Loading...
HomeMy WebLinkAboutSHAMROCK MANOR PUD FINAL - 53 89A - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICANT COMMUNICATIONGEFROH HATTMAN INC. ARCHITECTS/PLANNERS CONSTRUCTION MANAGEMENT 135 West Swallow Road Fort Collins. CO 80525 November 29, 1989 (303) 223-7335 Ms. Sherry Albertson -Clark City of Fort Collins Planning & Development Box 580 Fort Collins, CO 80522 RE: SITE FURNISHINGS -- SHAMROCK MANOR Dear Sherry: Two comments referring to site details were presented to us for con- sideration with the final P.U.D. submission. One was regarding site benches, the other referred to site lighting. The first item, site benches, is to be handled in this fashion. It is our intent to use an "old fashioned" styled bench similar to the Timberform Restoration Series Model 2118-6. The second matter is two fold. The parking lot lighting will require one new fixture. This fixture will match the existing site parking lot light located between Building A and the garages. The landscape lights will be down directional type that blend into the landscaping similar to a Malibu type light. In addition wall mounted lights on the buildings will provide additional illumination for security. Sincerely yours, GEFROH HATTMAN INC. ri+� Fredric J. Hattman Vice President kam Bench -top casting detail. 2119-7. Bench 2119-& Pks- I I 20 Bench, 2122 Seat and 2125-HT Litter Container. 07 /a Ot i. of mherForm®jieStot8tfon' 2120 Benches serve e• tN ;n - s gal7f Af t