PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Martin Bed and Breakfast P.U.D., Preliminary and Final, #57-89
APPLICANT: Mr. and Mrs. Mike
616 West Mulberry
Fort Collins, CO.
OWNER: Same
PROJECT DESCRIPTION:
and Becky Martin
Street
80524
This is a request for a Preliminary and Final P.U.D for a bed and breakfast
facility in a private owner -occupied home. The facility would allow up to
four guests. There would be no employees, except the owner -occupants. The
home is located at 616 West Mulberry Street and the lot consists of 8,750
square feet. The property lies between Whitcomb and Loomis Streets and is
adjacent to the alley connecting Mulberry and Magnolia Streets. The zoning is
R-M, Medium Density Residential.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
The Martin Bed and Breakfast P.U.D. is defined as a "service" and is evaluated
by the criteria of the Business Service Uses point chart of the L.D.G.S. The
P.U.D. scores 50% which is the minimum allowable score. A neighborhood
meeting was held and the land use was found to be compatible with the
surrounding area. Seven off-street parking spaces are provided plus two garage
spaces. The alley will be upgraded from gravel to asphalt. A concrete
approach will be constructed at the Mulberry/alley intersection. There will be
no new construction or exterior remodeling of the home.
DEVEIDPMENT SERVICES 300 LaPorte Ave. P.O. Box 580 Fort Collins, 00 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
Services 46
Planning Department
April 27, 1990
Mr. and Mrs. Mike and Becky Martin
616 West Mulberry Street
Fort Collins, CO. 80521
Dear Mike and Becky:
The alley
improvements associated with
the Bed
and Breakfast P.U.D. request
has gone
through several versions since
we first
began our discussions. The
following
represents our current thinking
based on
the latest assumptions-
1. It is the City's position that you should contract to do an engineering
design for the improvements. The Engineering Department does not have
sufficient staff to do the work. Similarly, the Streets Department has the
capability to do a quick "field check" only in association with the actual
work crew that would install the crushed asphalt tailings.
It is emphasized that the scope of the design does not have to be an
elaborate engineering utility plan. Rather, it is anticipated that the
design will be basic in nature and not complex.
2. The engineer should meet with Mike Herzig to establish the level of detail
on the design work. Areas of detail would include establishing grade,
drainage, concrete specifications for the apron, and limits of the
pavement.
3. The design should include a short letter from the engineer stating that the
impacts of the new storm flows attributed to the increase in impervious
surface area is minimal and would not negatively impact any adjacent
property.
4. The design should establish what needs to be done to lower the manhole.
Based on this design, it is anticipated that one of the City's crews will
adjust the manhole height.
5. The asphalt specification is a depth of 4 inches. The width of the
pavement is 16 feet. A soils report is not required.
6. The design should include a specification for the length, width, and depth
of concrete for the alley apron.
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6/ 50
7. There is a tree that would be close to the alley paving- towards the south.
Staff does not recommend that you remove the tree but cautions that
asphalt could harm the tree over time. Perhaps it would be a good idea
to plant a potential replacement tree now so if the mature trees is
damaged, the new tree will have begun to mature.
8. We still need to coordinate with Janet Perry of Light and Power on the
status of the poles and underground service to your house. Janet will
inform us of what her department can do to re-route . some of the
overhead electrical lines that serve your block.
9. The City realizes that by your paving approximately 175 feet of a 390
foot long alley, there is a savings to the alley improvement program.
However, please be aware that this program does not have a
reimbursement program whereby private parties can be compensated for
work that results in a public benefit: I encourage you to work with Jon
Ruiz of the Streets Department on any logistical solution to this dilemma.
It is far easier for our Streets Department to contribute in kind by
providing materials, time, and labor than by a straight financial
contribution. Mr. Ruiz is aware of this issue.
I realize the City's position seems like we have come full circle. It remains
our hope that we can still work with you in a cooperative manner. I plan on
putting the Bed and Breakfast P.U.D. on the May 21st agenda in anticipation
that much progress will be made by then.
As always, please call us if there are any questions.
Sincerely:
Tom' 1-4w....c
Ted Shepard
City Planner
cc Mike Herzig, Development Engineer
Jon Ruiz, Streets Supervisor
Kerrie Ashbeck, Civil Engineer
0 0
Martin Bed and Breakfast P.U.D., Preliminary & Final — n57-89
May 21, 1990 P & Z Meeting
Page 2
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
N: R-K
Existing
single
family
S: R-M;
Existing
single
family
E: R-H;
Existing
single
family
W: R-M;
Existing
single
family
The property is located on a combination of lots that were platted with the
original Town Plat. The house was built in 1905 for Charles Sheldon and
located at 131 South Howes Street. The house was moved in 1955 to its
present location.
2. Land Use:
The proposed bed and breakfast will be accommodated within an existing home
on a maturely landscaped lot. There will be no exterior remodeling in order
to serve the maximum of four guests. The basement of the home will continue
to be used as a separate student rental apartment.
As a land use, the proposal falls under the definition of a business service. As
such, the project scores 50% on the Business Service Uses point chart of the
L.D.G.S. Points are awarded for being located outside the "South College
Avenue Corridor", and for being surrounded by existing urban development.
Partial credit is awarded for energy conservation since an existing structure is
being used rather than construction of a new building. The score of 50% is
the minimum allowable score to permit the use at this location.
3. Neighborhood Compatibilitv:
A neighborhood meeting was held November 28, 1989. Although sparsely
attended, the neighbors supported the proposal. Letters from five affected
property owners have been received by the Planning Department, all in favor
of the Bed and Breakfast P.U.D. The fact that there will be no exterior
remodeling and the home will be owner -occupied contributes to the compatible
character of the request.
4. Transportation:
Since the property has frontage on a publicly dedicated alley, all parking will
be provided off-street. The alley will provide access to seven parking spaces
and two enclosed parking spaces in an existing garage. Seven parking spaces
plus two enclosed spaces are considered adequate for bed and breakfast guests,
the student rental apartment, and the owner -occupants.
0
Martin Bed and Breakfast P.U.D., Preliminary & Final — #57-89
May 21, 1990 P & Z Meeting
Page 3
The alley will upgraded from the present gravel surface to an asphalt surface.
The alley approach to Mulberry Street will improved with concrete. The
sidewalk along Mulberry will be extended across the alley approach.
RECOMMENDATION:
Staff finds that the request for Preliminary and Final P.U.D. for the Martin
Bed and Breakfast meets the required score for a business service use. In
addition, the P.U.D. is found to be compatible with the surrounding area and
satisfies the criteria of the Land Development Guidance System. Staff,
therefore, recommends approval.
4
CIN
iIR filhc':i�llill!!'f�
�_�� _�!
•.' :III Il I
S1 I
�tl:a I.
v
:mm .� _
City of Fort Collins
Services
MEMORANDUM
TO: Planning and Zoning Board
FM: Ted Shepard, City Planner IT
RE: Martin Bed and Breakfast P.U.D., Condition of Final Approval
DT: May 17, 1990
The Martin Bed and Breakfast P.U.D., Preliminary and Final, is being
recommended for final approval. As a result of the review process, it is
required that the Martins pave the alley adjacent to their property. This
comprises approximately one-half the alley length. The details of the
engineering specifications of the alley improvement project will be documented
in a standard development agreement. The Planning and Zoning Board should
be aware, however, that this development agreement has not yet been executed.
Under typical circumstances, items that are up for final consideration must
have an executed development agreement prior to Board action.
in the case of the Martin alley project, two City utilities will be participating
in the work. The Streets Department, as part of an annual alley improvement
program, will act as the contractor to improve the entire alley between
Mulberry and Magnolia. The Martins will provide design work and reimburse
the Streets Department for labor and materials that exceed the normal annual
alley improvement specification.
The Sewer Department will be replacing a sewer line in the alley this summer.
Therefore, part of the final grading and manhole adjustments will be
conducted by the Sewer Department prior to the alley improvement.
The development agreement will document the costs and obligations of both
City Departments and the Martins. These costs and obligations are in the
preliminary stages.
It has been very time consuming coordinating the improvements required for
the Bed and Breakfast P.U.D. with the improvements scheduled by the City.
Quite frankly, the utilities are unaccustomed with working with private owners
on a joint project.
The Martins have indicated that they agree to pave the alley next to their
house. They further agree to work with the City utilities on this project.
Please refer to the letter from Martins acknowledging this obligation.
The Planning Staff feels comfortable in allowing a Final P.U.D. approval
subject to the following condition:
The Martin Bed and Breakfast P.U.D. be approved subject to the execution of
a development agreement documenting the costs and obligations of all the
affected parties involved in improvement project for the alley between
Mulberry and Magnolia.
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
M A if A BE40 f- 6,fE#4-krAS7' 40u-40P
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA
APPLICABLE CRHRIA ONLY
CRITERION
13 the a terbn apocabie?
Wo me cri er n
be mfisfled9
If no, please explain
veS No
NEIGHBORHOOD COMPATABILITY
1. Social Compatability
✓
✓
2.-Neighborhood Character
-
3. Land Use Conflicts
,/
✓_
_-- _ __
4. Adverse Traffic Impact
✓
PLANS AND ROUCIES
5. Comprehensive Plan — -
PUBUC FACILITIES & SAFETY
6. Street Capacity
7. Utility Capacity
✓
8. Design Standard's
/
/
/
9. Emergency Access
of
✓
/
HazardsURCE
PROTECTIONSoils
& Slope Hazard
Significant Vegetation
o/Wildlife
Habitat
/Historical
rSecurity-LightingWater
Landmark
Mineiai Deposit
Eco-Sensitive Areas -
Agricultural Lands_RONMENTAL
STANDARDS
Air Quality
20. Water Quality.
21. Noise
-
_
22. Glare &Heat
-23. Vibrations
24. Exterior Lighting
25. Sewages &Wastes
✓
✓
SITE DESIGN
26. Community_ Organization
oe
27. Site Organization
_I✓
✓
28. Natural Features
29, Energy Conservation
30. Shadows
✓
_
31. Solar Access
-
32 Privacy
33. Open Space Arrangement
/
34. Building Height
/
35, VehicularMovement
✓
-_
36, Vehicular Design
37 Parking
38. Active Recreationdl-Areas
39. Private Outdoor Areas
_
40. Pedestran Convenience
41. Pedestrian Conflicts
42. Landscaping/Open Areas
/
43 LandscapingBuildings
✓
✓
44. Landsc_ going/Screening
i
45, Public Access
46. Signs
T/nl P. v, p.
4
1 ACTIVITY :
DEFINITION:
Business Service Uses
Those activities which are predominantly retail, office, and service uses
which would not qualify as or be a part of a neighborhood or commu:-
nity/regional shopping center. Uses include: retail shops; offices; per-
sonal service shops; financial institutions; hotels/motels; medical clin-
ics- health clubs; membership clubs; standard and fast-food restaurants;
hospitals; mortuaries; indoor theatres retail laundry and dry cleaning
outlets; limited indoor recreation uses; small animal veterinary clinics;
printing and newspaper offices; and, other uses which are of the same gen-
eral character.
CICITB CIA Each of the following applicable criteria must be
answered "yes" and implemented within the develop-
ment plan.
Yes No
1. Does the project gain its primary
vehicular access from a street other
than South College Avenue? mr El
2. DOES THE PROJECT EARN AT LEAST 50%
OF THE.MAXIMUM POINTS AS CALCULATED ❑
ON "POINT CHART E" FOR THE FOLLOWING CRITERIA?
a. Is the activity contiguous to an existing transit route (not appli-
cable for uses of less than 25,000 square feet GLA or with less
than 25 employees) or located in the Central Business District?
b. Is the project located outside of the "South College Avenue Corri-
dor?"
c. Is the project contiguous to and functionally a part of a neighbor-
hood or community/regional shopping center, an office or industrial
park, located in the Central Business District or in the case of a
single user, employ or will employ a total of more than 100 full-
time employees during a single 8-hour shift?
d. Is the project on at least two acres of land or located in the Cen-
tral Business District?
�`rlritlCll i�� �
-22-
a
of
A
Aj
3
A
3
e. Does the project contain two or more significant uses (such as
retail, office, residential, hotel/motel, and recreation)?
f. Is there direct vehicular and pedestrian access between on -site
parking areas and adjacent existing or future off -site parking
areas which contain more than ten (10) spaces?
g. Does the activity reduce non-renewable energy usage, through the
application of alternative energy systems, use of existing build-
ings, and through committed energy conservation measures beyond
that normally required by City Code?
h. Is the project located with at least 1/6th of its property boundary
contiguous to existing urban development?
i. If the site contains a building or place in which. a historic event
occurred, which has special public value because of notable archi-
tecture, or is of cultural significance, does the project fulfill
the following criteria.
i. Prevent creation of influences adverse to its preservation;
ii. Assure that new structures and uses will be in keeping
with the character of the building or place. Imitation of
period styles should be avoided; and
iii. Propose adaptive use of the building or place that will
lead to its continuance, conservation and improvement in an
appropriate manner while respecting the integrity of the
neighborhood.
il
-23-
11
E
BUSINESS
SERVICE USES
POINT CHART E
For All Critera
Applicable Criteria Only
Criterion
Is The
Criterion
Applicable.
Yes No
I II III IV
Circle
The
Correct
Score
Yes WC No
Multiplier
Points
Earned
1x11
Mapmum
Applicable
Points
a. Transit route
AX12
0
2
—
—
b. S. College corridor
X
0
4
$
8
c. Part of center
X
2
3
6
d. Two acres or more
e
X
2
3
6
e. Mixed -use
XI
2
3
Q
6
f. Joint parking
)d
1
2
0
3
—
—
g. Energy conservation
(01
92
0
4
8
h. Contiguity
0
X
610
5
16
10
i. Historic preservation
1
2
0
2
j.
112101
k.
1
2
0
I.
1
2
0
• VW — Very well Done Totals eta Yi ,
V VI
Percentage Earned of Maximum Applicable Points VNI =VII J�O
vIr
-24-