HomeMy WebLinkAboutPOUDRE VALLEY BUSINESS PARK REZONING COUNTY REFERRAL - 56 89, A - SUBMITTAL DOCUMENTS - ROUND 1 - OTHER JURISDICTIONSICATION FOR SUBDIVISION APPRO
Check One; Preliminary Plat. (X)
Final Plat ( )
Replat ( )
I. Name of Subdivision Poudre Valley Business Park
Location NW 1/4, NW 1/4, Section 23, Township 6 North, Range 68 West
Owner * Phone
Address
Mineral Rights Owner/Lessee Union,Paci.fic Resources-Minerals/Amw Production Co.
Address Mr. Steve Stacey, Amen Production Co., P.O. Brix 80, Denver, CO 80201
Applicant Poudre Valley Rural Electric Association Phone (303)226-1234
Address P.O. Box 1727, Fort. Collins; CO-80522-1727 -- -
Registered Engineer or surveyor John F. Donnelly, P.E./CDS Engineering_ Corp.
Address 100 West 29th Street
Phone (303)493-8010
_ a
2. Site Data:
Existing Zoain ciat--S�sti
j Total Development Area 31 Acres±.
Number of Lots traet Number of Dwelling Units Proposed N/A
Minimum Lot Size Proposed 3.00 Linear Feet of. New Streets 2600
Total Number of.Sq. Feet of Non-residential Floor
Total Number of Proposed Off -Street Parking Spaces
Space 45,000, 1st floor/12,000 2nd
110 cor
3. Domestic Water Supply: - Public, System Ft. Collins -Loveland Water
Dis i
On -Lot System
Estimated Requirements* 15,000 gallons/day
*(Complete where on -lot water system is proposed)
4. Water Storage for Fire Protection* gallons
*(Complete if subdivision is not served by district water or is more than 1 mile
from a public water system.)
5. Sewage Disposal: Public SystemSq1t Ft- Collins Sanitation
Dis i
- On -Lot System
Estimated Sewage* _ 2,000 gallons/day
*(Complete if sewage is to be treated in on -lot sewage treatment facility.)
*Charles &Lydia Frye Mrs. Dorothy Darden
34896 Weld County Road #19 C/O Mr. Tim Hasler
Windsor, Colorado 80550 P.O. Box 2267
(303) 686-9960 Fort Col-l-ins, CO 80522
(330)493-5070
LCPZ-109(3/85)
Page 1 of 2
6. (Complete for final plat application only.) .
Estimated Construction Cost of Improvements
Proposed Security for Subdivision Improvements Agreement
I understand and agree that this proposal may be delayed in processing if the
information provided is incomplete, inaccurate, or submitted after the submittal
deadline.
Date g pure Applicant
LCPZ-.109(3/85)
Page of 2
C
i A Commitmeng To Progress
b ui�
LARIMER COUNTY COLORADO
October 25, 1989
Tom Peterson
City of Fort Collins
Planning
P. 0. Box 580
Fort Collins CO 80522
( _ Planning Division
I �I I Jl,j i Henry R. Baker, Planning Director
P.O,. Box 1190
Fort Collins Colorado 80522
Planning 221-7683
/ Inspection Services 221-7700
Find enclosed various proposals as submitted to this office. Please
review and comment as applicable.
PROPOSALS ENCLOSED: Poudre Valley Business Park PUD- #S-88-89
Replat of Lot 2, Cotton Willows,6th-#S-89-89
COMMENTS REQUIRED BY: November 20, 1989
NOTE: Colorado Statutes state that failure of a referral agency to
respond within twenty-four days after the mailing by the County shall be
deemed an approval of the submitted plan.
MEETING TYPE: Larimer County Planning Commission
MEETING LOCATION: Board Hearing Room, Larimer County Courthouse,
200 West Oak Street, Fort Collins
MEETING DATE: December 20, 1989
MEETING TIME: 6:30 PM
Please send a copy of your comments to the applicant(s).
< A �.
Jan Dickinson
Planning Technician
BOARD OF COUNTY COMMISSIONERS
Courtlyn. W. Hotchkiss M.J. 'Moe' Mekelburg Daryle W. Klassen
District 1 District 11 District III