HomeMy WebLinkAboutTHE QUARRY BY WATERMARK - PDP200019 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYTHE QUARRY BY WATERMARK
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
NOVEMBER 2020
Prepared for:
Watermark Residential
111 Monument Circle, Suite 1500
Indianapolis, IN 46024
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
Project #2071
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrian Facilities ........................................................................................................ 9
Bicycle Facilities .............................................................................................................. 9
Transit Facilities .............................................................................................................. 9
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 12
Background Traffic Projections ..................................................................................... 12
Trip Assignment/Total Traffic ........................................................................................ 12
Signal Warrants ............................................................................................................. 12
Operation Analysis ........................................................................................................ 19
Geometry ...................................................................................................................... 19
Pedestrian Level of Service ........................................................................................... 25
Bicycle Level of Service ................................................................................................ 25
Transit Level of Service ................................................................................................. 25
IV. CONCLUSIONS .................................................................................................... 26
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 10
3. Short Range (2025) Background Peak Hour Operation .......................................... 20
4. Long Range (2040) Background Peak Hour Operation ........................................... 21
5. Short Range (2025) Total Peak Hour Operation ..................................................... 22
6. Long Range (2040) Total Peak Hour Operation ...................................................... 23
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Adjusted/Balanced Recent Peak Hour Traffic ........................................................... 7
5. Site Plan .................................................................................................................. 11
6. Trip Distribution ....................................................................................................... 13
7. Short Range (2025) Background Peak Hour Traffic ................................................ 14
8. Long Range (2040) Background Peak Hour Traffic................................................. 15
9. Site Generated Peak Hour Traffic ........................................................................... 16
10. Short Range (2025) Total Peak Hour Traffic ........................................................... 17
11. Long Range (2040) Total Peak Hour Traffic ............................................................ 18
12. Short Range (2025) and Long Range (2040) Geometry ......................................... 24
APPENDICES
A. Base Assumptions Form
B. Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor
Vehicle LOS Standards (Intersections)
D. Short Range (2025) Background Peak Hour Operation
E. Long Range (2040) Background Peak Hour Operation
F. Short Range (2025) Total Peak Hour Operation
G. Long Range (2040) Total Peak Hour Operation
H. Pedestrian/Bicycle Level of Service Worksheets
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements for the proposed The Quarry by Watermark development. The
proposed The Quarry by Watermark development is located in the northeast quadrant of
the Shields/Stuart intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the
owner/developer (Watermark Residential), the project engineering consultant (Northern
Engineering), the project planning consultant (Ripley Design), and Fort Collins Traffic
Engineering. This study generally conforms to the format set forth in the Fort Collins TIS
Guidelines in the “Larimer County Urban Area Street Standards” (LCUASS). A scoping
discussion was held with the Fort Collins Traffic Engineering staff. The Transportation
Impact Study Base Assumptions form and related documents are provided in Appendix A.
The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of The Quarry by Watermark is shown in Figure 1. It is important
that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial or residential. There are
residential uses surrounding the site. There are commercial uses to the west and
northwest of the site. Colorado State University is north of the site. The center of Fort
Collins lies to the east of the proposed The Quarry by Watermark site.
Streets
The primary streets near The Quarry by Watermark site are Shields Street,
Prospect Road, Hobbit Street, and Stuart Street. Figure 2 shows a schematic of the
existing geometry at the key intersections.
Shields Street is west of (adjacent to) the proposed The Quarry by Watermark
site. It is a north-south street classified as a four-lane arterial on the Fort Collins Master
Street Plan. Currently, Shields Street has a four-lane cross section. At the
Shields/Prospect intersection, Shields Street has northbound and southbound left-turn
lanes, two through lanes in each direction, and northbound and southbound right-turn
lanes. The Shields/Prospect intersection has signal control. At the Shields/Hobbit
intersection, Shields Street has a southbound left-turn lane, two through lanes in each
direction, and a northbound right-turn lane. The Shields/Hobbit intersection has stop
sign control on Hobbit Street. At the Shields/Stuart intersection, Shields Street has a
northbound left-turn lane, two through lanes in each direction, and a southbound right-
turn lane. The Shields/Stuart intersection has signal control. The posted speed limit on
Shields Street is 40 mph south of Prospect Road and 30 mph north of Prospect Road.
Prospect Road is north of the proposed The Quarry by Watermark site. It is an
east-west street classified as a four-lane arterial on the Fort Collins Master Street Plan.
Currently, Prospect Road has a four-lane cross section. At the Shields/Prospect
intersection, Prospect Road has dual eastbound and westbound left-turn lanes, two
through lanes in each direction, and an eastbound right-turn lane. The right-turn volume
on the westbound approach at the Shields/Prospect intersection indicates the need for a
right-turn lane. The need for this right-turn lane has been demonstrated in numerous
traffic studies for many years. Building this right-turn lane would likely require
acquisition of at least three properties along Prospect Road, east of Shields Street. The
decision to build this right-turn lane rests with the City of Fort Collins. The posted speed
limit on this segment of Prospect Road is 35 mph.
Spring Creek Trail
Prospect
Hobbit
Shields
Stuart
Lake
Sheely
SCALE: 1"=600'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 4
Prospect
Hobbit
Shields
Stuart
- Denotes Lane
STOP
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 5
Hobbit Street is north of The Quarry by Watermark site. It is an east-west street
classified as a local street on the Fort Collins Master Street Plan. Currently, Hobbit
Street has a two-lane cross section with parking on both sides of the street. At the
Shields/Hobbit intersection, Hobbit Street has a combined westbound left-turn/right-turn
lane. However, there is enough width in Hobbit Street to allow the left-turning vehicles
and the right-turning vehicles to form separate queues. There is no posted speed limit
on this segment of Hobbit Street.
Stuart Street is west of The Quarry by Watermark site. It is an east-west street
classified as a collector street on the Fort Collins Master Street Plan. Currently, Stuart
Street has a two-lane cross section with parking on both sides of the street. At the
Shields/Stuart intersection, Stuart Street has an eastbound left-turn lane and an
eastbound right-turn lane. The posted speed limit on this segment of Stuart Street is 25
mph.
Existing Traffic
Recent peak hour traffic volumes at the Shields/Prospect, Shields/Hobbit, and
Shields/Stuart intersections are shown in Figure 3. The counts at the Shields/Prospect
and Shields/Stuart intersections were obtained in October 2018 by the City of Fort
Collins. The counts at the Shields/Hobbit intersection were obtained in October 2020.
Raw traffic count data is provided in Appendix B. Since the traffic counts were done on
different days, different years, and considering the current Covid-19 pandemic, the
intersection volumes were adjusted/balanced, with more emphasis on the 2018 counts.
Figure 4 shows the averaged/balanced recent peak hour traffic volumes.
Existing Operation
The Shields/Prospect, Shields/Hobbit, and Shields/Stuart intersections were
evaluated and the peak hour operation is displayed in Table 1. Calculation forms are
provided in Appendix C. The key intersections are currently operating acceptably with
existing control, geometry, and signal timing in the peak hours, except for the west leg
of the Shields/Prospect intersection during the afternoon peak hour. With an
adjustment in the City signal timing, acceptable operation is achieved for the
Shields/Prospect intersection. The intersections were evaluated using techniques
provided in the 2016 Highway Capacity Manual. A description of level of service for
signalized and unsignalized intersections from the 2016 Highway Capacity Manual and
a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also
provided in Appendix C. Acceptable operation at signalized intersections during the
peak hours is defined as level of service E or better for each movement, leg, and level
of service D or better overall. At unsignalized intersections, acceptable operation is
considered to be at level of service F for any approach leg for an arterial/local
intersection. In such areas, it is expected that there would be substantial delays to the
minor street movements at unsignalized intersections during the peak hours. This is
considered to be normal and acceptable in urban areas. It is important to note that the
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 6
Prospect
Hobbit
Shields
68/203
783/818
152/109
164/256
217/169
723/451
102/102
98/189
268/739
105/224
616/893
46/169
696/1094
10/14
636/1100
5/13
14/24
7/10
21/100
968/1230
21/86
962/1309
58/67
91/71
Stuart
AM/PM
AVERAGED/BALANCED
RECENT PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 7
Prospect
Hobbit
Shields
69/220
797/887
155/118
164/256
217/169
723/451
113/112
108/208
268/739
105/224
680/980
46/169
889/1273
9/21
1004/1196
4/13
17/29
7/7
21/100
950/1142
21/83
875/1197
58/67
91/71
Stuart
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Prospect
(signal)
EB LT D E (E (60.2 secs))
EB T D D (C)
EB RT C C (C)
EB APPROACH D D (D)
WB LT D E (E (57.6 secs))
WB T D F (E (62.9 secs))
WB T/RT D F (E (63.6 secs))
WB APPROACH D F (E (62.2 secs))
NB LT B C (E (60.8 secs))
NB T C C (C)
NB RT A A (B)
NB APPROACH C C (D)
SB LT B C (D)
SB T C D (D)
SB RT B C (C)
SB APPROACH C C (D)
OVERALL C D (D)
Shields/Hobbit
(stop sign)
WB LT E (48.2 secs) F (80.1 secs)
WB RT B B
WB APPROACH C D
SB LT B B
OVERALL A A
Shields/Stuart
(signal)
EB LT E (57.6 secs) E (62.1 secs)
EB RT D D
EB APPROACH E (57.5 secs) E (51.9 secs)
NB LT A A
NB T A A
NB APPROACH A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL A A
(*) Adjusted signal timing
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 9
northbound queue from the Shields/Prospect signalized intersection stacked pass the
Shields/Hobbit intersection. However, in almost every instance, the northbound
queuing traffic left a gap and did not block the vehicles on Hobbit Street. This enabled
turning vehicles from Hobbit Street to experience less delay when attempting to execute
the turns.
Pedestrian Facilities
There are sidewalks along Shields Street, Hobbit Street, Prospect Road, and
Stuart Street within the pedestrian influence area. Many of the street cross section
elements were built prior to the current standards. Therefore, some of the sidewalks
may be considered to be substandard. The Spring Creek Trail crosses Shields Street
south of Stuart Street.
Bicycle Facilities
There are bicycle lanes along Shields Street, Stuart Street, and along Prospect
Road, west of Shields Street, within the study area. Prospect Road, east of Shields
Street, is constrained, in that on-street bike lanes do not exist due to the width of
Prospect Road. The Spring Creek Trail crosses Shields Street south of Stuart Street.
Transit Facilities
Currently, this area of Fort Collins is served by Transfort Routes 19, 2, and 32.
Route 19 operates along Shields Street, Route 2 operates, westbound, along Prospect
Road, and Route 32 operates eastbound on Prospect Road, west of Shields Street, and
northbound on Shields Street, north of Prospect Road.
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The Quarry by Watermark project is a residential apartment development with 329
dwelling units and 10,000 square feet of retail. Figure 5 shows a site plan of The
Quarry by Watermark project. The proposed Quarry by Watermark apartments are
marketed to the general public. The short range analysis (Year 2025) includes
development of The Quarry by Watermark and an appropriate increase in background
traffic due to normal growth and other potential developments in the area. The long
range future is considered to be the year 2040. The site plan shows that The Quarry by
Watermark will use existing Hobbit Street to access Shields Street and will have an
access that will line up with Stuart Street.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contain in Trip Generation, 10
th
Edition, ITE is used to estimate the trips that would be
generated by the proposed/expected uses at a site. Land use code 221 (Mid-rise
Multifamily Housing) and code 820 (Shopping Center) from the cited reference were used.
A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows
the expected trip generation on a daily and peak hour basis. The trip generation of The
Quarry by Watermark development resulted in 2,170 daily trip ends, 120 morning peak
hour trip ends, and 177 afternoon peak hour trip ends.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
221 Multifamily Housing
(Mid-Rise) 329 D.U. EQ 1792 EQ 29 EQ 81 EQ 85 EQ 54
820
Mixed-Use
Commercial Building
(Shopping Center)
4.0 KSF 37.75 152 0.58 2 0.36 2 1.83 7 1.98 8
Subtotal 1944 31 83 92 62
820
South Commercial
Building1 (Shopping
Center)
6.0 KSF 37.75 226 0.58 4 0.36 2 1.83 11 1.98 12
Total 2170 35 85 103 74
1 Not part of this proposal. However, it is included in this TIS
SCALE: 1"=200'
SITE PLAN Figure 5
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 11
West
Stuart
Street
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 12
Trip Distribution
Trip distribution for The Quarry by Watermark project was based on existing/
future travel patterns, land uses in the area, consideration of trip attractions in Fort
Collins, and engineering judgment. Figure 6 shows the trip distribution for the short
range (2025) and long range (2040) analysis futures. The trip distribution was agreed to
by City of Fort Collins staff in the scoping discussions.
Background Traffic Projections
Figures 7 and 8 respectively show the short range (2025) and long range (2040)
background traffic projections. Background traffic projections for the short range (2025)
future horizon were obtained by reviewing the North Front Range Regional
Transportation Plan and various traffic studies prepared for this area of Fort Collins.
Based upon these sources, it was determined that traffic volumes on Shields Street and
Prospect Road would increase by approximately 2.0% per year in the short range
future. The background traffic growth was agreed to by City of Fort Collins staff in the
scoping discussions. In addition to this, site generated traffic from the Landmark
Apartments Expansion development was included in the short range (2025) background
traffic forecasts.
Based upon the traffic growth history over the past 10 years, it was determined
that traffic volumes on Shields Street and Prospect Road would increase by
approximately 1.0% per year in the long range (2040) future.
Trip Assignment/Total Traffic
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figure 9 shows the site generated peak hour traffic assignment. Figures 10 and
11 respectively show the short range (2025) and long range (2040) total (site plus
background) peak hour traffic assignment.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. The Shields/
Prospect and Shields/Stuart intersections are currently signalized. The Shields/Hobbit
stop sign controlled intersection will not meet signal warrants in the future.
Spring Creek Trail
Prospect
Hobbit
Shields
Stuart
Lake
Sheely
30%
30%
10%
Nominal
30%
SCALE: 1"=600'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 13
AM/PM
SHORT RANGE (2025) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 14
Prospect
Hobbit
Shields
79/244
886/986
175/134
181/283
240/186
798/498
125/128
120/237
296/816
116/247
752/1095
51/187
980/1398
14/56
1103/1315
6/25
37/49
13/13
21/100
1051/1273
21/83
972/1328
58/67
91/71
Stuart
LONG RANGE (2040) BACKGROUND
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 15
Prospect
Hobbit
Shields
20/100
1210/1455
25/85
1095/1515
60/70
90/70
Stuart
1105/1590
15/55
1265/1495
5/30
35/50
15/10
90/275
1010/1115
200/155
205/320
270/210
900/560
140/145
135/270
335/920
130/280
850/1240
60/210
AM/PM
Rounded to Nearest
5 Vehicles
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 16
Prospect
Hobbit
Shields
9/8
25/22
25/22
3/11
10/30
11/30
14/41
10/30
31/33
4/12
28/19
12/8
Stuart
12/8
14/41
4/12
7/20
31/33
14/14
AM/PM
SHORT RANGE (2025) TOTAL
PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 17
Prospect
Hobbit
Shields
994/1439
24/86
1134/1348
10/37
65/68
25/21
Stuart
21/100
1055/1285
7/20
14/41
58/67
NOM
91/71
14/14
NOM
31/33
984/1336
21/83
Site Access
88/252
911/1008
200/156
181/283
240/186
798/498
128/139
130/267
296/816
116/247
763/1125
51/187
LONG RANGE (2040) TOTAL
PEAK HOUR TRAFFIC Figure 11
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 18
Prospect
Hobbit
Shields
1120/1630
25/85
1295/1530
10/40
65/70
25/20
Stuart
20/100
1215/1465
10/20
15/40
60/70
NOM
90/70
15/15
NOM
30/35
1105/1525
25/85
Site Access
100/285
1035/1140
225/175
205/320
270/210
900/560
145/155
145/300
335/920
130/280
860/1270
60/210
AM/PM
Rounded to Nearest
5 Vehicles
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 19
Operation Analysis
Operation analyses were performed at the Shields/Prospect, Shields/Hobbit, and
Shields/Stuart intersections. The operation analyses were conducted for the short range
future, reflecting year 2020 conditions and for the long range future, reflecting year 2040
conditions. The long range (2040) analyses are provided for informational and planning
purposes. It is important to note that there was an unknown glitch when using the
SYNCHRO software with the background traffic at the Shields/Stuart T-intersection where
the delay for Stuart Street could not be displayed on the analysis sheets. Therefore, the
delays and level of service was hand written on the analysis sheets.
Using the traffic volumes shown in Figure 7, the key intersections operate in the
short range (2025) background traffic future, with the existing geometry and signal timing,
as indicated in Table 3. Calculation forms for these analyses are provided in Appendix D.
The key intersections are currently operating acceptably with existing control, geometry,
and signal timing in the peak hours, except for the west leg of the Shields/Prospect
intersection during the afternoon peak hour. With an adjustment in the City signal
timing, acceptable operation is achieved for the Shields/Prospect intersection.
Using the traffic volumes shown in Figure 8, the key intersections operate in the
long range (2040) background traffic future, with the existing geometry and signal timing,
as indicated in Table 4. Calculation forms for these analyses are provided in Appendix E.
The key intersections will operate acceptably with existing control and geometry.
Using the traffic volumes shown in Figure 10, the key intersections operate in the
short range (2025) total traffic future, with the existing geometry and signal timing, as
indicated in Table 5. Calculation forms for these analyses are provided in Appendix F. As
with the background traffic, the key intersections are currently operating acceptably with
existing control, geometry, and signal timing in the peak hours, except for the west leg
of the Shields/Prospect intersection during the afternoon peak hour. With an
adjustment in the City signal timing, acceptable operation is achieved for the Shields/
Prospect intersection.
Using the traffic volumes shown in Figure 11, the key intersections operate in the
long range (2040) total traffic future, with the existing geometry and signal timing, as
indicated in Table 6. Calculation forms for these analyses are provided in Appendix G.
The key intersections will operate acceptably.
Geometry
Figure 12 shows a schematic of the likely short range (2025) and long range (2040)
geometry. This is the existing geometry at the Shields/Prospect and Shields/Hobbit
intersections. The Shields/Stuart intersection will have the addition of the east leg. At
the Shields/Prospect intersection, a westbound right-turn lane is required with the
current traffic. As mentioned earlier, the decision to build this right-turn lane rests with
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 20
TABLE 3
Short Range (2025) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Prospect
(signal)
EB LT D E (E (61.6 secs))
EB T D D (C)
EB RT C C (C)
EB APPROACH D D (D)
WB LT D E (E (56.9 secs))
WB T D F (E (68.9 secs))
WB T/RT D F (E (70.1 secs))
WB APPROACH D F (E (67.1 secs))
NB LT B D (C)
NB T C C (A)
NB RT A B (A)
NB APPROACH C C (B)
SB LT C D (B)
SB T C D (B)
SB RT B C (B)
SB APPROACH C D (B)
OVERALL D E (C)
Shields/Hobbit
(stop sign)
WB LT F (71.7 secs) F (167.9 secs)
WB RT B C
WB APPROACH D F (55.0 secs)
SB LT B B
OVERALL A A
Shields/Stuart
(signal)
EB LT E (57.6 secs) E (62.1 secs)
EB RT D D
EB APPROACH E (57.5 secs) E (51.9 secs)
NB LT A A
NB T A A
NB APPROACH A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL A A
(*) Adjusted signal timing
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 21
TABLE 4
Long Range (2040) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Prospect
(signal)
EB LT D E (77.8 secs)
EB T D C
EB RT C C
EB APPROACH D D
WB LT E (56.7 secs) D
WB T D E (70.5 secs)
WB T/RT D E (72.9 secs)
WB APPROACH D E (68.5 secs)
NB LT B C
NB T B A
NB RT A A
NB APPROACH B B
SB LT C B
SB T C B
SB RT B A
SB APPROACH C B
OVERALL C C
Shields/Hobbit
(stop sign)
WB LT F (97.2 secs) F (333.5 secs)
WB RT B C
WB APPROACH E (39.6 secs) F (70.8 secs)
SB LT B C
OVERALL A A
Shields/Stuart
(signal)
EB LT E (57.3 secs) E (61.9 secs)
EB RT D D
EB APPROACH E (56.8 secs) E (51.6 secs)
NB LT A A
NB T A A
NB APPROACH A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL A A
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 22
TABLE 5
Short Range (2025) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Prospect
(signal)
EB LT D E (E (61.6 secs))
EB T D D (C)
EB RT C C (C)
EB APPROACH D D (D)
WB LT D E (E (58.2 secs))
WB T D F (E (68.9 secs))
WB T/RT D F (E (70.1 secs))
WB APPROACH D F (E (67.2 secs))
NB LT B D (C)
NB T C C (A)
NB RT A B (A)
NB APPROACH C C (B)
SB LT C D (B)
SB T C D (B)
SB RT B C (B)
SB APPROACH C D (B)
OVERALL D E (C)
Shields/Hobbit
(stop sign)
WB LT F (106.1 secs) F (357.6 secs)
WB RT C C
WB APPROACH E (40.5 secs) F (97.2 secs)
SB LT B B
OVERALL A A
Shields/Stuart
(signal)
EB LT D E (56.2 secs)
EB T/RT D D
EB APPROACH D E (56.2 secs)
WB LT D D
WB T/RT D D
WB APPROACH D D
NB LT A A
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T B A
SB RT A A
SB APPROACH B A
OVERALL A A
(*) Adjusted signal timing
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 23
TABLE 6
Long Range (2040) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Prospect
(signal)
EB LT D E (77.8 secs)
EB T D C
EB RT C C
EB APPROACH D D
WB LT E (59.6 secs) E (55.3 secs)
WB T D E (70.5 secs)
WB T/RT D E (72.9 secs)
WB APPROACH D E (68.4 secs)
NB LT B D
NB T B A
NB RT A A
NB APPROACH B B
SB LT C C
SB T C B
SB RT A A
SB APPROACH C B
OVERALL C C
Shields/Hobbit
(stop sign)
WB LT F (148.2 secs) F (807.8 secs)
WB RT C C
WB APPROACH E (52.9 secs) F (195.0 secs)
SB LT B C
OVERALL A A
Shields/Stuart
(signal)
EB LT D E (56.3 secs)
EB T/RT D D
EB APPROACH D E (56.2 secs)
WB LT D D
WB T/RT D D
WB APPROACH D D
NB LT A A
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL A A
SHORT RANGE (2025) AND
LONG RANGE (2040) GEOMETRY Figure 12
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 24
Prospect
Hobbit
Shields
Stuart
- Denotes Lane
STOP
Site Access
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 25
the City of Fort Collins. This development proposal will contribute no traffic to this
movement. According to Figure 8-4, LCUASS, a northbound right-turn lane will not be
warranted at the Shields/Hobbit intersection, however this lane currently exists.
Pedestrian Level of Service
Appendix H shows a map of the area that is within 1320 feet of The Quarry by
Watermark site. There will be six pedestrian destinations within 1320 feet of The
Quarry by Watermark site. These are: 1) the residential area to the east of the site, 2)
the residential area to the north of the site, 3) the residential area to the northwest of the
site, 4) the commercial area to the northwest of the site, 5) the commercial area to the
west of the site, and 6) the residential area to the south of the site. This site is in an
area type termed “other.” As mentioned earlier, many of the street cross section
elements were built prior to the current standards. Therefore, some of the sidewalks
may be considered to be substandard. Acceptable pedestrian level of service will not
be achieved for all pedestrian destinations. The Pedestrian LOS Worksheet is provided
in Appendix H. The minimum level of service for “other” is C for all areas of evaluation.
The Spring Creek Trail crosses Shields Street south of Stuart Street.
Bicycle Level of Service
Appendix H shows a map of the area that is within 1320 feet of The Quarry by
Watermark development. There will be two bicycle destinations within 1320 feet of The
Quarry by Watermark development. These are: 1) the commercial area to the
northwest of the site and 2) the commercial area to the west of the site. The Bicycle
LOS Worksheet is provided in Appendix H. The base level of service is C and is B for
each of the bicycle destinations. This site is connected to Shields Street. Therefore, it
is concluded that level of service B can be achieved. The Spring Creek Trail crosses
Shields Street south of Stuart Street.
Transit Level of Service
This area of Fort Collins is served by Transfort Routes 19, 2, and 32. Route 19
operates along Shields Street, Route 2 operates, westbound, along Prospect Road, and
Route 32 operates eastbound on Prospect Road, west of Shields Street, and
northbound on Shields Street, north of Prospect Road.
DELICH The Quarry by Watermark TIS, November 2020
ASSOCIATES Page 26
IV. CONCLUSIONS
This study assessed the impacts of The Quarry by Watermark project on the street
system in the vicinity of the proposed development in the short range (2025) and long
range (2040) future. As a result of this analysis, the following is concluded:
- The development of The Quarry by Watermark is feasible from a traffic engineering
standpoint. At full development, The Quarry by Watermark will generate
approximately 2,170 daily trip ends, 120 morning peak hour trip ends, and 177
afternoon peak hour trip ends.
- All intersections operate acceptably with the existing traffic and geometry with an
adjustment in the signal timing at the Shields/Prospect intersection during the
afternoon peak hour. Current traffic volumes indicate that a westbound auxiliary
right-turn lane is required at the Shields/Prospect intersection. The decision to build
this lane rests with the City of Fort Collins.
- The Shields/Prospect and Shields/Stuart intersections are currently signalized. The
Shields/Hobbit stop sign controlled intersection will not have traffic signals in the
future.
- In the short range (2025) future, given development of The Quarry by Watermark
and an increase in background traffic, the key intersections will operate acceptably
with an adjustment in the signal timing at the Shields/Prospect intersection during
the afternoon peak hour.
- In the long range (2040) future, given development of The Quarry by Watermark
and an increase in background traffic, the key intersections will operate acceptably.
- The short range (2025) and long range (2040) geometry is shown in Figure 12.
This is the current geometry. Traffic volumes indicate that a westbound auxiliary
right-turn lane is required at the Shields/Prospect intersection. The decision to build
this lane rests with the City of Fort Collins.
- Acceptable level of service is achieved for bicycle and transit modes based upon
the measures in the multi-modal transportation guidelines and the Fort Collins
Pedestrian Plan. Many of the street cross section elements were built prior to
the current standards.
APPENDIX A
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 10/10/2018 Observer: City of Fort Collins
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Shields/Prospect
S = straight
L = left turn
Time Northbound: Shields Southbound: Shields Total Eastbound: Prospect Westbound: Prospect Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 11 202 60 273 29 145 12 186 459 62 235 13 310 17 67 25 109 419 878
7:45 16 259 41 316 59 173 11 243 559 72 187 35 294 29 56 30 115 409 968
8:00 17 164 27 208 36 132 14 182 390 37 144 19 200 25 63 24 112 312 702
8:15 24 157 24 205 40 166 9 215 420 46 157 35 238 27 82 26 135 373 793
7:30-8:30 68 782 152 1002 164 616 46 826 1828 217 723 102 1042 98 268 105 471 1513 3341
PHF 0.71 0.75 0.63 0.79 0.69 0.89 0.82 0.85 0.75 0.77 0.73 0.84 0.84 0.82 0.88 0.87 0.86
4:30 55 205 21 281 79 196 37 312 593 47 137 23 207 40 177 43 260 467 1060
4:45 47 196 35 278 62 203 28 293 571 50 134 29 213 48 174 67 289 502 1073
5:00 48 218 30 296 67 277 56 400 696 29 82 24 135 59 218 68 345 480 1176
5:15 53 199 23 275 48 217 48 313 588 43 95 26 164 42 170 46 258 422 1010
4:30-5:30 203 818 109 1130 256 893 169 1318 2448 169 448 102 719 189 739 224 1152 1871 4319
PHF 0.92 0.94 0.78 0.95 0.81 0.81 0.75 0.82 0.85 0.82 0.88 0.84 0.8 0.85 0.82 0.83 0.92
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 10/8/2020 Observer: Vickie
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Shields/Hobbit
S = straight
L = left turn
Time Northbound: Shields Southbound: Shields Total Eastbound: Westbound: Hobbit Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 140 0 140 1 151 152 292 0 2 6 8 8 300
7:45 181 3 184 3 191 194 378 0 2 2 4 4 382
8:00 171 0 171 3 177 180 351 0 2 3 5 5 356
8:15 144 2 146 3 177 180 326 0 1 3 4 4 330
7:30-8:30 0 636 5 641 10 696 0 706 1347 0 0 0 0 7 0 14 21 21 1368
PHF n/a 0.88 0.42 0.87 0.83 0.91 n/a 0.91 n/a n/a n/a n/a 0.88 n/a 0.58 0.66 0.9
4:30 255 1 256 4 265 269 525 0 2 6 8 8 533
4:45 290 4 294 5 270 275 569 0 2 3 5 5 574
5:00 280 2 282 0 277 277 559 0 3 7 10 10 569
5:15 275 6 281 5 282 287 568 0 3 8 11 11 579
4:30-5:30 0 1100 13 1113 14 1094 0 1108 2221 0 0 0 0 10 0 24 34 34 2255
PHF n/a 0.95 0.54 0.95 0.7 0.97 n/a 0.97 n/a n/a n/a n/a 0.83 n/a 0.75 0.77 0.97
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 10/9/2018 Observer: City of Fort Collins
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: Shields/Stuart
S = straight
L = left turn
Time Northbound: Shields Southbound: Shields Total Eastbound: Stuart Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 5 281 286 238 3 241 527 22 25 47 0 47 574
7:45 4 282 286 263 4 267 553 15 25 40 0 40 593
8:00 4 210 214 224 10 234 448 10 22 32 0 32 480
8:15 8 195 203 237 4 241 444 11 19 30 0 30 474
7:30-8:30 21 968 0 989 0 962 21 983 1972 58 0 91 149 0 0 0 0 149 2121
PHF 0.66 0.86 n/a 0.86 n/a 0.91 0.53 0.92 0.66 n/a 0.91 0.79 n/a n/a n/a n/a 0.89
4:30 23 277 300 269 11 280 580 17 17 34 0 34 614
4:45 15 282 297 335 21 356 653 21 18 39 0 39 692
5:00 27 336 363 325 22 347 710 11 18 29 0 29 739
5:15 35 335 370 380 32 412 782 18 18 36 0 36 818
4:30-5:30 100 1230 0 1330 0 1309 86 1395 2725 67 0 71 138 0 0 0 0 138 2863
PHF 0.71 0.92 n/a 0.9 n/a 0.86 0.67 0.85 0.8 n/a 0.99 0.88 n/a n/a n/a n/a 0.88
APPENDIX C
HCM 6th Signalized Intersection Summary Recent AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 217 723 113 108 268 105 69 797 155 164 680 46
Future Volume (veh/h) 217 723 113 108 268 105 69 797 155 164 680 46
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 252 841 22 126 312 75 80 927 56 191 791 1
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 222222222222
Cap, veh/h 536 943 418 214 461 109 369 1544 682 349 1670 738
Arrive On Green 0.16 0.27 0.27 0.06 0.16 0.16 0.05 0.43 0.43 0.08 0.47 0.47
Sat Flow, veh/h 3456 3554 1576 3456 2829 668 1781 3554 1570 1781 3554 1571
Grp Volume(v), veh/h 252 841 22 126 194 193 80 927 56 191 791 1
Grp Sat Flow(s),veh/h/ln 1728 1777 1576 1728 1777 1720 1781 1777 1570 1781 1777 1571
Q Serve(g_s), s 7.3 25.1 1.1 3.9 11.3 11.7 2.7 22.0 1.2 6.1 16.7 0.0
Cycle Q Clear(g_c), s 7.3 25.1 1.1 3.9 11.3 11.7 2.7 22.0 1.2 6.1 16.7 0.0
Prop In Lane 1.00 1.00 1.00 0.39 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 536 943 418 214 289 280 369 1544 682 349 1670 738
V/C Ratio(X) 0.47 0.89 0.05 0.59 0.67 0.69 0.22 0.60 0.08 0.55 0.47 0.00
Avail Cap(c_a), veh/h 536 1001 444 251 420 407 413 1544 682 378 1670 738
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 42.3 38.9 30.1 50.2 43.3 43.4 16.3 23.8 5.2 17.2 19.9 15.5
Incr Delay (d2), s/veh 0.6 9.8 0.1 2.6 2.7 3.0 0.3 1.7 0.2 1.4 1.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.1 11.8 0.4 1.7 5.1 5.1 1.1 9.1 0.8 2.5 7.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 43.0 48.7 30.2 52.8 45.9 46.4 16.5 25.5 5.4 18.5 20.8 15.5
LnGrp LOS DDCDDDBCABCB
Approach Vol, veh/h 1115 513 1063 983
Approach Delay, s/veh 47.1 47.8 23.8 20.4
Approach LOS DDCC
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.3 56.7 10.8 34.2 12.2 52.8 22.1 22.9
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 7.0 45.0 7.0 30.0 10.0 42.0 12.0 * 25
Max Q Clear Time (g_c+I1), s 4.7 18.7 5.9 27.1 8.1 24.0 9.3 13.7
Green Ext Time (p_c), s 0.0 3.4 0.0 1.1 0.1 3.8 0.2 1.0
Intersection Summary
HCM 6th Ctrl Delay 33.3
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Recent AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates recent am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 51 12 36 14 48 17 31
Maximum Split (%) 10.0% 46.4% 10.9% 32.7% 12.7% 43.6% 15.5% 28.2%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 100 41 53 89 103 72 41
End Time (s) 100 41 53 89 103 41 89 72
Yield/Force Off (s) 96 35 48 83 99 35 84 66
Yield/Force Off 170(s) 96 15 48 67 99 21 84 49
Local Start Time (s) 48 59 0 12 48 62 31 0
Local Yield (s) 55 104 7 42 58 104 43 25
Local Yield 170(s) 55 84 7 26 58 90 43 8
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (37%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Recent AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates recent am.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 252 841 131 126 434 80 927 180 191 791 53
v/c Ratio 0.45 0.90 0.25 0.53 0.70 0.24 0.67 0.26 0.65 0.52 0.07
Control Delay 44.8 51.6 6.8 57.5 43.6 16.5 33.2 7.9 24.1 24.4 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.8 51.6 6.8 57.5 43.6 16.5 33.2 7.9 24.1 24.4 0.2
Queue Length 50th (ft) 82 297 1 44 135 25 275 0 67 217 0
Queue Length 95th (ft) 124 355 41 73 169 58 366 60 103 262 0
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 562 964 530 241 805 332 1374 701 299 1524 766
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.45 0.87 0.25 0.52 0.54 0.24 0.67 0.26 0.64 0.52 0.07
Intersection Summary
HCM 6th Signalized Intersection Summary Recent PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 169 451 112 208 739 224 220 887 118 256 980 169
Future Volume (veh/h) 169 451 112 208 739 224 220 887 118 256 980 169
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 184 490 21 226 803 217 239 964 14 278 1065 73
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 267 956 424 316 755 204 315 1345 593 369 1389 613
Arrive On Green 0.08 0.27 0.27 0.09 0.28 0.28 0.14 0.50 0.50 0.12 0.39 0.39
Sat Flow, veh/h 3456 3554 1576 3456 2747 742 1781 3554 1567 1781 3554 1568
Grp Volume(v), veh/h 184 490 21 226 519 501 239 964 14 278 1065 73
Grp Sat Flow(s),veh/h/ln 1728 1777 1576 1728 1777 1713 1781 1777 1567 1781 1777 1568
Q Serve(g_s), s 6.2 14.0 1.2 7.6 33.0 33.0 9.7 25.3 0.4 11.1 31.3 3.6
Cycle Q Clear(g_c), s 6.2 14.0 1.2 7.6 33.0 33.0 9.7 25.3 0.4 11.1 31.3 3.6
Prop In Lane 1.00 1.00 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 267 956 424 316 489 471 315 1345 593 369 1389 613
V/C Ratio(X) 0.69 0.51 0.05 0.71 1.06 1.06 0.76 0.72 0.02 0.75 0.77 0.12
Avail Cap(c_a), veh/h 288 956 424 461 489 471 347 1345 593 409 1389 613
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.0 37.2 32.5 53.0 43.5 43.5 23.8 24.8 9.5 22.9 31.8 23.4
Incr Delay (d2), s/veh 6.2 0.5 0.0 3.0 58.4 59.2 8.5 3.3 0.1 7.0 4.1 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 6.0 0.5 3.4 22.1 21.4 4.4 9.7 0.2 5.2 14.0 1.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 60.2 37.7 32.5 56.0 101.9 102.7 32.3 28.1 9.6 29.9 35.9 23.8
LnGrp LOS E D C E F F C C A C D C
Approach Vol, veh/h 695 1246 1217 1416
Approach Delay, s/veh 43.5 93.9 28.7 34.1
Approach LOS D F C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 15.8 51.9 15.0 37.3 17.3 50.4 14.3 38.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 14.0 44.0 15.0 26.0 16.0 42.0 9.0 * 32
Max Q Clear Time (g_c+I1), s 11.7 33.3 9.6 16.0 13.1 27.3 8.2 35.0
Green Ext Time (p_c), s 0.2 3.8 0.4 1.4 0.3 3.6 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 50.4
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Recent PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 18 50 20 32 20 48 14 38
Maximum Split (%) 15.0% 41.7% 16.7% 26.7% 16.7% 40.0% 11.7% 31.7%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 42 60 110 10 42 62 28 110
End Time (s) 60 110 10 42 62 110 42 28
Yield/Force Off (s) 56 104 5 36 58 104 37 22
Yield/Force Off 170(s) 56 84 5 20 58 90 37 5
Local Start Time (s) 52 70 0 20 52 72 38 0
Local Yield (s) 66 114 15 46 68 114 47 32
Local Yield 170(s) 66 94 15 30 68 100 47 15
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 110 (92%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Recent PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent pm.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 184 490 122 226 1046 239 964 128 278 1065 184
v/c Ratio 0.67 0.59 0.26 0.59 1.13 0.86 0.77 0.20 0.87 0.82 0.28
Control Delay 66.2 44.2 8.2 56.4 111.5 57.5 35.3 1.9 51.1 40.1 6.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 66.2 44.2 8.2 56.4 111.5 57.5 35.3 1.9 51.1 40.1 6.3
Queue Length 50th (ft) 72 178 0 86 ~486 133 273 0 138 390 10
Queue Length 95th (ft) 111 240 50 126 #621 #264 342 15 #286 480 58
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 276 825 466 442 925 285 1244 641 329 1297 669
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.67 0.59 0.26 0.51 1.13 0.84 0.77 0.20 0.84 0.82 0.28
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Recent PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 10/29/2020 Synchro 11 Light Report
Delich Associates recent pm adj timing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 169 451 112 208 739 224 220 887 118 256 980 169
Future Volume (veh/h) 169 451 112 208 739 224 220 887 118 256 980 169
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 184 490 27 226 803 217 239 964 14 278 1065 73
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 267 1092 485 313 859 232 263 1280 564 318 1340 591
Arrive On Green 0.08 0.31 0.31 0.09 0.31 0.31 0.11 0.48 0.48 0.10 0.38 0.38
Sat Flow, veh/h 3456 3554 1577 3456 2748 743 1781 3554 1567 1781 3554 1567
Grp Volume(v), veh/h 184 490 27 226 519 501 239 964 14 278 1065 73
Grp Sat Flow(s),veh/h/ln 1728 1777 1577 1728 1777 1714 1781 1777 1567 1781 1777 1567
Q Serve(g_s), s 6.2 13.3 1.4 7.6 34.0 34.1 10.0 26.5 0.4 11.8 32.0 3.7
Cycle Q Clear(g_c), s 6.2 13.3 1.4 7.6 34.0 34.1 10.0 26.5 0.4 11.8 32.0 3.7
Prop In Lane 1.00 1.00 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 267 1092 485 313 555 536 263 1280 564 318 1340 591
V/C Ratio(X) 0.69 0.45 0.06 0.72 0.93 0.93 0.91 0.75 0.02 0.87 0.80 0.12
Avail Cap(c_a), veh/h 288 1092 485 403 563 543 263 1280 564 318 1340 591
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.0 33.4 29.3 53.1 40.1 40.1 28.2 26.9 10.5 25.8 33.3 24.4
Incr Delay (d2), s/veh 6.2 0.3 0.0 4.5 22.9 23.5 32.6 4.1 0.1 22.5 4.9 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 5.7 0.6 3.5 18.1 17.5 6.4 10.5 0.2 6.9 14.5 1.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 60.2 33.7 29.3 57.6 62.9 63.6 60.8 31.0 10.6 48.3 38.2 24.9
LnGrp LOS E C C EEEECBDDC
Approach Vol, veh/h 701 1246 1217 1416
Approach Delay, s/veh 40.5 62.2 36.6 39.5
Approach LOS D E D D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.0 50.2 14.9 41.9 15.0 48.2 14.3 42.5
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 9.0 44.0 13.0 33.0 11.0 42.0 9.0 * 37
Max Q Clear Time (g_c+I1), s 12.0 34.0 9.6 15.3 13.8 28.5 8.2 36.1
Green Ext Time (p_c), s 0.0 3.7 0.2 1.8 0.0 3.5 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 45.1
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Recent PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 10/29/2020 Synchro 11 Light Report
Delich Associates recent pm adj timing.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 13 50 18 39 15 48 14 43
Maximum Split (%) 10.8% 41.7% 15.0% 32.5% 12.5% 40.0% 11.7% 35.8%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 47 60 110 8 47 62 33 110
End Time (s) 60 110 8 47 62 110 47 33
Yield/Force Off (s) 56 104 3 41 58 104 42 27
Yield/Force Off 170(s) 56 84 3 25 58 90 42 10
Local Start Time (s) 57 70 0 18 57 72 43 0
Local Yield (s) 66 114 13 51 68 114 52 37
Local Yield 170(s) 66 94 13 35 68 100 52 20
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 110 (92%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Recent PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 10/29/2020 Synchro 11 Light Report
Delich Associates recent pm adj timing.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 184 490 122 226 1046 239 964 128 278 1065 184
v/c Ratio 0.67 0.49 0.23 0.62 0.99 1.13 0.79 0.20 1.09 0.83 0.28
Control Delay 66.2 37.6 6.8 59.0 64.1 132.2 36.1 1.9 110.5 40.9 6.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 66.2 37.6 6.8 59.0 64.1 132.2 36.1 1.9 110.5 40.9 6.3
Queue Length 50th (ft) 72 167 0 87 411 ~162 273 0 ~175 390 10
Queue Length 95th (ft) 111 221 46 128 #561 #328 342 15 #351 480 58
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 276 992 536 387 1061 211 1225 634 254 1282 663
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.67 0.49 0.23 0.58 0.99 1.13 0.79 0.20 1.09 0.83 0.28
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th TWSC Recent AM
2: Shields Street & Hobbit Street City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent am.syn
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 7 17 1004 4 9 889
Future Vol, veh/h 7 17 1004 4 9 889
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 8 19 1116 4 10 988
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1632 560 0 0 1120 0
Stage 1 1118 -----
Stage 2 514 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 92 472 - - 619 -
Stage 1 274 -----
Stage 2 565 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 91 472 - - 619 -
Mov Cap-2 Maneuver 91 -----
Stage 1 274 -----
Stage 2 556 -----
Approach WB NB SB
HCM Control Delay, s 23.2 0 0.1
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 91 472 619 -
HCM Lane V/C Ratio - - 0.085 0.04 0.016 -
HCM Control Delay (s) - - 48.2 12.9 10.9 -
HCM Lane LOS - - E B B -
HCM 95th %tile Q(veh) - - 0.3 0.1 0 -
HCM 6th TWSC Recent PM
2: Shields Street & Hobbit Street City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent pm.syn
Intersection
Int Delay, s/veh 0.5
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 7 29 1196 13 21 1273
Future Vol, veh/h 7 29 1196 13 21 1273
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 22222
Mvmt Flow 7 30 1233 13 22 1312
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1940 623 0 0 1246 0
Stage 1 1240 -----
Stage 2 700 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 57 429 - - 554 -
Stage 1 236 -----
Stage 2 454 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 55 429 - - 554 -
Mov Cap-2 Maneuver 55 -----
Stage 1 236 -----
Stage 2 436 -----
Approach WB NB SB
HCM Control Delay, s 26.9 0 0.2
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 55 429 554 -
HCM Lane V/C Ratio - - 0.131 0.07 0.039 -
HCM Control Delay (s) - - 80.1 14 11.8 -
HCM Lane LOS - - F B B -
HCM 95th %tile Q(veh) - - 0.4 0.2 0.1 -
Timing Report, Sorted By Phase Recent AM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates recent am.syn
Phase Number 1246
Movement NBL SBT EBL NBTL
Lead/Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Max None Max
Maximum Split (s) 11 79 20 90
Maximum Split (%) 10.0% 71.8% 18.2% 81.8%
Minimum Split (s) 11 23.5 20 22
Yellow Time (s) 3434
All-Red Time (s) 1222
Minimum Initial (s) 4 10 4 10
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 13 24 103 13
End Time (s) 24 103 13 103
Yield/Force Off (s) 20 97 8 97
Yield/Force Off 170(s) 20 87 8 97
Local Start Time (s) 20 31 0 20
Local Yield (s) 27 104 15 104
Local Yield 170(s) 27 94 15 104
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 103 (94%), Referenced to phase 2:SBT, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street
Queues Recent AM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates recent am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 65 102 24 1067 983 24
v/c Ratio 0.39 0.42 0.05 0.37 0.36 0.02
Control Delay 52.8 14.4 2.0 3.0 4.5 0.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.8 14.4 2.0 3.0 4.5 0.8
Queue Length 50th (ft) 44 0 2 75 99 0
Queue Length 95th (ft) 84 48 7 116 300 m3
Internal Link Dist (ft) 281 436 523
Turn Bay Length (ft) 150 130 80
Base Capacity (vph) 257 317 502 2915 2723 1222
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.25 0.32 0.05 0.37 0.36 0.02
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
Timing Report, Sorted By Phase Recent PM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent pm.syn
Phase Number 1246
Movement NBL SBT EBL NBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 11 91 18 102
Maximum Split (%) 9.2% 75.8% 15.0% 85.0%
Minimum Split (s) 11 23.5 18 22
Yellow Time (s) 3434
All-Red Time (s) 1222
Minimum Initial (s) 4 10 4 10
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 58 69 40 58
End Time (s) 69 40 58 40
Yield/Force Off (s) 65 34 53 34
Yield/Force Off 170(s) 65 24 53 34
Local Start Time (s) 18 29 0 18
Local Yield (s) 25 114 13 114
Local Yield 170(s) 25 104 13 114
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 40 (33%), Referenced to phase 2:SBT and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street
Queues Recent PM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 10/28/2020 Synchro 11 Light Report
Delich Associates recent pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 76 81 114 1298 1360 94
v/c Ratio 0.46 0.37 0.33 0.44 0.52 0.08
Control Delay 60.1 15.4 4.2 3.4 1.4 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.1 15.4 4.2 3.4 1.4 0.1
Queue Length 50th (ft) 57 0 11 108 23 0
Queue Length 95th (ft) 102 45 22 148 33 m0
Internal Link Dist (ft) 281 436 523
Turn Bay Length (ft) 150 130 80
Base Capacity (vph) 206 256 351 2944 2631 1192
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.37 0.32 0.32 0.44 0.52 0.08
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall
Any
Approach Leg
Any
Movement
Signalized D1
E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized D3 F4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
Roundabout E3,5 E5,4 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
APPENDIX D
HCM 6th Signalized Intersection Summary Short Bkgrd AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 10/30/2020 Synchro 11 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 240 798 125 120 296 116 79 886 175 181 752 51
Future Volume (veh/h) 240 798 125 120 296 116 79 886 175 181 752 51
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 279 928 36 140 344 88 92 1030 76 210 874 1
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 222222222222
Cap, veh/h 572 1000 444 229 482 121 328 1441 636 313 1577 697
Arrive On Green 0.17 0.28 0.28 0.07 0.17 0.17 0.05 0.41 0.41 0.09 0.44 0.44
Sat Flow, veh/h 3456 3554 1577 3456 2789 702 1781 3554 1569 1781 3554 1570
Grp Volume(v), veh/h 279 928 36 140 217 215 92 1030 76 210 874 1
Grp Sat Flow(s),veh/h/ln 1728 1777 1577 1728 1777 1714 1781 1777 1569 1781 1777 1570
Q Serve(g_s), s 8.1 27.9 1.8 4.3 12.7 13.0 3.2 26.7 1.8 7.1 20.0 0.0
Cycle Q Clear(g_c), s 8.1 27.9 1.8 4.3 12.7 13.0 3.2 26.7 1.8 7.1 20.0 0.0
Prop In Lane 1.00 1.00 1.00 0.41 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 572 1000 444 229 307 296 328 1441 636 313 1577 697
V/C Ratio(X) 0.49 0.93 0.08 0.61 0.71 0.73 0.28 0.71 0.12 0.67 0.55 0.00
Avail Cap(c_a), veh/h 572 1001 444 251 420 405 361 1441 636 327 1577 697
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 41.7 38.4 29.1 50.0 42.9 43.0 18.3 27.4 5.9 20.9 22.6 17.0
Incr Delay (d2), s/veh 0.6 14.2 0.1 3.7 3.3 4.1 0.5 3.1 0.4 5.0 1.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 13.7 0.7 2.0 5.8 5.8 1.3 11.4 1.2 3.3 8.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.3 52.6 29.1 53.7 46.2 47.1 18.7 30.4 6.3 25.9 24.0 17.0
LnGrp LOS DDCDDDBCACCB
Approach Vol, veh/h 1243 572 1198 1085
Approach Delay, s/veh 49.6 48.4 28.0 24.4
Approach LOS DDCC
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.0 53.8 11.3 36.0 13.2 49.6 23.2 24.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 7.0 45.0 7.0 30.0 10.0 42.0 12.0 * 25
Max Q Clear Time (g_c+I1), s 5.2 22.0 6.3 29.9 9.1 28.7 10.1 15.0
Green Ext Time (p_c), s 0.0 3.7 0.0 0.0 0.1 3.9 0.2 1.0
Intersection Summary
HCM 6th Ctrl Delay 36.4
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Bkgrd AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 10/30/2020 Synchro 11 Light Report
Delich Associates sb am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 51 12 36 14 48 17 31
Maximum Split (%) 10.0% 46.4% 10.9% 32.7% 12.7% 43.6% 15.5% 28.2%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 100 41 53 89 103 72 41
End Time (s) 100 41 53 89 103 41 89 72
Yield/Force Off (s) 96 35 48 83 99 35 84 66
Yield/Force Off 170(s) 96 15 48 67 99 21 84 49
Local Start Time (s) 48 59 0 12 48 62 31 0
Local Yield (s) 55 104 7 42 58 104 43 25
Local Yield 170(s) 55 84 7 26 58 90 43 8
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (37%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Short Bkgrd AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 10/30/2020 Synchro 11 Light Report
Delich Associates sb am.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 279 928 145 140 479 92 1030 203 210 874 59
v/c Ratio 0.51 0.96 0.27 0.58 0.73 0.32 0.77 0.30 0.80 0.58 0.08
Control Delay 46.8 60.8 8.3 59.6 44.1 18.1 37.3 10.0 41.9 25.9 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.8 60.8 8.3 59.6 44.1 18.1 37.3 10.0 41.9 25.9 0.2
Queue Length 50th (ft) 93 340 8 50 152 30 318 13 75 248 0
Queue Length 95th (ft) 137 #436 50 79 186 68 420 81 #177 296 0
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 547 964 531 241 805 295 1338 687 262 1498 756
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.51 0.96 0.27 0.58 0.60 0.31 0.77 0.30 0.80 0.58 0.08
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 186 498 128 237 816 247 244 986 134 283 1095 187
Future Volume (veh/h) 186 498 128 237 816 247 244 986 134 283 1095 187
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 202 541 24 258 887 242 265 1072 32 308 1190 92
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 283 941 417 348 754 205 302 1320 582 351 1363 601
Arrive On Green 0.08 0.26 0.26 0.10 0.28 0.28 0.16 0.49 0.49 0.13 0.38 0.38
Sat Flow, veh/h 3456 3554 1576 3456 2742 747 1781 3554 1567 1781 3554 1568
Grp Volume(v), veh/h 202 541 24 258 574 555 265 1072 32 308 1190 92
Grp Sat Flow(s),veh/h/ln 1728 1777 1576 1728 1777 1712 1781 1777 1567 1781 1777 1568
Q Serve(g_s), s 6.8 15.8 1.4 8.7 33.0 33.0 11.1 30.6 0.9 12.4 37.2 4.6
Cycle Q Clear(g_c), s 6.8 15.8 1.4 8.7 33.0 33.0 11.1 30.6 0.9 12.4 37.2 4.6
Prop In Lane 1.00 1.00 1.00 0.44 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 283 941 417 348 489 471 302 1320 582 351 1363 601
V/C Ratio(X) 0.71 0.58 0.06 0.74 1.18 1.18 0.88 0.81 0.05 0.88 0.87 0.15
Avail Cap(c_a), veh/h 288 941 417 461 489 471 314 1320 582 372 1363 601
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 53.7 38.3 32.9 52.5 43.5 43.5 25.7 26.8 10.2 24.9 34.3 24.2
Incr Delay (d2), s/veh 7.9 0.9 0.1 4.4 98.7 100.4 22.9 5.5 0.2 19.7 8.0 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.2 6.9 0.5 4.0 27.6 26.8 6.1 12.1 0.5 7.0 17.3 1.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.6 39.1 33.0 56.9 142.2 143.9 48.6 32.3 10.3 44.6 42.3 24.8
LnGrp LOS E D C E F F D C B D D C
Approach Vol, veh/h 767 1387 1369 1590
Approach Delay, s/veh 44.9 127.0 35.0 41.7
Approach LOS D F C D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 17.2 51.0 16.1 36.8 18.6 49.6 14.8 38.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 14.0 44.0 15.0 26.0 16.0 42.0 9.0 * 32
Max Q Clear Time (g_c+I1), s 13.1 39.2 10.7 17.8 14.4 32.6 8.8 35.0
Green Ext Time (p_c), s 0.1 2.5 0.4 1.4 0.2 3.3 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 63.5
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Bkgrd PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 18 50 20 32 20 48 14 38
Maximum Split (%) 15.0% 41.7% 16.7% 26.7% 16.7% 40.0% 11.7% 31.7%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 42 60 110 10 42 62 28 110
End Time (s) 60 110 10 42 62 110 42 28
Yield/Force Off (s) 56 104 5 36 58 104 37 22
Yield/Force Off 170(s) 56 84 5 20 58 90 37 5
Local Start Time (s) 52 70 0 20 52 72 38 0
Local Yield (s) 66 114 15 46 68 114 47 32
Local Yield 170(s) 66 94 15 30 68 100 47 15
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 110 (92%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Short Bkgrd PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 202 541 139 258 1155 265 1072 146 308 1190 203
v/c Ratio 0.73 0.67 0.29 0.64 1.25 0.96 0.88 0.23 1.01 0.93 0.31
Control Delay 69.8 46.6 8.0 57.6 157.4 77.8 41.1 3.0 88.0 49.3 7.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 69.8 46.6 8.0 57.6 157.4 77.8 41.1 3.0 88.0 49.3 7.7
Queue Length 50th (ft) 79 203 0 98 ~580 161 372 0 ~193 460 19
Queue Length 95th (ft) #131 267 52 142 #718 #328 #444 27 #380 #602 72
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 276 809 472 442 925 276 1225 634 305 1282 663
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.73 0.67 0.29 0.58 1.25 0.96 0.88 0.23 1.01 0.93 0.31
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm adj timing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 186 498 128 237 816 247 244 986 134 283 1095 187
Future Volume (veh/h) 186 498 128 237 816 247 244 986 134 283 1095 187
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 202 541 34 258 887 243 265 1072 32 308 1190 89
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 283 1148 510 348 914 250 368 2097 929 446 2097 929
Arrive On Green 0.08 0.32 0.32 0.10 0.33 0.33 0.11 0.78 0.78 0.08 0.59 0.59
Sat Flow, veh/h 3456 3554 1578 3456 2741 750 1781 3554 1574 1781 3554 1574
Grp Volume(v), veh/h 202 541 34 258 575 555 265 1072 32 308 1190 89
Grp Sat Flow(s),veh/h/ln 1728 1777 1578 1728 1777 1714 1781 1777 1574 1781 1777 1574
Q Serve(g_s), s 6.8 14.6 1.8 8.7 38.2 38.4 7.0 13.0 0.6 8.2 24.8 2.9
Cycle Q Clear(g_c), s 6.8 14.6 1.8 8.7 38.2 38.4 7.0 13.0 0.6 8.2 24.8 2.9
Prop In Lane 1.00 1.00 1.00 0.44 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 283 1148 510 348 592 571 368 2097 929 446 2097 929
V/C Ratio(X) 0.71 0.47 0.07 0.74 0.97 0.97 0.72 0.51 0.03 0.69 0.57 0.10
Avail Cap(c_a), veh/h 288 1148 510 461 592 571 368 2097 929 446 2097 929
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 53.7 32.4 28.1 52.5 39.4 39.5 14.3 6.7 6.9 10.1 15.2 10.7
Incr Delay (d2), s/veh 7.9 0.3 0.1 4.4 29.5 30.6 6.7 0.9 0.1 4.5 1.1 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.2 6.2 0.7 4.0 21.1 20.5 3.2 3.7 0.2 3.5 10.0 1.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.6 32.7 28.2 56.9 68.9 70.1 21.0 7.6 7.0 14.6 16.3 10.9
LnGrp LOS E C C E E E C AABBB
Approach Vol, veh/h 777 1388 1369 1587
Approach Delay, s/veh 40.0 67.1 10.2 15.6
Approach LOS D E B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.0 76.7 16.1 43.8 13.0 76.7 14.8 45.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 9.0 42.0 15.0 33.0 9.0 42.0 9.0 * 39
Max Q Clear Time (g_c+I1), s 9.0 26.8 10.7 16.6 10.2 15.0 8.8 40.4
Green Ext Time (p_c), s 0.0 5.2 0.4 2.0 0.0 4.9 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 31.8
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Bkgrd PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm adj timing.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 13 48 20 39 13 48 14 45
Maximum Split (%) 10.8% 40.0% 16.7% 32.5% 10.8% 40.0% 11.7% 37.5%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 49 62 110 10 49 62 35 110
End Time (s) 62 110 10 49 62 110 49 35
Yield/Force Off (s) 58 104 5 43 58 104 44 29
Yield/Force Off 170(s) 58 84 5 27 58 90 44 12
Local Start Time (s) 59 72 0 20 59 72 45 0
Local Yield (s) 68 114 15 53 68 114 54 39
Local Yield 170(s) 68 94 15 37 68 100 54 22
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 110 (92%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Short Bkgrd PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm adj timing.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 202 541 139 258 1155 265 1072 146 308 1190 203
v/c Ratio 0.73 0.54 0.25 0.64 1.04 1.29 0.88 0.23 1.50 0.97 0.32
Control Delay 69.8 38.1 6.5 57.6 74.9 192.1 41.1 3.0 275.5 58.0 8.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 69.8 38.1 6.5 57.6 74.9 192.1 41.1 3.0 275.5 58.0 8.1
Queue Length 50th (ft) 79 186 0 98 ~496 ~217 372 0 ~282 473 20
Queue Length 95th (ft) #131 246 48 142 #634 #392 #444 27 #464 #626 74
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 276 1008 555 442 1115 205 1225 634 205 1225 641
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.73 0.54 0.25 0.58 1.04 1.29 0.88 0.23 1.50 0.97 0.32
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th TWSC Short Bkgrd AM
2: Shields Street & Hobbit Street City Timing
Landmark Apartments Expansion 10/30/2020 Synchro 11 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 13 37 1103 6 14 980
Future Vol, veh/h 13 37 1103 6 14 980
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 14 41 1226 7 16 1089
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1807 617 0 0 1233 0
Stage 1 1230 -----
Stage 2 577 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 70 433 - - 561 -
Stage 1 239 -----
Stage 2 525 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 68 433 - - 561 -
Mov Cap-2 Maneuver 68 -----
Stage 1 239 -----
Stage 2 510 -----
Approach WB NB SB
HCM Control Delay, s 29.2 0 0.2
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 68 433 561 -
HCM Lane V/C Ratio - - 0.212 0.095 0.028 -
HCM Control Delay (s) - - 71.7 14.2 11.6 -
HCM Lane LOS - - F B B -
HCM 95th %tile Q(veh) - - 0.7 0.3 0.1 -
HCM 6th TWSC Short Bkgrd PM
2: Shields Street & Hobbit Street City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 1.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 13 37 1315 25 56 1398
Future Vol, veh/h 13 37 1315 25 56 1398
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 22222
Mvmt Flow 13 38 1356 26 58 1441
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2206 691 0 0 1382 0
Stage 1 1369 -----
Stage 2 837 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 38 387 - - 492 -
Stage 1 201 -----
Stage 2 385 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 34 387 - - 492 -
Mov Cap-2 Maneuver 34 -----
Stage 1 201 -----
Stage 2 340 -----
Approach WB NB SB
HCM Control Delay, s 55 0 0.5
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 34 387 492 -
HCM Lane V/C Ratio - - 0.394 0.099 0.117 -
HCM Control Delay (s) - - 167.9 15.3 13.3 -
HCM Lane LOS - - F C B -
HCM 95th %tile Q(veh) - - 1.3 0.3 0.4 -
Timing Report, Sorted By Phase Short Bkgrd AM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 10/30/2020 Synchro 11 Light Report
Delich Associates sb am.syn
Phase Number 1246
Movement NBL SBT EBL NBTL
Lead/Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Max None Max
Maximum Split (s) 11 79 20 90
Maximum Split (%) 10.0% 71.8% 18.2% 81.8%
Minimum Split (s) 11 23.5 20 22
Yellow Time (s) 3434
All-Red Time (s) 1222
Minimum Initial (s) 4 10 4 10
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 13 24 103 13
End Time (s) 24 103 13 103
Yield/Force Off (s) 20 97 8 97
Yield/Force Off 170(s) 20 87 8 97
Local Start Time (s) 20 31 0 20
Local Yield (s) 27 104 15 104
Local Yield 170(s) 27 94 15 104
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 103 (94%), Referenced to phase 2:SBT, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street
Queues Short Bkgrd AM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 10/30/2020 Synchro 11 Light Report
Delich Associates sb am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 65 102 24 1181 1092 24
v/c Ratio 0.39 0.42 0.05 0.41 0.40 0.02
Control Delay 52.8 14.4 2.0 3.2 4.3 0.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.8 14.4 2.0 3.2 4.3 0.7
Queue Length 50th (ft) 44 0 2 86 113 0
Queue Length 95th (ft) 84 48 7 133 339 m2
Internal Link Dist (ft) 281 436 523
Turn Bay Length (ft) 150 130 80
Base Capacity (vph) 257 317 457 2915 2723 1222
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.25 0.32 0.05 0.41 0.40 0.02
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
Timing Report, Sorted By Phase Short Bkgrd PM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm.syn
Phase Number 1246
Movement NBL SBT EBL NBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 11 91 18 102
Maximum Split (%) 9.2% 75.8% 15.0% 85.0%
Minimum Split (s) 11 23.5 18 22
Yellow Time (s) 3434
All-Red Time (s) 1222
Minimum Initial (s) 4 10 4 10
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 58 69 40 58
End Time (s) 69 40 58 40
Yield/Force Off (s) 65 34 53 34
Yield/Force Off 170(s) 65 24 53 34
Local Start Time (s) 18 29 0 18
Local Yield (s) 25 114 13 114
Local Yield 170(s) 25 104 13 114
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 40 (33%), Referenced to phase 2:SBT and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street
Queues Short Bkgrd PM
4: Shields Street & Stuart Street City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates sb pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 76 81 114 1447 1509 94
v/c Ratio 0.46 0.37 0.38 0.49 0.57 0.08
Control Delay 60.1 15.4 5.3 3.7 1.5 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.1 15.4 5.3 3.7 1.5 0.1
Queue Length 50th (ft) 57 0 11 130 27 0
Queue Length 95th (ft) 102 45 22 176 m38 m0
Internal Link Dist (ft) 281 436 523
Turn Bay Length (ft) 150 130 80
Base Capacity (vph) 206 256 307 2944 2631 1190
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.37 0.32 0.37 0.49 0.57 0.08
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX E
HCM 6th Signalized Intersection Summary Long Bkgrd AM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 270 900 140 135 335 130 90 1010 200 205 850 60
Future Volume (veh/h) 270 900 140 135 335 130 90 1010 200 205 850 60
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 284 947 48 142 353 95 95 1063 90 216 895 1
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 597 1048 465 220 487 129 314 1386 612 348 1531 676
Arrive On Green 0.17 0.29 0.29 0.06 0.18 0.18 0.11 0.78 0.78 0.10 0.43 0.43
Sat Flow, veh/h 3456 3554 1577 3456 2755 729 1781 3554 1568 1781 3554 1570
Grp Volume(v), veh/h 284 947 48 142 226 222 95 1063 90 216 895 1
Grp Sat Flow(s),veh/h/ln 1728 1777 1577 1728 1777 1708 1781 1777 1568 1781 1777 1570
Q Serve(g_s), s 8.1 28.2 2.4 4.4 13.2 13.6 3.4 18.0 0.8 7.5 21.1 0.0
Cycle Q Clear(g_c), s 8.1 28.2 2.4 4.4 13.2 13.6 3.4 18.0 0.8 7.5 21.1 0.0
Prop In Lane 1.00 1.00 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 597 1048 465 220 314 302 314 1386 612 348 1531 676
V/C Ratio(X) 0.48 0.90 0.10 0.65 0.72 0.74 0.30 0.77 0.15 0.62 0.58 0.00
Avail Cap(c_a), veh/h 597 1098 487 220 420 404 360 1386 612 386 1531 676
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 41.0 37.3 28.2 50.3 42.7 42.9 18.1 9.4 2.2 18.6 23.8 17.8
Incr Delay (d2), s/veh 0.6 10.2 0.1 6.4 3.9 4.8 0.5 4.1 0.5 2.6 1.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 13.2 0.9 2.1 6.0 6.0 1.3 4.1 0.6 3.2 9.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.6 47.5 28.3 56.7 46.6 47.6 18.7 13.5 2.7 21.2 25.4 17.8
LnGrp LOS D D C E D D B B A C C B
Approach Vol, veh/h 1279 590 1248 1112
Approach Delay, s/veh 45.5 49.4 13.1 24.6
Approach LOS D D B C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.2 52.4 11.0 37.4 13.7 47.9 24.0 24.4
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 8.0 42.0 6.0 33.0 12.0 38.0 14.0 * 25
Max Q Clear Time (g_c+I1), s 5.4 23.1 6.4 30.2 9.5 20.0 10.1 15.6
Green Ext Time (p_c), s 0.0 3.7 0.0 1.2 0.2 4.6 0.4 1.1
Intersection Summary
HCM 6th Ctrl Delay 31.0
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Bkgrd AM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 12 48 11 39 16 44 19 31
Maximum Split (%) 10.9% 43.6% 10.0% 35.5% 14.5% 40.0% 17.3% 28.2%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 50 62 0 11 50 66 31 0
End Time (s) 62 0 11 50 66 0 50 31
Yield/Force Off (s) 58 104 6 44 62 104 45 25
Yield/Force Off 170(s) 58 84 6 28 62 90 45 8
Local Start Time (s) 50 62 0 11 50 66 31 0
Local Yield (s) 58 104 6 44 62 104 45 25
Local Yield 170(s) 58 84 6 28 62 90 45 8
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Long Bkgrd AM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb am.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 284 947 147 142 490 95 1063 211 216 895 63
v/c Ratio 0.49 0.91 0.26 0.67 0.74 0.35 0.85 0.32 0.82 0.65 0.09
Control Delay 45.0 50.6 7.3 66.7 44.3 15.0 38.9 7.0 48.7 29.9 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 45.0 50.6 7.3 66.7 44.3 15.0 38.9 7.0 48.7 29.9 0.2
Queue Length 50th (ft) 93 334 6 51 155 35 371 30 98 270 0
Queue Length 95th (ft) 144 #453 53 #93 203 52 #472 71 #222 342 0
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 581 1057 572 211 805 279 1244 651 270 1369 706
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.49 0.90 0.26 0.67 0.61 0.34 0.85 0.32 0.80 0.65 0.09
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Long Bkgrd PM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 210 560 145 270 920 280 275 1115 155 320 1240 210
Future Volume (veh/h) 210 560 145 270 920 280 275 1115 155 320 1240 210
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 221 589 40 284 968 270 289 1174 47 337 1305 108
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 259 1179 524 380 979 272 342 2162 958 440 2221 984
Arrive On Green 0.08 0.33 0.33 0.11 0.36 0.36 0.10 0.81 0.81 0.09 0.63 0.63
Sat Flow, veh/h 3456 3554 1578 3456 2731 759 1781 3554 1574 1781 3554 1574
Grp Volume(v), veh/h 221 589 40 284 628 610 289 1174 47 337 1305 108
Grp Sat Flow(s),veh/h/ln 1728 1777 1578 1728 1777 1712 1781 1777 1574 1781 1777 1574
Q Serve(g_s), s 7.6 15.9 2.1 9.6 42.1 42.6 7.7 13.5 0.9 8.2 26.1 3.3
Cycle Q Clear(g_c), s 7.6 15.9 2.1 9.6 42.1 42.6 7.7 13.5 0.9 8.2 26.1 3.3
Prop In Lane 1.00 1.00 1.00 0.44 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 259 1179 524 380 637 614 342 2162 958 440 2221 984
V/C Ratio(X) 0.85 0.50 0.08 0.75 0.99 0.99 0.85 0.54 0.05 0.77 0.59 0.11
Avail Cap(c_a), veh/h 259 1179 524 576 637 614 342 2162 958 440 2221 984
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.8 32.1 27.5 51.8 38.2 38.4 16.7 5.8 7.4 10.9 13.3 9.1
Incr Delay (d2), s/veh 23.0 0.3 0.1 3.0 32.3 34.5 17.5 1.0 0.1 7.9 1.1 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.1 6.7 0.8 4.3 23.5 23.2 5.9 3.6 0.3 3.8 10.3 1.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 77.8 32.4 27.5 54.8 70.5 72.9 34.2 6.8 7.5 18.8 14.5 9.3
LnGrp LOS E C C D E E C AABBA
Approach Vol, veh/h 850 1522 1510 1750
Approach Delay, s/veh 44.0 68.5 12.0 15.0
Approach LOS D E B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 12.0 81.0 17.2 44.8 14.0 79.0 14.0 48.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 8.0 41.0 19.0 31.0 10.0 39.0 8.0 * 42
Max Q Clear Time (g_c+I1), s 9.7 28.1 11.6 17.9 10.2 15.5 9.6 44.6
Green Ext Time (p_c), s 0.0 5.4 0.6 2.0 0.0 5.4 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 33.0
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Bkgrd PM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 12 47 24 37 14 45 13 48
Maximum Split (%) 10.0% 39.2% 20.0% 30.8% 11.7% 37.5% 10.8% 40.0%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 61 73 0 24 61 75 48 0
End Time (s) 73 0 24 61 75 0 61 48
Yield/Force Off (s) 69 114 19 55 71 114 56 42
Yield/Force Off 170(s) 69 94 19 39 71 100 56 25
Local Start Time (s) 61 73 0 24 61 75 48 0
Local Yield (s) 69 114 19 55 71 114 56 42
Local Yield 170(s) 69 94 19 39 71 100 56 25
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Long Bkgrd PM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb pm.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 221 589 153 284 1263 289 1174 163 337 1305 221
v/c Ratio 0.89 0.58 0.27 0.63 1.05 1.51 1.03 0.27 1.54 1.09 0.35
Control Delay 90.1 39.1 6.6 55.0 78.2 276.5 71.1 6.1 289.6 91.6 9.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 90.1 39.1 6.6 55.0 78.2 276.5 71.1 6.1 289.6 91.6 9.9
Queue Length 50th (ft) 89 204 0 108 ~553 ~262 ~514 14 ~317 ~599 30
Queue Length 95th (ft) #162 276 51 149 #693 #441 #654 56 #506 #736 91
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 248 1016 568 553 1198 191 1140 601 219 1197 630
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.89 0.58 0.27 0.51 1.05 1.51 1.03 0.27 1.54 1.09 0.35
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th TWSC Long Bkgrd AM
2: Shields Street & Hobbit Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb am.syn
Intersection
Int Delay, s/veh 0.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 15 35 1265 5 15 1105
Future Vol, veh/h 15 35 1265 5 15 1105
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 16 37 1332 5 16 1163
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1949 669 0 0 1337 0
Stage 1 1335 -----
Stage 2 614 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 56 400 - - 512 -
Stage 1 210 -----
Stage 2 502 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 54 400 - - 512 -
Mov Cap-2 Maneuver 54 -----
Stage 1 210 -----
Stage 2 486 -----
Approach WB NB SB
HCM Control Delay, s 39.6 0 0.2
HCM LOS E
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 54 400 512 -
HCM Lane V/C Ratio - - 0.292 0.092 0.031 -
HCM Control Delay (s) - - 97.2 14.9 12.3 -
HCM Lane LOS - - F B B -
HCM 95th %tile Q(veh) - - 1 0.3 0.1 -
HCM 6th TWSC Long Bkgrd PM
2: Shields Street & Hobbit Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb pm.syn
Intersection
Int Delay, s/veh 1.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 10 50 1495 30 55 1590
Future Vol, veh/h 10 50 1495 30 55 1590
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 11 53 1574 32 58 1674
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2543 803 0 0 1606 0
Stage 1 1590 -----
Stage 2 953 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 22 326 - - 403 -
Stage 1 153 -----
Stage 2 335 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 19 326 - - 403 -
Mov Cap-2 Maneuver 19 -----
Stage 1 153 -----
Stage 2 287 -----
Approach WB NB SB
HCM Control Delay, s 70.8 0 0.5
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 19 326 403 -
HCM Lane V/C Ratio - - 0.554 0.161 0.144 -
HCM Control Delay (s) - -$ 333.5 18.2 15.4 -
HCM Lane LOS - - F C C -
HCM 95th %tile Q(veh) - - 1.5 0.6 0.5 -
Timing Report, Sorted By Phase Long Bkgrd AM
4: Shields Street & Stuart Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb am.syn
Phase Number 1246
Movement NBL SBT EBL NBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 11 77 22 88
Maximum Split (%) 10.0% 70.0% 20.0% 80.0%
Minimum Split (s) 11 23.5 18 22
Yellow Time (s) 3434
All-Red Time (s) 1222
Minimum Initial (s) 4 10 4 10
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 22 33 0 22
End Time (s) 33 0 22 0
Yield/Force Off (s) 29 104 17 104
Yield/Force Off 170(s) 29 94 17 104
Local Start Time (s) 22 33 0 22
Local Yield (s) 29 104 17 104
Local Yield 170(s) 29 94 17 104
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street
Queues Long Bkgrd AM
4: Shields Street & Stuart Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 63 95 21 1274 1153 26
v/c Ratio 0.38 0.41 0.05 0.44 0.41 0.02
Control Delay 52.7 14.5 1.9 3.3 6.8 4.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.7 14.5 1.9 3.3 6.8 4.8
Queue Length 50th (ft) 43 0 2 96 97 1
Queue Length 95th (ft) 84 48 6 151 264 m7
Internal Link Dist (ft) 281 436 523
Turn Bay Length (ft) 150 150 130 80
Base Capacity (vph) 289 338 436 2918 2790 1251
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.22 0.28 0.05 0.44 0.41 0.02
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
Timing Report, Sorted By Phase Long Bkgrd PM
4: Shields Street & Stuart Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb pm.syn
Phase Number 1246
Movement NBL SBT EBL NBTL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None C-Max
Maximum Split (s) 14 86 20 100
Maximum Split (%) 11.7% 71.7% 16.7% 83.3%
Minimum Split (s) 11 23.5 18 22
Yellow Time (s) 3434
All-Red Time (s) 1222
Minimum Initial (s) 4 10 4 10
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 20 34 0 20
End Time (s) 34 0 20 0
Yield/Force Off (s) 30 114 15 114
Yield/Force Off 170(s) 30 104 15 114
Local Start Time (s) 20 34 0 20
Local Yield (s) 30 114 15 114
Local Yield 170(s) 30 104 15 114
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street
Queues Long Bkgrd PM
4: Shields Street & Stuart Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lb pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 74 74 105 1532 1595 89
v/c Ratio 0.44 0.34 0.38 0.52 0.61 0.08
Control Delay 58.8 15.3 5.6 4.0 19.1 8.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 58.8 15.3 5.6 4.0 19.1 8.0
Queue Length 50th (ft) 55 0 10 142 412 19
Queue Length 95th (ft) 102 45 22 217 m406 m22
Internal Link Dist (ft) 281 436 523
Turn Bay Length (ft) 150 150 130 80
Base Capacity (vph) 236 275 322 2938 2622 1183
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.31 0.27 0.33 0.52 0.61 0.08
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX F
HCM 6th Signalized Intersection Summary Short Total AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 240 798 128 130 296 116 88 911 200 181 763 51
Future Volume (veh/h) 240 798 128 130 296 116 88 911 200 181 763 51
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 279 928 37 151 344 88 102 1059 106 210 887 1
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 222222222222
Cap, veh/h 583 1000 444 240 482 121 325 1428 630 302 1551 685
Arrive On Green 0.17 0.28 0.28 0.07 0.17 0.17 0.06 0.40 0.40 0.09 0.44 0.44
Sat Flow, veh/h 3456 3554 1577 3456 2789 702 1781 3554 1568 1781 3554 1570
Grp Volume(v), veh/h 279 928 37 151 217 215 102 1059 106 210 887 1
Grp Sat Flow(s),veh/h/ln 1728 1777 1577 1728 1777 1714 1781 1777 1568 1781 1777 1570
Q Serve(g_s), s 8.0 27.9 1.9 4.7 12.7 13.0 3.6 27.9 2.6 7.2 20.6 0.0
Cycle Q Clear(g_c), s 8.0 27.9 1.9 4.7 12.7 13.0 3.6 27.9 2.6 7.2 20.6 0.0
Prop In Lane 1.00 1.00 1.00 0.41 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 583 1000 444 240 307 296 325 1428 630 302 1551 685
V/C Ratio(X) 0.48 0.93 0.08 0.63 0.71 0.73 0.31 0.74 0.17 0.70 0.57 0.00
Avail Cap(c_a), veh/h 583 1001 444 251 420 405 351 1428 630 315 1551 685
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 41.3 38.4 29.1 49.8 42.9 43.0 18.6 28.0 6.1 21.7 23.3 17.5
Incr Delay (d2), s/veh 0.6 14.2 0.1 4.7 3.3 4.1 0.5 3.5 0.6 6.2 1.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 13.7 0.7 2.2 5.8 5.8 1.5 12.0 1.8 3.4 8.8 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.9 52.6 29.2 54.5 46.2 47.1 19.1 31.5 6.6 28.0 24.8 17.5
LnGrp LOS DDCDDDBCACCB
Approach Vol, veh/h 1244 583 1267 1098
Approach Delay, s/veh 49.5 48.7 28.5 25.4
Approach LOS DDCC
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.4 53.0 11.6 36.0 13.2 49.2 23.6 24.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 7.0 45.0 7.0 30.0 10.0 42.0 12.0 * 25
Max Q Clear Time (g_c+I1), s 5.6 22.6 6.7 29.9 9.2 29.9 10.0 15.0
Green Ext Time (p_c), s 0.0 3.8 0.0 0.0 0.1 4.0 0.2 1.0
Intersection Summary
HCM 6th Ctrl Delay 36.7
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 51 12 36 14 48 17 31
Maximum Split (%) 10.0% 46.4% 10.9% 32.7% 12.7% 43.6% 15.5% 28.2%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 100 41 53 89 103 72 41
End Time (s) 100 41 53 89 103 41 89 72
Yield/Force Off (s) 96 35 48 83 99 35 84 66
Yield/Force Off 170(s) 96 15 48 67 99 21 84 49
Local Start Time (s) 48 59 0 12 48 62 31 0
Local Yield (s) 55 104 7 42 58 104 43 25
Local Yield 170(s) 55 84 7 26 58 90 43 8
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (37%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Short Total AM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 279 928 149 151 479 102 1059 233 210 887 59
v/c Ratio 0.51 0.96 0.28 0.63 0.73 0.37 0.79 0.34 0.83 0.62 0.08
Control Delay 46.8 60.8 8.3 61.6 44.1 21.3 41.1 14.8 47.5 27.4 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.8 60.8 8.3 61.6 44.1 21.3 41.1 14.8 47.5 27.4 0.2
Queue Length 50th (ft) 93 340 8 54 152 36 340 32 83 254 0
Queue Length 95th (ft) 137 #436 50 85 186 86 465 133 #190 301 0
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 547 964 533 241 805 281 1337 687 253 1434 732
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.51 0.96 0.28 0.63 0.60 0.36 0.79 0.34 0.83 0.62 0.08
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Short Total PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 186 498 139 287 816 247 252 1008 156 283 1125 187
Future Volume (veh/h) 186 498 139 287 816 247 252 1008 156 283 1125 187
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 202 541 25 312 887 242 274 1096 56 308 1223 92
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 283 889 394 398 754 205 310 1418 626 360 1447 639
Arrive On Green 0.08 0.25 0.25 0.12 0.28 0.28 0.16 0.53 0.53 0.13 0.41 0.41
Sat Flow, veh/h 3456 3554 1576 3456 2742 747 1781 3554 1568 1781 3554 1569
Grp Volume(v), veh/h 202 541 25 312 574 555 274 1096 56 308 1223 92
Grp Sat Flow(s),veh/h/ln 1728 1777 1576 1728 1777 1712 1781 1777 1568 1781 1777 1569
Q Serve(g_s), s 6.8 16.2 1.5 10.5 33.0 33.0 11.1 29.4 1.6 11.9 37.3 4.4
Cycle Q Clear(g_c), s 6.8 16.2 1.5 10.5 33.0 33.0 11.1 29.4 1.6 11.9 37.3 4.4
Prop In Lane 1.00 1.00 1.00 0.44 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 283 889 394 398 489 471 310 1418 626 360 1447 639
V/C Ratio(X) 0.71 0.61 0.06 0.78 1.18 1.18 0.88 0.77 0.09 0.86 0.84 0.14
Avail Cap(c_a), veh/h 288 889 394 461 489 471 323 1418 626 387 1447 639
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 53.7 39.8 34.3 51.6 43.5 43.5 25.2 23.8 9.8 23.7 32.1 22.4
Incr Delay (d2), s/veh 7.9 1.2 0.1 7.5 98.7 100.4 23.1 4.1 0.3 16.2 6.2 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.2 7.1 0.6 4.9 27.6 26.8 6.1 11.2 0.8 6.4 17.0 1.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.6 41.0 34.4 59.1 142.2 143.9 48.3 28.0 10.1 39.8 38.4 22.9
LnGrp LOS E D C E F F D C B D D C
Approach Vol, veh/h 768 1441 1426 1623
Approach Delay, s/veh 46.2 124.9 31.2 37.8
Approach LOS D F C D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 17.2 53.9 17.8 35.0 18.1 52.9 14.8 38.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 14.0 44.0 15.0 26.0 16.0 42.0 9.0 * 32
Max Q Clear Time (g_c+I1), s 13.1 39.3 12.5 18.2 13.9 31.4 8.8 35.0
Green Ext Time (p_c), s 0.1 2.5 0.3 1.4 0.2 3.7 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 61.1
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 18 50 20 32 20 48 14 38
Maximum Split (%) 15.0% 41.7% 16.7% 26.7% 16.7% 40.0% 11.7% 31.7%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 42 60 110 10 42 62 28 110
End Time (s) 60 110 10 42 62 110 42 28
Yield/Force Off (s) 56 104 5 36 58 104 37 22
Yield/Force Off 170(s) 56 84 5 20 58 90 37 5
Local Start Time (s) 52 70 0 20 52 72 38 0
Local Yield (s) 66 114 15 46 68 114 47 32
Local Yield 170(s) 66 94 15 30 68 100 47 15
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 110 (92%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Short Total PM
47: Shields Street & Prospect Road City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 202 541 151 312 1155 274 1096 170 308 1223 203
v/c Ratio 0.73 0.69 0.32 0.74 1.25 0.99 0.89 0.27 1.01 0.95 0.31
Control Delay 69.8 47.7 7.9 61.3 157.4 86.0 48.6 10.7 88.0 53.2 7.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 69.8 47.7 7.9 61.3 157.4 86.0 48.6 10.7 88.0 53.2 7.7
Queue Length 50th (ft) 79 204 0 120 ~580 182 347 4 ~193 480 19
Queue Length 95th (ft) #131 267 54 170 #718 #346 #466 70 #380 #630 72
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 276 787 473 442 925 276 1225 634 305 1282 663
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.73 0.69 0.32 0.71 1.25 0.99 0.89 0.27 1.01 0.95 0.31
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Short Total PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm adj timing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 186 498 139 267 816 247 252 1008 156 283 1125 187
Future Volume (veh/h) 186 498 139 267 816 247 252 1008 156 283 1125 187
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 202 541 35 290 887 243 274 1096 56 308 1223 89
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 283 1117 496 378 914 250 360 2097 929 433 2097 929
Arrive On Green 0.08 0.31 0.31 0.11 0.33 0.33 0.11 0.78 0.78 0.08 0.59 0.59
Sat Flow, veh/h 3456 3554 1577 3456 2741 750 1781 3554 1574 1781 3554 1574
Grp Volume(v), veh/h 202 541 35 290 575 555 274 1096 56 308 1223 89
Grp Sat Flow(s),veh/h/ln 1728 1777 1577 1728 1777 1714 1781 1777 1574 1781 1777 1574
Q Serve(g_s), s 6.8 14.8 1.9 9.8 38.2 38.4 7.4 13.5 1.1 8.2 25.8 2.9
Cycle Q Clear(g_c), s 6.8 14.8 1.9 9.8 38.2 38.4 7.4 13.5 1.1 8.2 25.8 2.9
Prop In Lane 1.00 1.00 1.00 0.44 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 283 1117 496 378 592 571 360 2097 929 433 2097 929
V/C Ratio(X) 0.71 0.48 0.07 0.77 0.97 0.97 0.76 0.52 0.06 0.71 0.58 0.10
Avail Cap(c_a), veh/h 288 1117 496 461 592 571 360 2097 929 433 2097 929
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 53.7 33.3 28.9 52.0 39.4 39.5 15.7 6.7 7.0 10.5 15.4 10.7
Incr Delay (d2), s/veh 7.9 0.3 0.1 6.2 29.5 30.6 9.2 0.9 0.1 5.4 1.2 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.2 6.3 0.7 4.5 21.1 20.5 4.1 3.8 0.3 3.6 10.4 1.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.6 33.6 28.9 58.2 68.9 70.1 25.0 7.7 7.1 15.8 16.6 10.9
LnGrp LOS E C C E E E C AABBB
Approach Vol, veh/h 778 1420 1426 1620
Approach Delay, s/veh 40.7 67.2 11.0 16.1
Approach LOS D E B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.0 76.7 17.1 42.7 13.0 76.7 14.8 45.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 9.0 42.0 15.0 33.0 9.0 42.0 9.0 * 39
Max Q Clear Time (g_c+I1), s 9.4 27.8 11.8 16.8 10.2 15.5 8.8 40.4
Green Ext Time (p_c), s 0.0 5.2 0.3 2.0 0.0 5.1 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 32.2
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm adj timing.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 13 48 20 39 13 48 14 45
Maximum Split (%) 10.8% 40.0% 16.7% 32.5% 10.8% 40.0% 11.7% 37.5%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 49 62 110 10 49 62 35 110
End Time (s) 62 110 10 49 62 110 49 35
Yield/Force Off (s) 58 104 5 43 58 104 44 29
Yield/Force Off 170(s) 58 84 5 27 58 90 44 12
Local Start Time (s) 59 72 0 20 59 72 45 0
Local Yield (s) 68 114 15 53 68 114 54 39
Local Yield 170(s) 68 94 15 37 68 100 54 22
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 110 (92%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Short Total PM
47: Shields Street & Prospect Road Adjusted City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm adj timing.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 202 541 151 290 1155 274 1096 170 308 1223 203
v/c Ratio 0.73 0.54 0.27 0.70 1.04 1.34 0.89 0.27 1.50 1.00 0.32
Control Delay 69.8 38.5 6.4 59.6 74.9 210.2 48.6 10.7 275.5 64.1 8.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 69.8 38.5 6.4 59.6 74.9 210.2 48.6 10.7 275.5 64.1 8.1
Queue Length 50th (ft) 79 187 0 111 ~496 ~232 347 4 ~282 494 20
Queue Length 95th (ft) #131 246 50 159 #634 #410 #466 70 #464 #654 74
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 276 995 558 442 1115 205 1225 634 205 1225 641
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.73 0.54 0.27 0.66 1.04 1.34 0.89 0.27 1.50 1.00 0.32
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th TWSC Short Total AM
2: Shields Street & Hobbit Street City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 1.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 25 65 1134 10 24 994
Future Vol, veh/h 25 65 1134 10 24 994
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 28 72 1260 11 27 1104
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1872 636 0 0 1271 0
Stage 1 1266 -----
Stage 2 606 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 64 421 - - 542 -
Stage 1 229 -----
Stage 2 507 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 61 421 - - 542 -
Mov Cap-2 Maneuver 61 -----
Stage 1 229 -----
Stage 2 482 -----
Approach WB NB SB
HCM Control Delay, s 40.5 0 0.3
HCM LOS E
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 61 421 542 -
HCM Lane V/C Ratio - - 0.455 0.172 0.049 -
HCM Control Delay (s) - - 106.1 15.3 12 -
HCM Lane LOS - - F C B -
HCM 95th %tile Q(veh) - - 1.8 0.6 0.2 -
HCM 6th TWSC Short Total PM
2: Shields Street & Hobbit Street City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 3.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 21 68 1348 37 86 1439
Future Vol, veh/h 21 68 1348 37 86 1439
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 22222
Mvmt Flow 22 70 1390 38 89 1484
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2329 714 0 0 1428 0
Stage 1 1409 -----
Stage 2 920 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 31 374 - - 472 -
Stage 1 192 -----
Stage 2 349 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 25 374 - - 472 -
Mov Cap-2 Maneuver 25 -----
Stage 1 192 -----
Stage 2 283 -----
Approach WB NB SB
HCM Control Delay, s 97.2 0 0.8
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 25 374 472 -
HCM Lane V/C Ratio - - 0.866 0.187 0.188 -
HCM Control Delay (s) - -$ 357.6 16.8 14.4 -
HCM Lane LOS - - F C B -
HCM 95th %tile Q(veh) - - 2.6 0.7 0.7 -
HCM 6th Signalized Intersection Summary Short Total AM
4: Shields Street & Stuart Street/Site Access City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 58 0 91 14 0 31 21 1055 7 14 984 21
Future Volume (veh/h) 58 0 91 14 0 31 21 1055 7 14 984 21
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 65 0 1 16 0 1 24 1185 8 16 1106 8
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 161 0 108 161 0 108 424 2893 20 436 2824 1260
Arrive On Green 0.07 0.00 0.07 0.07 0.00 0.07 0.03 0.80 0.80 0.02 0.53 0.53
Sat Flow, veh/h 1416 0 1585 1416 0 1585 1781 3618 24 1781 3554 1585
Grp Volume(v), veh/h 65 0 1 16 0 1 24 582 611 16 1106 8
Grp Sat Flow(s),veh/h/ln 1416 0 1585 1416 0 1585 1781 1777 1866 1781 1777 1585
Q Serve(g_s), s 4.9 0.0 0.1 1.2 0.0 0.1 0.3 10.7 10.7 0.2 20.2 0.3
Cycle Q Clear(g_c), s 5.0 0.0 0.1 1.2 0.0 0.1 0.3 10.7 10.7 0.2 20.2 0.3
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.01 1.00 1.00
Lane Grp Cap(c), veh/h 161 0 108 161 0 108 424 1421 1492 436 2824 1260
V/C Ratio(X) 0.40 0.00 0.01 0.10 0.00 0.01 0.06 0.41 0.41 0.04 0.39 0.01
Avail Cap(c_a), veh/h 271 0 231 271 0 231 504 1421 1492 524 2824 1260
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.67 0.67 0.67
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.1 0.0 47.8 48.4 0.0 47.8 3.7 3.3 3.3 2.4 10.0 5.3
Incr Delay (d2), s/veh 1.6 0.0 0.0 0.3 0.0 0.0 0.1 0.9 0.8 0.0 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 0.0 0.4 0.0 0.0 0.1 2.8 2.9 0.0 8.6 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.7 0.0 47.8 48.6 0.0 47.8 3.8 4.2 4.1 2.4 10.4 5.4
LnGrp LOS D A D D A D AAAABA
Approach Vol, veh/h 66 17 1217 1130
Approach Delay, s/veh 51.7 48.6 4.1 10.3
Approach LOS D D A B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.1 92.4 11.5 5.5 92.9 11.5
Change Period (Y+Rc), s 4.0 6.0 5.0 4.0 6.0 5.0
Max Green Setting (Gmax), s 7.0 73.0 15.0 7.0 73.0 15.0
Max Q Clear Time (g_c+I1), s 2.3 22.2 7.0 2.2 12.7 3.2
Green Ext Time (p_c), s 0.0 5.2 0.1 0.0 4.7 0.0
Intersection Summary
HCM 6th Ctrl Delay 8.6
HCM 6th LOS A
Timing Report, Sorted By Phase Short Total AM
4: Shields Street & Stuart Street/Site Access City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Max None None Max None
Maximum Split (s) 11 79 20 11 79 20
Maximum Split (%) 10.0% 71.8% 18.2% 10.0% 71.8% 18.2%
Minimum Split (s) 11 23.5 20 11 22 15
Yellow Time (s) 343343
All-Red Time (s) 122122
Minimum Initial (s) 4 10 4 4 10 4
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 13 24 103 13 24 103
End Time (s) 24 103 13 24 103 13
Yield/Force Off (s) 20 97 8 20 97 8
Yield/Force Off 170(s) 20 87 8 20 97 8
Local Start Time (s) 20 31 0 20 31 0
Local Yield (s) 27 104 15 27 104 15
Local Yield 170(s) 27 94 15 27 104 15
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 103 (94%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street/Site Access
Queues Short Total AM
4: Shields Street & Stuart Street/Site Access City Timing
Landmark Apartments Expansion 11/02/2020 Synchro 11 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 65 102 16 35 24 1193 16 1106 24
v/c Ratio 0.45 0.29 0.14 0.10 0.06 0.43 0.04 0.41 0.02
Control Delay 55.5 2.1 45.7 0.6 2.3 5.7 0.6 4.8 0.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 55.5 2.1 45.7 0.6 2.3 5.7 0.6 4.8 0.6
Queue Length 50th (ft) 44 0 10 0 2 96 1 267 1
Queue Length 95th (ft) 84 0 31 0 8 232 m0 351 m2
Internal Link Dist (ft) 281 303 436 523
Turn Bay Length (ft) 150 70 130 150 80
Base Capacity (vph) 198 408 156 394 448 2748 425 2686 1216
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.33 0.25 0.10 0.09 0.05 0.43 0.04 0.41 0.02
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Total PM
4: Shields Street & Stuart Street/Site Access City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 67 0 71 14 0 31 100 1285 20 41 1336 83
Future Volume (veh/h) 67 0 71 14 0 31 100 1285 20 41 1336 83
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 76 0 1 16 0 1 114 1460 22 47 1518 75
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 166 0 120 166 0 120 383 2801 42 347 2785 1242
Arrive On Green 0.08 0.00 0.08 0.08 0.00 0.08 0.04 0.78 0.78 0.07 1.00 1.00
Sat Flow, veh/h 1416 0 1585 1416 0 1585 1781 3584 54 1781 3554 1585
Grp Volume(v), veh/h 76 0 1 16 0 1 114 723 759 47 1518 75
Grp Sat Flow(s),veh/h/ln 1416 0 1585 1416 0 1585 1781 1777 1861 1781 1777 1585
Q Serve(g_s), s 6.3 0.0 0.1 1.3 0.0 0.1 1.5 18.0 18.0 0.6 0.0 0.0
Cycle Q Clear(g_c), s 6.4 0.0 0.1 1.3 0.0 0.1 1.5 18.0 18.0 0.6 0.0 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 166 0 120 166 0 120 383 1389 1454 347 2785 1242
V/C Ratio(X) 0.46 0.00 0.01 0.10 0.00 0.01 0.30 0.52 0.52 0.14 0.55 0.06
Avail Cap(c_a), veh/h 224 0 185 224 0 185 429 1389 1454 389 2785 1242
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.3 0.0 51.3 51.9 0.0 51.3 2.0 4.8 4.8 3.5 0.0 0.0
Incr Delay (d2), s/veh 2.0 0.0 0.0 0.2 0.0 0.0 0.4 1.4 1.3 0.2 0.8 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.3 0.0 0.0 0.5 0.0 0.0 0.4 5.4 5.6 0.1 0.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 56.2 0.0 51.4 52.2 0.0 51.4 2.5 6.2 6.2 3.7 0.8 0.1
LnGrp LOS E A D D A D AAAAAA
Approach Vol, veh/h 77 17 1596 1640
Approach Delay, s/veh 56.2 52.1 5.9 0.8
Approach LOS E D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.9 99.0 13.1 8.2 98.8 13.1
Change Period (Y+Rc), s 4.0 6.0 5.0 5.0 6.0 5.0
Max Green Setting (Gmax), s 7.0 85.0 13.0 6.0 85.0 13.0
Max Q Clear Time (g_c+I1), s 3.5 2.0 8.4 2.6 20.0 3.3
Green Ext Time (p_c), s 0.1 9.1 0.1 0.0 6.7 0.0
Intersection Summary
HCM 6th Ctrl Delay 4.8
HCM 6th LOS A
Timing Report, Sorted By Phase Short Total PM
4: Shields Street & Stuart Street/Site Access City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None C-Max None
Maximum Split (s) 11 91 18 11 91 18
Maximum Split (%) 9.2% 75.8% 15.0% 9.2% 75.8% 15.0%
Minimum Split (s) 11 23.5 18 11 22 15
Yellow Time (s) 343343
All-Red Time (s) 122222
Minimum Initial (s) 4 10 4 4 10 4
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 58 69 40 58 69 40
End Time (s) 69 40 58 69 40 58
Yield/Force Off (s) 65 34 53 64 34 53
Yield/Force Off 170(s) 65 24 53 64 34 53
Local Start Time (s) 18 29 0 18 29 0
Local Yield (s) 25 114 13 24 114 13
Local Yield 170(s) 25 104 13 24 114 13
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 40 (33%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street/Site Access
Queues Short Total PM
4: Shields Street & Stuart Street/Site Access City Timing
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 76 81 16 35 114 1483 47 1518 94
v/c Ratio 0.56 0.29 0.14 0.12 0.39 0.56 0.16 0.58 0.08
Control Delay 67.1 4.1 50.8 0.9 5.7 8.0 1.1 1.5 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 67.1 4.1 50.8 0.9 5.7 8.0 1.1 1.5 0.1
Queue Length 50th (ft) 56 0 11 0 12 252 1 30 0
Queue Length 95th (ft) 105 8 33 0 22 302 m2 m39 m0
Internal Link Dist (ft) 281 315 436 523
Turn Bay Length (ft) 150 100 130 150 80
Base Capacity (vph) 159 301 139 307 301 2660 299 2610 1184
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.48 0.27 0.12 0.11 0.38 0.56 0.16 0.58 0.08
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX G
HCM 6th Signalized Intersection Summary Long Total AM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 270 900 145 145 335 130 100 1035 225 205 860 60
Future Volume (veh/h) 270 900 145 145 335 130 100 1035 225 205 860 60
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 284 947 50 153 353 95 105 1089 116 216 905 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 597 1048 465 220 487 129 315 1386 612 338 1518 677
Arrive On Green 0.17 0.29 0.29 0.06 0.18 0.18 0.12 0.78 0.78 0.10 0.43 0.00
Sat Flow, veh/h 3456 3554 1577 3456 2755 729 1781 3554 1568 1781 3554 1585
Grp Volume(v), veh/h 284 947 50 153 226 222 105 1089 116 216 905 0
Grp Sat Flow(s),veh/h/ln 1728 1777 1577 1728 1777 1708 1781 1777 1568 1781 1777 1585
Q Serve(g_s), s 8.1 28.2 2.5 4.8 13.2 13.6 3.8 19.1 1.1 7.5 21.5 0.0
Cycle Q Clear(g_c), s 8.1 28.2 2.5 4.8 13.2 13.6 3.8 19.1 1.1 7.5 21.5 0.0
Prop In Lane 1.00 1.00 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 597 1048 465 220 314 302 315 1386 612 338 1518 677
V/C Ratio(X) 0.48 0.90 0.11 0.70 0.72 0.74 0.33 0.79 0.19 0.64 0.60 0.00
Avail Cap(c_a), veh/h 597 1098 487 220 420 404 353 1386 612 376 1518 677
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 41.0 37.3 28.2 50.5 42.7 42.9 18.1 9.5 2.2 19.1 24.2 0.0
Incr Delay (d2), s/veh 0.6 10.2 0.1 9.2 3.9 4.8 0.6 4.5 0.7 3.1 1.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 13.2 1.0 2.3 6.0 6.0 1.5 4.2 0.8 3.3 9.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.6 47.5 28.3 59.6 46.6 47.6 18.7 14.0 2.9 22.2 26.0 0.0
LnGrp LOS D D C E D D B B A C C A
Approach Vol, veh/h 1281 601 1310 1121
Approach Delay, s/veh 45.5 50.3 13.4 25.2
Approach LOS D D B C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.6 52.0 11.0 37.4 13.7 47.9 24.0 24.4
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 8.0 42.0 6.0 33.0 12.0 38.0 14.0 * 25
Max Q Clear Time (g_c+I1), s 5.8 23.5 6.8 30.2 9.5 21.1 10.1 15.6
Green Ext Time (p_c), s 0.0 3.7 0.0 1.3 0.2 4.7 0.4 1.1
Intersection Summary
HCM 6th Ctrl Delay 31.1
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Total AM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 12 48 11 39 16 44 19 31
Maximum Split (%) 10.9% 43.6% 10.0% 35.5% 14.5% 40.0% 17.3% 28.2%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 50 62 0 11 50 66 31 0
End Time (s) 62 0 11 50 66 0 50 31
Yield/Force Off (s) 58 104 6 44 62 104 45 25
Yield/Force Off 170(s) 58 84 6 28 62 90 45 8
Local Start Time (s) 50 62 0 11 50 66 31 0
Local Yield (s) 58 104 6 44 62 104 45 25
Local Yield 170(s) 58 84 6 28 62 90 45 8
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Long Total AM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 284 947 153 153 490 105 1089 237 216 905 63
v/c Ratio 0.49 0.91 0.27 0.73 0.74 0.39 0.88 0.36 0.82 0.66 0.09
Control Delay 45.0 50.6 7.2 70.6 44.3 15.9 38.0 6.0 48.7 30.1 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 45.0 50.6 7.2 70.6 44.3 15.9 38.0 6.0 48.7 30.1 0.2
Queue Length 50th (ft) 93 334 6 55 155 37 384 38 98 274 0
Queue Length 95th (ft) 144 #453 53 #103 203 32 #509 44 #222 346 0
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 581 1057 576 211 805 275 1244 651 270 1367 706
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.49 0.90 0.27 0.73 0.61 0.38 0.88 0.36 0.80 0.66 0.09
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary Long Total PM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 210 560 155 300 920 280 285 1140 175 320 1270 210
Future Volume (veh/h) 210 560 155 300 920 280 285 1140 175 320 1270 210
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1796 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 221 589 43 316 968 270 300 1200 68 337 1337 108
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 259 1147 509 411 979 272 334 2162 958 428 2221 984
Arrive On Green 0.08 0.32 0.32 0.12 0.36 0.36 0.10 0.81 0.81 0.09 0.63 0.63
Sat Flow, veh/h 3456 3554 1578 3456 2731 759 1781 3554 1574 1781 3554 1574
Grp Volume(v), veh/h 221 589 43 316 628 610 300 1200 68 337 1337 108
Grp Sat Flow(s),veh/h/ln 1728 1777 1578 1728 1777 1712 1781 1777 1574 1781 1777 1574
Q Serve(g_s), s 7.6 16.1 2.3 10.6 42.1 42.6 8.0 14.0 1.3 8.2 27.1 3.3
Cycle Q Clear(g_c), s 7.6 16.1 2.3 10.6 42.1 42.6 8.0 14.0 1.3 8.2 27.1 3.3
Prop In Lane 1.00 1.00 1.00 0.44 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 259 1147 509 411 637 614 334 2162 958 428 2221 984
V/C Ratio(X) 0.85 0.51 0.08 0.77 0.99 0.99 0.90 0.56 0.07 0.79 0.60 0.11
Avail Cap(c_a), veh/h 259 1147 509 576 637 614 334 2162 958 428 2221 984
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.8 33.0 28.3 51.3 38.2 38.4 18.0 5.8 7.5 12.0 13.5 9.1
Incr Delay (d2), s/veh 23.0 0.4 0.1 4.1 32.3 34.5 25.7 1.0 0.1 9.4 1.2 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.1 6.9 0.9 4.8 23.5 23.2 7.3 3.7 0.4 4.1 10.7 1.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 77.8 33.4 28.4 55.3 70.5 72.9 43.7 6.9 7.6 21.4 14.7 9.3
LnGrp LOS E C C E E E D A A C B A
Approach Vol, veh/h 853 1554 1568 1782
Approach Delay, s/veh 44.6 68.4 13.9 15.7
Approach LOS D E B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 12.0 81.0 18.3 43.7 14.0 79.0 14.0 48.0
Change Period (Y+Rc), s 4.0 6.0 5.0 6.0 4.0 6.0 6.0 * 6
Max Green Setting (Gmax), s 8.0 41.0 19.0 31.0 10.0 39.0 8.0 * 42
Max Q Clear Time (g_c+I1), s 10.0 29.1 12.6 18.1 10.2 16.0 9.6 44.6
Green Ext Time (p_c), s 0.0 5.3 0.6 2.0 0.0 5.6 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 33.7
HCM 6th LOS C
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Total PM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 12 47 24 37 14 45 13 48
Maximum Split (%) 10.0% 39.2% 20.0% 30.8% 11.7% 37.5% 10.8% 40.0%
Minimum Split (s) 11 34 11 29 11 34 11 30
Yellow Time (s) 34343434
All-Red Time (s) 12221222
Minimum Initial (s) 4 10 4 10 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 20 16 14 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 61 73 0 24 61 75 48 0
End Time (s) 73 0 24 61 75 0 61 48
Yield/Force Off (s) 69 114 19 55 71 114 56 42
Yield/Force Off 170(s) 69 94 19 39 71 100 56 25
Local Start Time (s) 61 73 0 24 61 75 48 0
Local Yield (s) 69 114 19 55 71 114 56 42
Local Yield 170(s) 69 94 19 39 71 100 56 25
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 120
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 47: Shields Street & Prospect Road
Queues Long Total PM
47: Shields Street & Prospect Road
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 221 589 163 316 1263 300 1200 184 337 1337 221
v/c Ratio 0.89 0.59 0.29 0.67 1.05 1.57 1.05 0.31 1.54 1.12 0.35
Control Delay 90.1 40.0 6.8 55.6 78.2 301.6 73.9 5.0 289.6 101.3 9.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 90.1 40.0 6.8 55.6 78.2 301.6 73.9 5.0 289.6 101.3 9.9
Queue Length 50th (ft) 89 207 1 120 ~553 ~270 ~537 35 ~317 ~626 30
Queue Length 95th (ft) #162 276 54 165 #693 #454 #675 48 #506 #763 91
Internal Link Dist (ft) 5223 2455 583 829
Turn Bay Length (ft) 250 215 360 295 90 275 230
Base Capacity (vph) 248 992 564 553 1198 191 1140 601 219 1197 630
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.89 0.59 0.29 0.57 1.05 1.57 1.05 0.31 1.54 1.12 0.35
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th TWSC Long Total AM
2: Shields Street & Hobbit Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Intersection
Int Delay, s/veh 2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 25 65 1295 10 25 1120
Future Vol, veh/h 25 65 1295 10 25 1120
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 26 68 1363 11 26 1179
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2011 687 0 0 1374 0
Stage 1 1369 -----
Stage 2 642 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 51 389 - - 495 -
Stage 1 201 -----
Stage 2 486 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 48 389 - - 495 -
Mov Cap-2 Maneuver 48 -----
Stage 1 201 -----
Stage 2 460 -----
Approach WB NB SB
HCM Control Delay, s 52.9 0 0.3
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 48 389 495 -
HCM Lane V/C Ratio - - 0.548 0.176 0.053 -
HCM Control Delay (s) - - 148.2 16.2 12.7 -
HCM Lane LOS - - F C B -
HCM 95th %tile Q(veh) - - 2.1 0.6 0.2 -
HCM 6th TWSC Long Total PM
2: Shields Street & Hobbit Street
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Intersection
Int Delay, s/veh 5.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 20 70 1530 40 85 1630
Future Vol, veh/h 20 70 1530 40 85 1630
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 - - 80 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 21 74 1611 42 89 1716
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2668 827 0 0 1653 0
Stage 1 1632 -----
Stage 2 1036 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 18 315 - - 386 -
Stage 1 145 -----
Stage 2 303 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 14 315 - - 386 -
Mov Cap-2 Maneuver ~ 14 -----
Stage 1 145 -----
Stage 2 233 -----
Approach WB NB SB
HCM Control Delay, s 195 0 0.8
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 14 315 386 -
HCM Lane V/C Ratio - - 1.504 0.234 0.232 -
HCM Control Delay (s) - -$ 807.8 19.9 17.1 -
HCM Lane LOS - - F C C -
HCM 95th %tile Q(veh) - - 3.3 0.9 0.9 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Signalized Intersection Summary Long Total AM
4: Shields Street & Stuart Street/Site Access
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 60 0 90 15 0 30 20 1215 10 15 1105 25
Future Volume (veh/h) 60 0 90 15 0 30 20 1215 10 15 1105 25
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 63 0 1 16 0 1 21 1279 10 16 1163 12
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 159 0 106 159 0 106 490 2862 22 397 2835 1265
Arrive On Green 0.07 0.00 0.07 0.07 0.00 0.07 0.03 0.79 0.79 0.05 1.00 1.00
Sat Flow, veh/h 1416 0 1585 1416 0 1585 1781 3614 28 1781 3554 1585
Grp Volume(v), veh/h 63 0 1 16 0 1 21 629 660 16 1163 12
Grp Sat Flow(s),veh/h/ln 1416 0 1585 1416 0 1585 1781 1777 1865 1781 1777 1585
Q Serve(g_s), s 4.8 0.0 0.1 1.2 0.0 0.1 0.2 12.5 12.5 0.2 0.0 0.0
Cycle Q Clear(g_c), s 4.8 0.0 0.1 1.2 0.0 0.1 0.2 12.5 12.5 0.2 0.0 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.02 1.00 1.00
Lane Grp Cap(c), veh/h 159 0 106 159 0 106 490 1407 1477 397 2835 1265
V/C Ratio(X) 0.40 0.00 0.01 0.10 0.00 0.01 0.04 0.45 0.45 0.04 0.41 0.01
Avail Cap(c_a), veh/h 296 0 259 296 0 259 573 1407 1477 485 2835 1265
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.2 0.0 47.9 48.5 0.0 47.9 1.8 3.7 3.7 2.6 0.0 0.0
Incr Delay (d2), s/veh 1.6 0.0 0.0 0.3 0.0 0.0 0.0 1.0 1.0 0.0 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 0.0 0.4 0.0 0.0 0.1 3.3 3.5 0.0 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.8 0.0 48.0 48.8 0.0 48.0 1.9 4.7 4.7 2.6 0.4 0.0
LnGrp LOS D A D D A D AAAAAA
Approach Vol, veh/h 64 17 1310 1191
Approach Delay, s/veh 51.7 48.7 4.6 0.5
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.9 92.8 11.3 6.5 92.1 11.3
Change Period (Y+Rc), s 4.0 6.0 5.0 5.0 6.0 5.0
Max Green Setting (Gmax), s 7.0 71.0 17.0 7.0 70.0 17.0
Max Q Clear Time (g_c+I1), s 2.2 2.0 6.8 2.2 14.5 3.2
Green Ext Time (p_c), s 0.0 5.6 0.1 0.0 5.3 0.0
Intersection Summary
HCM 6th Ctrl Delay 4.2
HCM 6th LOS A
Timing Report, Sorted By Phase Long Total AM
4: Shields Street & Stuart Street/Site Access
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None C-Max None
Maximum Split (s) 11 77 22 12 76 22
Maximum Split (%) 10.0% 70.0% 20.0% 10.9% 69.1% 20.0%
Minimum Split (s) 11 23.5 18 11 22 15
Yellow Time (s) 343343
All-Red Time (s) 122222
Minimum Initial (s) 4 10 4 4 10 4
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 22 33 0 22 34 0
End Time (s) 33 0 22 34 0 22
Yield/Force Off (s) 29 104 17 29 104 17
Yield/Force Off 170(s) 29 94 17 29 104 17
Local Start Time (s) 22 33 0 22 34 0
Local Yield (s) 29 104 17 29 104 17
Local Yield 170(s) 29 94 17 29 104 17
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street/Site Access
Queues Long Total AM
4: Shields Street & Stuart Street/Site Access
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt am.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 63 95 16 32 21 1290 16 1163 26
v/c Ratio 0.45 0.28 0.14 0.10 0.05 0.47 0.04 0.42 0.02
Control Delay 55.2 2.1 45.5 0.6 2.4 6.2 4.1 7.4 2.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 55.2 2.1 45.5 0.6 2.4 6.2 4.1 7.4 2.0
Queue Length 50th (ft) 42 0 10 0 2 106 2 102 0
Queue Length 95th (ft) 83 0 31 0 7 274 m6 272 m1
Internal Link Dist (ft) 281 315 436 523
Turn Bay Length (ft) 150 100 130 150 80
Base Capacity (vph) 224 420 184 401 436 2740 379 2753 1245
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.28 0.23 0.09 0.08 0.05 0.47 0.04 0.42 0.02
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Total PM
4: Shields Street & Stuart Street/Site Access
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 70 0 70 15 0 35 100 1465 20 40 1525 85
Future Volume (veh/h) 70 0 70 15 0 35 100 1465 20 40 1525 85
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 74 0 1 16 0 1 105 1542 20 42 1605 71
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 164 0 117 164 0 117 364 2817 37 324 2791 1245
Arrive On Green 0.07 0.00 0.07 0.07 0.00 0.07 0.04 0.78 0.78 0.04 1.00 1.00
Sat Flow, veh/h 1416 0 1585 1416 0 1585 1781 3592 47 1781 3554 1585
Grp Volume(v), veh/h 74 0 1 16 0 1 105 762 800 42 1605 71
Grp Sat Flow(s),veh/h/ln 1416 0 1585 1416 0 1585 1781 1777 1862 1781 1777 1585
Q Serve(g_s), s 6.1 0.0 0.1 1.3 0.0 0.1 1.3 19.5 19.5 0.5 0.0 0.0
Cycle Q Clear(g_c), s 6.2 0.0 0.1 1.3 0.0 0.1 1.3 19.5 19.5 0.5 0.0 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 164 0 117 164 0 117 364 1393 1460 324 2791 1245
V/C Ratio(X) 0.45 0.00 0.01 0.10 0.00 0.01 0.29 0.55 0.55 0.13 0.58 0.06
Avail Cap(c_a), veh/h 248 0 211 248 0 211 455 1393 1460 369 2791 1245
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.3 0.0 51.5 52.1 0.0 51.5 2.0 4.9 4.9 3.8 0.0 0.0
Incr Delay (d2), s/veh 1.9 0.0 0.0 0.3 0.0 0.0 0.4 1.5 1.5 0.2 0.9 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.3 0.0 0.0 0.5 0.0 0.0 0.3 5.8 6.0 0.1 0.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 56.3 0.0 51.5 52.3 0.0 51.5 2.4 6.4 6.4 4.0 0.9 0.1
LnGrp LOS E A D D A D AAAAAA
Approach Vol, veh/h 75 17 1667 1718
Approach Delay, s/veh 56.2 52.3 6.2 0.9
Approach LOS E D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.9 99.2 12.9 8.0 99.1 12.9
Change Period (Y+Rc), s 4.0 6.0 5.0 5.0 6.0 5.0
Max Green Setting (Gmax), s 10.0 80.0 15.0 6.0 83.0 15.0
Max Q Clear Time (g_c+I1), s 3.3 2.0 8.2 2.5 21.5 3.3
Green Ext Time (p_c), s 0.1 10.1 0.1 0.0 7.4 0.0
Intersection Summary
HCM 6th Ctrl Delay 4.9
HCM 6th LOS A
Timing Report, Sorted By Phase Long Total PM
4: Shields Street & Stuart Street/Site Access
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None C-Max None
Maximum Split (s) 14 86 20 11 89 20
Maximum Split (%) 11.7% 71.7% 16.7% 9.2% 74.2% 16.7%
Minimum Split (s) 11 23.5 18 11 22 15
Yellow Time (s) 343343
All-Red Time (s) 122222
Minimum Initial (s) 4 10 4 4 10 4
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7
Flash Dont Walk (s) 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 20 34 0 20 31 0
End Time (s) 34 0 20 31 0 20
Yield/Force Off (s) 30 114 15 26 114 15
Yield/Force Off 170(s) 30 104 15 26 114 15
Local Start Time (s) 20 34 0 20 31 0
Local Yield (s) 30 114 15 26 114 15
Local Yield 170(s) 30 104 15 26 114 15
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 4: Shields Street & Stuart Street/Site Access
Queues Long Total PM
4: Shields Street & Stuart Street/Site Access
Landmark Apartments Expansion 11/03/2020 Synchro 11 Light Report
Delich Associates lt pm.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 74 74 16 37 105 1563 42 1605 89
v/c Ratio 0.52 0.28 0.12 0.13 0.38 0.59 0.15 0.62 0.08
Control Delay 63.7 4.5 49.2 1.0 6.1 8.8 5.5 19.7 7.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 63.7 4.5 49.2 1.0 6.1 8.8 5.5 19.7 7.2
Queue Length 50th (ft) 55 0 11 0 11 274 10 418 15
Queue Length 95th (ft) 104 13 33 0 23 370 m14 m407 m18
Internal Link Dist (ft) 281 315 436 523
Turn Bay Length (ft) 150 100 130 150 80
Base Capacity (vph) 182 313 167 322 319 2643 276 2587 1174
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.41 0.24 0.10 0.11 0.33 0.59 0.15 0.62 0.08
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX H
Spring Creek Trail
Prospect
Hobbit
Shields
Stuart
Lake
Sheely
SCALE: 1"=600'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Pedestrian LOS Worksheet
Project Location Classification: Other
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Neighborhood to the
east of the site Residential
Minimum C C C C C
1 Actual A C A B A
Proposed A C A B A
Neighborhood to the
north of the site Residential
Minimum C C C C C
2 Actual B C A B A
Proposed B C A B A
Neighborhood to the
northwest of the site Residential
Minimum C C C C C
3 Actual A C A B A
Proposed A C A B A
Commercial area to the
west of the site Commercial
Minimum C C C C C
4 Actual A C A B A
Proposed A C A B A
Commercial area to the
southwest of the site Commercial
Minimum C C C C C
5 Actual A C A B A
Proposed A C A B A
Neighborhood to the
south of the site Residential
Minimum C C C C C
6 Actual A C A B A
Proposed A C A B A
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Spring Creek Trail
Prospect
Hobbit
Shields
Stuart
Lake
Sheely
SCALE: 1"=600'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Commercial area to the
1 northwest of the site Commercial B B B
Commercial area to the
2 west of the site Commercial B B B
3
4