HomeMy WebLinkAboutSHAMROCK MANOR PUD FINAL - 53 89A - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICANT COMMUNICATIONGEFROH HATTMAN INC.
ARCHITECTS/PLANNERS
CONSTRUCTION MANAGEMENT
135 West Swallow Road
Fort Collins. CO 80525
November 29, 1989 (303) 223-7335
Ms. Sherry Albertson -Clark
City of Fort Collins
Planning & Development
Box 580
Fort Collins, CO 80522
RE: SITE FURNISHINGS -- SHAMROCK MANOR
Dear Sherry:
Two comments referring to site details were presented to us for con-
sideration with the final P.U.D. submission. One was regarding site
benches, the other referred to site lighting.
The first item, site benches, is to be handled in this fashion. It
is our intent to use an "old fashioned" styled bench similar to the
Timberform Restoration Series Model 2118-6.
The second matter is two fold. The parking lot lighting will require
one new fixture. This fixture will match the existing site parking
lot light located between Building A and the garages. The landscape
lights will be down directional type that blend into the landscaping
similar to a Malibu type light. In addition wall mounted lights on
the buildings will provide additional illumination for security.
Sincerely yours,
GEFROH HATTMAN INC.
ri+�
Fredric J. Hattman
Vice President
kam
Bench -top
casting detail. 2119-7.
Bench 2119-&
Pks-
I
I
20 Bench, 2122 Seat and 2125-HT Litter Container.
07
/a
Ot
i.
of mherForm®jieStot8tfon' 2120 Benches serve
e•
tN
;n
- s
gal7f Af
t