Staff has reviewed your submittal for the replat of Tracts D and E
and lots 33-40 of the Victorian Gables Patio Homes at Silverplume
PUD and offers the following comments:
1. US West will provide telephone service in accordance with the
rates and tariffs on file with the Colorado Public Utilities
Commission. The developer is responsible for provision of all
trench; street crossings, and ditch crossings for telephone
facilities within the project, and the developer pays up front
construction costs for facilities within the development.
2. Any relocation of existing telephone facilities, required by
these plans will be paid for by the developer.
3. Review of these plans should not be construed as a commitment
that telephone facilities sufficient to serve this project are
presently available.
4. Revised utility plans, showing how the new lots will receive
water and sewer services, are required.
5. No trees may be planted within 4' of any natural gas line.
6.. Please refer to the existing utility plans for further
construction details. Any proposed changes to these plans
must be reviewed by the City prior to issuance of building
permits.
7. Please submit a letter addressed to Glen Schlueter at the
Stormwater Utility, stating what the changes are and how they
will affect existing drainage and run=off patterns, flow
amounts, detention pond capacity, etc. If the changes will
affect the drainage as currently approved, this should be
addressed by an engineer and may delay the project. If a
drainage report is needed, it is likely that the project will
be delayed to the November Planning and Zoning Board hearing.
8. The outer boundary monuments must be described on the plat.
Show the tie-in from the SE corner of Lot 36-A, west., to the
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0550 • (303) 221-6750
easement 1-ine. Mapping checked the plat for closure and
indicated that it did not close. Please contact Wally Muscott
at the Engineering Department for more information.
9. There is a current drainage problem in the area of Tract E-1..
The area needs to be regraded for proper drainage and to avoid
standing water in the future. Please include with your
revisions, your plans for correcting this problem.
10. Parkland fees of $719.00 per unit are due for each new
dwelling unit, payable at the time of building permit
issuance.
11. Homeowners shall maintain all landscaping in the public right-
of-way.
12. The site plan should be revised to reflect the changes in lot
size and any other changes, such as landscaping; building
elevations, fencing, sidewalks, etc. It is possible that some
of these changes could be accomplished with an administrative
change, if not, the amended site plan should accompany this
replat request.
13. Any necessary modifications to the existing electrical system
will be at the owner/developer's expense.
This concludes staff comments at this time. In order to stay on
schedule for the October 25, 1993 Planning and Zoning Board
hearing, please note the following deadlines:
Plan revisions are due October 6, 1993 by 12:00 noon.
PMT's, colored renderings, and 10 prints are due Oct. 18th.
Final mylars and other documents are due October 22nd.
Please be aware that if a development agreement and/or utility
plans are required with this project, these documents and
plans must be signed prior to the Planning and Zoning Board
Hearing. If not, a condition will be placed on the project
giving you 60 days to finalize the plans and agreement, after
which time, you must submit a request for an extension from
the Planning and Zoning Board.
If you have any questions about these comments or would like to
schedule a time to meet to discuss them, please contact me at`221-
6750.
Sincerely
Kirsten Whetstone
Project Planner
CC : *r6e A_skOed<
�� le.