HomeMy WebLinkAboutVOA SENIOR RESIDENCES - FDP200015 - SUBMITTAL DOCUMENTS - ROUND 3 - PROJECT NARRATIVEland planning landscape architecture urban design entitlement
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
February 27
th
, 2019
Revised on April 3rd, 2019
VOA Senior Residences
Project Information and Design Narrative
1) Project title:
VOA Senior Residences Project Development Plan (PDP)
(formerly Drake Senior Housing)
2) Past Meeting Dates:
Conceptual Review October 18, 2018
Neighborhood Meeting January 31, 2019
3) General Information:
VOA Senior Residences is proposed to be a three-story, affordable, senior housing
project, located on a 2.3 acre at the northwest corner of Drake Road and Joseph Allen
Drive. A significant portion (.74 acres) of the site is encumbered with a drainage
easement that serves the proposed project and the existing single family subdivision to
the north. A total of 47 parking spaces are being proposed. The existing zoning is Low
Density Mixed-use Neighborhood (LMN).
The proposed project would have 39 one-bedroom dwelling units and 16 two-bedroom
dwelling units to be made available to seniors 62 years and older with incomes that
range from $9,570 - $54,480 (20-80% AMI). Eighteen or one third of the units are being
proposed at 20-30% AMI. Three daytime employees are anticipated.
Three modifications are proposed to the LMN zone district standards for density,
maximum number of units and maximum square footage [LUC 4.5(D)(1)(b),
4.5(E)(4)(a), and 4.5(E)(4)(i)] and one modification is being proposed to the General
Development Standards for the minimum number of off-street parking spaces. [LUC
3.2.2(K)(l)] Detailed Modification Requests have been submitted with this proposal.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
4) Proposed Owners:
Volunteers of America will form a single purpose Limited Liability Company (LLC) to
develop and own the subject property. The Managing Member of the LLC will be
controlled by Volunteers of America National Services (VOANS). See attached list of
officers and directors of VOANS.
5) Existing Owners:
Steve Maguire
St. Charles Investment Company
6300 S. Syracuse Way, #430
Centennial, CO 80111
6) Transportation Improvements:
The Traffic Impact Analysis prepared by Delich Associates indicates that the traffic
generated by the VOA Senior Residences will have minimal impact in the area and
acceptable level of service is achieved for pedestrians, bicycles and transit modes
based upon the multi-modal transportation guidelines. No transportation related
improvements are anticipated.
7) Written narrative addressing each concern/issue raised at the neighborhood
meeting:
Comments received at the neighborhood meeting were mixed. Many people
understood the need for affordable senior housing in our community and were
supportive of the proposed project (see Volunteers of America surveys with
neighborhood meeting notes). The main concerns that were noted are listed below with
a short narrative following each.
• Density and building height.
The number of units developed on the site is crucial to the success of the
proposed project by Volunteers of America (VOA). VOA is proposing to use 9%
Low Income Housing Tax Credit (LIHTC) financing for this project. Many 9%
LIHTC projects fall in the +/- 50 unit project size range. CHFA looks very closely
at Total Development Costs (including the cost of the land), per unit. Therefore a
55-unit project will be viewed much more favorably than say a 24-unit project on
this particular site. The larger building will be more efficient to finance (secure a
LIHTC allocation and other sources), construct (lower construction costs psf) in
the short term and to operate in the long term (spread staffing and operating
costs over more units).
Three story buildings are allowed in the LMN zone district and this one would not
be out of place in the neighborhood. The Trails at Timberline, a 16-acre multi-
family housing project with eleven 3-story buildings and a density of 19 du/ac has
been constructed adjacent to the site directly across Joseph Allen Drive to the
east. The building and parking will be buffered from adjacent single family
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
residential development by an 87-foot wide shared detention facility and
enhanced landscaping. The 3-story building would buffer the single-family
neighborhood from traffic noise associated with Drake Road, an arterial street.
Additional discussion regarding the building’s architectural character is provided
in number 11.
• Detention pond maintenance
Pursuant to the recorded Detention Pond “Reciprocal Easement Agreement”
north of the subject site and south of the single-family homes, Volunteers of
America (VOA) will pay its pro-rata share of all routine maintenance expenses of
the detention pond.
• Park use and maintenance
Neighbors were concerned that residents at VOA would use the small park
developed in their neighborhood. The park is open to the public and VOA
residents may use it, however, given the elderly population and the amenities
proposed on the project site it is doubtful that there would be heavy use.
Amenities proposed for the VOA site include a small grass turf area, a
community garden, reflective quiet zone, benches, pet station and walking paths.
• Increased traffic
The Traffic Impact Analysis prepared by Delich Associates indicates that the
traffic generated by the VOA Senior Residences will have minimal impact in the
area and acceptable level of service is achieved for pedestrians, bicycles and
transit modes based upon the multi-modal transportation guidelines.
We are anticipating hosting a follow-up meeting at VOA’s senior property in Fort Collins,
The Sanctuary Apartments, with the neighborhood to provide additional information on
how VOA operates its properties, show a progress update of the design and the
changes that we are able to accommodate.
8) Narrative description of the site design including building placement, vehicular
and pedestrian circulation, landscaping, proposed open space and treatments of
wetlands, natural habitats and features on site and in the general vicinity of the
project.
Factors that influenced the site plan include access, fire protection, street/curb appeal,
the setback from Drake Road and neighborhood buffering. The access to the site from
Joseph Allen Drive needed to be as far from Drake Road as possible to allow for
adequate stacking at the intersection of Drake Road and Joseph Allen Drive. The
additional drive lane and parking on the east side of the building along with emergency
access drive paths on the west side allows the project to meet fire access requirements.
The building is setback from Drake Road (28 to 45 feet) substantially further than the
minimum 15-foot requirement. A roundabout is designed for fire access and to provide
a safe loading and drop-off zone at the north entrance. This allows for additional
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
landscaping in front of the building that will enhance the architecture of the building and
create an attractive streetscape along Drake Road.
The existing detention pond is located along the north side of the property adjacent to
the existing single family subdivision. An enhanced landscape bed treatment as well as
a 42’ fence is proposed along the parking lot adjacent to the detention pond effectively
screening headlights from the adjacent neighborhood. The parking lot will have cut-off
type fixtures focusing light on the parking area and not on the adjacent property.
Evergreen and deciduous trees are proposed on the north to buffer the visual impact of
the 3-story building. The trash and recycling facility is located inside the building for the
convenience of the residents and the overall curb appeal of the property.
A variety of site amenities are provided on the west side of the building including a small
turf area, a community garden, benches and a quiet patio seating area. Street trees are
provided along both Drake Road and Joseph Allen Drive with ornamental and
evergreen trees added for seasonal interest.
9) Narrative description of how disturbances to wetlands, natural habitats and
features and/or wildlife are being avoided to the maximum extent feasible.
There are no wetlands or natural habitats on or adjacent to the project site.
10) Narrative description of transition techniques, associated buffering and how
conflicts between existing and proposed land uses are mitigated.
See number 8.
11) Narrative description of the architectural design including general description
of how Building Standards are met (Sections 3.5.1 and other applicable Sections
in 3.5).
The building’s exterior architecture centers around three story massing with deep
reveals which break down the apartment building’s overall size. These reveals create
three distinct building forms; a western facing amenity core, a central building form and
building end caps. These forms are articulated so each has its own characteristics
while still being part of the greater whole. Floor heights will be kept under the maximum
dimension allowed to create a residential scale and minimize the building’s impact on
the surrounding neighbors. Low pitched asphalt shingle hip roofs also reduce the
overall height, while standing seam metal roof dormers help breakup the main roof
form. Varying roof overhangs and bearing heights will add to the articulation of the
building forms and create a rich architecture. Quality materials such as brick veneer,
cement board panel and cement board siding will enhance the existing neighborhood
context, while care in detailing these materials will add to the pedestrian experience off
East Drake Road and Joseph Allen Drive.
There will be 3 residential entries to the building with the main tenant entrance off the
northern parking lot. This entrance will be defined by a low standing seam canopy roof
that wraps around the entry and adjacent units. This entrance will be the center piece
for the building’s amenity program, management / leasing offices and will connect to the
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
western facing great room. The great room will be surrounded by large windows and a
covered porch with columns. The great room will provide a direct connection to the
outside landscaped patio area and be a hub of activity for the building. On the third
floor of the western amenity core, there will be a resident lounge, this area includes
large expanses of windows with wood detailing and increased ceiling height which is
expressed into a raised roof form with standing seam metal roof. The remaining portion
of the building will be comprised of one- and two-bedroom units served by two
elevators. There will also be indoor bike storage, maintenance rooms and trash
facilities served by trash chute within the building. All of the buildings amenities and
units will meet local and national accessibility requirements.
12) Development Phasing Schedule:
If successful in receiving an allocation of Low Income Housing Tax Credits (LIHTC) in
the first attempt from Colorado Housing and Finance Authority (CHFA) in September
2020, the development schedule would be as follows;
• July, 2020 – Close on the Financing/Ground Breaking
• September, 2021 – Construction Completion (14 month duration)
The project will be built all in one phase. Given the site has existing infrastructure
around it, it is anticipated that public improvements will only include tapping into utility
lines and perhaps minor modifications to the adjacent detention pond. It is anticipated
that this work would be done in the first 6 months of the building construction.
13) City Plan Principles and Policies:
The project is supported by the following City Plan Principles and Policies:
Principal LIV 2: Promote Infill and redevelopment. Urban Mixed-Use Districts.
Policy LIV 2.3 Transit-Oriented Development
Require infill higher density housing and mixed-use development in locations that are
currently or will be served by BRT and/or high frequency transit in the future.
Policy LIV 5.5 Integrate and Distribute Affordable Housing
Integrate the distribution of affordable housing as part of individual neighborhoods and
the larger community rather than creating larger concentrations of affordable units in
isolated areas
Policy LIV 6.4 Permanent Supply of Affordable Housing
Create an inventory of affordable housing consistent with the Affordable Housing Strategic Plan.
Policy LIV 6.5 Aging in Place
Retain attainable housing options in existing neighborhoods so that long-term residents can
“age in place.”
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Principle LIV 7: A variety of housing types and densities for all income levels shall be
available throughout the Growth Management Area.
Policy LIV 7.5 – Address Special Needs Housing
Plan for and meet the housing needs of special populations within the community. Disperse residential
care facilities, shelters, group homes, and senior housing throughout the Growth Management Area.
Policy LIV 7.2 – Develop an Adequate Supply of Housing
Encourage public and private for- profit and non-profit sectors to take actions to develop and maintain an
adequate supply of single- and multiple-family housing, including mobile homes and manufactured
housing.
Policy LIV 7.4 – Maximize Land for Residential Development
Permit residential development in most neighborhoods and districts in order to maximize the potential
land available for development of housing and thereby positively influence housing affordability.
Principle LIV 8: The City will encourage the creation and expansion of affordable
housing opportunities and preservation of the existing affordable housing supply.
Policy LIV 8.3 – Offer Incentives
Support and encourage the private development of affordable housing by offering incentives, such as
special assistance to offset the costs of the City’s impact fees and development requirements, air rights,
energy saving features, and reducing local government barriers to the construction of and the
rehabilitation of affordable housing units.
Policy LIV 8.5 – Integrate and Distribute Affordable Housing
Encourage the integration and distribution of affordable housing as part of individual neighborhoods and
the larger community rather than creating larger concentrations of affordable units in isolated areas.