Loading...
HomeMy WebLinkAboutCOUNTRY CLUB RESERVE - FDP180030 - - UTILITY PLANS (2)LOCAL RESIDENTIAL (53' ROW) 2-LANE ARTERIAL STREET (78' ROW) EAST DOUGLAS ROADBETHPAGE DR. WINGED FOOT DR. KIAWAH DR. CARNOUSTIE DR. ROYAL TROON AVE. 2-LANE ARTERIAL STREET (72' ROW) TURNBERRY ROAD Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comCS1 COVER SHEET1 CONTACT INFORMATION PROJECT TEAM: GAS-----------------Xcel Energy---------------------------------------------------------(970) 225-7828 ELECTRIC--------City of Fort Collins Light & Power-----------------------------(970) 224-6152 CABLE-------------Comcast-------------------------------------------------------------(970) 567-0245 TELECOM.--------CenturyLink---------------------------------------------------------(970) 490-7501 WATER------------East Larimer County Water District---------------------------(970) 221-6700 WASTEWATER--Boxelder Sanitation District-------------------------------------(970) 498-0604 STORMWATER-City of Fort Collins Utilities--------------------------------------(970) 221-6700 FIBER OPTICS--Colorado State University---------------------------------------(970) 491-0187 UTILITY CONTACT LIST: * UTILITY COMPANY SEPTEMBER 2020 SHEET INDEX FINAL UTILITY PLANS FOR A TRACT OF LAND BEING THE NORTH HALF OF THE NORTHEAST QUARTER OF SECTION 30, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO COUNTRY CLUB RESERVE PHONE NUMBER Blaine Mathisen, EI Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Bob Tesley, PLS Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 VICINITY MAP NORTH I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: Northern Engineering Services, Inc.Additional Topo Project No. 103-005 1324-001 Date: July 11, 2006 May 2, 2017 ORIGINAL FIELD SURVEY BY: Earth Engineering Consultants, Inc. Preliminary Geotechnical Exploration - Boma Farm Development Fort Collins, Colorado EEC Project No. 1062013 Date: February 22, 2006 SUBSURFACE EXPLORATION BY: PROJECT BENCHMARKS: E N G I N E E R N GI EHTRON R N E N G I N E E R N GI EHTRON R N CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R SITE ENGINEER SURVEYOR CS1 COVER SHEET CS2 - CS3 GENERAL AND CONSTRUCTION NOTES EX1 - EX2 EXISTING CONDITIONS AND DEMOLITION PLAN PH1 PHASING PLAN OG1 OVERALL GRADING PLAN G1 - G6 GRADING PLAN EC1 EROSION CONTROL PLAN EC2 EROSION CONTROL DETAILS OU1 OVERALL UTILITY PLAN U1 - U6 UTILITY PLAN OS1 - OS4 OFFSITE SANITARY SEWER SS1 - SS3 SANITARY SEWER A PLAN AND PROFILE SS4 SANITARY SEWER A5 PLAN AND PROFILE SS5 - SS6 SANITARY SEWER A5-1 PLAN AND PROFILE SS7 SANITARY SEWER A5-1.5 & A5-1.6 PLAN AND PROFILE SS8 SANITARY SEWER B PLAN AND PROFILE SS9 SANITARY SEWER B4 PLAN AND PROFILE SD1 SUBDRAIN B AND A PLAN AND PROFILE SD2 SUBDRAIN A PLAN AND PROFILE SD3 SUBDRAIN C AND C2 PLAN AND PROFILE ST1 STORM LINE A AND F PLAN AND PROFILE ST2 STORM LINE B, C, AND E PLAN AND PROFILE ST3 STORM LINE D PLAN AND PROFILE R1 BETHPAGE DR. PLAN AND PROFILE R2-R3 WINGED FOOT DRIVE PLAN AND PROFILE R4 KIAWAH DRIVE PLAN AND PROFILE R5 CARNOUSTIE DRIVE PLAN AND PROFILE R6 BALTUSROL DRIVE/BALTUSROL COURT PLAN AND PROFILE R7 BALTUSROL DRIVE PLAN AND PROFILE R8 ROYAL TROON AVENUE PLAN AND PROFILE R9-R11 EAST DOUGLAS ROAD PLAN AND PROFILE R12-R13 TURNBERRY ROAD PLAN AND PROFILE XS1-XS3 EAST DOUGLAS ROAD ROADWAY CROSS SECTIONS XS4-XS5 TURNBERRY ROAD ROADWAY CROSS SECTIONS SP1 EAST DOUGLAS ROAD STRIPING PLAN SP2 EAST DOUGLAS ROAD INTERIM STRIPING AND GRADING PLAN SP3 TURNBERRY ROAD STRIPING PLAN INT1-INT4 INTERSECTION DETAILS DR1 DRAINAGE EXHIBIT D1-D7 DETAILS PROJECT LOCATION EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL The Birdsall Group, LLC 444 Mountain Avenue Berthoud, CO 80513 (970) 532-5891 PLANNER/ LANDSCAPE ARCHITECT DEVELOPER/APPLICANT Crystal Cove Development, LLC 8020 S County Road 5, Unit 200 Fort Collins, CO 80528 (970) 204-9393 PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 92-14 NORTHEAST CORNER OF DOUGLAS ROAD AND TURNBERRY ROAD, ON TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 5075.10 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 92-15 DOUGLAS ROAD AND COUNTY ROAD 13, ON A LARIMER COUNTRY BRASS CAP, ON THE SOUTHWEST CORNER OF A BRIDGE OVER LARIMER CANAL DITCH. ELEVATION = 5123.89 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED(PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.17 BASIS OF BEARING: THE BASIS OF BEARINGS IS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 30-T8N-R68W AS BEARING SOUTH 89°21'11" EAST. Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comCS2 CONSTRUCTION NOTESGENERAL AND2 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R GENERAL NOTES 1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the Local Entity. 2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the Local Entity Engineer. Use of these plans after the expiration date will require a new review and approval process by the Local Entity prior to commencement of any work shown in these plans. 4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the Local Entity, as beneficiary of said engineer’s work, for any errors and omissions contained in these plans, and approval of these plans by the Local Entity Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the Local Entity, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5.All sanitary sewer, storm sewer, and water line construction, as well as power and other “dry” utility installations, shall conform to the Local Entity standards and specifications current at the date of approval of the plans by the Local Entity Engineer. 6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7.The Engineer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the Local Entity prior to beginning construction. 10.The Developer shall coordinate and cooperate with the Local Entity, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16.The Local Entity shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17.Prior to final inspection and acceptance by the Local Entity, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18.The Local Entity shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the Local Entity failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19.All recommendations of the final drainage and erosion control study Final Drainage Report For Country Club Reserve Dated 09.02.2020 by Northern Engineering shall be followed and implemented. 20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the Local Entity street inspector. 22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the Local Entity Engineering Inspector (Fort Collins - 221-6605) and the Local Entity Erosion Control Inspector (Fort Collins – 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. 24.If the Local Entity Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the Local Entity reserves the right not to accept the improvement if subsequent testing reveals an improper installation. The Developer shall be responsible for obtaining soils tests within the Public Right-of- Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the Local Entity’s default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the Local Entity Engineer approves the final report. 25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the Local Entity inspector. The engineer or surveyor must certify in a letter to the Local Entity that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the Local Entity before installation of base course or asphalt will be allowed on the streets. 26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27.Portions of Larimer County are within overlay districts. The Larimer County FloodPlain Resolution should be referred to for additional criteria for roads within these districts. 28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (Local Entity, County or State), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact Local Entity Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor; however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development’s local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34.There shall be no site construction activities on Saturdays, unless specifically approved by the Local Entity Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the Local Entity. 35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the Local Entity Engineer immediately. 39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Local Entity’s Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the Local Entity Engineer. 40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 92-14 NORTHEAST CORNER OF DOUGLAS ROAD AND TURNBERRY ROAD, ON TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 5075.10 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 92-15 DOUGLAS ROAD AND COUNTY ROAD 13, ON A LARIMER COUNTRY BRASS CAP, ON THE SOUTHWEST CORNER OF A BRIDGE OVER LARIMER CANAL DITCH. ELEVATION = 5123.89 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED(PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.17 41.All stationing is based on centerline/flowline (insert proper word) of roadways unless otherwise noted. 42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer’s expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Local Entity Construction Inspector before any cuts are made. Patching shall be done in accordance with the Local Entity Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Local Entity Engineer and/or the Local Entity Inspector at the time the cuts are made. 44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45.Standard Handicap ramps are to be constructed at all curb returns and at all “T” intersections. 46.After acceptance by the Local Entity, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47.The Local Entity shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: City of Fort Collins, Boxelder Sanitation District, and ELCO Water District. 48.Approved Variances are listed as follows: 48.1.Minimum spacing between entrances along Turnberry Road and Douglas Avenue. CONSTRUCTION NOTES A. Grading and Erosion and Sediment Control Notes 1.The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3.All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4.At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5.Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of- way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Local Entity. 7.In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a.Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b.Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c.Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8.When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9.The contractor shall clean up any inadvertent deposited material immediately and make sure streets are free of all materials by the end of each working day. 10.All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12.The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the Local Entity or Homeowners Association (HOA). 13.City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14.A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15.To ensure that sediment does not move off of individual lots one or more of the following sediment/erosion control BMPs shall be installed and maintained until the lots are sufficiently stabilized, as determined by the erosion control inspector, (Within Loveland GMA and City Limits Only). a.Below all gutter downspouts. b.Out to drainage swales. c.Along lot perimeter. d.Other locations, if needed. 16.Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City/County. 17.A vehicle tracking control pad shall be installed when needed for construction equipment, including but not limited to personal vehicles exiting existing roadways. No earthen materials, i.e. stone, dirt, etc. shall be placed in the curb & gutter or roadway as a ramp to access temporary stockpiles, staging areas, construction materials, concrete washout areas, and/or building sites. 18.Add notes to reflect the stormwater runoff control plan of the individual development. B. Street Improvements Notes 1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the Local Entity Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the Local Entity Engineer in Loveland. 4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the Local Entity Engineer. 5.Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the Local Entity Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8.The Developer is required to perform a gutter water flow test in the presence of the Local Entity Inspector and prior to installation of asphalt. Gutters that hold more than ¼ inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. “Proof roll” vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the Local Entity Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The Local Entity Engineer shall be notified at least 24 hours prior to the “proof roll.” All “proof rolls” shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3.All signage shall be per Local Entity Standards and these plans or as otherwise specified in MUTCD. 4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5.All lane lines for concrete pavement should be epoxy paint. 6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the Local Entity Engineer prior to permanent installation of striping and symbols. 7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8.Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10.All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11.A field inspection of location and installation of all signs shall be performed by the Local Entity Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12.The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13.Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period, the Local Entity Engineer reserves the right to require additional signage and/or striping if the Local Entity Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2.All recommendations of the final drainage and erosion control study Final Drainage Report For Country Club Reserve Dated 09.02.2020 by Northern Engineering shall be followed and implemented. 3.Prior to final inspection and acceptance by The City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comCS3 CONSTRUCTION NOTESGENERAL AND3 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL BOXELDER SANITATION DISTRICT CONSTRUCTION NOTES 1.Existing Utility Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In the event of damage to any existing utility, the contractor shall immediately notify the owner of the utility involved and unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. The cost of repairs shall be the responsibility of the Contractor. 2.District Owned Easement Pictures: Contractor to provide sequential digital pictures spaced at no more than 300 feet detailing conditions of the off-site Boxelder Owned Easement Conditions and any structures that could be affected, to the District and the property owner prior to the start of any off-site work. These pictures shall include all existing fence, ditches, ditch structures, out buildings, water troughs, trees and all other landscaping. Pictures are to be placed at no more than four (4) pictures on a 11x8 sheet of photo paper inserted into transparent sleeves and delivered with the drawings of record in a three (3) ring binder. 3.Protection of Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. 4.Safety: All sewer main installation within the District shall be subject to current (Occupational Safety and Heath Association (OSHA) and the Colorado Safety Association, (CSA) safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 5.Start of Construction: No construction shall begin without prior design review of the District. The District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. 6.Road Excavation Permits: In event that State, County or City road excavation permit(s) are required, the Contractor is responsible for obtaining all road permits which may be required. 7.Other Permits: The Contractor shall be responsible for obtaining all permits required for construction. 8.Revisions: No verbal authorization for field revision shall be given. All requests for field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on the Drawings of Record. 9.Materials: Plastic Pipe -All gravity sanitary sewer piping shall be Polyvinyl Chloride (PVC) unless otherwise noted on the approved drawings. Pipe 15" and smaller shall conform to ASTM D3034, Type PSM, and SDR 35. Pipe 18" and larger shall conform to ASTM F679. All fittings shall be (PVC) unless otherwise noted. 10.Pipe Cover: A minimum cover of 3-1/2 feet of cover shall be maintained throughout the sewer line and service line installation. 11.Bedding: All sewer main installation shall include bedding. Bedding shall be ¾" washed rock uniformly graded and compacted. Refer to force main desgin for force main bedding requirements. Trench shall be excavated to a depth below established grade equal to ¼ of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30" initial lift above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 12.Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall not be placed in lifts of greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway and residential areas and 90% in all off-site easement areas unless otherwise noted. Compaction testing of bedding and back fill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority or as required in project specific specifications. 13.Concrete: All concrete construction shall be completed utilizing 3,000 psi at twenty-eight (28) days or equal concrete. 14.Pavement or Other Repairs: In event that asphalt or concrete pavement, sidewalks, storm sewers, waterline or any other public or privately owned property is damaged or requires reconstruction due to the work, repairs or replacement will be made in accordance with the requirements of the appropriate governing authority. Private property will be returned to its original condition or as close to original condition as reasonably possible, unless otherwise noted on the drawings. 15.Service Taps on Existing Lines: All taps made on existing lines shall be completed at developer's expense by District personnel or the District's authorized contractor with no exception. 16.Inspection: Construction shall conform to District Standards and Specifications or project specific specifications at all times. The District shall inspect the construction as necessary and shall observe all line testing. The District shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in 17.Testing: All lines shall be pressure tested and flushed by the Contractor in accordance with District Standards and Specifications and under the District's supervision. Upon passing, copies of all passing test results including soils compaction in the area of sewer main construction shall be provided to the District. 18.Acceptance: Upon completion of all utility construction (sewer and other) and fulfillment of all District requirements, preliminary acceptance of new sewer system improvements will occur in accordance with District's acceptance procedure. 19.Warranty: The Contractor shall warrant the materials, installation, workmanship and surface restoration for a period of two years from date of preliminary acceptance. During this warranty period the Developer shall promptly repair any defects in the work and maintain the work area. At the close of the two-year warranty period the District will make a field inspection. Upon satisfactory correction of any deficiencies noted the District would make final acceptance of the lines and work. The lines and the appurtenances shall then become the sole property and responsibility of Boxelder Sanitation District. 20.Drawings of Record and Total Costs: Within 90 days of preliminary acceptance of the new facilities, the District shall be provided with acceptable Drawings of Record of the complete system consisting of two sets of fill size reproduced prints, two sets of ½-size reproduced prints, one set of 6 mil double matted reproducible mylars and one complete digital file equivalent (software and version to be confirmed at time of delivery). Written confirmation of the total cost of all sewer system improvements shall also be submitted with the Drawings of Record. EAST LARIMER COUNTY WATER DISTRICT GENERAL NOTES FOR CONSTRUCTION 1.Standard and Specification: Construction shall be per the East Larimer County Water District Standard Construction Specifications in effect at the start of constructions. 2.Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In event of damage to any existing utility Contractor shall immediately notify owner of the utility involved and, unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. Cost of repairs shall be the responsibility of the Contractor. 3.Damage to Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. 4.Safety: All water main installation within the ELCO Water District shall be subject to current OSHA and COSHA safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 5.Landscaping Adjacent to District Waterlines: No landscaping (bushes, shrubs, trees or other plantings) that has a mature height of over 3 feet (3-ft)shall be placed within ten feet (10-ft) of any District waterline (distribution main, service line, meter, etc.). The District shall have the right to remove any landscaping that violates this standard, at any time such landscaping is discovered, and shall not be required to replace the removed landscaping. 6.Design Approval and Notice of Construction Start: No construction shall begin without prior design approval from ELCO. District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. District shall inspect the construction as necessary and shall observe all line testing. Construction or testing shall conform to District Specifications at all times. In event that State or City road excavation permit(s) are required Contractor shall notify District of proposed construction schedule well in advance to allow time for District to obtain the required permit(s). 7.Permits: Contractor is responsible for obtaining all County road permits which may be required. 8.Changes During Construction: No verbal authorization for field revision shall be given. All requests for such field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on As-Built drawings as detailed below in these Notes. 9.Materials of Construction: a.Pipe - All water piping shall be Polyvinyl Chloride (PVC). All PVC piping through 12-inch shall be manufactured in accordance with AWWA Standard C900, "Polyvinyl Chloride (PVC) Pressure Pipe, 4-inch through 12-inch, For Water Distribution", Class 150 (DR 18). All PVC piping 14-inch through 24-inch shall be manufactured in accordance with AWWA Standard C905, "Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14-inch through 36", Class 200 (DR 18). Pipe with a diameter greater than 24 inches shall be specified based on engineered design. Pipe size shall be as shown on the approved plans. All non-metal water piping shall be installed with a twelve (12) gauge braided copper wire, plastic coated, six hundred (600) volt taped to top of pipe and surfaced at each valve as a tracer wire. Pipe joints shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber ring gaskets and machined pipe ends to form a push-on type joint. All materials installed shall be free of manufacturer defects. Any defective or damaged materials noted on the construction site shall be so marked and removed from the site. All fittings shall be mechanical joint, ductile iron, manufactured in accordance with AWWA Standard C153. Fittings shall be furnished with a cement-mortar lining of standard thickness class with a 250 psi pressure rating. Under no circumstances shall any PVC piping be installed utilizing mechanical equipment to seat the joints. b.Gate Valves - Gate valves shall conform to AWWA Standard C509-87 with mechanical joint, 2" open left operating nut and resilient seat. Valve shall be Mueller A-2380-20 or approved equal. c.Butterfly Valves - Butterfly valves shall conform to AWWA Standard C504-80 with mechanical joint, 2" open left operating nut, resilient seat and shall be equipped with sand bonnet. Valve shall be Mueller or approved equal. d.Fire Hydrant Assembly - Hydrant shall conform to AWWA Standard C502-85, 1" square open right operating nut, no American Darling units. Mueller Super Centurion with epoxy coated shoe or American Flo Control Waterous Pacer WB-67-250X with epoxy coated shoe. e.Fittings - All fittings shall be swing assemblies with anchor couplings. 10.Pipe Wrap: All fittings, valves, fire hydrant shoes and plugs shall be poly-wrapped with 8-mil thick polyethylene plastic wrap, double layered, and ends securely taped prior to backfill. 11.Bedding: All water main installation shall include bedding. Bedding shall be 3/4" washed rock uniformly graded and compacted. Trench shall be excavated to a depth below established grade equal to 1/4 of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30" backfill above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 12.Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall be placed in lifts not greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway areas and 90% in all other locations. Compaction testing of bedding and backfill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority. 13.Joint Restraint: All fittings, tees, plugs, and fire hydrants shall be provided with anchor couplings and/or joint restraint in accordance with ELCO Specifications. Thrust blocks shall be used only as required per field conditions and as approved or directed by the ELCO field inspector. . 14.Concrete: All concrete construction, including thrust blocks, shall be completed utilizing Type 5 or equal cement only. 15.Asphalt Replacement: In event that asphalt pavement is involved that has been in place less than two years (according to City or County Engineer's record) and is cut, the cut shall be a minimum of 20 feet in width and will be replaced to the specified depth by a paving machine. 16.Pipe Cover: A minimum cover of 4-1/2 feet shall be maintained throughout the waterline and service line installation, particularly in areas of new grading and drainage swales. Extra bury depth may be required to maintain minimum cover at drainage culvert crossings and/or fire hydrant runs. Maximum allowable cover shall be 6 feet, unless specifically approved by the District. 17.Connection to Existing System: All connections to existing waterlines shall be completed at developer's expense by ELCO personnel or the District's authorized contractor with no exception. 18.Inspection: ELCO shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in the District's Specifications. The District shall also have the authority to assign an inspector to check any and all work, including all materials to be incorporated in the work, excavation, bedding, backfill, testing and all construction methods and practices. 19.Testing and Acceptance: All lines shall be pressure tested, chlorinated and flushed by the Contractor in accordance with District Specifications and under the District's supervision. Upon passing chlorination testing, bacteriological testing will be completed by an accredited water quality control laboratory. Copies of all passing test results, including soils compaction in the area of water main construction, shall be provided to the District. 20.Project As-Built and Record Drawing Requirements: a.As-built drawings are prepared by the contractor. They confirm, in red ink, on-site changes to the original construction documents. The As-built drawings shall be forwarded to project's design engineer for conversion to Record Drawings. b.Record Drawings are prepared by the project's design engineer and reflect on-site changes the contractor noted in the as-built drawings. The Record Drawings shall be approved by ELCO prior to Preliminary Acceptance of the project. Record Drawings are to be delivered to the District in hard copy (11 x 17 format) and electronic format. Hard copy drawing text font size shall be large enough to be legible with font size approved by the District. Electronic format shall be delivered in Adobe .pdf, AutoCAD and ArcView shape files (release version to be confirmed with District at time of submittal). These documents shall accurately reflect any change made in the field which varies from the approved construction plan and including, at a minimum, field dimensions and elevations, horizontal and vertical locations of underground utilities and appurtenances. Include with the Record Drawings a complete copy of the recorded Filing Plat and a written confirmation of total costs of all water system improvements involved. 21.Warranty: The Contractor shall warrant all work associated with the waterline installation including, but not limited to the materials, installation workmanship and surface restoration for a period of two years from date of Preliminary Acceptance. During this warranty period the Contractor shall repair any defects in the work and maintain the work area. At the close of the two year warranty period and upon satisfactory correction of any deficiencies noted, the District shall accept the constructed lines and appurtenances as the sole property and responsibility of the ELCO.EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWW W W W W W W W W W W W W WV.P.V.P.V.P. A.R.V. GAS GAS XX V.P.V.P.XXXXXXXG G G G G G G G G G G G G G G GGGGGGGGGGGGGEEEEEEEEEEEEEEEEEE E E EEEEEEEEE E E E E E E E E E E E E E XXXXXXXXXXXXXXXXXXXXXWV TELE HY DWV WV XXXXXXXXXXXXXXXX X X X X X X X X X X XXXFESFES/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /MXXXXXXXFESMMFESFES M M XXTELE F.O. TELEFESXFESFESMM / / / / / / / // / / / / / / / WV FESFE SFE SFE SEEFES / / / / / / / / MFES FE SMM WSOW FE SFE SMM X GASFES X XEEFES XXX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SM 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHE/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / A.V. AW WWW/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / /10"W 1976 (AC) 4" (AC)10"W 1976 (AC) 4" (AC) W EEEEE/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////EXISTING UNDERGROUND ELECTRIC LINE TO REMAIN EXISTING 10" WATERLINE TO BE ABANDONED IN PLACE ±1,067 L.F OF OVERHEAD ELECTRIC LINE TO BE BURIED GAS VALVE TO REMAIN ELEVATED PIPES (2) TO REMAIN EXISTING CATTLE GUARD TO REMAIN EXISTING FENCE TO REMAIN ELECTRICAL BOX W/ METAL 2 RAIL FENCE TO REMAIN ELECTRICAL BOX W/ METAL 2 RAIL FENCE TO REMAIN WATERLINE TO REMAIN GAS LINE TO REMAIN OIL RIG IN THE MIDDLE OF THE FENCE TO REMAIN ELECTRIC LINE TO REMAIN MSSU W/ METAL 2 RAIL FENCE TO REMAIN FENCE TO REMAIN MAILBOX TO REMAIN MAILBOX TO REMAIN TELEPHONE PEDESTAL TO REMAIN MAILBOXES TO REMAIN MAILBOX TO REMAIN MAILBOXES TO REMAIN EXISTING FIRE HYDRANT TO BE REMOVED (PHASE 2) TELEPHONE PEDESTAL TO BE REMOVED (PHASE 2) ± 905 L.F. OF FENCE TO BE REMOVED ± 1,157 L.F. OF FENCE TO BE REMOVED ± 42,003 S.F. OF WETLANDS TO REMAIN E. DOUGLAS ROAD N 1/4 S30-T8N-R68W N:150082.36 E:202773.42 CP "OIL" N:149442.70 E:202963.65 ± 4640 L.F. OF INTERNAL PRIVATE WATER SERVICE LINE FENCE TO REMAIN JUAN ITA LANE ABANDONED WELL HEAD EDGE OF WETLANDS EXISTING WELL ROAD EXISTING WELL ROAD EXISTING WELL ROAD CONTRACTOR TO VERIFY EXISTING WATER LINE PRIOR TO MOBILIZATION EXISTING ELCO AIR VAC TO BE REMOVED EXISTING SERVICE LINE TO ELCO AIR VAC TO BE REMOVED ////////// EXISTING CMP AND TWO (2) FES TO BE REMOVED (PHASE 2) EXISTING STORM CULVERT EXISTING STORM CULVERT /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////REPLAT CHERRYWOOD ACRES TRACT 1A REPLAT CHERRYWOOD ACRES TRACT 1B CHERRYWOOD ACRES TRACT 6 EXISTING 60' ROW EX1 AND DEMOLITION PLANSEXISTING CONDITIONS4 NORTH ( IN FEET ) 0 1 INCH = 80 FEET 80 80 160 240 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comKEYMAP DOUGLAS RD TURNBERRY RDEXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7.ALL DEMO AND REMOVAL SHOULD TAKE PLACE DURING PHASE 1 UNLESS NOTED OTHERWISE. ORIGINAL FIELD SURVEY BY: NORTHERN ENGINEERING SERVICES, INC.ADDITIONAL TOPO: PROJECT NUMBER: 103-005 1324-001 DATE: JULY 11, 2006 MAY 2, 2017 EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EARTH ENGINEERING CONSULTANTS, INC. PRELIMINARY GEOTECHNICAL EXPLORATION - BOMA FARM DEVELOPMENT EEC PROJECT NUMBER: 1062013 DATE: FEBRUARY 22, 2006 APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL AND MILL AND OVERLAY FOR PHASE 1 APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL AND MILL AND OVERLAY FOR PHASE 1 EX1 EX2 1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED 8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9.NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1-JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS ARE FOUND, THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. 10.REFER TO LANDSCAPE AND IRRIGATION PLANS FOR ADDITIONAL TREE PROTECTION MEASURES. TREE PROTECTION NOTES: TREE DIAMETER AT BREAST HEIGHT (INCHES) AUGER DISTANCE FROM FACE OF TREE (FEET) 0-2 1 3-4 2 5-9 5 10-14 10 15-19 12 OVER 19 15 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W B M V.P. W W W W W W W W W WWWWXXXXG G G G G G G G G GGGGE E E E E E E E E EEE/ / / / / / / // / / / / / / // / / / / / / /WV WVWV WVWVWV X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XV.P. W SO W SO WS OW S OXXXXXXXXXXXHY DWV XX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /MGAS/ / / / / / / // / / / / / / /FE SM FE STELE / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XX/ / / / / / / // / / / / / / /FE SM FE S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXXXX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXWS OX X X X X X X X X X X X X X V.P. VAULT CABLE BOX CABLE H2OX GASGASV.P. GAS 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W W WW OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE ST ST ST ST ST ST ST ST/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /10"W 1976 (AC) 10"W 1976 (AC) 4" (AC) 10"W 1976 (AC) 4" (AC) W WWWWWWWWWWWWWWWWWWW14"W 1976 (AC)14"W 1976 (AC)14"W 1976 (AC)/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /GWEW /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////PUMP HOUSE TO REMAIN GAS LINE TO REMAIN WATERLINE TO REMAIN ELECTRIC LINE TO REMAIN ELECTRIC TRANSFORMER BOX TO REMAIN PUMP HOUSE TO REMAIN VERTICAL PIPE TO REMAIN PUMP HOUSE TO REMAIN ± 345 L.F. OF FENCE TO BE REMOVED ± 1,962 L.F. OF OVERHEAD ELECTRIC LINE TO BE BURIED ± 1,322 L.F. OF FENCE TO BE REMOVED ± 565 L.F. OF FENCE TO BE REMOVED ± 783 L.F.OF FENCE TO BE REMOVED ± 690 L.F. OF FENCE TO BE REMOVED ± 925 S.F. OF WETLAND TO BE RELOCATED TO WETLAND TO THE WEST ± 42,003 S.F. OF WETLANDS TO REMAIN DROP BOX INLET INV. IN= 5062.84 (W) INV. OUT= 5058.62 (E) ± 55 L.F. 24" CMP (TO BE REMOVED) FL = 5063.37 TELEPHONE PEDESTAL TO BE REMOVED OVERHEAD ELECTRIC POLE TO BE REMOVED ± 350 S.F. OF CONCRETE TO BE REMOVED TURNBERRY ROADTURNBERRY ROADE. DOUGLAS ROAD OPEN WATER POND TO BE REMOVED OUTFALL PIPE EXTENDS TO BOTTOM OF THE DITCH TO THE EAST BENCHMARK 92-14 N:150095.01 E:205460.88 CP "DAY" N:149746.84 E:204141.24 NE CORNER S30-T8N-R68W N:150052.51 E:205416.94 "STOP" SIGN TO BE RELOCATED "STOP" SIGN "RIGHT LANE BIKES ONLY" SIGN /////////////EXISTING 12" CMP CULVERT TO BE REMOVED (PHASE 2) EXISTING 12" CMP CULVERT TO BE REMOVED //////////////FORT COLLINS CITY BOUNDARY EDGE OF WETLANDS EXISTING WELL ROAD EXISTING ELCO METER TO BE REMOVED EXISTING 12" ADS INV. IN = 5063 (S) INV. OUT = 5062.5 (N) EXISTING STORM CULVERT ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////±2,600 L.F. OF 4" AC ELCO WATERLINE TO BE ABANDONED IN PLACE ±2,650 L.F. OF 10" PVC ELCO WATERLINE TO BE ABANDONED IN PLACE LOT 11 LOT 6 LOT 5 LOT 1 //////////// PHASE 1 ENDS AT STATION 38+60.00 OF DOUGLAS RD. (SEE SHEET R10) EXISTING 60' ROW EXISTING 60' ROW EX2 AND DEMOLITION PLANSEXISTING CONDITIONS5 NORTH ( IN FEET ) 0 1 INCH = 80 FEET 80 80 160 240 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comKEYMAP DOUGLAS RD TURNBERRY RDEXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7.ALL DEMO AND REMOVAL SHOULD TAKE PLACE DURING PHASE 1 UNLESS NOTED OTHERWISE. ORIGINAL FIELD SURVEY BY: NORTHERN ENGINEERING SERVICES, INC.ADDITIONAL TOPO: PROJECT NUMBER: 103-005 1324-001 DATE: JULY 11, 2006 MAY 2, 2017 EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EARTH ENGINEERING CONSULTANTS, INC. PRELIMINARY GEOTECHNICAL EXPLORATION - BOMA FARM DEVELOPMENT EEC PROJECT NUMBER: 1062013 DATE: FEBRUARY 22, 2006 APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL AND MILL AND OVERLAY FOR PHASE 1 APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL AND MILL AND OVERLAY FOR PHASE 1 EX1 EX2 1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED 8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9.NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1-JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS ARE FOUND, THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. 10.REFER TO LANDSCAPE AND IRRIGATION PLANS FOR ADDITIONAL TREE PROTECTION MEASURES. TREE PROTECTION NOTES: TREE DIAMETER AT BREAST HEIGHT (INCHES) AUGER DISTANCE FROM FACE OF TREE (FEET) 0-2 1 3-4 2 5-9 5 10-14 10 15-19 12 OVER 19 15 B M V.P. V.P.V.P.V.P. A.R.V. GAS GAS V.P.V.P.XXXXXXG G G G G G G G G G G G G G G G GGGGGGGGGGG / / / / / / / // / / / / / / /X X X X X V.P.XXXXXXXXXXX X X X X X X XX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /MXXXXFES MM FE SFE SM M XTELE F.O. TELEFESFES / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /MGASXX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /F ES M FE STELE / / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / /FES M F E S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXX/ / / / / / / // / / / / / / /XV.P. VAULT CABLE BOX CABLE GASGASV.P. GAS TH TH TH OHEOHEOHEOHEOHEOHEOHEOHE OHE B B B B B B B B / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /ST AW/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /G8" W8" W 8" WUD UDUD UD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W8 " W 8" W 8" W 8" W 8" W 8" W8" W 8" W 8" W 8" W8" W8" W8" S S 8" S S8" SS8" SS8" SS 8" SS 8 " SS 8" SS 8" SS 8" SS 8" SS8" W8" W 8" W 8" W 8" W 8" W8" S S 8" SS IR8" S S 8" S S 8" SS IR 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" W8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" W 8" W 8" W 8" W 8" S S 8" S S 8" SS 16" W16" W16" W16" W16" W16" W16" W16" W16" W16" WWINGED FOOT DR. KIA W A H D R .ROYAL TROON AVE.E. DOUGLAS ROAD BALTUSROL CT. B A L T U S R O L D R .BETHPAGE DR.TURNBERRY ROADC A R N O U S T I E D R . WINGED FOOT DR. JUAN ITA LANE REPLAT CHERRYWOOD ACRES TRACT 1A REPLAT CHERRYWOOD ACRES TRACT 1B CHERRYWOOD ACRES TRACT 6 LOT 18 BLOCK 3 SERRAMONTE HIGHLANDS (LARIMER COUNTY) LOT 17 LOT 12 LOT 11 LOT 6 LOT 5 LOT 1 PHASE 2 PHASE 1 PHASE 1 30' EMERGENCY ACCESS PHASE 1 30' EMERGENCY ACCESS PHASE 1 30' EMERGENCY ACCESS PHASE 1 INTERIM CONNECTION END PHASE 1 SANITARY CONSTRUCTION END PHASE 1 WATER LINE CONSTRUCTION END PHASE 1 WATER LINE CONSTRUCTION (APPLICABLE ONLY TO ONSITE WATER LINE. WATER LINE IN DOUGLAS RD. TO BE COMPLETED IN ITS ENTIRETY DURING PHASE 1) END PHASE 1 WATER LINE CONSTRUCTION END PHASE 1 SANITARY CONSTRUCTION END PHASE 1 SANITARY CONSTRUCTION WATER LINE WITHIN "PHASE 1 30' EMERGENCY ACCESS" SHALL BE BUILT WITHIN PHASE 1. SANITARY LINE WITHIN "PHASE 1 30' EMERGENCY ACCESS" SHALL BE BUILT WITHIN PHASE 1. Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comPH1 PHASING PLAN6 NORTH KEYMAP DOUGLAS RD TURNBERRY RDLEGEND: 1.PHASE LINES SHOWN DELINEATE THE LOTS AND/OR AREAS THAT ARE INCLUDED WITHIN A PHASE. DEPENDING ON CONSTRUCTION SEQUENCING, INSTALLATION OF INFRASTRUCTURE OUTSIDE THE LIMITS OF THE PHASE MAY BE REQUIRED. 2.DEPENDING ON CONSTRUCTION SEQUENCING, PREVIOUSLY CONSTRUCTED ROADWAYS MAY REQUIRE SAWCUTS, MILLING AND/OR PATCHING OF ASPHALT. FINAL LIMITS WILL BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL PATCHING AND STREET REPAIRS SHALL BE IN ACCORDANCE WITH CITY STANDARDS. 3.TURNBERRY ROAD IMPROVEMENTS ARE TO BE COMPLETED IN PHASE 1. 4.E. DOUGLAS ROAD IMPROVEMENTS PAST STATION 38+60.00 ARE TO BE COMPLETED IN PHASE 2. PLEASE REFER TO SHEET SP2 FOR ADDITIONAL INFORMATION. 5.ALL DEMO AND REPLACEMENT WORK SHALL BE COMPLETED DURING PHASE 1 UNLESS OTHER WISE NOTED ON SHEET EX1-EX2 6.A PORTION OF STORM LINE D IS TO BE COMPLETED IN PHASE 1 AND FINISHED IN PHASE 2. PLEASE REFER TO SHEET ST3 FOR ADDITIONAL INFORMATION. NOTES: PROPOSED EASEMENT EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPERTY BOUNDARY PROPOSED CURB AND GUTTER PROPOSED SWALE EXISTING CONTOUR PROPOSED CONTOUR PROPOSED STORM INLET EXISTING STORM SEWER PHASE LINE PROPOSED RIGHT OF WAY PROPOSED STORM SEWER END OF PHASE ROADWAY AND UTILITY TERMINATIONS ON BALTUSROL DRIVE ( IN FEET ) 0 1 INCH = 120 FEET 120 120 240 360 PH1 8" SS 8" SS 8" SS 8" SS 8" W 8" W 8" W 8" W 8" S S 8" SS 8" SS 8" W 8" W 8" W 8" W 50' END OF PHASE ROADWAY AND UTILITY TERMINATIONS ON WINGED FOOT DRIVE 15' 15' CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R END OF PHASE ROADWAY AND UTILITY TERMINATIONS ON CARNOUSTIE DRIVE 8" S S 8" SS 8" SS 8" W 8" W 8" W 8" W / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /8" W8" W 8" WUD UDUD UD 15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W8 " W 8" W 8" W 8" W 8" W 8" W8" W 8" W 8" W 8" W8" W8" W8" S S 8" S S8" SSSD SD SD SD S D S D SD SD SDSDSDSD8" SS8" SS 8" SS 8 " SS 8" SS 8" SS 8" SS 8" SS SD SD SD SDSD SD SDSDSDSDSDSD SDSDSDSDSDSDSD8" WA.V.A.V. 8" W 8" W 8" W 8" W 8" W8" S S 8" SS IR8" S S 8" S S 8" SS S D S D SD IR 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" W8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SD SD SD SD SD SD SD SD 8" W 8" W 8" W 8" W 8" S S 8" S S 8" SS SD SD A.V.16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" WV.P. W W W W W W W W W W W W W W W W WWWWWWWWWWW W W W W W W W W W W V.P.V.P.V.P. A.R.V. GAS GAS V.P.V.P.XXXXXXG G G G G G G G G G G G G G G G GGGGGGGGGGG EEE E E E E E E E E E E E E E E E E EEEEEEEE E E E E E E E E / / / / / / / // / / / / / / /X X X X X V.P.XXXXXXXXXXX X X X X X X X XX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /MXXXXFES MM FESFES M M XTELE F.O. TELEFESFES / / / / / / / // / / / / / / // / / / / / / // / / / / / / /MGAS / / / / / / / /XX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /F E SM FES TELE / / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / / F ES M F E S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXX/ / / / / / / // / / / / / / // / / / / / / /XWSO X XV.P. VAULT CABLE BOX CABLE M M H2O XGASGASV.P. GAS WW OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE / / / / / / / // / / / / / / / ST ST AW WW/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /WWWWWWWWWWWWW14"W 1976 (AC)14"W 1976 (AC)14"W 1976 (AC)14"W 1976 (AC)/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /EEEGWEW TURNBERRY ROADBETHPAGE DR.WINGED FOOT DR. KIA W A H D R .ROYAL TROON AVE.E. DOUGLAS ROAD C A R N O U S T I E D R . B A L T U S R O L D R . REPLAT CHERRYWOOD ACRES TRACT 1A REPLAT CHERRYWOOD ACRES TRACT 1B CHERRYWOOD ACRES TRACT 6 LOT 18 BLOCK 3 SERRAMONTE HIGHLANDS (LARIMER COUNTY) LOT 17 LOT 12 LOT 11 LOT 6 LOT 5 LOT 1 FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT FIRE HYDRANT SIDEWALK CULVERT (TYP.) UNDERDRAIN FOR RAIN GARDEN 3 CONNECT TO EXISTING ELCO WATERLINE PROPOSED FIRE HYDRANT FIRE HYDRANT UNDERDRAIN FOR RAIN GARDEN 2 UNDERDRAIN FOR RAIN GARDEN 1 FIRE HYDRANT 8" SANITARY SEWER JUANITA LN . BAL T U S R O L C T. 30' SANITARY SEWER EASEMENT TO BE DEDICATED BY SEPARATE DOCUMENT 8" WATER SIDEWALK CULVERT SIDEWALK CULVERT SANITARY SEWER B SEE SHEET SS8 SANITARY SEWER B4 SEE SHEET SS9 STORM LINE D SEE SHEET ST3 SANITARY SEWER A SEE SHEET SS1. SUBDRAIN B SEE SHEET SD2 STORM LINE C SEE SHEET ST2 STORM LINE E SEE SHEET ST2 STORM LINE B SEE SHEET ST2 SUBDRAIN A SEE SHEET SD1 SUBDRAIN C2 SEE SHEET SD3 SUBDRAIN C SEE SHEET SD3 SANITARY SEWER A5-1.5 SEE SHEET SS7 SANITARY SEWER A5-1 SEE SHEET SS5 SANITARY LINE A5-1.6 SEE SHEET SS7 SANITARY SEWER A5 SEE SHEET SS4 SANITARY OFFSITE SEWER SEE SHEET OS3 FIRE HYDRANT ABANDONED WELL 12" ELCO WATERLINE (SEE PLANS BY OTHERS) 16" ELCO WATERLINE (SEE PLANS BY OTHERS) FLAT BOTTOM SWALE CONCRETE PAN STORM LINE A SEE SHEET ST1 EXISTING WELL HEAD NATURAL HABITAT BUFFER ZONE EXISTING PUMP HOUSE NATURAL HABITAT BUFFER ZONE EXISTING WATERLINE (CONTRACTOR TO LOCATE PRIOR TO MOBILIZATION) DEPTH GAUGE EXISTING 14" AC ELCO WATERLINE EXISTING 10" AC ELCO WATERLINE R350' EXISTING WELL HEAD GAS AND OIL BUFFER R150' R350' R350' GAS AND OIL BUFFER EXISTING WELL HEAD STORM LINE F SEE SHEET ST1 OU1 OVERALL UTILITY PLAN16 Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comKEYMAP DOUGLAS RD TURNBERRY RD8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL U5 U6U4 U2 U3U1 NORTH ( IN FEET ) 0 1 INCH = 120 FEET 120 120 240 360 WWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W V.P.V.P.V.P. A.R.V. GAS XXXXXXXXXGGGGGGGGGG G G EEEEEEEEE E E E E E E E E E E E E E E E EXXXX XXXXXXXXXXXXXXX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /MXXXXXXXXXXXXXXXFESMMFESFES M M XXXXTELE F.O. TELEFESXX / / / / / / / /ST / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / AW/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /W8" W8" W8" W8" W 8" W 8" W8" W8" W8" W12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W8" W8" W8" W8" W8" W8" SS8" SS8" SS8" SS8" SSSDSDSDSDSDSDSDSD SSSSSWWWWWWWWWSSSSS W 8" W 8" W 8" W 8" W 8" SS 8" SS 8" SS 8" SSSDSDSDSD8" SSREPLAT CHERRYWOOD ACRES TRACT 1A REPLAT CHERRYWOOD ACRES TRACT 1B 25.22 LF 8" PVC N83°22'01"W 31.34 LF 8" PVC R=300.00' 13.18 LF 8" PVC S00°38'49"W 58.81 LF 8" PVCS39°38'13"W 358.61 LF 8" PVCS00°38'49"W204.15LF8"PVCR=300.00'145.25LF8"PVCR=300.00'LOT 3 LOT 4 LOT 1 LOT 2 LOT 1 LOT 2 LOT 7 LOT 8 LOT 6 LOT 5 LOT 4 LOT 3 LOT 2 LOT 9 E. DOUGLAS ROAD BETHPAGE DR.WINGED FOOT DR. STA. 10+00.00 12"X8" TEE w/ TB 1 - 12" BFV (E) 1 - 8" GV (S) N:150051.30 E:203575.49 STA. 13+20.81 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) N:149764.12 E:203450.64 STA. 13+90.05 8"X8" TEE w/ TB 2 - 8" GV (S & E) N:149696.87 E:203434.81 STA. 12+76.14 11.25° BEND N:149804.84 E:203468.87 EXISTING ELECTRIC LINE FIRE HYDRANT N:149772.39 E:203427.73 SANITARY LINE A5-1.6 SEE SHEET SS7 SANITARY SEWER A5-1 SANITARY SEWER A5-1 SEE SHEET SS6 15' UTILITY EASEMENT 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMETN 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) FIRE HYDRANT N:150041.31 E:203233.16 78' R.O.W EXISTING PUMP HOUSE 30' - 53' R.O.W 9' UTILITY EASEMENT 9' UTILITY EASEMENT ABANDONED OIL WELL 12" ELCO WATERLINE (SEE PLANS BY OTHERS) BLOCK 9 BLOCK 8 SWALE EXISTING WATERLINE (CONTRACTOR TO LOCATE PRIOR TO MOBILIZATION) DOUGLAS RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT KEYMAP DOUGLAS RD TURNBERRY RDCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 MATCHLINE - SEE SHEET U4 MATCHLINE - SEE SHEET U2U5 U6U4 U2 U3U1 U1 UTILITY PLAN17 W W W W W W W W W W W WWE E E E E E E E E E E E E EXXXXXX / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FES M FES TELE / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXWW WW8" W8" WUD UD UD UD UD UD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W8" W8" W8" W 8 " W 8" W 8" W 8" W 8" W8" W8" W8" SSSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD WWWWWSSSSSS WWWWWW SSSSSSS S SSS S SS SW W W W W WWWWWWWWWWWWWWWWWW W W W W WWS S S S SSSSSSS S S S S S S SSSSW S SS SW 8" W8" W8" WIR8" SS8" SS8" SS 8" S S 8" S S 8" S S 8" S S8" SS8" SSS D S D S D S DSDSDSDSDIR 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W S 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD A.V. STA. 15+47.48 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) N:149680.90 E:204468.39 993.30 LF 8" PVC N89°21'11"W 160.38 LF 8" PVCS00°38'49"W141.54LF8"PVCR=300.00'2 7 7 . 6 0 L F 8 " P V C N 5 2 ° 3 4 ' 4 5 " W 48.36 LF 8" PVC N24°27'45"W 61.90 LF 8" PVC N00°41'16"E 4 6 . 8 1 L F 8 " P V CR= 3 0 0 . 0 0 '60.59LF8"PVCR=299.60'LOT 3 LOT 6 LOT 2 LOT 5LOT 4 LOT 6 LOT 16LOT 15LOT 14LOT 13LOT 12LOT 9 LOT 11LOT 10LOT 7 LOT 8 LOT 18LOT 17 LOT 19 LOT 20 LOT 2 LOT 1 LOT 1 LOT 4 LOT 5 LOT 12LOT 11LOT 10LOT 9LOT 8LOT 7LOT 3LOT 2 LOT 7 LOT 8 LOT 10 LOT 11 LOT 9 TRACT E ACCESS & DRAINAGE EASEMENT LOT 3 LOT 4 LOT 5 LOT 19 LOT 18 TRACT A DRAINAGE EASEMENT WINGED FOOT DR. C A R N O U S T I E D R . E. DOUGLAS ROAD ROYAL TROON AVE.STA. 15+94.70 8"X8" TEE w/ TB 2 - 8" GV (S & E) N:149681.46 E:204421.17 STA. 21+17.37 8"X8" TEE w/ TB 1 - 8" GV (N) N:149687.43 E:203898.53 STA. 23+09.42 8"X8" TEE w/ TB 2 - 8" GV (S & E) N:149689.53 E:203706.49 STA. 17+18.37 11.25° BEND N:149567.39 E:203711.13 STA. 16+98.89 AIR/VACUUM RELIEF VALVE N:149549.66 E:203719.20 STA. 16+70.01 11.25° BEND N:149523.37 E:203731.16 STA. 14+93.90 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) STA. 12+50.24 8"X1" TEE w/ TB (SEE IRRIGATION PLANS FOR ADDITIONAL INFORMATION) N:149432.73 E:204405.00 STORM LINE D SEE SHEET ST3 SUBDRAIN C2 SEE SHEET SD3 SUBDRAIN C SEE SHEET SD3 12" ELCO WATERLINE (SEE PLANS BY OTHERS) POND 3 SIDEWALK CULVERT (TYP.) EXISTING WATERLINE (CONTRACTOR TO LOCATE PRIOR TO MOBILIZATION) NATURAL HABITAT BUFFER ZONE SWALE NATURAL HABITAT BUFFER ZONE CONCRETE FOREBAY FIRE HYDRANT N:149698.45 E:203898.66 FIRE HYDRANT N:149691.99 E:204468.39 FIRE HYDRANT N:149418.88 E:203871.81 SANITARY SEWER A5-1.5 SEE SHEET SS7 SANITARY SEWER A5-1 SEE SHEET SS5 CONCRETE COLLAR RG3 INV. IN=5079.00 (S) FG=5078.80 34.02 LF 6" HDPE @ 0.20% MON ITORING WELL RG3 INV. IN=5079.07 (W) INV. OUT=5079.07 (N) FG=5081.31 232.10 LF 6" P E R F O R A T E D H D P E @ 0 . 2 0 % CLEANOUT RG3 INV. OUT=5079.53 (E) FG=5080.94 SANITARY SEWER A5 SEE SHEET SS4 72' R.O.W 15' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMENT 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 5' DRAINAGE EASEMENT 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) EXISTING PUMP HOUSE EXISTING ELECTRIC LINE 2' CONCRETE PAN 30' - 53' R.O.W6' UTILITY EASEMENT 5' DRAINAGE EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 53' R.O.W30' - 9' UTILITY EASEMENT 9' UTILITY EASEMENT 9' UTILITY EASEMENT 9' UTILITY EASEMENT 53' R.O.W 30' -9' UTILITY EASEMENT 9' UTILITY EASEMENT STA. 15+92.75 8"X1" TEE w/ TB N:149469.86 E:203786.36 BLOCK 1 BLOCK 10 EXISTING CULVERTDOUGLAS RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT KEYMAP DOUGLAS RD TURNBERRY RDCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 MATCHLINE - SEE SHEET U5 MATCHLINE - SEE SHEET U3MATCHLINE - SEE SHEET U1U5 U6U4 U2 U3U1 U2 UTILITY PLAN18 / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /B M V.P./ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SM FE S / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXXXXXXXXXXX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XW S OX X X V.P. VAULT CABLE BOX CABLE H2OXX W W W WWWWOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE STW WWWWWWWWWWWWWWWW14"W 1976 (AC)14"W 1976 (AC)UDUDUD15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W SDSDSDSDSDSDSSSSS SSS SW WWWW WWWW WW WW WW WW WW WW WW WWW WW WS SSS SS SS SS SS SS SS SS SS SA.V. 8" W 8" W 8" W 8" W 8" W 8" W8" W8" W8" W8" W8" SS 8" S S 8" S S 8" SS8" SS8" SSSD SD SD SD SDSDSD8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" SS 8" SS 8" SS SD SD SD SD SD SD SD SD SD SD SD SD 16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" WSTA. 11+53.99 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (NW) N:149885.31 E:204772.17 STA. 13+50.89 AIR/VACUUM RELIEF VALVE N:149731.59 E:204654.83 STA. 10+00.00 12"X8" TEE w/ TB 1 - 12" BFV (E) 1 - 8" GV (S) N:150037.61 E:204788.41 STA. 11+69.95 8"X8" TEE w/ TB 2 - 8" GV (SE & SW) N:149870.32 E:204766.69 60.27 LF 8" PVCS00°38'49"W471.24LF8"PVCR =300.00'14 3 . 7 9 L F 8 " P V C N6 3 ° 3 5 ' 1 5 " W 182 . 0 1 L F 8 " P V C N67 ° 5 2 ' 3 2 " W 109.33 LF 8" PVC N89°21'11"W 134.91 LF 8"PVCR=300.00' 112.86 LF 8"PVC R=1508.00' LOT 22 LOT 23 LOT 24 LOT 21 LOT 20 LOT 2 LOT 4 LOT 3 LOT 5 LOT 8 LOT 9 LOT 10 LOT 1 LOT 2 LOT 3 LOT 4 LOT 8 LOT 10 LOT 9 LOT 11 LOT 2 LOT 1 LOT 3 LOT 6 LOT 1 LOT 7 LOT 5 LOT 7 TRACT C ACCESS & DRAINAGE EASEMENT TRACT B ACCESS & DRAINAGE EASEMENT KIA W A H D R .TURNBERRY ROADE. DOUGLAS ROAD WINGED FOOT DR.STA. 10+77.06 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) N:149659.77 E:205329.27 STA. 10+00.00 16"X8" TEE w/ TB 1 - 16" BFV (S) 1 - 8" GV (W) N:149658.90 E:205406.33SANITARY SEWER B SEE SHEET SS8 SANITARY SEWER B4 SEE SHEET SS9 STORM LINE D SEE SHEET ST3 SUBDRAIN B SEE SHEET SD2 STORM LINE B SEE SHEET ST2 EXISTING 14" AC ELCO WATERLINE CONCRETE FOREBAY FIRE HYDRANT N:149888.84 E:204761.65 FIRE HYDRANT N:149671.68 E:205329.41 10.98 LF 6" HDPE @ 0.20% CLEANOUT RG1 INV. OUT=5067.21 (E) FG=5069.21 END BEND RG1 INV. IN=5067.19 (W) INV. OUT=5067.19 (E) FG=5069.21 14 2 . 6 5 L F 6 " H D P E @ 0 . 2 0 % MONITORING WELL RG1 INV. IN=5066.84 (NW) INV. OUT=5066.84 (S) FG=5070.04 61.31 LF 6" HDPE @ 0.20% CONCRETE COLLAR RG1 INV. IN=5066.72 (N) FG=5066.72 29.96 LF 6" HDPE @ 0.20% START BEND RG1 INV. IN=5066.90 (NW) INV. OUT=5066.90 (SE) FG=5069.21 72' R.O.W SANITARY OFFSITE SEWER SEE SHEET OS4 15' UTILITY EASEMENT15' UTILITY EASEMENT RIPRAP (TYP.) 6' UTILITY EASEMENT 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 72' R.O.W BLOCK 3 BLOCK 2 LOT 6 STA. 10+69.42 WATERLINE LOWERING (SEE DETAIL) N:149659.69 E:205336.91 STA. 10+51.00 WATERLINE LOWERING (SEE DETAIL) N:149986.61 E:204787.83 RIPRAP (TYP.) DEPTH GAUGE 5' DRAINAGE AND GRADING EASEMENT (TYP.) STORM LINE A SEE SHEET ST1 15' UTILITY EASEMENT TURNBERRY RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" DOUGLAS RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT KEYMAP DOUGLAS RD TURNBERRY RDCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 MATCHLINE - SEE SHEET U6MATCHLINE - SEE SHEET U2U5 U6U4 U2 U3U1 U3 UTILITY PLAN19 WW W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWGASX X V.P.V.P.XXXXXXGG G G G G G G G G G G G G G G G G G G GGGGGGGGGGGGGGGEEEEEEEEE E E E E E E E E E E E E E E E E E E E EEEEEEEEEXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X AW WWWWWWW/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /EEEEEEEEEEE8" W 8" W 8" W 8" W 8" W8" W8" S S 8" S S 8" S S 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" S S SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S SSWW WSSSSSSS S S S S SSWWW W W WWWWW W WW SSSW WSS WA.V.8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W WCHERRYWOOD ACRES TRACT 6 LOT 18 LOT 17 117.29 LF 8" PVC N89°21'11"W 48.8 0 L F 8" P V C S53° 3 5' 0 5" W 112.65 LF 8" PVC S89°11'17"W 192.55 LF 8"PVC R=300.00' 2 6 3 .9 2 L F 8 "P V C R =4 0 8 .0 0 ' 1 8 6 .4 2 L F 8 "P V C R =3 0 0 .0 0 'LOT 6 LOT 4 LOT 3 LOT 5 LOT 6 LOT 28 LOT 1 LOT 2 LOT 26 LOT 25 LOT 27 LOT 24 LOT 23 LOT 22 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 2 LOT 1 LOT 34 LOT 21 BALT U S R O L C T.JUANITA LANE STA. 26+62.60 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (S) N:149306.87 E:203441.88 STA. 26+75.70 8"X8" TEE w/ TB 1 - 8" GV (N) N:149307.02 E:203428.77 STA. 32+03.60 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (S) N:149148.91 E:202939.48 STA. 33+76.55 AIR/VACUUM RELIEF VALVE N:149139.54 E:202767.16 FIRE HYDRANT N:149130.83 E:202943.74 SANITARY SEWER A SEE SHEET SS3. 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 2' FLAT BOTTOM SWALE 53' R.O.W 30' - 9' UTILITY EASEMENT 9' UTILITY EASEMENT STA. 33+68.62 10"X8" REDUCER 1 - 8" GV (E) N:149139.51 E:202775.09 30' WATERLINE EASEMENT TO BE DEDICATED BY SEPARATE DOCUMENT EXISTING TRANSFORMER STA. 33+81.52 TIE TO EXISTING 10" AC ELCO WATERLINE N:149139.32 E:202762.19 BLOCK 6 SEE NOTE 14 SEE NOTE 14 EXISTING 10" AC ELCO WATERLINE EXISTING WATERLINE EXISTING GAS LINE EXISTING ELECTRIC LINE Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT KEYMAP DOUGLAS RD TURNBERRY RDCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 MATCHLINE - SEE SHEET U1 MATCHLINE - SEE SHEET U4U5 U6U4 U2 U3U1 U4 UTILITY PLAN20 W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E X X X X X UD UD UD 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" W8" W8" W8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S SD S D S D S D S D S D S D S D SD SD SD SD SD SD SD SD SD SDSDSDSDSDSD8" SS8" SS8" SS8" SSSDSDSDSDSD8" SS8" SS8" SS8" SS8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SD SD SD SD SD SD SD SD8" W8" W8" W8" W8" WWWWSSSSSS S S S SSSS W W W W WWWW WSSSSSS S S S W WWW W WW W WS SS S S SSSW WWW W WSSSWWWWWWWWWSSSSSSSSSSSSSSSS S S S S S S W WWW W WWW WWWWWW W WWWSS WW8" W 8" W 8" W8" S S 8" S S 8" S S 8" SS 8" SS 8" SS 8" SSW8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" SS 8" SS 8" SS 8" SS S D S D S D S D S D SD SD SD SD SD SD BLOCK 3 SERRAMONTE HIGHLANDS (LARIMER COUNTY) LOT 12 LOT 11 LOT 692.59 LF 8" PVCS27°40'43"W244.28 LF 8" PVCS11°16'47"W19.46 LF 8" PVC S57°01'44"W 145.03 L F 8 " P V C N77°42' 4 4 " W 2 0 7 . 9 4 L F 8 " P V C N 5 2 ° 3 4 ' 4 5 " W 112.23LF8"PVCR=392.00'336.45 LF 8" PVC R =767.00' 196.71 L F 8 " P V C N76°57 ' 0 6 " W 148.88 LF 8"PVC R=350.00' LOT 29 LOT 14 LOT 16 LOT 15 LOT 11 LOT 10 LOT 12 LOT 13 LOT 10 LOT 34 LOT 11 TRACT D ACCESS, DRAINAGE & UTILITY EASEMENT LOT 13LOT 33 LOT 12 LOT 32 LOT 14 LOT 31 LOT 30 TRACT E ACCESS & DRAINAGE EASEMENT LOT 29 LOT 9 LOT 10 LOT 8 LOT 7 LOT 5 LOT 4 LOT 6 LOT 2 LOT 1 LOT 3 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 13 LOT 18 LOT 16 LOT 13 LOT 14 LOT 17 LOT 15 LOT 13 LOT 17 LOT 28 LOT 15 LOT 22 LOT 19 LOT 21 LOT 27 LOT 18 LOT 16 LOT 12 LOT 23 LOT 20 LOT 14 LOT 24 LOT 25 LOT 26 LOT 30 C A R N O U S T I E D R . BALT U S R O L D R .ROYAL TROON AVE.STA. 14+93.90 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) N:149409.79 E:203864.86 STA. 14+68.23 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) N:149235.02 E:204314.11 STA. 14+91.81 8"X8" TEE w/ TB 2 - 8" GV (S & W) N:149212.27 E:204307.94 STA. 17+70.48 45.00° BEND w/ TB N:148947.53 E:204240.63 STA. 17+51.02 45.00° BEND w/ TB N:148958.12 E:204256.96 STA. 20+82.67 8"X6" SWIVEL TEE w/ TB 1 - 6" GV (N) N:149031.42 E:203940.75 CONCRETE FOREBAY CONCRETE FOREBAY SANITARY SEWER A SEE SHEET SS2. FIRE HYDRANT N:149041.32 E:203945.32 SANITARY SEWER A5-1 SEE SHEET SS5 SANITARY SEWER A5 SEE SHEET SS4 6' UTILITY EASEMENT6' UTILITY EASEMENT 5' DRAINAGE EASEMENT 6' UTILITY EASEMENT 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE AND GRADING EASEMENT (TYP.) 6' UTILITY EASEMENT 5' DRAINAGE EASEMENT (TYP.) TRACT C ACCESS & DRAINAGE EASEMENT 2' FLAT BOTTOM SWALE FIRE HYDRANT N:149242.70 E:204288.84 6' UTILITY EASEMENT 5' DRAINAGE EASEMENT (TYP.) 53' R.O.W 30' -9' UTILITY EASEMENT 9' UTILITY EASEMENT 53' R.O.W 30' - 9' UTILITY EASEMENT 9' UTILITY EASEMENT 53' R.O.W 30' - 9' UTILITY EASEMENT 9' UTILITY EASEMENT BLOCK 6 BLOCK 9 BLOCK 9 BLOCK 5 RIP-RAP OVERFLOW PROTECTION (SEE SHEET EC1 FOR ADDITIONAL EROSION MEASURES) CLEANOUT RG2 INV. OUT=5067.95 (NE) FG=5069.81138.10 LF 6" PERFORATE D HDPE @ 0.10 % MONITORING WELL RG2 INV. IN=5067.81 (SW) INV. OUT=5067.81 (NE) FG=5070.65 268.53 LF 6" HDPE @ 0.10%EXISTING WATERLINE EXISTING GAS LINE TRACT C ACCESS & DRAINAGE EASEMENT SIDEWALK CULVERT (TYP.) Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT KEYMAP DOUGLAS RD TURNBERRY RDCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 MATCHLINE - SEE SHEET U2 MATCHLINE - SEE SHEET U6MATCHLINE - SEE SHEET U4U5 U6U4 U2 U3U1 U5 UTILITY PLAN21 / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /W W W W W WWWWWWWWXXXXXXXXG G G G G GGGGGGGGE E E E EEEEEEE/ / / / / / / // / / / / / / // / / / / / / /X X X X X X X X X X X X X X X X XXV.P.XXST/ / / / / / / /MGAS XXXXXE OHEOHEOHEOHEOHEOHEOHEOHE/ / / / / / / /ST ST ST ST/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / / / / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /WWWWWWWWWWWWWWWWWWWW14"W 1976 (AC)/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /GGGWWWEEEW 15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS15" SS8" SS 8" SS 8" SS 8 " SS 8 " SS 8 " SS 8 " SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SD SD SD SDSDSDSDSDSD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" WLOT 5 LOT 1 BLOCK 3 SERRAMONTE HIGHLANDS (LARIMER COUNTY)TURNBERRY ROADSANITARY SEWER A SEE SHEET SS1. 30' SANITARY SEWER EASEMENT BY TO BE DEDICATED BY SEPARATE DOCUMENT STORM LINE C SEE SHEET ST2 STORM LINE E SEE SHEET ST2 STORM LINE F SEE SHEET ST1 SUBDRAIN A SEE SHEET SD1 2' CONCRETE PAN BOXELDER GRAVEL ACCESS ROAD SANITARY OFFSITE SEWER SEE SHEET OS3 EXISTING PUMP HOUSE EXISTING PUMP HOUSE FIRE HYDRANT N:148958.37 E:205376.09 EXISTING 14" AC ELCO WATERLINE (TO BE ABANDONED)268.53 LF 6" HDPE @ 0.10%CONCRETE COLLAR RG2 INV. IN=5067.54 (SW) FG=5067.54 EXISTING ELECTRIC LINE DEPTH GAUGE EXISTING CULVERT STORM LINE A SEE SHEET ST1 2' CONCRETE PAN TRACT C ACCESS & DRAINAGE EASEMENT 15' UTILITY EASEMENT TURNBERRY RD. WATER LINE SEE "UTILITY PLANS FOR COUNTRY CLUB RESERVE - OFFSITE WATER LINES" Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com8" W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORMLINE LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTIONS SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 8.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE ELCO AND BOXELDER STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10.ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH ANCHOR COUPLINGS AND/OR JOINT RESTRAINT IN ACCORDANCE WITH ELCO SPECIFICATIONS. THRUST BLOCKS SHALL BE USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE ELCO FIELD INSPECTOR. 11.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 12.ALL SUBDRAINS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 13.STORM LINES A, B, C, D, E, AND F ARE TO TO BE PUBLICLY OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. 14.RAIN GARDENS ARE TO BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. 15.PLEASE REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION. 16.INSTALL SERVICE IN 2" HDPE SLEEVE. W OHE OHE T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERDRAIN SUBDRAIN CLEANOUT SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED STREET LIGHT PROPOSED LOTLINE RIGHT OF WAY PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE WPROPOSED RESIDENTIAL WATER SERVICE PROPOSED SUBDRAIN UD SD EXISTING FIRE HYDRANT PROPOSED STORMLINE NATURAL HABITAT BUFFER ZONE (NHBZ) EASEMENT LINE EXISTING SANITARY SEWER GEXISTING GAS PROPOSED FIRE HYDRANT KEYMAP DOUGLAS RD TURNBERRY RDCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 MATCHLINE - SEE SHEET U3 MATCHLINE - SEE SHEET U5U5 U6U4 U2 U3U1 U6 UTILITY PLAN22 Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comUNDERDRAIN CLEAN-OUT LOCATION. SEE SERVICE CLEAN-OUT DETAIL FOR RISER & VALVE BOX INFORMATION. CLEAN-OUTS SHALL BE PLACED DOWNSTREAM OF MANHOLES AT MAJOR CHANGE IN DIRECTION. NORTHERN ENG. MODIFICATION NOV. 7, 2018 ELCO WATER DISTRICT DETAIL:DRAWN:DATE: SEE TRENCH WIDTH TABLE BELOW ELCO WATER DISTRICT DETAIL:DRAWN:DATE: BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL D1 DETAILS68 Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.comELCO WATER DISTRICT DETAIL: DRAWN:DATE: ELCO WATER DISTRICT DETAIL:DRAWN:DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL ELCO WATER DISTRICT DETAIL:DRAWN:DATE: ELCO WATER DISTRICT DETAIL:DRAWN:DATE: ELCO WATER DISTRICT DETAIL:DRAWN:DATE: RKB 10/91 WATER MAIN CORPORATION STOP BRASS TAPPING SLEEVE (SUBJECT TO DISTRICT APPROVAL) BEDDING OF WATERMAIN- TYPE 'K' COPPER -ALL FITTINGS TO BE AWWA OR I.P. BY COPPER COMPRESSION PL 3"SEE ELCO STANDARD BEDDING DETAIL BEDDED IN PEA GRAVEL 6" IN ALL DIRECTIONS ELCO WATER DISTRICT DETAIL:DRAWN:DATE: RKB 10/91 WATER MAIN CORPORATION STOP BRASS DOUBLE STRAPPING SADDLE (SUBJECT TO DISTRICT APPROVAL) TYPE 'K' COPPER - PL BED IN PEA GRAVEL 6" ALL DIRECTIONS D2 DETAILS69 Sheet of 74COUNTRY CLUB RESERVEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SET301 North Howes Street, Suite 100Fort Collins, Colorado 80521ENGINEERNGIEHTRONRNPHONE: 970.221.4158www.northernengineering.com7 3/8" (L)1 3/8"17"6"3 3/8"14"FLR 16"R 16"DRIVE-OVER CURB, GUTTER AND DETACHED SIDEWALK31"See Drawing 160110 3/4"(L)R 16"DRIVE-OVER CURB, GUTTER AND ATTACHED SIDEWALK 18"18"3 3/8"1 3/8"6"R 16"FL14"6"17"1 1/2"5' (L)8 5/8" (F.C.)7 1/4" F.C.12" (F.C.)Slope to curb 1/4"/Ft.1' min. (F.C.)48:1 min.4:1 max.ExcavationFill1' min.2' min.1/4"/Ft.CURB & GUTTER IN A CUT OR FILL6"3'-9" (F.C.)For Thickness2' min. (L)NOTES:1. 6' wide pan for residential streets.2. All intersections to have access ramps.3. Standard Curb and Gutter Section, See Standard Drawing 7014. 0" Curb Height, See Section A-A5. All of these pedestrian improvements shall be in ROW or a pedestrian or public access easement.6. Detectable Warning to extend the full width of the ramp and be 2'-0" in the direction of travel. Maximum slope in the direction of travel shall be no more than 5.0 percent (1:20). Material to be approved by local engineer7. T = 6" for residential and 8" for commercial.8. Distance from back of curb to the beginning of Detectable Warning cannot be greater than 5'-0"TYPE IIIDETACHED WALKN.T.S.SECTIONS A-A APPROACHCLASSIFICATIONTYPESingle Family12'24'I, II, III, or IVCommercialMulti Family36'24'24'36'MINIMUMWIDTHWIDTHMAXIMUMIndustrial24'36'I, II, III, or IVI or IIRESIDENTIAL:*****DRIVEWAY WIDTHS High volume driveways (Type III or IV) allowed for 350 orgreater trip ends/day. * 30' maximum for 3 car garages. * *No single opening shall exceed 36'. Wider driveways shallbe divided w/a median not less than 6' wide.1/4" per ft.1" per ft.1:50 SlopeT Walk 1:50 1:12 (max.)GutterParkwaySidewalk1:12DetachedAA(max)2'FlareSee Note 4See Note 3If Concrete DrivewayExpansion JointSee Note 61/4" per ft.1" per ft.1:12 (max.)1" per ft.DrivewayFLSee Note 8 I, II, III, or IVSidewalkDetachedSECTION A-APAVEMENT DESIGN + 1/2" FOR COLLECTOR8" MIN. FOR RESIDENTIAL. USE CONCRETE10' MINIMUM (ARTERIAL)8' MINIMUM (COLLECTOR)PLAN VIEW6' MINIMUM (LOCAL)COLD JOINT (See Standard Drawing 714)AT 10' O.C.TOOL JOINTFOR PANS OVER 40'CONTROL JOINT REQUIREDCONTROLROADWAY WIDTHALL INTERSECTIONS TOHAVE ACCESS RAMPSNOTE:**& ARTERIALS.SIDES.TO PAN SECTION, TYPICAL BOTHTRANSITION FROM C & G SECTIONWALK8'DOWELL IFJOINTSTOOL JOINTAAJOINTS (TYP.)CONTROLPARALLELSTREETCLASSIFICATIONLOVELANDDEPTH OF INVERTWWIDTHCROSS PANArterial10'1 1/4"1 1/2"Collector8'1"1 1/8"Local6'3/4"7/8"d (MAX.)d (MIN.)1 1/2"2 1/2"2"DEPTH OF INVERTFT. COLLINSdd8' MIN. WIDTH WHERE CROSSING A COLLECTOR ROADWAY.****LENGTH(for monolithic pour)Max. Sign Panel 1. Attach the sign panels tightly to the post and use oversized washers to keep the sign from breaking loose from the post when hit by a vehicle. 2. Sign panels should be mounted a minimum of 7 feet above the pavement or ground. Cross section of post 3" - 6" ABOVE GRADE 2 1/4" Anchor 3. Signs larger than 36 inches in length or width require wind bracing and special post design. NOTES: 4. Anchor Stub and post are square steel tube (perforated). Anchor/Stub Post Size CRITERIA FOR SINGLE POST 36" x 36"2.25" x 2.25" x 3'-0"2" x 2" x 12'-0" 5. All "No Parking" signs shall be installed at 45° from Flow Line. ** 2" x 2" x 10' OR 12' 12 GAUGE TELESPAR POST (22F12A31)7'-0" MIN. CLEARANCE2' - 3' FROM F Street Curb See Figure 16-1 SW SAMPLEAVE 2400 R1-1 "STOP" SIGN 30" HIGH DENSITY/DIAMOND GRADE. SIGN MOUNTED TO POST WITH 1 EACH DRIVE RIVET WITH NYLON WASHER AGAINST SIGN FACE (ON TOP OF THE SIGN). THE BOTTOM OF THE SIGN SHALL BE MOUNTED WITH 1 EACH 5/16"x2-1/2" HEW BOLT WITH METAL AND FROM NYLON WASHERS (NYLON WASHER AGAINST SIGN FACE) AND SECURED WITH 1 EACH 5/16" HEX NUT ON THE BACK SIDE OF POST.L 2-1/4" x 2-1/4" x 3' ANCHOR/STUB 2 EACH 8" BLADES MOUNTED TO POST WITH 4 EACH DRIVE RIVETS WITH NYLON WASHERS *12 Gauge 30"8"8"PAVEMENT MARKINGS Projected Flowline (FL) Broken line 4" white 10' Segments 30' Gaps (3:1 Ratio) Wide Lane 1.5'x9' 8" White Line 4" white Double Line 4" Yellow 4" Space CROSSWALK MARKINGS: STRIPING: PREFERENTIAL LANE SYMBOL: STOP LINES: MANDATORY MOVEMENT: 1.5'x9 100' Taper (min.).2L L = Turn Bay Storage Length.4L 10' .4L 10' 4" Ywllow 4" White Extension Line An Engineering study should be required before crosswalk markings are installed in locations away from traffic signals or stop signs. Continental crosswalk bars (1.5' x 9' typ.) shall be placed adjacent to the projected flowline or abutting to existing crosspan. A bar shall be placed centered on each lane line and in the center of each lane. Lanes 5' wide or less shall not receive a bar centered in the lane. It is important that the markings are in alignment with the access ramps / sidewalks. On curves: Dotted extension of lane edge with same as solid downstream line, 2' segments, 4' gaps. Mandatory movement lanes shall use a lane-use arrow marking, the word marking "only", another lane-use arrow marking (accompanied by signs). Symbols & words are 8' of more in height -- use CDOT specification sizes. Place stop lines (1.5' x Variable typ.) only when inportant to indicate the point behind which vehicles are required to stop (more often on main arterials) -- placement should ordinarily be 4' in advance of and parallel to the nearest crosswalk line in the absence of a marked crosswalk, the stop line should be placed at the desired stopping point no more than 30' or less than 4' from the nearest edge of the intersecting roadway.PLS shall be used for designated bikeways. Intersection placement -- the symbol shall be placed downstream to convey to turning traffic that the bike lane exists. It shall be placed 4" down from the PCR & centered on the bike lane. Frequency of placement between blocks is a matter for Engineering judgement. All Longitudinal (lane) striping shall terminate at the Continental crosswalk bars -- except the downstream bike lane which shall terminate at the curb return. If a stop line is in place -- upstream stripping shall terminate at the stop line. Not Required with lane lengths less than 100'. Not Required with lane lengths less than 100'. 8" White Line 8" White Extension Line8" White Extension 4" White Line 65' (min) 4' 300 2' CONCRETE PAN (PRIVATE ON-SITE) D3 DETAILS70 ELCO WATER DISTRICT DETAIL: DRAWN:DATE: A A EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN APPROVAL Sanitary Sewer Main Subdrain Main Sanitary Service Subdrain Service (No Perforations) Reducing WYE Trench Stake Identifier (Sanitary Sewer) (Subdrain) Stake Identifier Sanitary Sewer Main Subdrain Main PLAN VIEW CROSS SECTION Bedding (Non-Perforated Pipe) by the approved plans. Pipe Sizes to be specified FORT COLLINS ONLY