Loading...
HomeMy WebLinkAboutPOUDRE VALLEY BUSINESS PARK REZONING COUNTY REFERRAL - 56 89, A - SUBMITTAL DOCUMENTS - ROUND 1 - OTHER JURISDICTIONSICATION FOR SUBDIVISION APPRO Check One; Preliminary Plat. (X) Final Plat ( ) Replat ( ) I. Name of Subdivision Poudre Valley Business Park Location NW 1/4, NW 1/4, Section 23, Township 6 North, Range 68 West Owner * Phone Address Mineral Rights Owner/Lessee Union,Paci.fic Resources-Minerals/Amw Production Co. Address Mr. Steve Stacey, Amen Production Co., P.O. Brix 80, Denver, CO 80201 Applicant Poudre Valley Rural Electric Association Phone (303)226-1234 Address P.O. Box 1727, Fort. Collins; CO-80522-1727 -- - Registered Engineer or surveyor John F. Donnelly, P.E./CDS Engineering_ Corp. Address 100 West 29th Street Phone (303)493-8010 _ a 2. Site Data: Existing Zoain ciat--S�sti j Total Development Area 31 Acres±. Number of Lots traet Number of Dwelling Units Proposed N/A Minimum Lot Size Proposed 3.00 Linear Feet of. New Streets 2600 Total Number of.Sq. Feet of Non-residential Floor Total Number of Proposed Off -Street Parking Spaces Space 45,000, 1st floor/12,000 2nd 110 cor 3. Domestic Water Supply: - Public, System Ft. Collins -Loveland Water Dis i On -Lot System Estimated Requirements* 15,000 gallons/day *(Complete where on -lot water system is proposed) 4. Water Storage for Fire Protection* gallons *(Complete if subdivision is not served by district water or is more than 1 mile from a public water system.) 5. Sewage Disposal: Public SystemSq1t Ft- Collins Sanitation Dis i - On -Lot System Estimated Sewage* _ 2,000 gallons/day *(Complete if sewage is to be treated in on -lot sewage treatment facility.) *Charles &Lydia Frye Mrs. Dorothy Darden 34896 Weld County Road #19 C/O Mr. Tim Hasler Windsor, Colorado 80550 P.O. Box 2267 (303) 686-9960 Fort Col-l-ins, CO 80522 (330)493-5070 LCPZ-109(3/85) Page 1 of 2 6. (Complete for final plat application only.) . Estimated Construction Cost of Improvements Proposed Security for Subdivision Improvements Agreement I understand and agree that this proposal may be delayed in processing if the information provided is incomplete, inaccurate, or submitted after the submittal deadline. Date g pure Applicant LCPZ-.109(3/85) Page of 2 C i A Commitmeng To Progress b ui� LARIMER COUNTY COLORADO October 25, 1989 Tom Peterson City of Fort Collins Planning P. 0. Box 580 Fort Collins CO 80522 ( _ Planning Division I �I I Jl,j i Henry R. Baker, Planning Director P.O,. Box 1190 Fort Collins Colorado 80522 Planning 221-7683 / Inspection Services 221-7700 Find enclosed various proposals as submitted to this office. Please review and comment as applicable. PROPOSALS ENCLOSED: Poudre Valley Business Park PUD- #S-88-89 Replat of Lot 2, Cotton Willows,6th-#S-89-89 COMMENTS REQUIRED BY: November 20, 1989 NOTE: Colorado Statutes state that failure of a referral agency to respond within twenty-four days after the mailing by the County shall be deemed an approval of the submitted plan. MEETING TYPE: Larimer County Planning Commission MEETING LOCATION: Board Hearing Room, Larimer County Courthouse, 200 West Oak Street, Fort Collins MEETING DATE: December 20, 1989 MEETING TIME: 6:30 PM Please send a copy of your comments to the applicant(s). < A �. Jan Dickinson Planning Technician BOARD OF COUNTY COMMISSIONERS Courtlyn. W. Hotchkiss M.J. 'Moe' Mekelburg Daryle W. Klassen District 1 District 11 District III