variability, the limited number of tests performed, and to account for siltation, a correction factor of 2 should be applied to the calculated average percolation rate per basin. This report is intended exclusively for use by the client. Any use or reuse of the findings, conclusions, and/or recommendations of this report by parties other than the client is undertaken at said parties’ sole risk. We appreciate the opportunity to be of continued service to you during this phase of the project. Respectfully submitted, NINYO & MOORE Kelley Lange, EI Senior Staff Engineer Brian F. Gisi, PE Principal Engineer KL/BFG Attachments: Figure 1 – Site Location Figure 2 – Percolation Test Locations Appendix A – Percolation Test Results Distribution: (1) Addressee (via email) (1) Mr. Dan Skeehan, PE, Kimley Horn (via email) 10/3/2019 Ninyo & Moore | Mulberry Connection Percolation Tests, Fort Collins, Colorado | 501710003 | October 3, 2019 Appendix A Photographic Documentation FIGURES FIGURE 1 bsm file no: 1710vmap0619501710003 | 10/19 REDMAN DRIVE AND NORTHWEST FRONTAGE ROAD FORT COLLINS, COLORADO POUDRE VALLEY DEVELOPMENT SITE LOCATION NOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE. Source: US Geological Survey 7.5-minute topographic map, Fort Collins and Timnath, Colorado, 2016. 0 2000 FEET NN APPROXIMATE SITE LOCATION FIGURE 2 bsm file no: 1710sp0919501710003 | 9/19 PERCOLATION TEST LOCATIONS FORT COLLINS, COLORADO MULBERRY CONNECTION PERCOLATION TESTING SOURCE: KIMLEY-HORN AND ASSOCIATES, 08/14/2019. NOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE. 0 120 FEET NN Geotechnical & Environmental Sciences Consultants LEGEND Percolation Test LocationP4-3 P1-1 P1-2 P1-3 P2-1 P2-2 P2-3 P3-1 P3-2 P3-3 P4-3 P4-2 P4-1 REDMAN DRIVE NORTHWEST FRONTAGE ROAD Ninyo & Moore | Mulberry Connection Percolation Tests, Fort Collins, Colorado | 501710003 | October 3, 2019 APPENDIX A Percolation Tests Project Number:501710003 Test Date:9/13/2019 Project:Mulberry Connection Tested By:FT Location:Fort Collins Elevation:-+/- (MSL) Hole Number Hole Depth Time Interval Initial Water Level Height at Start Final Water Level Height at End Drop in Water Level Average Percolation Rate Time Start Time Stop (inches)(minutes)(inches)(inches)(inches)(min/in)(hh:mm)(hh:mm) P1-1 37 0 29.00 29.00 0.00 Height of Sand/Gravel 30 29.00 27.00 2.00 15.00 added at bottom (in):2.0 30 28.50 27.50 1.00 30.00 30 29.50 25.50 4.00 7.50 30 29.00 25.00 4.00 7.50 30 29.00 27.00 2.00 15.00 30 29.50 27.00 2.50 12.00 30 28.50 26.50 2.00 15.00 30 29.00 27.00 2.00 15.00 P1-2 31 0 23.00 23.00 0.00 Height of Sand/Gravel 30 23.00 19.00 4.00 7.50 added at bottom (in):2.0 30 23.00 21.50 1.50 20.00 30 22.50 20.00 2.50 12.00 30 23.00 21.50 1.50 20.00 30 23.00 22.00 1.00 30.00 30 23.50 21.50 2.00 15.00 30 23.00 21.50 1.50 20.00 30 23.00 21.00 2.00 15.00 P1-3 32 30 24.00 24.00 1.25 Height of Sand/Gravel 30 24.00 23.00 1.00 30.00 added at bottom (in):2.0 30 25.00 24.00 1.00 30.00 30 23.50 21.50 2.00 15.00 30 24.00 22.50 1.50 20.00 30 24.00 21.50 2.50 12.00 30 24.50 22.00 2.50 12.00 30 24.00 21.00 3.00 10.00 30 23.50 21.50 2.00 15.00 Average Percolation Rate =15.00 min/in Corrected Percolation Rate =30.00 min/in PERCOLATION TEST RESULTS Project Number:501710003 Test Date:9/13/2019 Project:Mulberry Connection Tested By:FT Location:Fort Collins Elevation:-+/- (MSL) Hole Number Hole Depth Time Interval Initial Water Level Height at Start Final Water Level Height at End Drop in Water Level Average Percolation Rate Time Start Time Stop (inches)(minutes)(inches)(inches)(inches)(min/in)(hh:mm)(hh:mm) P2-1 31 0 21.5 21.50 0.00 Height of Sand/Gravel 30 22 18 4.00 7.50 added at bottom (in):2.0 30 23 19.5 3.50 8.57 30 22.5 20.5 2.00 15.00 30 23 20.5 2.50 12.00 30 23 21.5 1.50 20.00 30 23.5 21 2.50 12.00 30 23 20 3.00 10.00 30 22.5 20 2.50 12.00 P2-2 33 0 24.5 24.50 0.00 Height of Sand/Gravel 30 24.5 22.5 2.00 15.00 added at bottom (in):2.0 30 25 22.5 2.50 12.00 30 25 22 3.00 10.00 30 25 22 3.00 10.00 30 24.5 22 2.50 12.00 30 25 23 2.00 15.00 30 25 22 3.00 10.00 30 25 23 2.00 15.00 P2-3 36 0 27 27.00 0.00 Height of Sand/Gravel 30 27 24.5 2.50 12.00 added at bottom (in):2.0 30 28 25.5 2.50 12.00 30 27.5 24 3.50 8.57 30 27.5 23 4.50 6.67 30 27 24 3.00 10.00 30 28 26 2.00 15.00 30 27.5 24.5 3.00 10.00 30 28 26 2.00 15.00 Average Percolation Rate =14.00 min/in Corrected Percolation Rate =28.00 min/in PERCOLATION TEST RESULTS Project Number:501710003 Test Date:9/13/2019 Project:Mulberry Connection Tested By:FT Location:Fort Collins Elevation:-+/- (MSL) Hole Number Hole Depth Time Interval Initial Water Level Height at Start Final Water Level Height at End Drop in Water Level Average Percolation Rate Time Start Time Stop (inches)(minutes)(inches)(inches)(inches)(min/in)(hh:mm)(hh:mm) P3-1 33 0 24.5 24.50 0.00 Height of Sand/Gravel 30 24.5 20 4.50 6.67 added at bottom (in):2.0 30 24 21.5 2.50 12.00 30 24.5 21 3.50 8.57 30 24.5 22 2.50 12.00 30 25 23.5 1.50 20.00 30 25 22.5 2.50 12.00 30 24.5 23 1.50 20.00 30 25 23.5 1.50 20.00 P3-2 30 0 22 22.00 0.00 Height of Sand/Gravel 30 22 18 4.00 7.50 added at bottom (in):2.0 30 21 18.5 2.50 12.00 30 21 20 1.00 30.00 30 22 20 2.00 15.00 30 21.5 19 2.50 12.00 30 22 21 1.00 30.00 30 22.5 21 1.50 20.00 30 22 21 1.00 30.00 P3-3 30 0 22 22.00 0.00 Height of Sand/Gravel 30 22 20 2.00 15.00 added at bottom (in):2.0 30 21.5 20.5 1.00 30.00 30 22 20.5 1.50 20.00 30 22 19.5 2.50 12.00 30 23 22 1.00 30.00 30 21.5 20 1.50 20.00 30 22 20 2.00 15.00 30 22 21 1.00 30.00 Average Percolation Rate =26.67 min/in Corrected Percolation Rate =53.33 min/in PERCOLATION TEST RESULTS Project Number:501710003 Test Date:9/13/2019 Project:Mulberry Connection Tested By:FT Location:Fort Collins Elevation:-+/- (MSL) Hole Number Hole Depth Time Interval Initial Water Level Height at Start Final Water Level Height at End Drop in Water Level Average Percolation Rate Time Start Time Stop (inches)(minutes)(inches)(inches)(inches)(min/in)(hh:mm)(hh:mm) P4-1 30 0 22 22.00 0.00 Height of Sand/Gravel 30 22 20 2.00 15.00 added at bottom (in):2.0 30 22 18.5 3.50 8.57 30 22.5 19.5 3.00 10.00 30 21.5 18 3.50 8.57 30 22 19.5 2.50 12.00 30 22 19.5 2.50 12.00 30 21 19 2.00 15.00 30 22 19.5 2.50 12.00 P4-2 30 0 21.5 21.50 0.00 Height of Sand/Gravel 30 21.5 18.5 3.00 10.00 added at bottom (in):2.0 30 22 18.5 3.50 8.57 30 22 20 2.00 15.00 30 23 22 1.00 30.00 30 21.5 20 1.50 20.00 30 22 20.5 1.50 20.00 30 22 20 2.00 15.00 30 22 20 2.00 15.00 P4-3 31 0 22 22.00 0.00 Height of Sand/Gravel 30 23 20 3.00 10.00 added at bottom (in):2.0 30 23 21 2.00 15.00 30 22.5 19.5 3.00 10.00 30 23 21 2.00 15.00 30 23.5 23 0.50 60.00 30 23 21 2.00 15.00 30 22.5 21 1.50 20.00 30 23 21.5 1.50 20.00 Average Percolation Rate =15.67 min/in Corrected Percolation Rate =31.33 min/in PERCOLATION TEST RESULTS