Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS UTILITY SERVICE CENTER 5TH FILING PDP - 16 90C - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI F I I 1 1 [J 1 1 FINAL, DRAINAGE AND EROSION CONTROL STUDY FOR FORT COLLINS UTILITY CENTER FIFTH FILING FORT COLLINS, COLORADO MARCH 1997 THE SEAR -BROWN GROUP Standards in Excellence 11 Wood Street, Elm Street, and the existing Service Center parking lot and the Colorado and Southern Railroad/Burlington Northern Railroad. Basin 6 is comprised of the existing Service Center parking. Basin 7 is the Service Center storage yard. The 100 year historic storm flow from Basins 1 and 3 (359 cfs) is far in excess of the capacity of Elm street. therefore, the design along the northern side of Elm Street has sought to let as much of the flow pass into the adjacent swale as quickly as possible. The water level at the deepest point in Elm street is calculated as 4995.03 which is 1.54 feet above the flow line (refer to the street capacity calculation section of the Appendix. It is not possible to tilt the road to the north due to a shallow fiber optics line located in the street section. In the proposed condition, runoff from Basins 1, 3, 4, 5 and a portion of the runoff from Basin 6 flows into the area behind the existing wooden box culvert. The flows then pass around the west end of the embankment. These flows then flow east along the north side of the railroad embankment contained in a channel formed by the railway embankment on one side and CDOT Type 4 concrete barriers on the other and then to the storage yard. These barriers are used to provide a temporary drainage path until such time as the entire site is built out and the railroad embankment removed. The storm flows then sheet flow northeast toward the northeast comer of the storage yard where they are guided to the east, away from the adjacent pond, by a retaining wall. Flows the pass to a low lying area in the Cache LaPoudre River floodplain. The drawing .100 year Storm Inundation. Proposed Condition, shows the area of inundation in the proposed condition and also the flood path across storage yard and to the Cache La Poudre River during the 100 Year Storm. This show that the 100 Year water surface level is lower during the proposed condition than during the existing 1 condition. This is because the grading around the northwest end of the railroad berm has been lowered to release more flow. Please refer to 1QQ Year Storm Inundation- Existing Condition. Both of the previously mentioned drawings are located at the back of the Appendix. 11 1 5 i 2 '�2RENT DATE: 08-27-1996 FILE DATE: AUGUST tRENT TIME: 15:17:15 FILE NAME:: WEIR PERFORMANCE CURVE FOR CULVERT # 1 - 1 ( 1.916667!BY 1..166667 ) RCPE DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRITICAL OUTLET TAILWATER FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH VEL.:DEPTH VEL. DEPTH (cfs) (ft) (ft) (ft) <F4> (ft) (ft) (fps) (ft) (fps) (ft) 0 4990..93 0.00 0.00 0-NF 0.00 0.00 0.00 0_00 0.00 -0.49 2 4991.49 0.56 0.56 1-S2n 0.33 0.42 4.57 0.33 0.83 -0.37 4 4991.83 0.90 0.90 1-S2n 0.47 0.62 5.62 0_48 1-09 -0.31 5 4991.96 1.03 1.03 1-S2n 0.54 0.71 5.98 0.54 1.19 -0.2-9 8 4992-34 1.41 1.41 5-S2n 0.73 0.91 6.77 0_74 1..42 -0.22 10 4992..68 1.75 1.75 5-S2n 6.85 1..00 7.22 0.85 1-55 -0.19 12 4993.11 2.18 2.18 5-S2n 1.02 1.09 7.30 1.02 1..65 -0.15 14 4993.62 2.69 2.58 6-FFn 1.17 1.17 7.87 1.11 1-.75 -6.12 15 4993.79 2.86 2.76 6-FFn 1.17 1..17 8.20 1.11 1..84 -0.09 15 499.3_86 2.93 2.83 6-FFn 1.17 1-17 8.34 1..11 1_.92 -0.06 15 4993.92 2.99 2.89 6-FFn 1.17 1.-11 8.44 1.17 2.00 -0.03 E1. inlet face invert 4990.93 ft El. outlet invert 4990.31 ft El. inlet throat invert 0.00 ft El. inlet crest 0.00 ft r SITE DATA ***** CULVERT INLET STATION (FT) INLET ELEVATION (FT) OUTLET STATION (FT) OUTLET ELEVATION (FT) NUMBER OF BARRELS SLOPE (V-FT/H-FT) INVERT CULVERT LENGTH ALONG SLOPE (FT) CULVERT DATA SUMMARY BARREL SHAPE BARREL SPAN BARREL RISE BARREL MATERIAL BARREL MANNING'S N INLET TYPE INLET EDGE AND WALL INLET DEPRESSION 0.00 4990.93 62.00 4990.31 1 0.0100 62.00 ELLIPTICAL 1.92 FT 1.17 FT CONCRETE 0.012 CONVENTIONAL GROOVED END PROJECTING NONE 5} t"RRENT DATE: 08-27-1996 ARENT TIME: 15:17:15 FILE DATE: AUGUST FILE NAME: WEIR 3 ************************** TAILWATER ****** REGULAR CHANNEL CROSS SECTION **************** BOTTOM WIDTH (FT) 20.00 SIDE SLOPE H/V (X:1) 4.0 CHANNEL SLOPE V/H (FT/FT) 0.007 MANNING'S N (.01-0.1) 0.035 CHANNEL INVERT ELEVATION (FT) 4989.82 CULVERT NO-1 OUTLET INVERT ELEVATION 4990.31 FT UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL \******* FLOW W.S.E. FROUDE DEPTH VEL. SHEAR (CFS) (FT) NUMBER (FT) (FPS) (PSF) 0.00 4989.82 0.000 0.00 0.00 0.00 2.00 4989.94 0.431 0.1.2 0.83 0.05 4.00 4990.00 0.458 0.18 1.09 0.08 5.00 4990.02 0.466 0.20 1.19 0.09 8.00 4990.09 0.485 0.27 1.42 0.12. 10.00 4990.13 0.493 0.31 1.55 0.13 12.00 4990.16 0.500 0.34 1.65 0.15 14.00 4990.19 0.506 0.37 1.75 0.16 16.00 4990.22 0.511 0.40 1.84 0.18 18.00 4990.25 0.515 0.43 1.92 0.19 20.00 4990.28 0.519 0.46 2.00 0.20 ************************* ROADWAY OVERTOPPING DATA ************************** ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH (FT) 30.00 **** USER DEFINED ROADWAY PROFILE CROSS-SECTION X Y COORD. NO. (FT) (FT) 1 0.00 4994..61 2 21.00 4993.69 3 31.00 4993.69 4 80.00 4995.29 11 PIPE CAPACITY 18" PROFILE C Worksheet for Circular Channel Project Description_ Project File c:lhaestadlfmw1189039.fm2 Worksheet bypass pipe Flow Element Circular Channel Method Manning's Formula Solve For _ _ _. _Full Flow Capacity_ Input Data Mannings Coefficient 0.013 Channel Slope 0.005000 ft/ft Diameter 18.00 in Results Depth 1.50 ft Discharge 7.43 cfs Flow Area 1.77 ft2 Wetted Perimeter 4.71 ft Top Width 0.00 ft Critical Depth 1.06 it Percent Full 100.00 Critical Slope 0.007032 iVft Velocity 4.20 ft/s Velocity Head 0.27 ft Specific Energy FULL ft Froude Number FULL Ma)dmum Discharge 7.99 cis Full Flow Capacity 7.43 cis Full Flow Slope 0.005000 ft/ft 03113l97 Fja~ter v5.13 �j 05:51:35 AM Haestad Methods,. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 EM PIPE CAPACITY 21" PROFILE A Worksheet for Circular Channel Project Description Project File c:lhaestadlfmw11890391m2 Worksheet bypass pipe Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.005100 ft/ft Diameter 21.00 in Results_ Depth 1.75 ft Discharge 11:32 cfs Flow Area 2.41 ft2 Wetted Perimeter 5,50 It Top Width 0.00 It Critical Depth 1.25 ft Percent Full 100.00 Crfical Slope 0.006850 ft(ft Velocity 4.70 ft/s Velocity Head 0.34 ft Specific Energy FULL ft Froude Number FULL Mabmum Discharge 12..17 cfs Full Flow Capacity 11.32 cfs Full Flow Slope 0.005100 ft(ft 03/13/97 FbwMaster v5.13 06:13:36 AM Haestad Methwds,. Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page of 1 --------------------------------------------------------- - - - - -- ----- g� UDINLET: INLET HYDARULICS AND SIZING DEVELOPED BY DR.. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO:AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD -------------------------------------------------------------------------- SER:KEVIN GINGERY-RDB INC FT. COLLINS COLORADO.._.............................. N DATE 03-13-1997 AT TIME 08:.22:04 �*** PROJECT TITLE: FORT COLLINS UTILITY CENTER *** CURB OPENING INLET HYDRAULICS AND SIZING: INLET ID NUMBER: 4 INLET HYDRAULICS: IN A SUMP. GIVEN INLET DESIGN INFORMATION: GIVEN CURB OPENING LENGTH (ft)= 20.00 HEIGHT OF CURB OPENING (in)= 6.00 INCLINED THROAT ANGLE (degree)= 45.00 LATERAL WIDTH OF DEPRESSION (ft)= 2.00 SUMP DEPTH (ft)= 0.25 Note: The sump depth is additional depth to flow depth. STREET GEOMETRIES: STREET LONGITUDINAL SLOPE M = 0.99 STREET CROSS SLOPE (%) = 2.00 STREET MANNING N = 0.016 GUTTER DEPRESSION (inch)= 1.50 GUTTER WIDTH (ft) = 2.00 STREET FLOW HYDRAULICS: WATER SPREAD ON STREET (ft) = 29.50 GUTTER FLOW DEPTH (ft) = 0.71 FLOW VELOCITY ON STREET (fps)= 4.98 FLOW CROSS SECTION AREA (sq ft)= 8.83 GRATE CLOGGING FACTOR (%)= 50.00 CURB OPENNING CLOGGING FACTOR(%)= 10.00 INLET INTERCEPTION CAPACITY: IDEAL INTERCEPTION CAPACITY (cfs)= 47.74 BY FAA HEC-12 METHOD: DESIGN FLOW (cfs)= FLOW INTERCEPTED (cfs)= CARRY-OVER FLOW (cfs)= BY DENVER UDFCD.METHOD: DESIGN FLOW (cfs)= FLOW INTERCEPTED (cf's)= CARRY-OVER FLOW (cfs)= 44.00 42.96 1.045�11°ee- 44.00 42.96 1.04 SWALE DESIGN u �3 CROSS SECTION A5 Cross Section for Trapezoidal Channel Project Description Project File cAhaestad\fmw1189039.fm2 Worksheet Flow Element DEPTH OF CHANNEL AT SECTION'S A Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coefficient 0.035 Channel Slope 0.010000 ft(ft Depth 2.33 ft Left Side Slope 5.000000 H : V Right Side Slope 5.000000 H : V Bottom Width 22.00 ft i. Discharge 477.00 cfs U t 2.33 ft 1 22.00 ft V H 1 NTS 03/13/97 FlowMaster v5.13 06:24:23 AM Haestad Methods, Inc. 37 Brookuk Road Waterbury, CT 06708 (2D3) 755-1666 Page 1 of 1 CROSS SECTION A5 Worksheet for Trapezoidal Channel Project Description Project File cAhaestad\fmw\189039.fm2 Worksheet DEPTH OF CHANNEL AT SECTION 5 a Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input- Data Mannings Coefficient 0.035 Channel Slope 0.010000 fvft Left Side Slope 5.000000 H : V Right Side Slope 5.000000 H : V Bottom Width 22.00 ft Discharge. _ 477.00-- _ cfs Results Depth 2.33 ft Flow Area 78.45 ftz Wetted Perimeter 45.77 ft Top Width 45.31 ft Critical Depth 2-.07 ft Critical Slope 0.015554 ft/ft Velocity 6.08 ft/s Velocity Head 0.57 ft Specific Energy 2.91 ft Froude Number 0.81 Flow is subcritical.. - i 03/13/97 Flo vMaster v5.13 06:24:07 AM Haestad Methods, Inc.. 37 Brookside Road Waterbury, CT 06708 (203);755-1666 Page 1 of 1 9¢ CROSS SECTION 135 Cross Section for Trapezoidal Channel Project Description Project File c4\haestad\fmw\189039.fm2 Worksheet DEPTH OF CHANNEL AT SECTION B Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channe -Depth. _ Section Data - - - --- Mannings Coefficient 0.035 Channel Slope 0.007700 ft/ft Depth 2.45 ft Left Side Slope 7.000000 H : V Right Side Slope 7.000000 H a V Bottom Width 20.00 ft Discharge 477.00.- cfs 2.45 ft NMI1 20.00 ft V ts, H 1 NTS 03/13/97 FkwNaster v5.13 ' 66:22:25 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 1s CROSS SECTION B5 Worksheet for Trapezoidal Channel Project Description Project File c.:lhaestad\fr6w\1 ti9039 fm2 Worksheet DEPTH OF CHANNEL AT SECTION B Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.035 Channel Slope 0.007700 ft(ft Left Side Slope 7.000000 H : V Right Side Slope 7.000000 H : V Bottom Width 20.00 ft Discharge 477.00 cfs Results Depth 2.45 ft Flow Area 91.10 ft2 Wetted Perimeter 54.67 ft Top Width 54.32 ft Critical Depth 2.04 ft Critical Slope 0.015928 f fft Velocity 5.24 fvs Velocity Head 0.43 It Specific Energy 2.88 ft Froude Number 0.71 Flow is subcritical. 03M3/97 Flosrtuaster v5.13 ' 06:22:55 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 V. CJA STORM WATER QUALITY A. General Concept The water quality of storm water runoff must be addressed on all final design utility plans. The City of Fort Collins Light and Power Parking Lot is anticipated to be constructed during the summer of I,997. Therefore, we have sought to find various Best Management Practices for the treatment of stormwater runoff. The runoff will enter a grass lined swale and then be informally detained behind the wooden box culvert. In the future a detention area is planned when the railroad embankment is removed. All construction activities must comply with the State of Colorado permitting process for Stormwater Discharges Associated with Construction Activity. However, since this site is more than 5 acres, a Colorado Department of Health NPDES Permit will be required for this project. EROSION CONTROL A. General Concept The Fort Collins Utility Service Center 5th Filing, lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins Zone Maps. The potential exists for silt movement off the site and into the existing storm drainage system during construction. Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites and related calculations in the appendix, the erosion control performance standard for the subject site during construction is 79.8% and 93.9% after construction. The erosion control plan gives a performance standard of 80.00% during construction and 100% after construction. An erosion control escrow amount of $6029.00 has been calculated for this site. B. Specific Details To control silt movement caused by stormwater runoff gravel mulch and a straw bale dam at the entrance of the wooden culvert is recommended to prevent clogging of the culvert. If construction is completed quickly enough and the asphalt surface is placed with in 30 days of overlot construction then the gravel mulch may not be required. To control vehicles tracking mud from the site, tracking pads shall be set up at the two main entrancelexit points. After the asphalt in Elm Street is complete then gravel inlet filters should be placed until all construction and landscaping is complete. WR RBD, Inc., Engineering Consultants JAM 13-Mar-97 Project: Fort Collins Utility Service Center For. The City of Fort Collins Project No.: 183-039 This sheet calculates the controlling condition for the area inlets Design Point: 3 Neenah grate inlet R-3900, or approved equal: Weir equation: Orifice equation: Qw= C L H"1.5 Qo = C A (2gH)"0.5 C = 3.0 C = 0.6 L = 4.00 ft A = 1.64 ft2 (50% clogged) Q. 0.70 7.03 0.80 8.59 0.90 10,25 1.00 12.00 13-Mar-97 Concrete barrier bypass channel Cross Section for Irregular Channel Project Description Project File c:\haestad\fmw\189039.fm2 Worksheet Bypass Ditch Flow Element Irregular Channel Method Manning's Formula Salve For Water Elevation Section Data Wtd. Mannings Coefficient 0.033 Channel Slope 0.005000 fHft Water Surface Elevation 91.03 ft Discharge___ 242.00 cfs w 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 Station (ft) 04I25197 04MA 8 PM FlowMaster v5.13 Haestad Meltwds, Irrc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Concrete Barrier Bypass Channel Worksheet for Irregular Channel Project Description Project File cAhaestadlfmW1189039.fm2 Worksheet Bypass Ditch Flow Element Irregular Channel Method Manning's Formula Solve For Water levation Input Data 1 Channel Slope 0.005000 fu t. Elevation range: 89.00 ft to 92.00 fL Station (ft) Elevation (ft) Start Station 1 0.00 92.00 0.00 12.00 89.00 27.00 27.00 89.00 35.00 89.00 35.00 91.67 Discharge 242.00 cfs Results Wtd. Mannings Coefficient 0.03.3 Water Surface Elevation 91.03 ft FI6W Area 54.95 ftz Wetted Perimeter 33.40 ft Top Width 31.12 ft Height 2.03 ft Critical Depth 90.45 ft Critical Slope 0.015163 ftfft Velocity 4.40 ft/s Velocity Head 0.30 ft Specific Energy 91.33 ft Froude Number 0.58 Flow is subcritical. I I End Station 27.00 35.00 Roughness 0.060 0.016 04MG7 FlowMaster v5.13 04:34:02 PM Haestad Methods, inc. 37 Brookside Road Waterbury, CT 66708 (203) 755.1666 Page 1 of 1 I 1 i i 1 1 1 1 0 1 1 1 F 1 1 1 EROSION CONTROL DESIGN r 1 �g RBD, Inc. RAINFALL PERFORMANCE STANDARD EVALUATION 1 #183-039 PROJECT: FORT COLLINS UTILITY SERVICE CENTER PARKING STANDARD FORMA CALCULATED BY: JAM DATE: 03/1.3197 Developed Erodibilty Asb Lsb Ssb Lb 186 PS --S.ubbasin. Zone ac ft . % ft °k 5 moderate 7.45 600 1.70 Total 7.45 600 1.7 79.8 I a fGhA,I NIGIINLZ►` f Lb = sum(AiLi)/sum(Ai) = 7.45 x 600 / 7.45 600 ft Sb = sum(AiSi)/sum(Ai) = 7.45 x 1.70 / 7.45 1.7 % ' PS (during construction) = 79.8 PS (after construction) = 79.8/0.85 = (from Table 8A) 93.9 RBD, Inc. E.FFECTNEN.ESS CALCULATIONS Total Site as one phase TED BY: mber Method 3 Bare Soil - Rough Irregular Surface 4 Sediment/Basin Trap 6 Gravel Finer 9 Asphalt/Concrete Pavement 16 Established Grass Ground Cover- 70% 19 Established Grass Ground Cover -100% 20 Sod Grass 21 Temporary Vegetation 23 Hydraulic Mulch @ 2 tons/acre 38 Gravel Mulch 43 Hay or Straw Dry Mulch (21-25% slope) MAJOR BASIN PS % AREA - ac SITE 79.8 7.45 QUO DIA0111d MRGM BASIN CONDITION I (ac) /alue I Value 1 0.9 1 0.5 1 0.8 0.01 1 0.04 1 0.02 1 0.01 1 0.45 1 0.1 1 0.05 1 0.14 1 5 PERVIOUS AREA DISTURBED 2.92 21 1.31 2.92 Temporary Vegetation 5 HARD AREA 3.16 38 0.16 3.16 Gravel Mulch 5 UNDISTURBED AREA 1.37 19 0.03 1.37 Established Grass Ground Carver -100% 19 0.00 0.00 Established Grass Ground Cover -100% 9 0.00 0.00 Asphaft/ConcretePavement Cnet = [0.45 x 0.02+. +0.13 x 0.011 / 38.85 020 Pnet = [0.45 x 1.00 +.+ 0.13 x 1.00] / 38.35 0.80 EFF = (1-C'P)100 = (1:-0.20*0.80)100 = 83.91 > 79.8 (PS) RBD, Inc. ! w EFFECTIVENESS CALCULATIONS Total Site #183-039 PROJECT. FORT COLLINS UTILITY SERVICE CENT -STANDARD FORM B - GALCULATED BY-. JAM DATE: _. - 03/13/97 Erosion Control - - C=Facto P=Facto -,Comment Number Method Value Value 9 AsphalNConcrete Pavement 0.01-- 1 Paved and constructed- 16 Established Grass Ground Cover - 70% 0.04 1 reestablished open areas 19 Established Grass Ground Cover -100% 0.02 1 Areas not disturbed during const 20 sod Grass 0.01 1 newly sodded MAJOR PS AEA BASIN- ° - _ - _ - _ __Jac) SITE 93.9 7.45 SUB BASIN AREA Practice C ` A P ` A Remarks BASIN CONDITION _ ac AFTER CONSTRUCTION 5 PERVIOUS AREA DISTURBED 2.92 16 0.12 2.92 Established Grass Ground Cover-70% 5 HARD AREA 3.16 9 0.03 3.16 Asphalt/Concrete Pavement 5 UNDISTURBED AREA 1.37 .2o 0.01 1.37 Sod Grass 19 0.00 0.00 Established Grass Ground Cover -100% 9 0.00 0.00 Asphatt Concrete Pavement Cnet = [0.45 x 0.02+. +0..13 x 0.021 / 38.85 - 0.02 Pnet = [0.45 x 1.00 +.+ 0.13 x 1.001 / 38.35 = 1.00 EFF = (1-C`P)100 = (1-0.02.1.00)100 97.83 > 93.9 (PS) RBD, I= 1 o/ EROSION CONTROL CONSTRUCTION SEQUENCE PHASE 1 Construction Indicate by use of a bar fine or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 1 1997 WIND EROSION CONTROL SOH Roughing Perimeter Berner Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Fi ters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Gravel Mulch Asphafuconcrete Paving Other VEGETATIVE: Permanent Seed Planting(Channeo Permanent Seed Planting(Site) Mulching/Sealant Temporary Seed Planting Sod Iratallation Nettings/Mats/Blankets Other STRUCTURES: INSTALLED BY. VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON 1 /oZ RBD, Inc. i EROSION CONTROL COST ESTIMATE PROJE CT: FORT COLLINS UTILITY SERVICE CEN #183-039 PREPA RED BY: JAM DATE: 03/13/97 CITY RESEEDING COST _._Unit - Total-- - - - Method-. _ _ QuantiUnit Cost _ Cost. Notes _ Reseed/mulch 6.07564 ac $650 $3,949 See Note 1. Subtotal $3,949 Contingency 50% $1,975 Total $5;924 EROSION CONTROL MEASURES Unit Total Number Method -Quantity .__-Unit Cost_ Cost Notes 38 Gravel Mulch 3.1584_7 ac $200 $632 21 Temporary Vegetation 2.91717 ea $750 $2,188 6 Gravel Filter 2 ea $300 $600 5 Straw Bale Barrier 2 ea $300 $600 Subtotal $4,020 Contingency 50% $2,010 Total __ _ _$6 029 Total Secuq $6 029- Notes: 1. A<1 ac=$1300/ac; A=1-10 ac=$650/ac; A>10 ae=$500/ac. I 03 i I I I I ' CHARTS, TABLES AND FIGURES I I I 1 11 I I I I I r a I VII. CONCLUSIONS A. B. C. D. Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm Drainage Design Criteria Manual. Drainage Concept This site has the difficult problem of passing 359 cfs of historic offshe flows through its site and then ensure that no increase in pondmg levels occur due to improvements. Also that downstream offsite impacts are mitigated due to the increase in run off. This Plan adequately provides for the transmission of the 100-year event runoff from the portion of the Old Town Basin tributary to the Light and Power Service Center through areas between the Service Center and to the Cache La Poudre River. Runoff from Basins 1, 3, 4, 5 and 6 flows into the ponding area behind the existing wooden box culvert in Basin 5. They then flow around the west end of the embankment and east along the north side of the railroad embankment, contained within a temporary channel to the storage .yard. The storm flows then sheet flows northeast toward the northeast corner of the storage yard where they are guided to the east, away from the adjacent pond, by a retaining wall: Flows then pass to a low lying area in the Cache LaPoudre River tloodplain Stormwater Quality Concept Storm flows from the parking lot are treated by a grass lined swale and the informal detention behind the existing wooden box culvert. Being less than 5.0 acres, it is not required that this site submit a formal NPDES permit: Erosion Control Concept Per the City of Fort Collins Erosion Control Reference Manual for Construction sites, this project will meet or exceed the recommended performance standard calculated. All measures taken to control erosion 7 DRAINAGE CRITERIA MANUAL RUNOFF 1674 c 1 1 1 1 1 1 1 1 5C 3C 1•— 20 z w U cC W 10 z w a O 5 Ul W to cc 3 O U 2 w Q 3 1 ®mmmmmmu�r ®FARIP - MME111111 013111FIrm mm����i FA m 0111111111111111®Ills ,�■ GIs■■® mill I •, , l I' I �I��II III ���i®�_������■� ������®��►���ria�� MEMO -on .2 .3 .5 1 1 2 3 5 _ 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. $ MOST FREQUENTLY OCCURRINVUNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55. USDA, SCSJan. 1975. 5 -1-84 ' URBAN DRAINAGE 3 FLOOD CONTROL DISTRICT DRCOG No Text 106 INTERPOLATED VALUES FOR 100 YEAR INTENSITIES Tc Value 5.00 9.0 S.10 9.0 5.20 8.9 5.30 8.9 5.40 8.9 5.50 8.8 5.60 8.8 5.70 8.7 5.80 8.7 5.90 8.7 6.00 8.6 6.10 8.6 6.20 8.6 6.30 8.5 6.40 8.5 6.50 8:5 6.60 8.4 6.70 8.4 6.80 8.4 6.90 8.3 7.00 8.3 7.10 8.2 7.20 8.2 7.30 8.2 7.40 8.1 7.50 8.1 7.60 8.1 7.70 8.0 7.80 8.0 7.90 8.0 8.60 7.9 8.10 7.9 8.20 7.8 j 8.30 7.8 8.40 7.8 8..50 7.7 8.60 7.7 8.70 7.7 8.80 7.6 8.90 7.6 9.00 7.6 9.10 1.5 9.20 7.5 9.30 7.5 9.40 7.4 9.50 7.4 9.60 7.3 9.70 7.3 9.80 7.3 9.90 7.2 20.00 7.2 b '-)- Table 86 C-Factors and P-Factors for Evaluating EFF Values. Treatment CFactor P-Factor BARE SOIL Packed and smooth ........................................ 1.00 1.00 Freshlydisked.:...................................................................... 1.00 0.90 Rough irregular surface .;.::,;:.;..;..,.:.:,...:::..::.......................... 1.00 6.96 SEDIMENT BASIN/TRAP..... ......... ........ ............... 1.00 0.50rn ............................ STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG ........................ 1.00 0.80 SILT FENCE BARRIER .................................................... :....... .:...... 1.00 0.50 ASPHALT/CONCRETE PAVEMENT.... ,.: :.:.. ......... 0.01 1.00 ESTABLISHED DRY LAND (NATIVE) GRASS :..'...:.:..:............ See Fig. 8-A 1.00 SODGRASS..................:.................................::...:.:..:..::,::........... 0.01 1.00 TEMPORARY VEGETATION/COVER CROPS .:..s ...:.:.........:............. 0.4512' 1.00 HYDRAULIC MULCH @ 2 TONS/ACRE .>.;.;,;.::............................... 0.1061 1.00 SOIL SEALANT ...... ..... .............:............................0.01-0.6014 1.00 EROSION CONTROL MATS/BLANKETS............................................ 0.10 1.00 GRAVEL MULCH Mulch shall consist of gravel having a diameter of approximately 1 /4" to 1 1 /2" and applied at a rate of at least 135 tons/acre.............. 0.05 1.00 HAY OR STRAW DRY MULCH After Planting grass seed, apply mulch at a rate of 2 tons/acre (minimum) an. d adequately anchor, tack or crimp material into the soil. Slone L%) 1 to 05:.: :.::....:.::.................;,.,.:::.......,..:................ ........0.06 1.00 w to 11 to 15:..:...: .....................................................................0.07 1.00 16 to 20...... ....:.:.. ... ::,....:....:...................0.11 1.00 21 to 25 :.....................................................................:...,:. , . 1.00 25 to 33...... ...:. ........................................................ 0.17 1.00 >33..................................:... :. ..... ......:..0.20 1.00 NOTE: Use of other C-Factor or P-Factor values reported in this table must be substantiated by documentation. (1) Must be constructed as the first step in overlot grading. (2) Assumes planting by dates identified in Table 11-4, thus dry or hydraulic mulches are not required. (1) Hydraulic mulches shall be used only between March 15 and May 15 unless irrigated. (4) Value used must be substantiated by documentation. MARCH 1991 84 DESIGN CRITERIA I r: I [I I 1 I. 11 I Tabie.8-6 C-Factors and P-Factors for Evaluating EFF Values (continued from previous page). Treatment C-Factor P-Factor CONTOUR FURROWED SURFACE Must be maintained throughout the construction period, otherwise P-Factor = 1.00. Maximum length refers to the down slope length. Basin Maximum Slope Length (%) (feet) 1 to 2 400..............................:.......:::.......:.:;......................1.00 0.60 0.50 3 to 5 300............................................................:...:.:...:..:1.00 6 to 8 200..... :..:... :.... ..:..:.::.:.............................................1.00 ...... 0:50 0.60 9 to 12 120.................. ...,:::. .. ...:::;.........1.00 0.70 13 to 16 80:....:....:.:,.....;:...::,:.............................................1.00 17 to 20 60................................................ .;. ::.:...:........1.00 0.80 >20 50.....:......:...........:.................................................1.00 0.90 TERRACING Must contain 10-year runoff volumes, without overflowing, as determined by applicable hydrologic methods, otherwise P-Factor = 1.00. Basin Slope (% 1 to 2... :........... ..:.::........ :................................................. :..:. 1.00 0.12 3 to 8 1.00 0.10 ................................................... :...... ..:..;_...:.....,............ 9 to 12 ...... :.:..:. . 13 to 16...... ......... _... ............. ....... ................ 1.00 0.14 17 to 20.:.::...::::............................................................:.:..:..:.:.1.00 0.16 > 20 ........................... ......... ..;:: .............................. 1.00 0.18 NOTE Use of other C-Factor or P-Factor values reported in this table must be substar6wed by doamnernacon. MARCH 1931 8.7 DESIGN CRITERIA o mm000 /o� o v et' to U1 to o-o,mmm000000 o er�vvWWtn�Wut � WWWOaoWcoo,eo�. o Wc�o�mo,o+o,o,mmmm000 . . . . . . . . . . . . . . . . o varrvvervvvvvvinllln eh commWcowWWmmoDWcoWW o t`eommolm0,mmmmmmc,0,rn0,0,a%0, o vvvvevvvvvvvvvvvvvvv N W N W W W W O m W W W m W W m W W W W W '. '. . O o O .-1 vvvvvvvvvvvvvvvvv.vvvvvv�vver WWWWWWWWcoco0WWWWep0maDCOwwwwWoo RrYi� O W NMd'LL'l lcf ul t0 ,O t0. �010 ,O nI�I����t���f� W W W a o, Mefel'd't!'e7'alsl'e1'vvvvvvvvvvvvvvvvv UmWWWmWWmmWmmWWWWmmmWWWWWWW O ,DON UI W mmf-0 v leRewegwled'v11-0d'7elvIT V'eT veP H COtOCOCOWmWmmWNWCOW WmCOCOCO'mCOCOCO W CD W a O vmriNMMvv-w rinLnInIntnininInIn%D%0WW%0%Dt` O r` cot Mvervvvvvvervvvvvvgrvv wes•vvvv U o C*COWCD0OW WCOmW Wm CDWWCOCOWCO CIO aDWcoW W OD 010c00ririNNmmmInvvvv�'vay.In.ultllu1%0W . O 10 .......................... M M M v v v v.v v v v v er v v v v v v v v v v v v v i=e CO CO W CD COW WCO W.W m W COW W W CD CO CO CO W O CD CO CO CD —0 inNtnc-WO,00rlrir4nNNNNMInmmmvvvv v 10 dP . . • • • • • • . • • • . . • • . . . . . . . • . . . co W �In NmI°fr'fmm w.0verel4Qvvvvv4vv4e}v%ry WODWWWWCID WWWCDWWWWWWWWWWCID WWW W k7 to W. I.7o as rqW,iM�Inln�o�ot`t`t`camWmWWD,rnrn00000 QQ. . .7v . . . . . . . . . . . . . . . . . . . . . . . . . NNCfncolmInme'1C1C1Ml'fMMC'fC"Imm1'fmRrgPvvv HC3 to a*ODIDCDCDCD CO CDCOCCCOCOCOCCCOCocvmCOCDCD W W CO CO CO O t0t11CDOrlNMvd1f11AIt110�D10�D1D1�t�t�t�WWCDO0% H • • • . . . . . . . . . • . . . • . . . . • • . • • • ca v r4NNC-1 m m m hmmenm !f In m m m m M M M M M Ii Inn CO W CO CO W CO CO CO CO W W CO CO CO W CO CO CO W CO W W CO CO W CO _ W Ci in • r{rttnt-WOOrtNNMMMvvvvvtoInIn W W1Dt-t! . •. . . . . • . . . . . . . . . . . . . . . . • . y - - CO) e!f Cf M riNNNNYfMM en MMMMMMMMMMMM!!1 WWWWWWCOmWWWCO WWWWWWCID WWWW.CID WCO - - O.. O MNtO W at0dNNMco) MvvvvvvinIninInl0%o %o W w R.' (!') 074.-1.i.-1-NCVNNNNNNNNNNNNNNNNNNN 67 W m W CO CO W W CO CO CO CO CO W W CO W CO CO CO CO W CO CO W CO CO a In In Ina%NMvinwt-r%t�CO W Wmmmmata%oo00o0 a N 0100 ri rq rq rq rq rir♦rirqrtrlr4r1r{r-t.4rIN N N N N N Ri t- W W W W W W co co co CO co co co W CO co co co W co co W CO CO CO x O vIn0MInWCOmm000rirerlr4NNNNe' M M M M M N NmOOOOOOOrtrlrire.irtrlri.i ri.irl ri re.-tr♦ri r-NCDW WWCOCOWCDCnW WCiDWWODW WCOCOW WEOCOCO to co co rt v In l`r co m m 00 rl H rl rt re N N N M m n m M ri Wco co O,O,O,mmO,mm000000000000000 rrrrnrrrrrt+weococococccocccocOccW coW co O toC'fOv1%010r4NMM-we tnIninInW%Dw10r%r.W w W . . . . . . . r1 . . . . • . . . . • . . • . . . . . . • VWI-r-r%t-WWWWWmWWWmWmmWWWW CO Wm to rrt`rrrrt;r.Nrt;r-rt-NI-t`t`rt-t`c-t-rt- as w%Dt-m co t`r-r-%owwInvvMMNNO,IOvr-Ic%w O 0 N N NNNNNNNNNNNNNNNNNr{r'iH.-I00 t%rt7%t-t-I-rr-r%NIrtnt�rnnrrrtnrr N r% x 00000000000000000000000000 3H o 0 H 00066600000000000000000000 azw rIWt`WOIOr-INP,v.IfnWr-co0%0In0In0In0 LL Wv rqHrHrHririrlrir•1rHNNMIr1vsf!n a 8.4 DESIGN - MARCH 1991 CRITERIA must be left in place and maintained until the project is stabilized with pavement or permanent vegetation. REFERENCES 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins; Colorado, May 1984, revised January 1991. I I 11 I I I I u I I 1 1 i 1 I I I 1 1 1 1 I 1 I E FA w 9 DIIN 17 M 1 A 2- n i I I VICINITY MAPS I I i 1 I i I I I I 50os 36 35 -34 Tr Ilfx: ar�k''It � i Ire f y _ �r f .' f •�� II 'r .L� Ic LLI ull - i�r� 9p/�- 'AND` � % � .. — ■wl li. �. — -a Trader - :arS SDI6 OM i a1.n - may?' r n Parks Sulxta PROJECT SITE I ,•30.• VINE •L-hF�/VFI,-_ LEE•�._.. _.-�_—•�-- ='T%�'I 'soiz-� i. _- sg{r`" -ci r:�MARTI ;y i --r �_ t =1 ' PARK . �` ■■.+ R . 7 or }I•'j I Fa ly-•,.� s\ ✓/'� .\r_:�Yu,• rl .fm •��- ? -.� I L _� I�"-ry;:_M I w' lam-G - II : r JL +a - (� - - . II 1 I' s.'.....:.:10 a_ 1I �Ij 7 11 ss •I / •v �I W I\ �! \ �M UNTAIN �)r_MOUMiFI(J-_il�-.—It.\.yL!I j ^'1EN Grand�ti''•• r� IIGI II tlnr Tj�1�.=:. _ II\•I~-1 �IL_—_ll._woJ,.--..II �I. �l._.�•l_.. If \ :: ----, : rJ \ �.-..Irk - v Ir♦� II \. I • • • .. i M • I I 1.. \ .I a - ;:.• •V �`. �� 1p� Q}�_ ��n�Il .:u U , : - - 1' FAT TZINSi •► II :1 Will. 112.11 �_ I .. 1, { � I':, �L. F3AI __ .�...•C ..: .. ... ''�A'.. :.r —t�..��.;._—_J .. h\.-. :_�i . �..,' -'•.y.\ '' ��1-�L''Y_:::.I�__. i • )Lrldon r -�,I. -i. I IIMa,�e.Es�_ � -- � ^li\a ij ii � ij i' ~ it �Ir • �\�0�\ ^c'Itt �... ,_� ►i i :I: `�•r� 9 it /..„:�•1 :� .I("I I� l \\I! W { II 1 j I� :. 1. . t % �1 I' •'' o it 'I LAURE4.r: 157 a �+l .L.`. ; i.:...,: . I....... ` ,c.. �.ue� yl Z `l 150y 7I I �- •� �i r 3.4 [ ■'I' !Ij I I \I I I II I -t 1 M 1I13 II . ji \., .� ,•T'ip.u1L\Inl KI'. 'I'h� ,ri 1 Y i I(II j. CIZnDCTN� Sr Islcr:r-elTv 14. IJJi•�il- �L•t�7 t �[�. I�l ,�.� ;{] 1! `li.. .I:. WII $•hP• �� .� �.. ::: �■. _ •� 1�• _ 1 .��W Y��� W I:'.al•.cl,....r ..Ir. .�l1 �-_* i . J I I I I. • 1 . W` O a ose v r :• `�'"•. .'� l� -� I�LL O '�II • fiy� !4..: / ' ' +.! I \ = • • I ■mn � y� l � l_i �r W Srli' . VICINITY MAP SCALE: 1" = 2000' n 3 I j I 11 Fi r I r i I I I I 1 F� r SWMM MODELING I 40 DRAINAGE CRITERIA MANUAL RUNOFF 50 -j:-to:7 40 el w 30 a 0 10 X TEST AREA LOCATIONS 0 ARAPAHOE COUNTY O ❑ . LITTLEION 00 000000 a LOW DENSITY IVEDIUM DENSITY C 1 2 4 5 HOUSING DENSITY - UNrrs PER ACRE FIGURE 2-1. RESIDENTIAL HOUSING DENSITY VS. IMPERVIOUS AREA I$ D.V. 5-1-8 4 URBAN DRAINAGE & FLOOD CONTROL DISTRICT 5' SWMM MODEL 100 YEAR STORM EXISTING CONDITION E� FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE FORT COLLINS UTILITY SERVICE CENTER P.U.D. 5TH FILING FORT COLLINS, COLORADO April 28, 1997 Prepared for: Vaught*Frye Architects and The City of Fort Collins Prepared by: The Sear -Brown Group Formerly RBD Inc. 209 South Meldrum Fort Collins, Colorado 80521 (970) 482-5922 RBD Job No. 108-039 Ar WENT JOP NO. RM.0 'e�J'CALCULATION'S FOR 77 0' PROJECT CALCULATION'S Engineering Consultants "DE BY DATE CKEcao By— ol.-rE SHEET —OF A 4fisixian AfTht Srw-im-n Group 16 19 i1, r MN =lu 'I 11 ............ Z-A Crr- ZJI�SSI 7V0.2=h i I DRAINAGE CRITERIA MANUAL RUNOFF 50 00 uj 30 cl: 0 .20 w CL 10 0 IIZZI AREA LOCATIONS I 0 ARN HOE COUNTY 0. LITTLEION 0 01 /13 LOW DENSITY MEDIUM DENSITY 2 % 4 5 HOUSING DENSITY - UNrrs PER ACRE FIGURE_ 2-1. RESIDENTIAL HOUSING DE SITY Vs. IMPERVIOUS AREA 5-1-84 URBAN DRAINAGE 3 FLOOD CONTROL DISTRICT E r c ; 020112S3.DAT 2 1 1 2 3 4 WATERSHED . 0 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT R80, INC. (DWB) %/ FILE=020112S3.DAT // 28 OCT 96 1 300 0 0 1. 1 2. 25 5. 0;60 0.96 1.44 1.6B 3.00 5.04 9.00 3.72 2.16 1.56 1.20 0.84 0.60 0648 0.36 0.36 0.24 0.24 0.24 0.24 0.24 1.24 0.12 1,12 0,00 * -2 .016 .250 0.1 0.5 0.5 0.5 .0018 * Shields/Vine/Cherry/Wood basin #1 1 1 1 838248.11 38. .014 * Shields/Vine%Cherry/Wood basin #2 1 3 3 471827.08 36. :017 • Elm/Wood/Loomis basin 1 4 4 308617.71 38. .016 * Future parking lot basin 1 5 5 888 7.48 11.0 .02 * Existing L&P parking basin (from Preliminary Overall Drainage Plan) 1 6 6 504 1.91 95. Ai5 * Existing L&P yard basin 1 7 7 138412.71 99. .02. * Basin draining to existing 30" ADS and 24" RCP's along north property line 1 17 18 1384 4:80 99. .02 * 0 0 * West Elm Street channel 1 9 0 4 0.5 120.0. 0.010 25. 25. 0.016 0.5 50. um 6.010 20. 20. 0.016 10. r,.. ple & Wood Streets channel 3 9 0 4 0.5 1650. 0.011 25. 25. 0.016 0.5 50. 1650. 0.011 20. 20. 0.016 id. * Grant Street channel 4 16 0 4 0.5 450. 0.010 25. 25. 0.016 0.5 56. 450. 6.010 20. 20. 0.016 10. * East. Elm Street channel 9 10 0 4 0.5 450* 0,009 21, 21, 0.016 0.5 50. 450. 0.009 20. 20. 0.016 id. * NODE: sump along Elm Street 10 11 0 3 1. 1. 0.001 0. 0. 0.013 1. * Future parking lot channel 5 11 0 4 2. 340. 0.016 50. 50. 0.016 6.5 t 340. 0.016 20. 20. 0.016 id. Detention po50. nd north * Detention poof Elm Street 11 15 17 2 0.1 500. 0.005 0. 0. 0.013 0.1 0.0 0.0 0,0 1.18 12.87 2.91 4.73 14.69 0.04 5.48 8.24 16.33 6.31 6.08 10.78 19.77 6.71 27.07 7.37 41.15 8.06 65.24 8.77 102.50 0.52 164.17 10AO 246.97 11.11 349.93 11.96 468.80 12.84 619.08 Surface flow along north side of railroad berm �* 15 7 0 1 3. 500. 0.010 50. 4. 0.035 5. • Parking lot outflow channel 6 14 0 4 10. 200. 0.007 3. 3. 0.016 0.5 so. 200. 0.067 20. 20. 0.035 10. �* Runoff from parking lot split between detention pond and storage yard 5 14 7 4 3 1. 1. 0.001 0. 0. 0.013 1. 0.0 0.0 10.7 7.1 20.7 13.8 33.0 22.0 * Yard -surface flow 7 70 0 1 20. 730. 0.020 50. 50. 0.016 5. Detention pond at northeast corner of storage yard 70 16 4 2 0.1 500. 0.001 0. 0. 0.013 1. 0.0 M 0.31 102.9 1.90 1554.4 4.99 4981.4 * Existing 301, ADS and 24" RCP's along north property line (Use extra diameter) 11 18 16 0 2 5.0 975. 0.009 0. 0. 0.013 5.0 )E: At Northeast corner of storage yard 16 19 0 3 1.0 1.0 0.010 0. 0. 0.013 3.0 Overflow channel into open grassland to the northeast of Utility Center I* 19 0 1 3.0 4. 0.010 B. S. 0.060 5.0 0 4 5 7 10 11 13 ENDPR06RAM i r i �1 <o FILE: 020112SIOU'r ENVIRONMENTAL PROTECTION AGENCY - STORM WATER MANAGEMENT MODEL VERSION PC.1 DEVELOPED BY UPDATED BY TAPE OR DISK ASSIGNMENTS JIN(1) JIN(2) JIN(3) 2 1 0 ,. JOUT(1) JOUT(2) JOUT(3) 1 2 0 NSCRAT(1) 3 WATERSHED PROGRAM CALLED ENTRY MADE TO RUNOFF MODEL ♦k METCALF + EDDY, INC. UNIVERSITY OF FLORIDA WATER RESOURCES ENGINEEERS, INC. (SEPTEMBER 1970) UNIVERSITY OF FLORIDA (JUNE 1973) HYDROLOGIC ENGINEERING CENTER, CORPS OF ENGINEERS MISSOURI RIVER DIVISION, CORPS OF ENGINEERS (SEPTEMBER 1974) BOYLE ENGINEERING CORPORATION (MARCH 1985, JULY 1985) JIN(4) JIN(5) JIN(6) JIN(7) JIN(8_) JIN(9) JINGO) 0 0 0 0 0 0 0 JOUT(4) JOUT(5) JOUT(6) JOUT(7) JOUT(8) JOUT(9) JOUT(10) 0 0 0 0 0 0 0 NSCRAT(2) NSCRATO) NSCRAT(4) NSCRAT(5) 4 0 0 0 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT ARID, INC. (DWB) // FILE=02053.DAT // 28 OCT 96 112 NUMBER OF TIME STEPS 300 INTEGRATION TIME INTERVAL (MINUTES) 1.00 2.0 PERCENT OF IMPERVIOUS AREA HAS ZERO DETENTION DEPTH FOR 25 RAINFALL STEPS, THE TIME INTERVAL IS 5.00 MINUTES FOR RAINGAGE NUMBER 1 RAINFALL HISTORY IN INCHES PER HOUR .60 .96 1.44 1.68 3.60 5.04 9.00 3.72 2.16 1_56 1.20 .84 .60 .48 .36 .36 .24 .24 .24 .24 % .24 .24 .12 _12 .00 i ` CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RID, INC. (DWB) // FILE=02011253.DAT // 28 OCT 96 JIEA GUTTER WIDTH AREA PERCENT SLOPE RESISTANCE FACTOR SURFACE STORAGE(IN) INFILTRATION RATE(IN/HR) GAGE NUMBER OR MANHOLE (FT) CAC) IMPERV. (FT/FT) IMPERV. PERV. IMPERV. PERV. MAXIMUM MINIMUM DECAY RATE NO 0 .0 .0 .0 .0300 .016 .250 .100 .500 .50 .50 .00180 - 1 8382A 48.1 38.0 .0140 .016 .250 _100 .5DO .50 .50 .60180 1 3 3 4718.0 27.1 38.0 .6170 .016 .250 .100 .500 .50 .50 .00180 1 4 4 3086.0 17.7 38.0 0160 .014 .250 .100 .500 .50 .50 .00180 1 5 5 888.0 7.5 11.0 .0200 .016 25O .100 .500 .50 .50 .00180 1 6 6 504..0 1.9 95.0 .0150 .016 .250 _100 .500 .50 .50 .00180 1 7 7 138 .0 12.7 00.0 MOD .016 .250 .100 .500 .50 .50 .00180 1 17 TOTAL 18 NUMBER OF 1384.0 4.8 SUBCATCHMENTS, 00.0 7 Am .016 .250 .100 .500 .50 _50 .00180 1 TOTAL TRIBUTARY AREA (ACRES), 119.80 �ICITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD, INC. (DWB) // FILE=020112S3.DAT // 28 OCT 06 *** CONTINUITY CHECK FOR SUBCATCHMEMT ROUTING IN UDSWM2-PC MODEL *** WATERSHED AREA (ACRES) 119.800 TOTAL RAINFALL (INCHES) 2.890 TOTAL INFILTRATION (INCHES) .461 TOTAL WATERSHED OUTFLOW (INCHES) 2.116 TOTAL SURFACE STORAGE AT END OF STROM (INCHES) 313 ERROR IN CONTINUITY, PERCENTAGE OF RAINFALL .600 i OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD, INC. COW // FILE=020112S3.DAT %/ 28 OCT 96 _ WIDTH INVERT SIDE SLOPES OVERRANK/SURCHARGE GUTTER GUTTER NDP RIP OR DIAN LENGTH SLOPE HORIZ TO VERT MANNING DEPTH JK NUMBER CONNECTION (FT) (FT) (FT/FT) L R N (FT) 1 9 0 4 CHANNEL .5 1200. .0100 25.0 25.0 .016 30 0 OVERFLOW 50.0 1200. .0100 20.0 20.0 .016 10.00 3 9 0 4 CHANNEL .5 1650. .0110 25.0 25.0 .016 .50 0 OVERFLOW 50.0 1650. .0110 20.0 '20.0 .016 10.00 4 10 0 4 CHANNEL .5 450. .0100 25.0 25.0 .016 .50 0 OVERFLOW 50.0 450. .0100 20.0 20.0 .016 10.00 9 10 0 4 CHANNEL .5 450. ..OD90 25.0 25.0 .016 .50 0 OVERFLOW 50.0 450. .0090 20.0 20.0 .016 10.00 10 11 0 3 1.0 1. .0010 .0 .0 .013 1.00 0 5 11 0 4 CHANNEL 2.0 340...0160 50.0 50.6 .016 .50 0 OVERFLOW 56.0 340. .0160 20.0 20.0 - .016 10.00 11 15 17 2 PIPE .1 500. .0050 .0 .0 .013 .10 0 RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW :0 .0 .0 47 .0 8.2 ,3 10.8 1.2 12.9 2.9 14.7 5.5 16.3 6.1 10.6 6.7 27.1 7.4 41..1 8:1 65.2 &.8 102.5 9.5 164.2 10.3 247.0 11.1 349.9 12.0 468.8 12.8 619.1 15 7 0 1 CHANNEL 3.0 500. .0100 50.0 4.0 5.00 0 6 14 0 4 CHANNEL 10.0 200. .0070 3.0 3.0 .035 .016 .50 0 OVERFLOW 50.0 200. .0070 20.0 20.0 .035 10.00 14 7 4 3 1.0 1. .0010 .0 .0 .013 1.00 5 DIVERSION TO GUTTER NUMBER 5 - TOTAL 0 VS DIVERTED 0 IN CFS .6 .0 10.7 7.1 20.7 13.8 33.0 22.0 7 70 0 1 CHANNEL 20.0 730. .6200 50.0 50.0 .016 5.00 0 "1 16 4 2 PIPE .1 500. .0010 .0 .0 .013 1.00 0 RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW 0 .0 .3 102.9 1.9 1554.4 5.0 4981.4 18 16 0 2 PIPE 5.0 975. .0090 .0 .0 .013 5..0.0 0 16 19 0 3 1.0 1.. .0100 9 0 0 1 CHANNEL 3.0 4. 0100 ruTAL NUMBER OF GUTTERS/PIPES, 15 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD, INC. (DWB) // FILE=020112S3.DAT // 28 OCT 96 ARRANGEMENT OF SUBCATCHMENTS AND GUTTERS/PIPES GUTTER TRIBUTARY GUTTER/PIPE 1 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 7 15 14 0 0 0 0 0 0 0 0 9 1 3 0 0 0 0 0 0 0 0 10 4 9 0 0 0 0 0 0 0 0 11 10 5 0 0 0 0 0 0 0 0 _. 14 6 D 0 0 0 0 0 0 0 0 15 11 0 0 0 0 0 0 0 0 0 16 70 18 0 0 0 0 0 0 0 0 18 0 0 0 0 0 0 0 0 0 0 19 16 0 0 0 0 0 0 0 0 0 70 7 0 0 0 0 o 0 0 0 0 ORDER OF TREE STRUCTURE (NGUT VALUE) DECREASES THROUGH DIVERSION FROM GUTTER TIME STEP UNLESS GUTTER CARDS ARE MODIFIED TO REVERSE DIVERSION. m 12, .0 0 .013 3.00 0 8.6 8.0 060 5.00 0 TRIBUTARY SUBAREA D.A.(AC) 1 0 0 0 0 0 0 0 0 0 48:1 3 0 0 0 0 0 0 0 0 0 27.1 4 0 0 0 0 0 0 0 0 0 17.7 5 0 0 0 0 0 0 0 0 0 7.5 6 0 0 0 0 0 0 0 0 0 1.9 7 0 0 0 0 0 0 0 0 0 115.0 0 0 0 0 0 0 0 0 0 0 t.2 0 0 0 0 0 0 0 0 0 0 92.0 0 0 0 0 0 0 0 0 0 0 100.4 0 0 0 0 0 0 0 0 0 0 1.9 0 0 0 0 0 0 0 0 0 0 100.4 0 0 0 0 6 0 0 0 0 0 110.8 17 0 0 0 0 0 0 0 0 0 4.8 0 0 0 0 0 0 0 0 0 0 119.8 0 0 0 0 0 0 0 0 0 0 115.0 9 TO GUTTER 5 COMP THROUGH DIVERSION WILL LAG ONE ' OF FORT COLLINS LIGHT & POWER, SERVICE CENTER; DOWNTOWN BASIN, 100-YR EVENT INC. (DWB) /% FILE=020112S3.DAT // 28 OCT 96 It HYDROGRAPHS ARE LISTED FOR THE FOLLOWING 4 CONVEYANCE ELEMENTS THE UPPER NUMBER IS DISCHARGE IN CFS THE LOWER NUMBER IS ONE OF THE FOLLOWING CASES: ( ) DENOTES DEPTH ABOVE INVERT IN FEET (S) DENOTES STORAGE IN AC -FT FOR DETENTION DAM. DISCHARGE INCLUDES SPILLWAY OUTFLOW; (I) DENOTES GUTTER INFLOW IN CFS FROM SPECIFIED INFLOW HYDROGRAPH (D) DENOTES DISCHARGE IN CFS DIVERTED FROM THIS GUTTER (0) DENOTES STORAGE IN AC -FT FOR SURCHARGED GUTTER TIME(HR/MIN) 7 10 11 13 0 21. 0 26. 0 31. 0 36. 41. 0 46. .00 .00( ) .00 .00( ) .12 .61( ) .5.80 .10( ) 19.38 .19( ) 39.39 .27( ) 70.96 .36( ) 115.05 .46( ) 77.34 58.2.3 .00 -DO( ) .01 .00( ) .78 .00( ) 15.68 .00( ) 38.40 -Do( ) 72.54 .Do( ) 145.13 .00( ) 343.45 _00( ) 314.78 00( ) 25137 .60 .Do( ) .00 00( ) .92 .00( ) 6.58 .02(S) 9.47 J 7(S) 1124 .50(S) 12.89 1.20(S) 14.70 2.92(S) 16.22 5.30(S) 37.70 .00 00( ) .00 .00( ) .00 .00( ) .00 .00( ) AD .00( ) woo .00( ) .00 .00( ) .00 .00( ) .00 .00( ) .00 13 .33( ) .00( ) 7.21(S) .00C ) 73.55 201.34 85.80 .00 .37( ) .00( ) 8.45(S) .00( ) 113.93 162.98 196.31 .00 .46( ) .00( ) 9.06(S) .00( 143.51 129.53 139.23 .00 .51( ) .60( ) 9.22(S) .00( ) 147.07 102.38 132.46 .00 .51( ) .00( ) 9.13(5) .00( ) 135.93 82.10 117.79 00 .50( ) .00( ) 8.96(S) .00( ) 119.51 65.44 101.62 .00 .47( ) .00( ) 8.75(S) .00( ) 104.80 52.98 90.16 .00 .44( ) .00( ) 8.53(S) .00( ) 92.08 43.41 78.72 .00 .41( ) .00( ) 8.32(S) .00( ) 80.39 35.16 67.79 .00 .38( ) 00( ) 8.11(S) .00( ) 70.26 29.83 60.23 .00 .36( ) _00( ) 7.92(S) .00( ) 62.84 25.57 53.93 .00 34( ) .00( ) 7.74(S) .00( ) 56.53 22.60 48.10 .00 .32( ) .00( ) 7.57(S) .00( ) 50.84 20.51 42.94 .00 .31( ) .00( ) 7.42(S) .00( ) 45.52 17.83 39.38 .00 .29( ) AN ) 7.29(S) _00( ) 41.62 15.26 36.51 .00 .28( ) 00( ) 7.15(S) OO( ) 38.02 12.51 33.65 . .00 .26( ) .00( ) 7.02(S) 00( ) 34.70 10.04 30.77 .00 :25( ) .00( ) 6.8B(S) .00( ) 31.59 8.17 27.97 .00 .24( ) .00( ) 6.75(S) 00( ) 28.79 6.78 26.10 .00 .23( ) 00( ) 6.63(S) .00( ) 26.77 5.73 24.65 .00 .22( ) .00( ) 6.56(S) .00( ) 25.14 4.90 23.23 .66 .21( ) .00( ) 6.38(S) 00( ) 23.65 4.24 21.86 .00 .21( ) AN ) 6.26(S) 00( ) 22.24 3.40 20.54 .00 .20( ) .00( ) 6.15(S) .60( ) 20.91 3.24 19.53 .00 .19( ) .00( ) 6.04(S) .00( ) 19.92 2.85 18.91 .00 .19( ) .00( ) 5.9-US) .00( ) 19.18 2.51 18.30 .00 .18( ) .00( ) 5.82(S) .00( ) 18.53 2.22 17.70 .00 18( ) .00( ) 5.72(S) .00( ) 17.91 1.97 17.12 .00 .18( ) .00( ) 5.62(S) .00( ) 17.31 1.75 16.54 .66 .17( ) .00( ) 5.52(S) .00( ) 16.77 1.55 16.30 .00 .17( ) .00( ) 5.42(S) .00( ) 16.47 1.37 16.23 .00 .17() .00( ) 5.32(S) .00( ) 16.34 1.21 16.17 00 .17( ) .00( ) 5.22(S) .00( ) 16.25 1.07 16.10 .00 .17( ) .00( ) 5.12(S) .00( ) 16.17 .95 16.04 .00 .17( ) .00( ) 5.01(S) .0.0( ) 16.10 83 15.97 .00 .17( ) .60( ) 4.91(S) .00( ) e if 1+ 3 46. 16.03 .73 15;91 .00 .17( ) .00( ) 4.81(S) .00( ) 3 51. 15.96 .64 15:84 .00 .17( ) .00( ) 4.70(S) .00( ) 3 56. 15.89 .56 15.78 .17( ) _00( ) 4.60(S) ;OO 60( ) 4 1. 15.82 .48 15.71 .00 .17( ) .00( ) 4.50(S) .00( ) 4 6. 15.75 .42 15.64 .00 17( ) .00( ) 4.39(S) .00( ) 4 11. 15.69 .36 15.58 .00 .17( ) 00( ) 4.29(S) .00( ) 4 16. 15.62 .31 15.51 :00 .17( ) .00( ) 4.19(S) .00( ) 4 21. 15.55 .26 15.44 .00 AR ) .00( ) 4.08(S) .00( ) 4 26. 15.48 .22 15.38 .00 :16( ) .00( ) 3.98(S) .00( ) 4 31. 15.41 .18 15.31 :00 .16( ) 00( ) 3.87(S) 00( ) 4 36. 15_35 .15 15.25 .00 :16( ) .00( ) 3.77(S) .00( ) 4 41_: 15.28 .12 15.18 .00 a 16( ) 00( ) 3.67(S) .00( ') 4 46. 15.21 .10 15.11 .00 .16( ) .00( ) 3.56(S) .00( ) 4 51. 15.14 .08 15.05 .00 .16( ) .00( ) 3.46(S) .00( ) 4 56: 15.08 .07 14.98 .00 THE FOLLOWING 16( ) CONVEYANCE :00( ) ELEMENTS HAVE 3:36(S) NUMERICAL .00( STABILITY PROBLEMS THAT LEAD TO HYDRAULIC OSCILLLATIONS DURING THE SIMULATION. 11 19 70 a CITY OF FORT COLLINS LIGHT 8 POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RED, INC. (DWB) it FILE=020112S3.DAT li 28 OCT 96 *;+ PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS ♦*" CONVEYANCE PEAK STAGE STORAGE TIME ELEMENT (CFS) (FT) (AC -FT) (HR/M1N) 1 194.1 .9 0 36. 3 92:9 .7 0 38. 4 80.6 .7 0 35. .5 26.8 .4 0 36. 6 16.9 .4 0 35. 7 148.1 .5 1 4: 9 277.4 1.0 0 37. 10 349.9 (DIRECT FLOW) 0 37. 11 139.2 .1 9.2 1 1. 14 16.9 (DIRECT FLOW) 0 35. 15 137,3 1:2 1 4. 16 151.5 (DIRECT FLOW) 1 5. 18 41.5 1.4 0 35. 19 151.6 2.4 1 5. 70 147.9 .1 .4 1 5. tr, -CROGRAM PROGRAM CALLED i5 CLIENT I ��- V V JOB NO. 1 Sa ' Ca;� T3D wC. PROJECT.-_.G__._l: CALCULATIONS FOR wEp ��D DLO\V - Engineering Consultants MADE BY_DATE CMECKEDBY_DATE SHEET OF A division of The Sw.Bro n Group G3: rl ' *- -- - S - - t i + _ . 1 - 32,0� 3- 40& 3L7- _ -=3:>4. c SSS THE SEAR —BROWN GROUP FULL -SERVICE DESIGN PROFESSIONALS ' FORMERLY RBD, INC. 209 SOUTH MELDRUM FORT COLLI INS, COLORADO 80521-2603 970-482-5922 FAX:970-482-6368 April 28, 1997 Mr. Basil Harridan City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 1 1 1 1 1 I 1 1 n 1 RE: Final Drainage and Erosion Control Study for the Fort Collins Utility Service Center, P.U.D. , 5th filing Dear Basil: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Study for the Fort Collins Utility Service Center, P.U.D., 5th filing. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. To date, there are no variances being requested for this project. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, RBD Inc. Engineering Consultants by: en -Morley, P.E. Engineer Reviewed by: Kevin W. Gingery, P.E. Water Resources Project Manager cc: Mr. Jack Gianola City of Fort Collins Facilities Mr. John Renhowe Vaught*Frye Architects NEW YORK • PENNSYLVANIA COLORADO•UTAH ' STANDARDS IN EXCELLENCE EQUAL OPPORTUNITY EMPLOYER r I I / A 0 Detention Pond Rating Curves (Existing Condition) /(0 RBD, Inc., Engineering Consultants at /9L FORT COLLINS UTILITY CENTER 183-039 Detention Pond 11 Rating Curve_ Existing Condition 06-Nov-96 Elev ft) Area (ft2) Area (ac Storage ac-ft Cumulative Storage ac-ft Outflow cfs 4986.2 0 0.00 0.00 0.00 - 4987.0 34 MID 0.00 0.00 4.73 4988.0 4,800 0.11 0.04 0.04 814 4989.0 21,254 0.49 0.27 0.31 10.78 4990.0 57,662 1.32 0.86 1.18 12.87 4991.0 96,771 2.22 1.74 2.91 14.69 4992.0 129,603 2.98 2.56 5.48 16.33 4992.2 135,732 3.12 0.60 6.08 19.77 4992.4 141,861 3.26 0.63 6.71 27.07 4992.6 147,989 3.40 0.66 7.37 41.15 4992.8 154,118 3.54 0.69 8.06 65.24 4993.0 160,247 3.68 0.71 8.77 102.50 4993.2 167,851 3.85 0.75 9.52 164.1.7 4993.4 115,456 4.03 0.78 10.30 246.97 4993.6 183,060 4.20 0.81 11.11 349.93 4993.8 190,664 4.38 0.85 11.96 468.80 4994.0 198,268 1 4.551 0.881 12.841 619.08 100 year WSEL(9.2) ac-ft = 4993.12 V=1 /3d(A+B+(AB)^.5 MNov-96 RBD, Inc., Engineering Consultants H 7� FORT COLLINS UTILITY CENTER Historic Event JOB NO. 183-039 16-Sep-96 POND WATER SURFACE (elev) STORAGE VOLUME (ac. ft.) 30" x 12" WBC (cfs) ae17(page WEIR #1 (SE end) (cfs) 23(page WEIR #2 (P. Lot) (cfs) 27 TOTAL OUTFLOW (cfs) 11 4986.16 0.00 0.00 - - 11 4987.00 0.00 4:73 - - 4.73 11 4988.00 0.04 8.24 - 8.24 11 4989.00 0.31 10.78 - - 10.78 11 41990.00 1.18 12.87 - - 12.87 11 4991.00 2.91 14.69 - - 14.69 11 4992.00 5.48 16.33 - 0.00 16.33 11 4992.20 6.08 16.63 - 3.14 19.77 11 4992.40 6.71 16.93 - 10.14 27.07 11 4992-.60 7.37 17.22 - 23.93 41.15 11 4992.80 8.06 17.52 - 47.72 65.24 11 4993.00 8.77 17.82 0.00 84.68 102.50 11 4993.20 9.52 18.19 8.55 137.43 164.17 11 4993.40 10.30 18.66 25.35 202.96 246.97 11 4993.60 11.11 19.13 48.70 282.10 349.93 11 4993.80 11.96 19.60 73.63 375.57 468.80 11 1 4994.00 1 12.84 -1 20.071 114.991 484.02 619.08 9 16-Sep-96 RBD, Inc., Engineering Consultants FORT COLLINS UTILITY CENTER 183-039 Detention Pond 70 Rating Curve 06-Nov-96 Cumulative Elev Area Area Storage Storage Outflow ft) (ft2) (ac ac-ft ac-ft cfs 4974.5 0 0.00 0.00 0.00 0.00 4976.0 7,074 0.16 0.03 0.03 0.00 4976.0 181519 0.43 0.28 0.31 102.90 4977.0 35,074 0.81 0.60 0.91 599.30 4978.0 52,741 1.21 0.99 1.90 1554.40 4979.0 67,667 1.55 1.36 3.26 3020.80 4980.0 84593 1.94 1.73 4.991 4981.40 100 year WSEL( 0.4) ac ft = 4916.15 V=1 /3d(A+B+(AB)^:5 06-Nov-96 Existing Wooden Box Culvert (Stage vs. Discharge) I la 21 1 CURRENT DATE: 09-10-1996 FILE -DATE: 08.09:1996 r" RRENT TIME: 14:26:21 Flrr raar C TBETi 0�3Tt�-`C Z FHWA CULVERT ANALYSIS HY-8, VERSION 4.0 �I U I--___--SITE-DATA----------I-----CULVERT-SHAPE, MATERIAL, -INLET ------------I L V INLET OUTLET CULVERT ELEV. ELEV. LENGTH. (FT) (FT) (FT) 4986.16 ----------------- 4985.91 33.61 BARRELS SHAPE SPAN RISE' MANNING INLET MATERIAL (FT) (FT) n ---_-TYPE--- 1 RC3 2.50 0.80 .025 CONVENTIONAL "C �V?o�lcA BQ�GOLT/Ee� SUMMARY OF CULVERT FLOWS (CFS) FILE: OUTLETI DATE: 08-09-1996 ELEV (FT) TOTAL 1 2 3 4 5 6 ROADWAY ITR 4986.16 0 0 0 0 0 0 0 0 1 4986.65 2 2 0 0 0 0 0 0 1 986.92 4 4 0 0 0 0 0 0 1 4987.03 5 5 0 0 0 0 0 0 1 4987.91 8 8 0 0 0 0 0 0 1 ' 4988.65 10 4989.55 12 10 12 0 0 0 0 0 0 0 _ 0 0 0 0 1 0 1 4990.59 14 14 0 0 0 0 0 0 1 4991,78 16 16 0 0 0 0 0 0 1 4993.12 18 18 0 0 0 0 0 .0 1 4993.97 20 19 0 0 0 0 0 0 30 4994.00 19 19 0 0 0 0 0 OVERTOPPING SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: OUTLETI DATE: 08-09-1996 HEAD HEAD TOTAL FLOW °s FLOW ELEV(FT) ERROR(FT) FLOW(CFS) ERROR(CFS) ERROR 4986.16 0.00 0 0 0.00 4986.65 0.00 2 0 0.00 4986.92 0.00 4 0 0.00 4987.03 0.00 5 0 0.00 4987.91 0.00 8 0 0.00 4988.65 0.00 10 0 0.00 4989.55 0.00 12 0 0.00 4990.59 0.00 14 0 0.00 4991.78 0.00 16 0 0.00 4993.12 0.00 18 0 0.00 4993.97 -0.01 20 1 5.23 <1> TOLERANCE (FT) = 0.010 <2> TOLERANCE M) = 1.000 V.RENT DATE: 09-10-1996 FILE DATE.: 08-09-1996 .:RENT TIME: 14:26:21 FILE NAME: OUTLETI PERFORMANCE CURVE FOR CULVERT # 1 - 1 ( 2.5 BY .8 ) RCB DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRITICAL OUTLET TAILWATER FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH VEL. DEPTH VEL.. DEPTH (cfs) (ft) (ft) (ft) <F4> (ft) (ft) . (fps) (ft) (fps) (ft) 0 4986.16 0.00 0.00 0-NF 0.00 0.00 0.00 0..00 0.00 -0.06 2 4986.65 6.46 0.49 3-Mlt 0.36 0.27 2.05 0.39 1.45 0.39 4 4986..9.2 0.72 0.76 3-Mlt 0.58 0.43 2.76 0.58 1..77 0.58 5 4987.03 0.85 0.81 3-M2t 0.67 0.50 3.03 0.66 1.88 0.66 8 4987.91 1.26 1.15 4-FFt 0.80 0.68 4.00 0.80 2.13 0.88 10 4988.6.5 1.63 2.49 4-FFt 0.80 0.7.9 5.00 0.80 2.26 1.00 12 4989.55 2.08 3.39 4-FFt 0.80 0.80 6.00 0.80 2.37 1.13 14 4990.59 2.64 4.43 4-FFt 0.80 0.80 7.00 0.80 2-.47 1.26 16 4991.78 3.32 5.62 4-FFt 0.80 0.60 8.00 0.80 2.55 1.40 18 4993.12 4.10 6.96 4-FFt 0.80 0.80 9.00 0.80 2.63 1.56 19 4993.97 4.50 7.81 4-FFt 0.80 0.80 9.48 0.80 2.70 1.79 > El. inlet face invert 4986.1.6 ft El. outlet invert 4985.91 ft El. inlet throat invert 0.00 ft El. inlet crest 0.00 ft �** SITE DATA ***** CULVERT INVERT ************** . INLET STATION (FT) 0.00 INLET ELEVATION (FT) 4986.16 OUTLET STATION (FT) 33.61 OUTLET ELEVATION (FT) 4985.91 -- NUMBER OF BARRELS 1 SLOPE (V-FT/H-FT) CULVERT LENGTH ALONG SLOPE (FT) 0.0074 33.61 ***** CULVERT DATA SUMMARY BARREL SHAPE BOX BARREL SPAN 2.50 FT BARREL RISE 0.80 FT BARREL MATERIAL; eeifeRerrz - BARREL MANNING'S N 0.025 INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE (90-45 DEG.) INLET DEPRESSION NONE U-3RENT DATE: 09-10=1996 -.RENT TIME: 14:26:21 FILE DATE: 08-09-1996 FILE NAME: OUTLETI TAILWATER TAILWATER RATING CURVE FLOW(CFS) W.S.E.(FT) DEPTH (FT) 0 4985.85 -0.06 2 4 4986.30 4986.4.9 0.39 0.58 5 4986.57 0.66 8 4986.7.9 0.88 .10 4986.91 1.00 12 4981.04 1_13 14 4981.17 1..26 (� 16 4987.31 1.40 ■ 18 4987.47 1.56 20 4967.70 1.79 012rfllti ZQ rQ+.7NEr-lt7"U�J ZEZ i�IL\`iSaTGP_. W' 1J71 i10!Jf�. .- - ************************* ROADWAY OVERTOPPING DATA ************************** ROADWAY SURFACE GRAVEL 8NlBANI�lENT TOP WIDTH (FT) 50.00 CREST LENGTH (FT) 200.00 OVERTOPPING CREST ELEVATION (FT) 49.94.00._ 24 Table Rating Table for Circular Channel -Project Description _ Project File c:1haestacAfmvAfcutctr.fq12 Worksheet 24 INCH CMP RATING CURVE �EttiM. CF Zv7E1J BOX - Flow Element Circular Channel Method Manning's Formula Solve For Discharge Constant Data Mannings Coefficient 0.024 Channel Slope 0.022000 ft/ft Diameter 24.00 in Increment 2.00 Rating Table Depth Discharge Velocity (ft) - (cfs)- 0110 ._ - . _. 0.10 0.09 1.49 0.20 0.38 2.32 0.30 0.88 299 0.40 1.59 3.56 0.50 2.49 4.05 0.60 3.% 4.49 0.70 4.78 4.88 0.80 6.12 5.22 0.90 7.57 5.52 1.00 9.09 5.79 1.10 10.64 6.01 1.20 12.21 6.20 1.30 13.75 6.36 1.40 15.22 6.48 1.50 16.57 6.56 1.60 17.76 6.59 1 70 18.73 6.58 1.80 19.37 6.50 1.90 19.53 6.33 2.00 18.17 5.79 09140l96 Flo vMaster v5.13 02:05:33 PM Haestad Methods, Ino. 37 Brookside Road Waterbury, CT 06708 (203) 755-16M Page 1 of U Q IU 13 -� _ l` C " Of N � U Z F--1 A 1-4 m ca F' 17 NO lrl 1 � •f' ♦ ` 9oj w 1 � oe Li Li ♦ ♦'� J i i i a 3S_ 'n3S 'NVS .9 W W CI J V L2 N 7 3 J IL f rr 4m 25, ;- R a P -, --_- 'C-N h PAGE I. GENERAL LOCATION AND DESCRIPTION 1 A. Location I B. Description of Property 1 II.. DRAINAGE BASINS I A. Major Basin Description 1 B. Sub -basin Description 2 C. SWMM Model 2 D. HEC-2 Model 3 III. DRAINAGE DESIGN CRITERIA 3 A. Regulations 3 B. Development Criteria Reference and Constraints 3 C. Hydrological Criteria 3 D. Hydraulic Criteria 4 E. Variances from Criteria 4 IV. DRAINAGE FACILITY DESIGN 4 A. General Concept 4 B. Specific Details 4 V.. STORM WATER QUALITY 5 A: General Concept 5 VI. EROSION CONTROL 5 A. General Concept 5 B. Specific Details 6 VII. CONCLUSIONS 6 k Compliance with Standards 6 B. Drainage Concept 6 C. Stormwater Quality Concept 7 D. Erosion Control Concept 7 REFERENCES 7 1 VICINITY MAPS 3 SWMM MODEL 4 HEC-2 MODEL 58 STREET CAPACITY 74 1?4 Weir 4.1 at Southeast End of Ponding Area (Stage vs. Discharge) A 2,kj� RBD INC. ENGINEERING CONSULTANTS WEIR SECTION FLOW DATA WEIR #1 AT SOUTHEAST END OF SITE iA1 I:s � WEIR COEF. 2.500 STA ELEV* 32.0 93.00 37.0 93.00 37.0 93.60 37.4 93.60 37.4 93.00 41.4 93.00 41.4 93.60 41.8 93.60 41.8 93.00 49.8 93.00 49.8 93.60 50.2 93.60 50.2 93.00 54.2 93.00 54.2 93.60 54,6 93.60 54.6 93.00 70.0 93.00 74.0 94.00 80.0 95.00 ELEVATION DISCHARGE (feet) (ds) 93.00 0.00 93.20 8.55 93.40 25.35 93.60 48:70 93.80 .78:63 94.00 114.99 94.20 159.80 715 94.40 210.53 94.60 267.10 94.80 329.45 95.00 397.56 * Station and elevation information were taken from an existing HASP file/survey. These values represent the engineer's best juddgement regarding the geometry of the weir area in question. B No Text 3 Weir #2 at Northwest Corner of Ponding Area (Stage vs-. Discharge) A JW RBD INC. ENGINEERING CONSULTANTS WEIR SECTION FLOW DATA WEIR COEF. 2.400 ----� _ STA ELEV 0.0 95.00 21.0 94.00 06.0 93.00 145.0 92.30 157.0 92.:80 170.0 92.00 183.0 92.00 190.0 93.00 194.0 94.00 198.0 95.00 ELEVATION DISCHARGE' - (feet) (ds) 9200 0.00 92.20 3.14 92.40 10.14 92.60 23.93 92.80 47.72 93.00 84.68 93.20 137.43 93.40 202.96 93.60 282.10 93.80 375.57 94.00 484.0.2 94.20 613.77 94.40 75697 94.60 913.12 94.80 1081.86 95.00 1262.91 D r- O c) c� 3 .. N 4 �F-vo�o tj W w > — 190 _y r 1 1 t \ 1 ` 6 33 SWMM MODEL 100 YEAR STORM AND 2 YEAR STORM PROPOSED CONDITION 9 1 CLIENT J \�^- � :.l � _''—Y� —JOB NO `^� • �•'•79 INC. PROJECT �.� S.`7.1,. �\'"• `�-''�' CALCULATIONS FOR=\-.�.kS.% _>' ' Engineering Consultants MADE BY DATES �� CHECKED BY -DATE SHEET OF A dmsm of ne scar.Brovn Group — ------ :.. Ib i9 17* i47 70 j^ DIzS,OI� . 7. 15 so."1 !. 9 lt3 - C.— 3 I 3 i _ , ` ?k : t�Gzi'Sa�S?�ct����?�,� •�`�-�Sl�.t.� b�.pP=Lir:S—'TO�.SPC['�bT....: ' coo.%:cr-i. ep s!J. -7, or--s�� i C`i'J n C n I 3� I C 1 I 1 I I C I I 1 I 1 I 2 1 1 2 3 4 YATERSHED 0 CITY OF FORT COLLINS LIGHT & POYER SERVICE CENTER, DOYHTOYN BASIN, 2-YR EVENT RBD, INC:, (JAM) // FILE=020112Si.DAT // 10 roar 97 1 300 0 0 1. 1 2. 1 25 5. 0.12 0.36 0.48 0.60 0.84 1.80 3.24 1.08 0.84 0.48 0.36 0.36 0.36 0.24 0.24 0.24 0.24 0.12 0.12 0.12 0.;12 0.12 0.12 0.12 0.00 * -2 .016 .250 0.1 0.5 0.5 0.5 .0018 * Shields/Vine/Cherry/Wood basin #1 1 1 1 838248.11 38. .014 * Shields/Vine/Cherry/Wood basin #2 1 3 3 471827.08 38. .017 * Elm/Wood/Loomis basin 1 4 4 308617.71 38. .016 * Future parking lot basin 1 5 5 888 7.48 51. .02 * Existing L&P parking basin (from Preliminary Overall Drainage Plan) 1 6 6 504 1.91 95. .015 * Existing L&P yard basin 1 7 7 138412.71 99. .02 * Basin draining to existing 30" ADS and 24" RCP's along north property Line 1 17 18 1384 4.80 99. .62 0 0 * West Elm Street channel 1 9 0 4 0.5 1200. 0.010 25. 25. 0.016 0.5 50. 1200. 0.010 20. 20. 0.016 10. Maple & Wood Streets channel 3 9 0 4 0.5 1650. 0.011 25. 25. 0.016 0.5 56. 1656. 0.011 26. k. 0.016 10. * Grant Street channel 4 10 0 4 0.5 450. 0.010 25. 25. 0.016 0.5 so. 450. 0.010 20. 20. 0.016 10. ' East Elm Street channel 9 10 0 4 0.5 450. 0.009 25. 25. 0..016 0.5 50. 450. 0.000 20. 20. 0.016 10. * NODE: sump along Elm Street 10 11 0'3 1. 1. 0.001 0. 0. 0.013 1. * Future parking lot channel 5 11 0 4 2. 340. 0.016 50. 50. 0.016 0.5 56. 340. 6.616 20. 20. 0.616 10. * Detention pond north of Elm Street 11 15 17 2 0.1 500. 0.005 0. 0. 0.013 0.1 0.0 0.0 0.0 4.73 0.04 8.24 0.31 10.78 1.18 12.87 2.01 14.69 5.48 42.11 6.08 67.81 6.71 102.82 7.37 146.95 8.06 260.64 8.77 265.77 9.52 350.85 10.30 454.97 11.11 570.14 11.96 686.90 12.84 820.08 * Jersey barrier oveflow channel along north side of railroad berm 15 7 0 1 30. 506. MOW 0.1 4. 0.033 5. • Parking lot outflow channel 6 14 0 4 10. 200. 0.007 3. 3. 0.016 0.5 50. 200. 0.007 20. 20. 0.035 10. * Runoff from parking lot split between detention pond and storage yard 5 14 7 4 3 1. 1. 0.001 0. 0. 0.013 1. 0.0 0.0 70.7 7.1 20.7 13.8 33.0 22.0 • Yard surface flow 7 70 0 1 20. 730. 0.020 50. 50. 0.016 5. * Detention pond at northeast corner of storage yard 70 16 4 2 0.1 500. 0.001 0. 0. 0.013 1. 0.0 0.0 0.31 102.9 1.90 1554.4 4.99 4981.4 * Existing 30" ADS and 24n RCP's along north property Line (Use extra diameter) 18 16 0 2 5.0 975. 0.004 0. 0. 0.613 '5'. 0 • NODE: At Northeast corner of storage yard 16 19 0 3 1.0 1.0 0.010 0. 0. 0.613 3.0 1 I DESIGN OF STORM SEWERS AND CULVERTS 82 SWALE DESIGN 92 EROSION CONTROL DESIGN 97 CHARTS; TABLES AND FIGURES 103 1 I I I 1 1 J 1 I I 0 * Overflow channel into open grassland to the northeast of Utility Center 19 0 1 3.0 4. 0.010 8. 8. 6.060 5.0 0 4 5 7 10 11 13 EMDPROGRAM I r7 u 1 I I I I I I SVVMM output Me 020112SLOUT: March 11,1997 ENVIRONMENTAL PROTECTION AGENCY - STORM WATER MANAGEMENT MODEL - VERSION PC.1 ' DEVELOPED BY METCALF + EDDY, INC. UNIVERSITY OF FLORIDA WATER RESOURCES ENGINEEERS, INC. (SEPTEMBER 1970) UPDATED BY n 11 IWATERSHED PROGRAM CALLED UNIVERSITY OF FLORIDA (JUNE 1973) HYDROLOGIC ENGINEERING CENTER, CORPS OF ENGINEERS MISSOURI RIVER DIVISION; CORPS OF ENGINEERS (SEPTEMBER 1974) BOYLE ENGINEERING CORPORATION (MARCH 1085, JULY 1985) *** ENTRY MADE TO RUNOFF MODEL *** CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 2-YR EVENT Rib, INC. tilk) // FILE=020112Si.DAT // 10 mar 97 NUMBER OF TIME STEPS 300 INTEGRATION TIME INTERVAL (MINUTES) 1.00 .Z.0 PERCENT OF IMPERVIOUS AREA HAS ZERO DETENTION DEPTH 25 RAINFALL STEPS, THE TIME INTERVAL IS MO MINUTES ...R RAINOAGE NUMBER 1 RAINFALL HISTORY IN INCHES PER HOUR .12 .36 .48 .60 .84 1.80 3.24 1.08 36 .36 .36 .24 .24 .24 _24 .12 .12 .12 .12. .12 .00 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 2-YR EVENT RBD, INC. (PEC) // FILE=020112Si.DAT // 10 mar 97 84 12 SUBAREA GUTTER WIDTH AREA PERCENT SLOPE RESISTANCE FACTOR SURFACE STORAGE(IN) NUMBER OR MANHOLE (FT) (AC) IMPERV. (FT/FT) IMPERV. PERV. IMPERV. PERV. -2 6 .0 .0 .0 .6300 .016 .256 .100 .500 1 1 8382.0 48.1 38.0 _0140 .016 .250 .100 .500 3 3 4718.0 27.1 38.0 .0170 .016 .250 .100 .500 4 4 3086.0 17.7 38.0 .0160 .016 .250 .100 A00 5 5 888.E 7.5 51.0 .0200 .016 .250 .100 .500 6 6 504.0 1.9 95.0 .0150 .016 .250 100 .100 7 7 1384.0 12.7 99.0 .0200 .016 .250 .100 .500 17 18 1384.0 4.8 99.0 .0200 .016 .250 .100 .500 TOTAL NUMBER OF SUBCATCHNENTS, 7 TOTAL TRIBUTARY AREA (ACRES), 119.80 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 2-YR EVENT RID, INC. (PEC) // FILE=020112Si.DAT // 10 mar 97 t CONTINUITY CHECK. FOR SUBCATCHMEMT ROUTING IN UDSWM2-PC MODEL *** WATERSHED AREA (ACRES) 119.800 TOTAL RAINFALL (INCHES) 1.060 .48 .12 INFILTRATION RATE(IN/HR) GAGE MAXIMUM MINIMUM DECAY RATE NO .50 .50 .00180 .50 .50 .00180 1 .50 .50 .0018D 1 .50 .50 .60166 1 .50 .50 .00180 1 .50 .50 .00180 1 .50 .5.0 .00180 1 .56 50 .00180 1 ITOTAL INFILTRATION (INCHES) .352 mlo TOTAL WATERSHED OUTFLOW (INCHES) .467 TOTAL SURFACE STORAGE AT ENO OF STROM (INCHES) .241 AROR IN CONTINUITY, PERCENTAGE OF RAINFALL .601 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, RBD, INC. (PEC) // FILE=020112Si.DAT %/ 10 mar 97 WIDTH GUTTER GUTTER HOP NP OR DIAM NUMBER CONNECTION (FT) 2-YR EVENT INVERT SIDE SLOPES OVERBANK/SURCHARGE LENGTH SLOPE HORIZ TO VERT MANNING DEPTH JK (FT) (FT/FT) L R N (FT) 1 9 0 4 CHANNEL .5 1200. .0100 25.0 25.0 .016 .50 0 OVERFLOW 50.0 1200. .010.0 20.0 20.0 .016 10.00 3 9 0 4 CHANNEL .5 1650. .0110 25.0 25.0 .016 AD 0 OVERFLOW 50.0 1650. 0110 20.0 20.0 .016 10.00 4 10 0 4 CHANNEL .5 450. .0100 25.6 25.0 ,016 .50 0 OVERFLOW 50.0 450. .0100 20.0 20.0 .016 10.00 9 10 0 4 CHANNEL .5 450. .0090 25.0 25.0 .016 .50 0 OVERFLOW 50.0 450. .0090 20.0 20.0 .016 10.00 10 11 0 3 1..0 1. .0010 .0 .0 .013 1.00 0 5 11 0 4 CHANNEL 2.0 346. .0160 50.6 50.0 .016 .50 0 OVERFLOW 50.0 346. .0160 20.6 20.6 .014 10.00 11 15 17 2 PIPE .1 500. .0050 .0 .0 .013 .10 0 RESERVOIR, STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW .0 .0 .0 4.7 .0 8.2 .3 10.8 1.2 12.9 2.9 14.7 5.5 9.5 42.1 350.9 6.1 67.8 10.3 455.0 6.7 11.1 102.8 ODD 7.4 12.0 146.9 686.9 6.1 12.8 20066 146.1 8.8 265.8 15 7 0 1 CHANNEL 30.0 500. .0059 .1 4.0 .033 5.00 0 6 14 0 4 CHANNEL 10.0 200. .0070 3.0 3.0 .016 .50 0 OVERFLOW 50.0 200. .0070 20.0 20.0 .035 10.00 14 7 4 3 1..0 7. .0010 .0 .0 ,013 1.00 5 DIVERSION TO GUTTER NUMBER 5 - TOTAL 0 VS DIVERTED 0 1N CPS .0 .0 10.7 7.1 20.7 13.8 33.0 22.0 7 70 0 1 CHANNEL 20.0 730. .0200 50.0 50.0 .016 5.00 0 70 16 4 2 PIPE .1 50.0.. .0010 .0 .0 ..013 1.00 0 RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW .0 .0 .3 102.9 1.9 1554.4 5.0 4981.4 18 16 0 2 PIPE 5.0 975. .0090 .0 .0 .013 5.00 0 16 19 0 3 1.0 1. .0100 .0 .0 .013 3.00 0 19 0 0 1 CHANNEL 3.0 4. .0100 8.0 8.0 .060 5.00 0 TOTAL NUMBER OF GUTTERS/PIPES, 15 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 2-YR EVENT RBD, INC. (PEC) // FILE=020112Si.DAT // 10 mar 97 OF SUBCATCHMENTS AND GUTTERS/PIPES ARRANGEMENT GUTTER_ TRIBUTARY GUTTER/PIPE TRIBUTARY SUBAREA D.A.(AC) 1 O 0 0 0 0 0 0 0 0 0 1 0 O 0 0 0 0 0 0 0 48.1 3 O 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 27.1 4 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 6 6 17.7 5 0 0 0 0 0 0 0 0 0 0 5 0 O 6 0 0 0 0 0 0 7.5 6 0 0 0 0 0 0 0 0 6 0 6 6 0 0 0 0 0 0 0 0 1.9 7 15 14 0 0 0 0 0 0 0 6 7 0 0 0 0 0 0 0 0 0 115.0 9 1 3 0 0 6 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75.2 10 4 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 92.9 11 10 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 166.4 14 6 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 6 0 0 0 1.9 15 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100.4 16 70 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 119.8 18 0 0 0 0 0 0 0 6 0 0 17 0 0 0 0 0 0 0 0 0 4.8 19 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 119.8 76 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 115.0 ORDER OF TREE STRUCTURE (NGUT VALUE) DECREASES THROUGH DIVERSION FROM GUTTER 9 TO GUTTER 5 COMP THROUGH DIVERSION WILL LAG ONE TIME STEP UNLESS GUTTER CARDS ARE MODIFIED TO REVERSE DIVERSION. NONCONVERGENCE IN GUTTER DURING TIME STEP 222 AT CONVEYANCE ELEMENT 11 h 39 RPITBOY OF FORT COLLINS LIGHT 8 POWER SERVICE CENTER, DOWNTOWN BASIN, 2-YR EVENT INC. (PEtj // FILE=020112Si.DAT // 10 mar 97 HYDROGRAPHS ARE LISTED FOR THE FOLLOWING 4 CONVEYANCE ELEMENTS THE UPPER NUMBER IS DISCHARGE IN CFS THE LOWER NUMBER IS ONE OF THE FOLLOWING CASES: ( ) DENOTES DEPTH ABOVE _INVERT IN FEET (S) DENOTES STORAGE IN AC -FT FOR DETENTION DAN. DISCHARGE INCLUDES SPILLWAY OUTFLOW. (I) DENOTES GUTTER INFLOW IN CFS FROM SPECIFIED INFLOW HYDROGRAPH (D) DENOTES DISCHARGE IN CFS DIVERTED FROM THIS GUTTER (6) DENOTES STORAGE IN AC -FT FOR SUROHARGED GUTTER IN) 7 10 11 13 .00 .00 .00 .00 00( ) .00( ) 00( ) 00( ) .00 .00 .00 .00 .00( ) .00( ) .00( ) .00( ) .00 .01 .00 .00 .00( ) .00( ) .00( ) .00( ) .00 .03 .03 .00 .00( ) .00( ) .60( ) .00( ) .13 .79 1.04 .00 .01( ) .00( ) .00( ) .00( ) 2.82 8.61 5." AD .06( ) .00( ) .01(S) .60( ) 15.31 34.30 9.04 .00 .16( ) .00( ) .12(S) .00( ) 36.76 69.55 11.21 .00 .26( ) .00( ) 49(S) 00( ) 32.56 62.47 12.32 .00 24( ) .00( ) .95(S) .00( ) 27:54 47.61 12.98 .00 .22( ) .00( ) 1.28(S) .00( ) 23.54 33.79 13.21 .00 .21( ) .00( ) 1.50(S) .00( ) 20.93 23.55 13.35 .00 .19( ) .00( ) 1.63(S) .00( ) 19.60 17.51 13:41 00 .19( ) .00( ) 1.69(S) .00( ) 18.93 15.02 13.44 .00 .18( ) .00( ) 1.72(S) .00(. ) 18.08 12.77 13.46 .00 .18( ) .00( ) 1.74(S) .00( ) 17.48 10.96 13.46 A .18( ) .00( ) 1.73(S) .00( ) 17.13 9.86 13.45 .00 I7( ) .00( ) 172(S) .00( ) 16.89 9.22 13.43 .60 .17( ) .00( ) 1.70(S) .00( ) 16.31 8.00 13.40 .00 .17( ) .00( ) 1.68(S) .00( ) 15.82 6.69 13.36 .00 .17( ) .00( ) 1.64(S) 00( ) 15.49 5.76 13.32 .00 .16( ) .00( ) 1.60(S) 00( ) 15.26 5.17 13.27 .00 .16( ) .00( ) 1.55(S) .00( ) 15.09 4.81 13.21 .00 Au ) .60 ) 1.50(S) .00( ) 14.96 4.59 13.15 .00 .16( ) .00( ) 1.44(S) _00( ) 14.84 4.44 13.10 .00 .16( ) .00( ) 1.39(S) .00( ) 14.41 3.77 13.03 .00 .16( ) .00( ) 1.33(S) .00( ) 14.00 2.88 12.97 .00 .16( ) .00( ) 1.27(S) .00( ) 13.60 2.13 12.89 .00 .15( ) .00( ) 1.20(S) .00( ) 13.44 1.58 12.74 .00 .15( ) .00( ) 1.12(S) .00( 2 26. 13.18 1.19 1255 .00 .15( ) _00( ) 1.05(S) :00( 2 31. 12.93 .91 12.37 .00 .15( ) .00( ) .97(S) .00( 2 36. 12.66 .71 12.18 .00 .15( ) .00( ) 89(S) :00( 2 41.. 12.45 .56 11.99 .00 15( ) .00( ) .81(S) .00( 2 46. 12.23 .45 11.80 .00 .14( ) 00( ) .73(S) .00( 2 51. 12.01 .36 11.62 00 .14( ) .00( ) .66(S) .00( 2 56. 11.80 .30 11.43 .00 .14( ) .00( ) .58(S) .00( 3 1. 11.60 .25 11.25 .00 .14( ) .00( ) .50(S) .00( 3 6. 11.41 .21 11.07 .00 .14( ) _00( ) .43(S) .00( 3 11. 11.21 .17 10.89 .00 .14( ) .00( ) .35(S) .00( 3 16. 11.01 .15 10.51 .00 .14( ) .60( ) .28(S) .60( 3 21. 10.63 .13 9.86 00 3 26. .13( ) 10.09 .00( _11 ) _21(S) 9.25 .00( .00 .13( ) .00( ) .15(S) .00( 3 31. 9.51 .10 8.67 .00 :13( ) 00( ) 09(S) .00( 3 36. 8.93 .08 7.27 00 .12( ) .00( ) .63(S) .00( 3 41. 7.28 .07 .00 .00 .11( ) .00( ) .00( ) .00( 3 46. 4.12 :68( ) .07 00( ) .03 .00( ) .00 .00( 3 51. 2:33 .06 .11 .00 .06( ) _00( ) .00( ) .00( 3 56. 1.43 .05 .01 .00 .04( ) .00( ) .00( ) .00( 1: .95 .015 .1.0 -00 .03( ) .00( ) .00( ) .00( 4 6. .61 .04 .01 .00 .03( ) .00( ) DO( ) .00( 4 11. .50 .04 .08 .00 .02( ) .00( ) .00( ) .00( 4 16. :39 .04 .01 :00 .02( ) .00( ) .00( ) .00( 4 21. .31 .03 .07 .00 .02( ) .00( ) .00.( ) .00( 4 26. .25 .03 .01 .00 :02( ) DO( ) .00( ) .00( 4 31. 31 .03 .06 .00 .01( ) .00( ) .DO( ) .00( 4 36. .18 .02 .01 .00 .01( ) .00( ) .00( ) .00( 4 4L .15 .02 .05 400 .01( ) .00( ) .00( ) .00( 4 46. .13 .02 .01 .00 .O1( ) .00( ) .00( ) .00( 4 51. .12 .02 .04 .00 .01( ) .00(02 :) .00( ) :00( 4 56. .11 . .01 :00 .01( ) .00( ) 00( ) .00( THE FOLLOWING CONVEYANCE ELEMENTS HAVE NUMERICAL STABILITY OSCILLLATIONS PROBLEMS THAT DURING THE LEAD TO HYDRAULIC SIMULATION. 11 19 70 CITY OF FORT COLLINS LIGHT 8 POWER SERVICE CENTER, DOWNTOWN BASIN, 2-YR EVENT P6D; INC. (PEC) %/ FILE=020112Si.DAT // 10 mar 97 I*** PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS *** 4-e) CONVEYANCE PEAK STAGE STORAGE TIME ELEMENT (CFS) (FT) (AC -FT) (HR/MIN) 1 3 21. 21.0 .G .5 0 0 36. 36. 4 10.8 .5 0 35. 5 13.6 3 0 36. 6 5.3 .2 0 35. 7 37.1 .3 0 37. 9 56.8 .6 0 38. 10 71.4 (DIRECT FLOW) 0 37. 11 13.5 .1 1.7 1 73. 14 5.3 (DIRECT FLOW) 0 35. 15 13.5 .3 1 16. 16 43.8 (DIRECT FLOW) 0 38. 18 13.2 .8 0 35. 19 43.8 1.4 0 70 34.4 .1 .1 0 40. 40. �I ENDPROGRAN PROGRAM CALLED Ll I L 0 i f/ 0 I ¢ z. 1- - : 020112S4.DAT 2 1 1 2 3 4 WATERSHED 0 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 10MR_EVENT- ROD, INC. (PEC) // FILE=020112S4.DAT // 29.00T 96 1 300 0 0 1. 1 2. 1 25 5. 0.60 0.96 1." 1.68 3.00 5.04 9.00 3.72 2.16 1.56 1.20 0.84 0.60 0.48 0.36 0.36 0.24 0.24 0.24 0.24 0.24 0,24 0.12 0.12 0.00 * -2 .016 .250 0.1 0.5 0.5 0.5 .0018 * Shields/Vine/Cherry/Wood basin #1 1 1 1 838248A1 38. .014 * Shields/Vine/Cherry/Wood basin#2 1 3 3 471827.08 38. .017 * ELMfWood/Loomis basin 1 4 4 308617.71, 38. .016 Future parking lot basin �* 1 5 5 888 7.48 51. .02 * Existing L&P parking basin (from Preliminary Overall Drainage Plan) 1 6 6 504 1.91 95. .615 * Existing L&P yard basin 1 7 7 138412.71 99. .02 * Basin draining to existing.30" ADS and 240 RCP's along north property line 1 17 18 1384 4.80 99. .02 0 0 * West Elm Street channel 1 9 0 4 0.5 1200. 0.010 25.. 25: 0.016 0.5 50. 1zoo. 0.010 20. 2b. 6.016 io. * .dpL* & Wood Streets channel 3 9 0 4 0.5 1650. 0.011 25. 25. 0.016 0.5 50. 1650. 0.011 20. 20. 0.016 10. �* Grant Street channel 4 10 0 4 0.5 450. 0.010 8.. 25,4 0.016 0 3 50. 450. 0.010 N. 20. 0.016 10. * East Elm Street charnel 9 10 0 4 0.5 450. O.OD9 21, 25. 0.016 0.5 50. 450. 0.009 20. 20. 0.016 10. ' NODE: sure along ELM Street 10 11 0 3 1. 1. 0.001 0. 0. 0.013 1. * Future parking lot channel 5 11 0 4 2. 340. 0.016 50. 50. 0.616 0.5 50. 340. 0.016 20. 20. 0.016 10. * Detention pond ,north of Elm Street 11 15 17 2 0.1 500. 0.005 6. 0. 0.013 0.1 0.0 0.0 0.0 4,73 0,04 8.24 6.31 10.78 1.18 12.87 2.91 14.69 5.48 42.11 6.08 67.81 6.71. 102.82 7.37 14&95 8.06 200.64 8.77 265.77 9.52 350.85 10.30 4$4.97 11.11 570.14 11.96 666.90 12A4 820.08 �* Jersey barrier oveflow channel along north side of railroad berm 15 7 0 1 30. 500. 0.0059 0.1 4. 0.033 5. • Parking lot outflow channel 6 14 0 4 10. 200. 0.007 3. 3. 0.016 0 50. 200. 0.007 20. 20. 0.5 .035 10. Runoff from parking lot split between detention pond and storage yard 5 14 7 4 3 1. 1. 0.001 0. 0. 0.013 1. 0.0 0.0 10.7 7.1 20.7 13.8 33.0 22.0 * Yard surface flow 7 70 0 1 20. 730. 0.020 50. 50. 0.016 5. Detention pond at northeast cornier of storage yard 70 16 4 2 0.1 500. 0.061 0. 0. 0.013 1. 0.0 6.0 031 162.9 1.90 1554.4 4.99 4081.4 * Existing 3011 ADS and 2411 RCP's along north property line (Use extra diameter) 4-3 t18 16 0 2 5.0 975. 0.009 0. 0. 0.013 5.0 E: At Northeast corner of storage yard 16 19 0 3 1.0 1.0 0.010 0. 0. OA13 3u0 Overflow channel into open grassland to the northeast of Utility Center �* 19 0 1 3.0 4. 0.010 8.. 8. 0.060 5.0 0 4 5 7 10 11 13 ENDPROGRAM 11 I I H I I 1 I E I ma I FILE: 020112S4.OUT ENVIRONMENTAL PROTECTION AGENCY STORM WATER MANAGEMENT MODEL - VERSION PC.1 DEVELOPED BY METCALF + EDDY, INC.. UNIVERSITY OF FLORIDA WATER RESOURCES ENGINEEERS, INC. (SEPTEMBER 1970) UPDATED BY TAPE OR DISK ASSIGNMENTS JIN(1) JIN(2) JIN(3) 2 1 0 JOUTO ) JOUT(2) JOUT(3) 1 2 0 NSCRAT(1) 3 WATERSHED PROGRAM CALLED i*** ENTRY MADE TO RUNOFF MODEL *" UNIVERSITY OF FLORIDA (DUNE 1973) HYDROLOGIC ENGINEERING CENTER, CORPS OF ENGINEERS MISSOURI RIVER DIVISION, CORPS OF ENGINEERS (SEPTEMBER 1974) BOYLE ENGINEERING CORPORATION (MARCH 1985, JULY 1985) JIN(4) JIN(5) JIN(6) JIN(7) JIN(8) JIN(9) JINGO) 0 0 0 0 0 0 0 JOUT(4) JOUT(5) JOUT(6) JOUT(7) JOUT(8) JOUT(9) JOUT(10) 0 0 0 0 0 0 0 NSCRAT(2) NSCRATO) NSCRAT(4) NSCRAT(5) 4 0 0 0 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT Rib, INC. (PEG) // FILE=020112S4,DAT /% 29 OCT 96 NUMBER OF TIME STEPS 300 INTEGRATION TINE INTERVAL (MINUTES) 1.00 2.0 PERCENT OF IMPERVIOUS AREA HAS ZERO DETENTION DEPTH FOR 25 RAINFALL STEPS, THE TIME INTERVAL IS 5.00 MINUTES FOR RAINGAGE 'NUMBER i RAINFALL HISTORY IN INCHES PER HOUR .60 .96 1.44 1.68 3.00 5.04 9.00 3.72 1.20 .84 .60 .48 .36 .36 .24 .24 .24 .24 .12 .12 .00 CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD, INC. (PEC) // FILE=020112S4.DAT // 29 OCT 96 ISuSAREA GUTTER WIDTH 2.16 1.56 .24 .24 AREA PERCENT SLOPE RESISTANCE FACTOR SURFACE STORAGE(IN) INFILTRATION RATE(IN/HR) GAGE I ¢5 -4BER OR MANHOLE (FT) (AC) IMPERV 2 0 .0 .0 .0 1 1 8382.0 48.1 38.0 3 3 4718.0 27.1 38.0 4 4 3686.6 17.7 38.0 5 5 BB8.0 7.5 51.0 6 6 5D4.0 1.9 95.0 7 7 1384.0 12.7 99.0 17 18 1384.0 4.8 99.0 TOTAL NUMBER OF SLBCATCHMENTS, 7 TOTAL TRIBUTARY AREA (ACRES), 119.80 (FT/FT) IMPERV. PERV. IMPERV. PE RV. MAXIMUM MINIMUM DECAY RATE NO .0366 .016 .250 .100 .500 .50 .50 .00180 .0140 .016 .250 .100 .500 .50 .50 .00180 1 .0170 .016 .250 .100 .500 .50 .50 .00180 1 .0160 .016 .250 .100 .500 .50 .50 .60160 1 .6200 .016 .250 .100 .500 .50 .50 .00180 1 .0150 .016 .250 .100 .500 .50 .50 .00180 1 .0260 .016 .25O .100 .500 .k AD .00180 1 .0200 .016 .250 .100 .560 .50 .50 .00180 1 CITY OF FORT COLLINS LIGHT & POWER SERVICE. CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD; INC. (PEC) // FILE=020112S4.DAT // 29 OCT 96 ,t CONTINUITY CHECK FOR SUBCATCNMEMT ROUTING IN UDSWM2-PC MODEL *** WATERSHED AREA (ACRES) 119.1800 TOTAL. RAINFALL (INCHES) 2.890 TOTAL INFILTRATION (INCHES) ."0 TOTAL WATERSHED OUTFLOW (INCHES) 2.149 TOTAL SURFACE STORAGE AT END OF STROM (INCHES) .301 ERROR IN CONTINUITY, PERCENTAGE OF RAINFALL .000 l CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD, INC. (PEC) // FILE=020112S4.DAT // 29 OCT 96 WIDTH INVERT SIDE SLOPES OVERBANK/SURCHARGE GUTTER GUTTER NO NP OR DIAM LENGTH SLOPE HORIZ TO VERT MANNING DEPTH JK NUMBER CONNECTION (FT) (FT) (FT/FT) L R N (FT) 1 9 0 4 CHANNEL .5 1200. .0100 25.0 25.0 016 .50 0 OVERFLOW 50.0 1206. 0100 20.0 20.0 .016 10.00 3 9 0 4 _ CHANNEL .5 1650. 0110 25.0 25.0 .016 .50 0 OVERFLOW 50.0 1650. .0110 20.0 20.0 .016 10.00 4 10 0 4 CHANNEL .5 450. .0100 25.0 25.0 .016 .50 0 OVERFLOW 50.0 450. 01 .00 20.0 20.0 .016 10.00 9 10 6 4 CHANNEL .5 450. .0090 25.0 25.0 .016 .50 0 OVERFLOW 50.0 450. .0090 20.0 20.0 .016 10.00 10 11 0 3 1.0 1. .0010 .0 .0 .613 1.60 0 5 11 0 4 CHANNEL 2.0 340. .0160 50.0 50.6 .016 .50 0 OVERFLOW 50.0 340. .6160 20.0 20.0 .616 10.00 11 15 17 2 PIPE .1 500. .0050 .0 .0 .013 .10 0 RESERVOIR STORAGE IN ACRE-FEET VS.SPILLWAY OUTFLOW .0 .0 .0 4.7 .0 8.2 .3 10.8 1,.2 12..9 2.0 14.7 5.5 42.1 6.1 67.8 6.7 102.8 7..4 146.0 8.1 206.6 6.6 265.8 9.5 350.9 10.3 455.0 11.1 570.1 12.0 686.0 12.8 820.1 15 7 0 1 CHANNEL 30.6 500. .6659 .1 4.0 .033 5.00 0 6 14 0 4 CHANNEL 10.0 260. .6670 3.0 3.0 .016 .50 0 OVERFLOW 50.0 200. .6070 20.0 20.0 .035 10.00 14 7 4 3 1.0 1. .0010 .0 .0 .013 1.00 5 DIVERSION TO GUTTER NUMBER 5 - TOTAL 0 VS DIVERTED 0 IN CFS .0 .0 10.7 7.1 20.7 13.8 33.0 22.0 70 0 1 CHANNEL 20.0 730. 0200 50.0 50.0 .016 5.00 0 16 4 2 PIPE .1 500. .0010 .0 .0 .013 1.00 0 RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW .0 .0 .3 102.9 1.0 1554.4 5.0 4981.4 iI I FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE FORT COLLINS UTILITY SERVICE CENTER, P.U.D. 5TH FILING ' L GENERAL LOCATION AND DESCRIPTION A. Location This 7.5 acre site is located at the northeast corner of Elm and Wood Street ' in the City of Fort Collins. It is bounded on the South by Ehn Street, on the west by Wood Street, on the northeast by the Colorado and Southern Railroad embankment and on the north by the existing Fort Collins Utility Service Center. ' The site location can also be described as situated in the Northwest Quarter, Section 11, Township 7 North, Range 69 West of the 6th P.M.., City of Fort Collins, I arimer County, Colorado. The site location can be seen on ' page 2 of the Appendix. B. Description of Property rThe Fort Collins Utility Service Center, P.U.D., 5th filing site in located south of the existing Utility Service Center. The site generally slopes from east to west at approximately 1.7%. It is presently covered with native grasses. The site itself is a 7.5 acre trapezoidal shaped piece of land that will become an integral part of the Fort Collins Utility Service Center master Plan. It was formerly a construction yard for a pipe manufacturer. This report will refer to the 7.5 acre portion of land as onsite and all other areas as offsite. When flows pass offshe to the north they will be flowing onto property owned by the City of Fort Collins but will offsite to this particular piece of property. II. DRAINAGE BASINS A. Major Basin Description ' The proposed development lies within the Old Town Basin, and adjacent to the West Vine Basin. Off site flow generally enter the site from the south and west. These flows then pass through a wooden box culvert or around the railroad embankment and then northeast. 11 48 16 0 2 PIPE 5.0 975. 6 19 0 3 1.0 1. .0090 .0100 .0 .0 0 .0 .013 .013 5.00 3.06 0 0 19 0 0 1 CHANNEL 3.0 4. .0100 8.0 8.0 .060 5.00 0 TOTAL NUMBER OF GUTTERS/PIPES, 15 CITY OF FORT COLLINS LIGHT & POWER SERVICE R&D, INC. (PEC) // FILE=020112S4.DAT %/ 29 CENTER, DOWNTOWN OCT 96 BASIN, 100-YR EVENT ARRANGEMENT OF SUBCATCHMENTS AND GUTTERS/PIPES GUTTER TRIBUTARY GUTTER/PIPE TRIBUTARY SUBAREA D.A.(AC) 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 48.1 3 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 6 6 0 0 Z7A 4 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 6 0 O. 0 17.7 5 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 7.5 6 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 1.9 7 15 14 0 0 0 0 0 0 0 0, 7 0 0 0 0 0 0 0 0 0 115.0 9 1 3 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M 2 10 4 9 0 0 0 0 0 0 0 0 0 0 0 U 0 0 0 6 0 0 92,9 11 10 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106.4 14 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9 15 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100.4 16 70 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 119.8 18 0 0 0 6 6 0 0 0 0 0 17 0 0 0 0 0 0 0 0 0 4:.8 19 16 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6 6 0 0 119.8 70 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 115.0 ORDER OF TREE STRUCTURE (NGUT VALUE) DECREASES THROUGH DIVERSION FROM GUTTER 9 TO GUTTER 5 COMP THROUGH DIVERSION WILL LAG ONE TIME STEP UNLESS GUTTER CARDS ARE MODIFIED TO REVERSE DIVERSION. ( OF FORT COLLINS LIGHT & POWER SERVICE: CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD; INC.. (PEC) // FILE=020112S4.DAT // 29 OCT 96 HYDROGRAPHS ARE LISTED FOR THE FOLLOWING 4 CONVEYANCE ELEMENTS THE UPPER NUMBER IS DISCHARGE IN CFS THE LOWER NUMBER IS ONE OF THE FOLLOWING CASES: ( ) DENOTES DEPTH ABOVE INVERT IN FEET (S) DENOTES STORAGE IN AC -FT FOR DETENTION DAM. DISCHARGE INCLUDES SPILLWAY OUTFLOW. (I) DENOTES GUTTER INFLOW IN CFS FROM SPECIFIED INFLOW HYDROGRAPH (D) DENOTES DISCHARGE IN CFS DIVERTED FROM THIS GUTTER (0) DENOTES STORAGE IN AC -FT FOR SURCHARGED GUTTER TIME(HR/MIN) 7 10 11 13 0 1c .00 .00 .00 .00 .00( ) 00( ) .00( ) .00( ) 0 6. 00 .01 .00 .00 .00( ) .00( ) .00( ) .00( ) 0 11. .12 .78 1.05 .00 .01( ) .00( .) 00( ) 00( ) 0 16: 5.40 15.68 7:08 .00 0 21, .69( 18.61 ) 00( ) 38.46 .63(S) 9.74 00( ) .60 .18( ) .00( ) .20(S) .00( ) 0 26. 39.09 72.54 11.42 .00 .27( ) 00( ) _57(S) 00( ) 0 31. 71.06 145.13 13.06 .00 36( ) .00( ) 1.35(S) .00( ) 36. 115.40 343.45 18.12 .66 .46( ) .00( ) 3.23(S) 00( ) J 41. 87.68 314.78 47.15 .60 _40( ) _00( ) 5.60(S) 00( ) .I 114.69 251.37 128.93 .00 .46( ) .00( ) 7.10(S) .00( ) 174.48 201.34 173.64 .00 .56( ) .00( ) 7.71(S) .00C ) 197.66 162.98 182.04 .00 .59( ) .00C ) 7.82(S) .00( ) 191.86 129.53 171.10 .00 .58C ) .90( ) 7.68(S) .00( ) 172.00. 102.38 150.94 .00 .55( ) .00( ) 7.420) DO( ) 150.60 82.10 130.81 00 52( ) .00( ) 7.13(S) .00( ) 1.29.55 65.44 111.36 .00 .48( ) .00( ) 684(S) .00( ) 110.50 52.98 94.75 .00 _45( ) .00( ) 6.56(S) 00( ) 94.61 43.41 80.02 .00 .42( ) .00( ) 6.32(S) .00( ) 80.96 3.5.16 66.42 .00 .39( ) :00( ) 6M(S) .00( ) 69.83 29:83 59.66 .00 _36C ) .00( ) 5.89(S) 00( ) 61.28 25.57 52.08 00 .34C ) .00( ) 5.71(S) .00C ) 53.98 22.60 45.40 .00 AU ) .00C ) 5.56(S) .00( ) 47.86 20.51 41.51 .00 .30( ) .00( ) 5.42(S) 00( ) 44.29 17.83 40.05 .66 .29( ) .00( ) 5.29(S) .00( ) 42.12 15:26 38.48 .00 .is( ) .00( ) 5-A4(S) .00( ) 39.66 12.51 36:82 .00 .27( ) .00( ) 4.98(S) .00( ) 37.71 10.04 35.07 .00 .26( ) .00( ) 4.82(S) .00( ) 35.67 8.17 33.27 .00 .26( ) .00C ) 4.65(S) .00( ) 33.70 6.78 31.47 .00 .25( ) .00( ) 4.48(S) :00( ) 31.80 5.73 29.72 .66 .24C ) .00( ) 4.32(S) .00( ) 29.98 4.90 28.01 .00 .23( ) .00( ) 4.16CS) .00( ) 28.24 4.24 2637 400 .23( ) 00( ) 4.00(S) 00( ) 26.58 3.69 24.80 .00 .22C ) .00( ) 3.86(S) .00C ) 25.00 3.24 23.30 .00 .21( ) .00( ) 3.72(S) .00( ) 23.50 2.85 21.88 .00 .21C ) _00( ) 3.58(S) .00( ) 22.08 2.51 20.53 .00 .20( ) .00( ) 3.46(S) .00C ) 20.74 2.22 19.25 .06 .19( ) .00( ) 3.340) .00C ) 19.47 1.97 18.05 .00 .19( ) .00( ) 3.22(S) .00C ) 18.27 1.75 16.91 .00 18( ) 00( ) 3.12_(S) .00( ) 17.14 1.55 15.83 .00 .17( ) 00( ) 3.02(S) 00( ) 16.07 1.31 14.82 .00 .17( ) .00( ) 2.920) .00( ) 15.20 1.21 14.61 .00 .16( ) .00( ) 2.83(S) .00( ) 14.80 1.07 14.52 .00 .16( ) 00( ) 2.74(S) .00( ) 14.162 .95 14.42 .00 .16( ) 00C ) 2.65CS) .00( ) 14.49 .83 14.32 .00 u .16( ) .00( ) 2.55(S) 46. 14.39 .73 14.22 .16( ) 00( ) 2.46(S) 3 51. 14.28 .64 14.13 .16( ) .00( ) 2.37(S) 3 56. 14.16 36 14.03 _10 ) .00( ) L28(5) 4 1. 14.08 .48 13.93 .16( ) 00( ) 2.18(S) 4 6. 13.98 .42. 13.83 .16( ) 00( ) 2.09(S) 4 11. 13.88 .36 13.74 ..16( ) .00( ) 2.00(S) 4 16. 13.78 .31 13.64 .15( ) .00( ) 1.91(S) 4 21. 13.60 .26 13.54 .15( ) .00( ) 1.62(S) 4 26. 13.59 .22 13.45 .15( ) .60 ) 1.720) 4 31. 13.49 ..18 13.35 .15( ) .00( ) 1.63(S) 4 36. 13.39 .15 13.26 .15( ) .00( ) 1.54(S) 4 41. 13.30 .12 13.16 .15( ) .00( ) 1.45(S) 4 46. 13.20 .10 13.07 .15( ) .00( ) 1.36(S) 4 51. 13.11 .08 12.97 .15( ) .00( ) 1.27(S) 4 56. 1301 .07 12.88 .15( ) .00( ) 1.19(S) THE FOLLOWING CONVEYANCE ELEMENTS HAVE NUMERICAL STABILITY PROBLEMS THAT LEAD TO HYDRAULIC OSCILLLATIONS DURING THE SIMULATION. 19 70 .00( ) .00 .00( ) .00 .00( ) .00 .00( ) .00 .00( ) .00 .00( ) .00 .60( ) _00 .00( ) .00 .00( ) .0 . b .bo( ) .00 .00( ) .00 .00( ) .00 .00( ) .00 .60( ) 00 .00( ) .00 .00( ) CITY OF FORT COLLINS LIGHT & POWER SERVICE CENTER, DOWNTOWN BASIN, 100-YR EVENT RBD, INC. (PEC) // FILE=020112S4.DAT // 29 OCT 96 " PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS *** CONVEYANCE PEAK STAGE STORAGE TIME ELEMENT (CFS) (FT) (AC -FT) (HR/MIN) 1 194.1 .9 0 36. 3 92.9 .7 0 38. 4 80.6 .7 0 35. 5 51.2 .5 0 35. 6 16.9 .4 0 35. 7 106.6 ti 0 57. 9 277.4 1.0 0 37. 10 349.9 (DIRECT FLOW) 0 37. 11 182.3 _1 7.8 0 55. 14 16.9 (DIRECT FLOW) 0 35. 15 181.4 1.4 0 57. 16 263.3 (DIRECT FLOW_) 0 57. 18 19 41.5 203.3 1.4 2.7 0 35. 0 57. 70 197.7 .1 .4 0 58. I 'ROGRAM PROGRAM CALLED u I I Detention Pond Rating Curves Condition) I 11 0 I RBD, Inc., Engineering Consultants FORT COLL-INS UTILITY CENTER 183-039 Detention Pond 11 Rating Curve Interim Condition 06-Nov-96 Elev ft_ Area ft2 Area ac Storage aft . Cumulative Storage (ae-ft) Outflow (Cfs j 4986:2 0 0.00 0.00 0.00 - 4987.0 34 0.00 0.00 0.00 4.73 4988.0 4,800 0.11 0.04 0.04 8.24 4989.0 21,254 0.49 0.27 0.31 10.78 4990.0 57,662 1.32 0.86 1.18 12.87 4991..0 96,771 2.22 1.74 2.91 14.69 4992.0 129,603 2.98 2.56 5.48 42.11 4992.2 135,732 3.12 0.60 6.08 67.81 4992.4 141,861 3.26 0.63 6.71 102.82 4992.6 147,989 3.40 0.66 7.37 146.95 4992.8 154,118 3.54 0.69 8.06 200.64 4993.0 160,241 3.68 0.71 8.71 265.42 4993.2 167,851 3.85 0.75 9.52 350.85 4993.4 175,455 4.03 0.78 10.30 454.97 4993.6 183,060 4.20 0.81 11.11 570.14 4993.8 190,664 4.38 0.85 11.96 686.90 4994.0 198,268 1 4.55 0.88 12.841 820.08 100 year WSEL(9.2) aa-ft = 4992.73 'I V=1 /3d(A+B+(AB)^.5 50 u 06-Nov-96 S% RBD, Inc., Engineering Consultants FORT COLLINS UTILITY CENTER Historic Event JOB_ NO. 183-039 06-Nov-96 POND WATER SURFACE (elev) STORAGE VOLUME (ac. ft.) 30" x 12" WBC (cfs) (page(page(page WEIR #1 (SE end) (cfs) WEIR #2 (P. Lot) (cfs) TOTAL OUTFLOW (cfs) 11 4986.16 0.00 0.00 - - 11 4987.00 0.00 4.73 - - 4.73 11 4988.00 0.04 8.24 - - 8.24 11 4989.00 0.31 10.78 - - 10.78 11 49.90.00 1.18 12.87 - - 12.87 11 4991.00 2.91 14.69 - - 14.69 11 4992.00 5.48 16.33 - 25.78 42.11 11 4992.20 6.08 16.63 - 51.18 67.81 11 49.92.40 6.71 16.93 - 85.89 102.82 11 4992.60 7.37 17.22 - 129.73 146.95 11 4992.80 8.06 , 17.52 - 183.12 200.64 11 4993.00 .8.77 17.82 0.00 247.60 265.42 11 4993.20 9.52 18.19 8.55 324.11 350.85 11 4993.40 10.30 18.66 25.35 410.97 454.97 11 4993.60 11.11 19.13 48.70 502.32 570.14 11 4993.80 11.96 19.60 73.63 593.67 686.90 11 1 4994-00 .1 12.84 1 20.071 114.991 685.021 820.08 06-Nov-96 RBD, Inc., Engineering Consultants 5-z FORT COLLINS UTILITY CENTER 183-M9 Detention Pond_70 Rating Curve 06-Nov-96 Cumulative Elev Area Area Storage Storage Outflow ft ft2 ac ac-ft ac-ft cfs 4974:5 0 0.00 0.00 0.00 0.00 4975,0 71074 0.16 0.03 0.03 0.00 4976..0 18,519 0.43 0.28 0.31 102.90 4977.0 35,074 0.81 0.60 0.91 599.30 4978.0 52,141 1.21 0.99 1.90 1554.40 4979.0 67,667 1.65 1.36. 3.26 3020.80 4980.01 84,593 1 1.941 133 _ _ _ _ _ _4.99 _ _ 4901,.40 100 year WSEL( 0.4) ac-ft= 4976.15 V=1 /3d(A+B+(AB)^.5 06-Nov-96 Existing Wooden Box Culvert (Stage vs. Discharge) ,5NWF 571 Vq Weir #1 at Southeast End of Ponding Area (Stage vs. Discharge) sw A} 2� v�7It� N S4 u 9 c WeiWX at Northwest Corner, of Ponding Area (Stage vs. Discharge) I B. Sub -basin Description Please refer to the enclosed drainage Basin Maps: Runoff from Basins 1, 3, 4, 5 and 6 is routed via curb and gutter, open channel to a ungraded ' informal detention facility located on the eastern portion of the site adjacent to the northern boundary of Elm Street. L� Off -site storm flows generally come from the south and west. The majority of the off -site flows come from basins 1 and 3 and enter the site at the intersection of Wood and Elm Street (Design Point 1). Offsite flows also enter the Site from Basin 4 at the intersection of Elm and Grant Street ' (Design Point 4). A portion of the flows from Basin 6 will also enter the site from the north and west. ' On -site Flows ' Historically onsite storm flows have drained to a 30" by 12" wooden box culvert under the Colorado and Southern railroad embankment. This culvert then discharges to a 24" diameter CMP which takes flow off -site ' underneath the storage yard and discharges to an existing ditch along the eastern boundary of the storage yard, During Major Storms when the capacity of the box culvert is exceeded storm flows would pond on site and ' flow around the western end of the railroad embankment and flow off -site to north and east. A SWMM model was generated to calculate the extent of the ponding. C. SWMM MODEL 1 SWMM models for the 2 year and 100 year storm events within the portion of the Old town Basin occupied by the City of Fort Collins Light and Power Service Center were developed. The SWMM Models were developed to assess the effect of the proposed development on the existing storm drainage conditions. Two SWMM models were generated: One for the existing condition and another for the proposed interim condition. The SWMM model for the existing condition has been reviewed by the City of Fort Collins and is accepted as the benchmark by which to judge the effect of the improvements of the proposed condition. The SWMM model for the proposed condition includes the next phase of improvements to the site, the existing Service Center and the upstream tributary neighborhood areas 1 2 1 S� i RBD INC. ENGINEERING CONSULTANTS WEIR SECTION FLOW DATA WEIR #2 (BASED ON INTERIM GRADING) WEIR COEF. 2.800 STA ELEV 0.0 94:93 9.0 94.60 23.0 93.00 66.0 92.00 95.0 91.50 107.0 91.50 113.0 92.00 117.0 93.66 121.0 94.00 126.0 95.00 ELEVATION DISCHARGE (feet) --------- (Cfs) --------- 91.50 0.00 91.70 4.24 91.90 15.51 92.10 36.05 92.30 66:31 92.50 105.47 92.70 153.98 92.90 212.26 93.10 282.93 93.30 365:29 93.50 456.64 9370 556.78 93.90 665.54 94.10 783.69 94:30 911.04 94.50 1046.66 94.70 1190.46 94.90 1342.45 WATER ELECTRIC i SERVICE VAULT I 42" TO TOP OFWCITY � I 0 '� > � - T TOP .:.:._--.... ,........� _ 1z: -w -14" STEEL ' W TER { r- TRAt SFORMER __-_ I L ---- ---- - 22" TO TOP BUILDING „C '-' OF GAS ETER ' GPI; .. _ �--•-:_ J .. _ 4 I I tr g,,' :♦ /i i •:, 90 GREASE •"• SEDJ1�° 1-p WELLkzzz �. ! 1 �A r l �N I. ` �9? ' c53 `` .......... �� � / { end - ��';_..--- ----- •-----•--=---- ............ - • � odoe r•oca y -- I I 1 1 1 I 1 1 1 j 1 1 HEC-2 MODELING 0 1 n kOSS HEC-2 for AutoCAD version 2.0 PROJECT TITLE : FORT COLLINS UTILITY_ CENTER PROJECT NUMBER : 183-039 BOSS HEC-2 for AutoCAD (tm) Copyright (C) 1-994 BOSS International All Rights Reserved Version : 2.0 Serial Number : 22331 Licensed to RBD Engineering ROGRAM ORIGIN : --------------- PAGE 1 3/07/1997 BOSS HEC-2 for AutoCAD is an enhanced version of the U.S. Army Corps of Engineers Hydrologic Engineering Center HEC-2 program for water -surface profile computations. Program based upon the September 1990 version, updated on August 1991. i DISCLAIMER : 'I ---------- BOSS HEC-2 for AutoCAD is a complex program which requires engineering �expertise to use correctly. BOSS International assumes absolutely no = responsibility for the correct use of this program. All results obtained should be carefully examined by an experienced professional engineer to determine if they are reasonable and accurate. Although BOSS International has endeavored to make BOSS HEC-2 for AutoCAD error free, the program is not and cannot be certified as infallible. Therefore, BOSS International makes no warranty, either implicit or explicit, as to the correct performance or accuracy of this software. In no event shall BOSS International be liable to anyone for special, collateral, incidental, or consequential damages in connection with or arising out of purchase or use of this software. The sole and exclusive liability to BOSS International, regardless of the form of action, shall not exceed the purchase price of this software. ROJECT DESCRIPTION ----------- -_----- ----- PROJECT TITLE PROJECT NUMBER DESCRIPTION ENGINEER DATE OF RUN TIME OF RUN : FORT COLLINS UTILITY CENTER : 183-039 : EXISTING CONDITION PEC 3/07/1997 5:18 am I BOSS HEC-2 for AutoCAD version 2.0 PROJECT TITLE c FORT COLLINS UTILITY CENTER PROJECT NUMBER 183-039 I Ga PAGE 2 3/07/1997 Ti 1.83-039 T2 FORT COLLINS UTILITY CENTER EXISTING CONDITION IT3 JOB PARAMETERS -------------- Jl ICHECK INQ NINV IDIR STRT METRIC HVINS Q -10 2 139.2 J2 NPROF IPLOT PRFVS XSECV XSECH FN ALLDC IBW -1 -1 -6 RICTION LOSS EQUATION OPTION (J6) : ----------------------------------- J6 IHLEQ ICOPY SUBDIV STRTDS FI 0 MOST DOWNSTREAM DETENTION POND 70 STORAGE YARD NORTHEAST PARKING LOT CORNER STORAGE YARD WITH PALLETTES STORAGE YARD STORAGE YARD WITH PALLETTES STORAGE YARD STORAGE YARD STORAGE YARD RAILROAD BERM ON RIGHT CHANNEL BANK WEIR SECTION RMILE STATUS: Analyzing profile 1. STATUS: Friction loss equation index (IHLEQ) = 1. Therefore friction loss (HL) is calculated as a function of the profile type, which can vary from reach to reach. See documentation for further details. Contraction Coefficient (CCHV) 0.100 Expansion Coefficient (CEHV) 0.300 STATUS: Analyzing cross-section reach 1.000. G/ BOSS HEC-2 for AutoCAD version 2.0 PAGE 3 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-0.39 3/07/19.97 ' STATUS: (3280) For cross-section 1.00, ends have been extended vertically 0.35 feet in order to calculate the hydraulic cross-section properties. STATUS: (3470) Encroachment computation information follows: Left Encroachment Station (ft, STENCL) 21.24 Right Encroachment Station (ft, STENCR) 266.54. Encroachment Method (TYPE) 1 Width or Percent Target 245.300 Left Encroachment Elevation (ft, ELENCL) 4979.90 Right Encroachment Elevation (ft, ELENCR) 4980.41 I I I I I I L 1 BOSS HEC-2 for AutoCAD version 2.0 PAGE 4 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 3/07/1997 MOST DOWNSTREAM 'DETENTION POND 70 Cross Left Channel Right Flow Water Critical Known 'Section Overbank Manning Overbank Depth Surface W. S. W. S. Number Manning n Manning Elevation Elevation Elevation SECNO XNL XNCH XNR DEPTH CWSEL CRIWS WSELK (ft) (ft MSL) (ft MSL) (ft MSL) ------------------- -- ------ ---------------'-------------------- -Energy Left Channel Right Energy Weighted Friction Other Gradient Overbank Length Overbank Gradient Velocity Energy Energy Length Length Elevation Head Loss Loss 'SLOPE XLOBL XLCH X_LOBR EG HV HL OLOSS (ft/ft) (ft) (ft) (ft) (ft MSL) (ft) (ft) (ft) ------------------ Cummul- Left Channel Right Bridge Left Right Number of ative Overbank Area Overbank Deck Bank Bank Balance Volume Area Area Area Elevation Elevation Trials OL ALOB ACH AROB CORAR LTBNK RTBNK ITRIAL (acre-ft) (sq ft) (sq ft) (sq ft) (sq ft) (ft MSL) (ft MSL) ----------- --------- ------ --------------- --------- --------- _ �tal Left Channel Right Computed Left Right Number of .�ow Overbank Flow Overbank. W. S. W. S. W. S. Crit Dpth Flow Plow Top Width Station Station Trials Q QLOB QCH QROB TOPWD SSTA ENDST IDC (cfs) (cfs) (cfs) (cfs) (ft) (ft) (ft) --------------------------- -- -------------- Flow Left. Channel Right Length Cummul. Minimum Number of travel Overbank Mean Overbank Weighted Surface C- S. Other ime Velocity Velocity Velocity Manning n Area Elevation Trials TIME VLOB VCH VROB WTN TWA ELMIN ICONT '(hrs) (ft/s) (ft/s) (ft/s) (acres,) (.ft MSL) ------------------------------------------------------- --- --------- 1.000 0.000 0.016 0.016 2-.00 4976.35 0.00 4975.00 0.000226 0 0 0 4976.37 0.02 0.00 0.00 0.00 0 118 21 0.00 .4976.57 4975.80 0 139 0 124 14 24.5.3 21.27 266.54 0 0.00 0.00 1.05 0..68 0.000 0.0 4974.35 0 STATUS: Analyzing cross-section reach 2.000. STATUS: (3265) Divided flow.. 1 WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. WARNING: (3720) Critical depth has been assumed. 1 G3 BOSS HEC-2 for AutoCAD version 2.0 PAGE 5 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 3/07/1997 'STORAGE YARD SECNO XNL XNCH XNR DEPTH CWSEL CRIWS WSELK SLOPE XLOBL XLCH XLOBR EG HV HL GLOSS OL ALOE ACH AROB CORAR LTBNK RTBNK ITRIAL Q QLOB QCH QROB TOPWD SSTA ENDST IDC TIME VLOB ------------------ VCH------ VROB WTN------ TWA ---_-- -- -_-----_- ELMIN --------- ICONT ---- 2.000 0.000 0.016 0.000 0.51 4977.21 4977.21 0.00 0.006204 83 83 87 4977.35 0.14 0.52 -0.21 0.18 0 46 0 0.00 4979.75 4977.80 7 139 0 13.9 0 173.7 111.13 3.94.83 14 0.01 0.00 3.02 0.00 0.000 0.4 4976.70 0 STATUS: Analyzing cross-section reach 2.500. STATUS: (326`5) Divided flow. WARNING: (3685) 20 trials attempted in balancing assumed water surface elevation (WSEL) and computed water surface elevation (CWSEL). WARNING: (3693) It is probable that critical depth has been crossed. WARNING.: (3720) Critical depth has been assumed. 2.500 0.000 0.020 0.016 1.09 4978.09 4978.09 0.00 0.010356 41 36 46 4978.27 0.18 0.37 -0.06 0.22 0 41 0 0.00 4980.60 4978.00 20 139 0 13.9 0 137.8 321.95 467.25 23 0.01 0.00 3.39 1.22 0.000 0.5 4977.00 0 STATUS: Analyzing cross-section reach 3.000. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. ' WARNING: (3720) Critical depth has been assumed. 3.000 0.000 0.020 0,000 0.49 4978.69 4978.69 0.00 ' 0.008146 42 43 44 4978.86 0.18 0.36 0.04 0.26 0 41 0 0.00 4981.00 4978.79 5 139 0 139 0 116.9 302.29 419.22 11 0.01 0.00 3.36 0.00 0.000 0.7 4978.20 0 STATUS: Analyzing cross-section reach 4.000. STATUS: (3265) Divided flow. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. I BOSS HEC-2 for AutoCAD version 2.0 PROJECT TITLE :FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 WARNING: (3720) Critical depth has been assumed. 4- PAGE 6 3/07/1997 SECNO XNL XNCH XNR DEPTH CWSEL CRIWS WSELK ,SLOPE XLOBL XLCH XLOB.R EG HV HL OLOSS OL ALOB ACH AROB CORAR LTBNK RTBNK ITRIAL Q QLOB QCH QROB TOPWD SSTA ENDST IDC TIME - VLOB----- VCH------ VROB---_- WTN------ TWA ELMIN ICONT -------- ---- -------------------- 4.000 0.000 0.020 0.000 0.63 4980..83 4980.83 0.00 0.009427 101 98 106 4981.00 0.17 0.93 -0.06 0.35 0 42 0 0.00 4983.30 4982.02 4 13.9 0 139 0 133.4 205.85 342.62 11 0.02 0.00 3.28 0.00 0.000 0.9 4980.20 0 STATUS: Analyzing cross-section reach 5.00.0. rSTATUS: (3265) Divided flow. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. I WARNING: (3720) Critical depth has been assumed. 5.000 0.000 0.020 0.000 0.53 4982.60 4982.60 0.00 0.009090 98 99 141 4982.74 0.14 0.90 0.02 0.45 0 46 0 0.00 4983.24 4984.36 7 139 0 139 0 167.7 111.80 287.5.9 12 0.03 0.00 2.99 0.00 0.000 1.3 4982.01 0 STATUS: Analyzing cross-section reach 6.000. STATUS: (3265) Divided flow. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. ' WARNING: (37.20) Critical depth has been assumed. 6.000 0.000 0.016 0.000 0.57 4.984.57 4984.57 0.00 1 0.006282 100 97 139 4984.70 0.13 0.61 0.11 0.56 0 48 0 0.00 4985.00 4985.70 6 139 0 139 0 196.8 102.28 304.2.0 8 0.04 0.00 2.88 0.00 0.000 1.7 4984.00 0 STATUS: Analyzing cross-section reach 7.000. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. WARNING: (3720) Critical depth has been assumed. Ii BOSS HEC-.2 for AutoCAD version 2.0 PAGE 7 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 3/07/1997 ' SECNO XNL XNCH XNR DEPTH CWSEL CRIWS WSELK SLOPE XLOBL XLCH XLOBR EG HV HL GLOSS ALOE ACH AROB CORAR LTBNK RTBNK ITRIAL ,VOLQ QLOB QCH QROB TOPWD SSTA ENDST IDC TIME VLOB VCH VROB WTN TWA ELMIN ICONT --------- --------- --------- --------- --------- --------- --------- --------- 7.000 0.000 0.016 0.000 0.46 4987.;66 4987.66 0.00 0.005808 115 169 207 4987.81 0.15 0.98 0.04 0.74 0 45 0 0.00 4989:00 4989.51 5 13.9 0 139 0 155.9 210.37 366.23 17 0.06 0.00 3.09 6.00 0.000 2.4 4987.20 0 STATUS: Analyzing cross-section reach 7.500. STATUS: (3280) For, cross-section 7.50, ends have been extended vertically 1.04 feet in order to calculate the hydraulic cross-section properties. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. WARNING: (3720) Critical depth has been assumed. follows: STATUS: (3470) Encroachment computation information Left Encroachment Station (ft, STENCL) 120.42 Right Encroachment Station (ft, STENCR) 377.47 Encroachment Method (TYPE) 1 Width or Percent Target 257_050 Left Encroachment Elevation (ft, ELENCL) 5001_87 Right Encroachment Elevation (ft, ELENCR) 4999_91 7.500 0.016 0.035 0.000 1.04 4989.04 4989.04 0.00 0.004228 95 137 129 4989.21 0.16 0.49 0.08 0.86 42 0 0 0.00 4989.00 4994.00 6 ' 139 138 0 0 135.0 201.83 336.86 22 0.07 3.24 0.34 0.00 0.000 2.8 4988.00 0 STATUS: Analyzing cross-section reach 8.000. STATUS: (3470) Encroachment computation information follows: Left Encroachment Station (ft; STENCL) 188.31 Right Encroachment Station (ft, STENCR) 324.18 Encroachment Method (TYPE) 1 Width or Percent. Target 135.870 Left Encroachment Elevation (ft, ELENCL) 5000.87 Right Encroachment Elevation (ft, ELENCR); 4995.01 I No existing SWMM model was available to update for this area: D. HEC-2 MODEL A HEC-2 computer model was generated in order to assess the effect of the storm runoff predicted by the SWMM model for the proposed condition. This was done using BOSS HEC-2. In order to assess the effect of the items kept in the storage yard a computer surface was generated with palates included as shown on the BBC -2 drawings, see drawings for both the existing and proposed condition in the pockets at the back of this report. M. DRAINAGE DESIGN CRITERIA A. Regulations The City of Fort Collins Storm Drainage Design Criteria is being used for the subject site. B. Development Criteria Reference and Constraints The site is subject to large off -site storm flows which pass through the site and create a large ponded area behind the railroad embankment and then flow around the west end of the embankment. The storm drainage then flows to the north and east through the site. Due to the magnitude of these flows they must be kept away from areas where damage can occur to future buildings. Also, the flows must be kept from flowing off -.site north into the adjacent pond and guided to the east at the northeast corner of the storage yard (Design Point 7). C. Hydrological Criteria The SWMM model was used to determine surface runoff for the project site. the 2-year and 100-year storm event criteria, obtained by the City of 1 Fort Collins was used in calculating runoff values. These calculations and criteria are included in the Appendix of this report. 1 3 1 BOSS HEC-2 for AutoCAD version 2.0 PAGE 8 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER 183-039 3/07/1997 ISECNO XNL XNCH XNR DEPTH CWSEL i CRIWS WSELK SLOPE XLOBL XLCH XLOBR EG HV HL OLOSS VOL ALOE ACH AROB CORAR LTBNK I RTBNK ITRIAL QLOB QCH QROB TOPWD SSTA ENDST IDC IME VLOB VCH VROB WTN TWA ELMIN ICONT ---------------------------------- 8.000 0.000 0.035 0.000 2.49 4989.:49 0.00 0.00 0.003043 91 139 126 4989.62 0.13 0.41 0.00 0.98 0 48 0 0.00 4990.00 4994.00 2 139 0 139 0 34.4 270.64 305.06 0 0.08 0.00 2.89 0.00 0.000 3.0 4987.00 0 STATUS: Analyzing cross-section reach 8.500. STATUS: (3280) For cross-section 8.50, ends have been extended vertically 2.41 feet in order to calculate the hydraulic cross-section properties. WARNING: (3685) 20 trials attempted in balancing assumed water surface elevation (WSEL) and computed water surface elevation (CWSEL) WARNING: (3693) It is probable that critical depth has been crossed. WARNING: (3720) Critical depth has been assumed. STATUS: (3410) Encroachment computation information follows: Left Encroachment Station (ft, STENCL) 90.97 Right Encroachment Station (ft, STENCR) 288.38 Encroachment Method (TYPE) 1 Width or Percent Target 197.410 Left Encroachment Elevation (ft, ELENCL) 5003.82 Right Encroachment Elevation (ft, ELENCR) 5020.96 8.500 0.016 0.035 0.000 2.60 4990.60 4990.60 0.00 0.009431 68 77 75 4990,.88 0.29 0.71 -0.19 1.05 13 19 0 0.00 4990.00 4995.00 20 139 62 77 0 62.3 202.76 265.07 9 0.08 4.71 3.94 0.00 0.000 3.1 4988.00 0 STATUS: Analyzing cross-section reach 9.000. WARNING: (7185) Critical depth has been crossed, therefore critical depth has been. assumed for the current cross-section. WARNING: (3720) Critical depth has been assumed:: BOSS HEC-2 for AutoCAD version 2.0 PAGE 9 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 j 3/07/1997 ,SECNO XNL XNCH XNR DEPTH CWSEL CRIWS WSELK SLOPE XLOBL XLCH XLOBR EG HV i HL OL_OSS -VOL ALOB ACH AROB CORAR LTBNK RTBNK ITRIAL I2 QLOB QCH QROB TOPWD SSTA ENDST IDC TIME VLOB VCH VROB WTN TWA ELMIN ICONT 9.000 0.016 0.035 0.000 1.45 499086 4990.86 0.00 0.005869 30 19 22 4991.13 0.�27 0.15 0.04 1.07 22 13 0 0.00 4990.00 4992.99 2 139 102 36 0 70.0 179;86 249.87 11 0.08 4.57 2.75 0.00 0.000 3.1 4989.41 0 STATUS: Analyzing cross-section reach 10.000. WARNING:. (718.5) Critical depth has been crossed, therefore critical depth has been assumed for the current cross-section. WARNING: (3720) Critical depth has been assumed. STATUS: (3470) Encroachment computation information follows: Left Encroachment Station (ft, STENCL) Right Encroachment Station (ft, STENCR) Encroachment Method (TYPE) Width or Percent Target ' Left Encroachment Elevation (ft, ELENCL) Right Encroachment Elevation (ft, ELENCR) 130.78 220.49 1 -130.780 4991.85 100000.00 10,000 0.016 0.035 0.000 1.42 4991.42 4991.42 0.00 ' 0.011728 43 34 32 4991.68 0.26 0.45 -0.11 1.10 5 28 0 0.00 4991.00 4991.80 2 139 19 119 0 63.9 146.85 210.72 8 ' 0.09 3.40 4.20 0.00 0.000 3.2 4990.00 0 STATUS: Analyzing cross-section reach 11.000. WARNING: (3685) 20 trials attempted in balancing assumed water surface elevation (WSEL) and computed water surface elevation (CWSEL). WARNING: (3693) It is probable that critical depth has been crossed. WARNING: (3720) Critical depth has been assumed. 11.000 0.016 0..016 0.000 1.03 4992.33 4992.33 0.00 0.004168 49 23 16 4992.66 0.33 0.10 0.07 ' 1_12 139 0 1 29 137 0 0 0.00 48.4 4992.00 129.85 4993.10 178.23 20 19 0.09 1.82 4.63 0.00 0.000 3.2 4991.30 0 1 STATUS: Analyzing cross-section reach 12.000. I &8 .BOSS HEC-2 for AutoCAD version 2.0 PAGE 10 PROJECT TITLE : FORT COLLINS UTILITY- CENTER PROJECT NUMBER : 183-03.9 3/07/1997 ' WARNING: (3685) 20 trials attempted in balancing assumed water surface elevation (WSEL) and computed water surface elevation (CWSEL) WARNING: (3693) It is probable that critical depth has been crossed. WARNING: (372.0) Critical depth has been assumed. ISECNO XNL XNCH XNR DEPTH CWSEL CRIWS WSELK SLOPE XLOBL XLCH XLOBR EG HV HL OLOSS VOL ALOB ACH AROB CORAR LTBNK RTBNK ITRIAL QLOB QCH QROB TOPWD SSTA ENDST IDC IME VLOB VCH VROB WTN TWA ELM.IN ICONT --------- --------- --------- ------------------------------------ --------- 12.000 0.016 0.016 0.035 1.03 4992.62 4992.62 0.00 0.003638 47 18 13 4992.90 0.28 0.08 0.01 1.14 8 25 0 0.00 4992.00 4992.30 20 139 23 115 0 64.4 133.86 198.24 5 0.09 2.85 4.46 0.75 0.000 3.2 4991.59 0 STATUS: Analyzing cross-section reach 13.000. WARNING: (3685) 20 trials attempted in balancing assumed water surface ' elevation (WSEL) and computed water surface elevation (CWSEL) WARNING: (3693) It is probable that critical depth has been crossed. WARNING: (3720) Critical depth has been assumed. 13.000 0.016 0.016 0.035 0.97 4992.76 4.992,76 0.00 0.003517 23 15 12 4993.02 0.26 0.06 0.00 1.15 11 22 2 0.00 4992.12 4992.29 2.0 139 34 100 3 71.2 128.26 199.44 11 0.09 2.93 4.50 1.68 0.000 3.3 4991.79 0 STATUS: Analyzing cross-section reach 14.000. STATUS: (3265) Divided flow. WARNING: (3685) 20 trials attempted in balancing assumed water surface elevation (WSEL) and computed water surface elevation (CWSEL) WARNING: (3693) It is probable that critical depth has been crossed. WARNING: (3720) Critical depth has been assumed. it � G9 BOSS HEC-2 for AutoCAD Version 2.0 PAGE 11 PROJECT TITLE FORT COLLINS UTILITY CENTER PROJECT NUMBER 183-039 3/07/1997 ,SECNO XNNL XNCH XNR DEPTH CWSEL CRIWS WSELK -ELOPE XLOBL XLCH XLOBR EG HV HL OLOSS VOL ALOB ACH AROB CORAR LTBNK RTBNK ITRIAL. ,Q QLOB QCH QROB TOPWD SSTA ENDST IDC TIME VLOB VCH VROB WTN TWA ELMIN ICONT --------- -- ----------- --- ----------------------------------------- 14.000 0.016 0.016 0.035 1.76 4993.!28 4993.28 0.00 0.004021 30 21 8 4993.58 0.f30 0.09 0.01 ' 1_17 1 30 0 0.00 4993.�17 4993.00 20 139 2 136 0 68.0 52.56 207.28 17 0.09 1.36 4.43 0.72 0.000 3.3 4991.52 0 (SPECIAL- - - NOTE : ®---------- - An asterisk (*) to the left of the cross-section number indicates a special note is present in the SUMMARY OF WARNING AND STATUS MESSAGES section. `SUMMARY PRINTOUT TABLE 150 :FORT COLLINS UTILITY CENTER ------=-------------------- EXISTING CONDITION 183-039 Cross- Channel Top of Max.. Low Minimum Discharge Computed Critical Section Reach Roadway Chord C. S. Flow W. S. W. S. 1 Number Length Elevation Elevation Elevation Elevation Elevatio (ft) (ft MSL) (ft MSL) (ft MSL) (cfs) (ft MSL) (ft MSL). SECNO XLCH ELTRD ELLC ELMIN Q CWSEL CRIWS ---- ------------------------------------------------- --- ------ 0.0 2.000 83.12 0.00 0.00 4976.70 139.20 4977.21 4977.2 * 2.500 36.13 0.00 0.00 4977.00 139.20 4978.09 4978.0 t3.000 43.81 0.00 0.00 4978.20 139.20 4978.69 4978.6 * 4.000 98.78 0.00 0.00 4980.20 139.20 4980.83 4986.8 t5.000 99.35 0.00 0.00 4982.07 139.20 4982.60 4982.6 6.000 97.89 0.00 0.00 4984..00 139.20 4984.57 4984.5 * 7.000 169.20 0.00 0.00 4987.20 139.20 4987.66 4987.6 e* 7.500 137.68 0.00 0.00 4988.00 139.20 4989.04 4989.0 I BOSS HEC-2 for AutoCAD version 2.0 �O PAGE 12 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 3/07/1997 Cross- Channel Top of Max. Low Minimum Discharge Computed Critical Section Reach Roadway Chord C. S. Flow W. S. W. S. Number Length Elevation Elevation Elevation Elevation Elevatio (ft) (ft MSL) (ft MSL) (ft MSL) (cfs) (ft MSL) (ft MSL) SECNO XLCH ELTRD ELLC ELMIN Q CWSEL CRIWS ----------------------------------------------------------------------- 8.000 139.52 0.00 0.00 4987.00 13'9.20 4989.49 0.0 �* 8.500 77.26 0.00 0.00 4988.00 139.20 4990.60 4990.6 * 9.000 19.17 0.00 0.00 4989.41 139.20 4990.86 4990.8 �* 10.000 34.08 0.00 0.00 4990.00 139.20 4991.42 4991.4 ■* 11.000 23.04 0.00 0.00 4991.30 139.20 4992.33 4992.3 '* 12.000 18.28 0.00 0.00 4991.59 139.20 4992.62 4992.6 �* 13.000 15.63 0_00 0.00 4991.79 139.20 4992.76 4992.7 * 14.000 21.64 0.00 0.00 4991.52 139.20 4993.28 4993.2 VV24ARY PRINTOUT TABLE 150 FORT COLLINS UTILITY CENTER ---------------------------- EXISTING CONDITION 183-039 Cross- Discharge Computed W.S. Elev W.S. Elev W.S. Elev Water Channel Section Flow W. S. Diff per Diff per Diff per Surface Reach Number Elevation Profile Section Know/Comp Top Width Length (cfs) (ft MSL) (ft) (ft) (ft) (ft) (ft) SECNO Q CWSEL DIFKWP DIFWWX DIFKWS TOPWID XLCH --------------------- -----==----------------- --- - - -------------- 1.000 139.20 4976.35 0.00 0.00 1.35 245.27 0.0 ,* 2.000 139.20 4977.21 0.00 0.86 0.00 173.70 83.1 * 2.500 139.20 4978.09 0.00 0.88 0.00 137.77 36.1 3.000 139.20 4978.69 0.00 0.60 0.00 116.92 43.8 4.000 139.20 4980.83 0.00 2.14 0.00 133.40 98.7 * 5.000 139.20 4982.60 0.00 1.77 0.00 167.75 99.3 6.000 139.20 4984.57 0.00 1.97 0_00 196.76 97.8 -71 BOSS HEC-2 for AutoCAD version 2.0 PAGE 13 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 3/07/1997 Cross= Discharge Computed W.S. Elev W.S. Elev W.S. Elev Water Channel Section Flow W. S. Diff per Diff per Diff per Surface Reach Number Elevation Profile Section Know/Comp Top Width Length (cfs) (ft MSL) (ft) (ft) (ft) I (ft) (ft) SECNO --------- Q --------- CWSEL DIFWSP ------------------ DIFWSX --------- DIFKWS --------- TOPWID --------- XLCH -------- �* 7.000 139.20 4987.66 0.00 3.09 0.00 155.86 169.2 '* 7.500 139.20 4989.04 0.00 1.38 0_00 135.03 137.6 8.000 139.20 4989.49 0.00 0.45 0.00 34.43 139-5 '* 8.500 139.20 4990.60 0.00 1.11 0.00 62..31 71-2 * 9.000 139.20 4990.86 0.00 0.27 0.00 70.01 19.1 '* 10.000 139.20 4991.42 0.00 0.55 0_00 63.81 34.0 * 11.000 139.20 4992.33 0.00 0.92 0_00 48.38 23.0 �* 12.000 139.20 4992.62 0.00 0.29 0.00 64.38 18.2 13.000 139.20 4992.76 0.00 0.14 0.00 71.18 15.6 * 14.000 139.20 4993.28 0.00 0.52 0.00 67.96 21.6 iSUMMARY OF ---------------------------------------- WARNING AND STATUS MESSAGES Section 2, profile 1, critical depth assumed. Section 2, profile 1, minimum specific energy. tSection 2.5, profile 1, critical depth assumed. Section 2.5, profile 1, probable minimum specific energy. Section 2.5, profile 1, 20 trials attempted to balance. water surface elevation. 1 depth Section 3, profile 1, critical assumed. Section 3, profile 1, minimum. specific energy. Section 4, profile 1, critical depth assumed. Section 4, profile 1, minimum specific energy. Section 5, profile 1, critical depth assumed. I �1Z BOSS HEC-2 for AutoCAD version 2_0 PAGE 14 PROJECT TITLE FORT COLLINS UTILITY CENTER PROJECT NUMBER 183-039 3/07/1997 Section 5, profile 1, minimum specific energy. Section 6, profile 1, critical depth assumed. Section 6, profile 1, minimum specific energy. i Section 7, profile 1, critical depth assumed. Section 7, profile 1, minimum specific energy. Section 7.5, profile 1, critical depth assumed. Section 7.5, profile 1, minimum specific energy. Section 8.5, profile 1, critical depth assumed. Section 8.5, profile 1, probable minimum specific energy. Section 8.5, profile 1, 20 trials attempted to balance water surface elevation. Section 9, profile 1, critical depth assumed. Section 9, profile 1, minimum specific energy. Section 10, profile 1, critical depth assumed. Section 10, profile 1, minimum specific energy. Section 11, profile 1, critical depth assumed. Section 11, profile 1, probable minimum specific energy.. Section 11, profile 1, 20 trials attempted to balance water surface elevation. Section 1.2, profile 1, critical depth assumed. Section 12, profile 1, probable minimum specific energy. Section 12, profile 1, 20 trials attempted to balance water surface elevation. Section 13, profile 1, critical depth assumed. Section 13, profile 1, probable minimum specific energy. Section 13, profiled, 20 trials attempted to balance water surface elevation. Section 14, profile 1, critical depth assumed. BOSS HEC-2 for Au_toCAD version 2.0 PAGE 15 PROJECT TITLE : FORT COLLINS UTILITY CENTER PROJECT NUMBER : 183-039 3/07/1997 I Section 14, profile 1, probable minimum specific energy. Section 14, profile 1., 20 trials attempted to balance water surface elevation.. 36 Warning and status message(s) generated I mEND OF OUTPUT i] J I 1 1 i 1 1 i i t i 1 i F 1 STREET CAPACITY 1 �?S 2 YEAR FLOW DEPTH Cross Section for Irregular Channel _ Project,Description Project File c:lhaestadlfmw\18903.9.fm2 Worksheet ELM STREET Flow Element Irregular Channel Method Manniing's Formula Solve.For Water Elevation Section Data _ Wtd. Mannings Coefficient 0.016 Channel Slope 0.01.0000 fvft Water Surface Elevation 100.48 ft Discharge 44.00 cfs r 1 r 1 r 1 � 1 v r r ca ca m 1 W r r r r 03/13197 02.01:55 PM 1 100.0' 1r 1 - - 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 Station (ft) FkwhAaster v5.13 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 FJ D. hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria and are also included in the Appendix. A BEC-2 computer model was generated to determine the extent of the flooding through the Fort Collins Utility Center Site. E. Variances from Criteria No variances are being sought for the proposed project site. IV. DRAINAGE FACILITY -DESIGN A. General Concept Runoff from the portion of the Old town Basin tributary to the Light and Power Service Center, the runoff from the new Light and Power Parking Lot and a portion of the runoff from the parking area in Basin 6 flow to the south and then east toward the existing wooden box culvert. Because of the size of the upstream catchment a great deal of storm water is generated. The storm water then ponds behind the railroad embankment. Flows then pass around the west end of the embanlonent. These flows then flow east along the north side of the railroad embankment and then to the storage yard. In order to protect a proposed vehicle maintenance building from being inundated these flows(369 cfs), are constrained by traffic CDOT Type 4 concrete barriers to contain and guide the flows to the storage yard and around the proposed building. The storm flows then sheet flow northeast toward the northeast corner of the storage yard where they are guided to the east, away from the adjacent pond, by a retaining wall. Flows the pass to a low lying area in the Cache La Poudre River 100 year floodplain. These excess flows the travel in low lying area eastward until they enter the Cache La Poudre River near College Avenue. B. Specific Details The City of Fort Collins Light and Power Service Center on -site and off - site catchments are divided into 6 sub -basins: 1, 3, 4, 5, 6 and 7. Basin 1 is roughly bounded by the West Vine Basin, Maple Street, Shields Street, West Street, Sycamore Street Wood Street. and Vine Drive. Basin 3 is bounded Shields Street, Maple Street, Wood Street, Sycamore Street, and West Street. Basin 4 is roughly bounded by Wood Street, Cherry Street, Grant Avenue, Loomis Avenue, and Elm Street. Basin 5 is Bounded by 4 -?6 ELM STREET 2 YEAR FLOW DEPTH Worksheet for Irregular Channel Project Description Project File cAhaestaditvAll 89039.fm2 Worksheet ELM; STREET Flow Element Irregular Channel Method Mapping's Formula Solve For Water Elevation Input Data - - - - Channel Slope 0.010006 f0ft Elevation range: 100.00 ft to 100.70 ft. Station (ft) Elevation (ft) 0.00 100.70 Start Station 0.00 10.00 100.50 10.00 10.60 100.00 50.00 30.00 100.40 50.00 100.00 50.00 100.50 60.00 100.70 Discharge 44.00 cfs Results Wtd.. Mannings Coefficient 0.016 Water Surface Elevation 100.48 ft Flow Area 11.23 ft2 Wetted Perimeter 40.07 ft Top Width 40.00 ft Height 0.48 ft Critical Depth 100.54 ft Critical Slope 0.010725 ft/ft Velocity 3.92 ftfs Velocity Head 0.24 ft Specific Energy 100.72 ft Froude Number 1.30 Flow is supercritical. End Station 10.00 50.00 60.00 Roughness 0.060 0.016 0.060 03/13/97 FbwMaster v5.13 02.02:39 PM Haestad Me&tods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755.1666 Page 1 of 1 CLIENT JOB No. i S3. Dac) RWINC. PROJECT CALCULATIONS FOR i-A ,Z Engineering Consultants MADEB'/ PC DAtEC)2"-O�'CHECKED BY - DATE �SHEET - OF A division cf:M Se -&Own GmW IN K 1 -0 + 01 M RBD INC. ENGINEERING CONSULTANTS WEIR SECTION FLOW DATA FORT COLLINS UTILITY CENTER ELM STREET WEIR TO NORTH WEIR COEF. 2.700 STA ELEV 0.0 97.00 0.0 96.60 196.9 94.84 216.9 94.79 244.9 94.06 264.9 93.66 282.5 93.99 414.0 94.92. 414.0 97.00 ELEVATION DISCHARGE (feet) (efs) 93.66 0.00 93.86 1.76 94.06 10.41 94.26 33.04 94.46 73.26 94.66 134.66 94.86 221.49 95.06 350.46 95.26 513.46 95.46 706.22 95.66 928.88 95.86 1181.83 96.06 1465.58 96.26 1180.70 96.46 2127.82 96.66 2514.86 96.86 2948.41 RWINC. Engineering Consultants A division of The SiraiBmirn Group we--),e Q c. Rewd-&M-61 WENT JOB NO. PROJECT 7 CALCULATIONS FOR MAPEBY—:71 %\OATE.L�CHECKED BY —DATE SHEET I_ F,pvt57-t RBD INC. ENGINEERING CONSULTANTS WEIR SECTION FLOW DATA FORT COLLINS UTILITY CENTER ELM STREET WEIR GOING EAST WEIR COEF. 2.700 STA ELEV 0.0 97.00 0.0 95.09 11.0 94.92 11.0 94.42 31.0 94.82 51.0 94.42 51.0 94.92 61.0 95.09 61.0 97.00 ELEVATION DISCHARGE (feet) (ds) 94.42 0.00 94.62 1.71 94.82 9.66 95.02 27.69 95.22 55.84 95.42 92.43 95.62 13534 95.82 183.68 96.02 236.88 96.22 294.51 96.42 356.24 96.62 421.83 96.82 491.05 9 RBD, Inc, file:elmweir FORT COLLINS UTILITY SERVICE CENTER ELM STREET WEIR CALCULATION This calculation aproximates the flow leaving the western catchment of elm street under a weir condition to the north and east. North Elm St East Elm St Weir Weir Elevation Discharge Elevation Discharge (cls) (cfs) 94 8 94 0 94.1 15 94.1 0 94.2 26 94.2 0 94.3 41 94.3 0 94.4 61 94.4 0 94.5 86 94.5 1 94.6 116 94.6 2 94.7 152 94.7 5 94.8 195 94.8 9 94.9 247 94.9 17 95 312 95 26 95.1 383 96.1 39 95.2 465 95.2 53 95.3 513 95.3 70 95.4 513 95.4 89 95.5 513 95.5 110 Water Surface Elevation at 359 cfs = Elm St. Combined Discharge (cfs) 8 15 26 41 61 86 118 157 204 264 338 422 518 584 602 623 95.03 feet MAO DESIGN OF STORM SEWERS AND CULVERTS E 3 UDINLET: INLET HYDARULICS AND SIZINGi DEVELOPED BY DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD ------------------------------------------------------------------.----- 1SER:&EVIN GINGERY-RDB INC FT. COLLINS COLORADO..........�.................... ON DATE 03-13-1997 AT TIME 05:35:46 ** PROJECT TITLE: FORT COLLINS UTILITY CENTER *** CURB OPENING INLET HYDRAULICS AND SIZING: INLET ID NUMBER: 1 INLET HYDRAULICS: IN A SUMP. GIVEN INLET DESIGN INFORMATION: GIVEN CURB OPENING LENGTH (ft)= 1.50 HEIGHT OF CURB OPENING (in) 6.00 INCLINED THROAT ANGLE (degree)= 0.00 LATERAL WIDTH OF DEPRESSION (ft) 2.00 SUMP DEPTH (ft)= 0.00 Note: The sump depth is additional depth to flow depth. INLET INTERCEPTION CAPACITY: IDEAL INTERCEPTION CAPACITY (Cfs)= 3.75 BY FAA HEC-12 METHOD.: DESIGN FLOW (cfs)= 56.00 FLOW INTERCEPTED (Cfs)= 3.00 CARRY-OVER FLOW (cfs)= 53.00 BY DENVER UDFCD METHOD: DESIGN FLOW (cfs)= 56.00 FLOW INTERCEPTED (Cfs)= 3.00 CARRY-OVER FLOW (Cfs)= 53.00 g4 ---------------------- ------------------------ UDINLET: INLET HYDARULICS AND SIZING DEVELOPED BY DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER. -------------SUPPORTED BY METRO :DENVER CITIES/COUNTIES AND UD&FCD ----------=------------------------------------------ -- SER:KEVIN GINGERY-RDB INC FT COLLINS COLORADO .............................. ON DATE 03-13-1997 AT TIME 05:36:47 PROJECT TITLE: FORT COLLINS UTI_LITY CENTER *** CURB OPENING INLET HYDRAULICS AND SIZING: INLET ID NUMBER: 2 INLET HYDRAULICS: IN A SUMP. GIVEN INLET DESIGN INFORMATION: GIVEN CURB OPENING LENGTH (ft)= 4.00 HEIGHT OF CURB OPENING (in)= 6.00 INCLINED THROAT ANGLE (degree)= 0.00 LATERAL WIDTH OF DEPRESSION (ft)= 2.00 SUMP DEPTH (ft)= 0.00 Note: The sump depth is additional depth INLET INTERCEPTION CAPACITY: IDEAL INTERCEPTION CAPACITY (cfs)= BY FAA HEC-12 METHOD: DESIGN FLOW FLOW INTERCEPTED CARRY-OVER FLOW BY DENVER UDFCD METHOD: DESIGN FLOW FLOW INTERCEPTED CARRY-OVER FLOW 0 Cl 11 to flow depth. (cfs)= 56.00 (cfs)= 8.00 (cfs) = 48.00 (cfs)= 56.00 (cfs) = 8.00 (cfs) = 48.00 I x z " vA 1 lbJRRERENT DATE: 08-27-1996 FILE DATE.: AUGUST TTRNT TIME: 15:17:15 FILE NAME.: WEIR FHWA#CULVERT*ANALYSIS ************************** HY-8, VERSION 4.0 ********#*************#*#* C SITE DATA CULVERT INLET U -- ------------------------ -SHAPE, -MATERIAL, -- ---------- --------------------- L INLET OUTLET CULVERT BARRELS V ELEV. ELEV.. LENGTH SHAPE SPAN RISE' MANNING INLET # (FT) (FT) (FT) MATERIAL (FT) (FT) n TYPE 1 -------------------------- 4990.93 4990.31 62.00 ----------------------------------------------- 1 RCPE 1.92 1.17 .012 CONVENTIONAL 2 3 6 SUMMARY OF CULVERT FLOWS (CFS) FILE: WEIR DATE: AUGUST ELEV (FT) TOTAL 1 2 3 4 .5 6 ROADWAY ITR 4990.93 0 0 0 0 0 0 0 0 1 4991*49 2 199183 4 2 0 0 0 4 0 0 0 0 0 0 1 0 0 0 1 4991.96 5 5 0 0 0 0 0 0 1 4992.34 8 8 0 0 0 0 0 0 i 4992.68 10 10 0 0 0 0 0 0 1 4993.11 12 12 0 0 0 0 0 0 i 4993.62 1 14 0 0 0 0 0 0 1 4993.80 16 4993.87 18 0 0 0 0 0 0 0 0 1 15 0 0 3 10 4993.92 20 \15 0 0 0 0 0 5 9 4993.69 140 0 0 0 0 OVERTOPPING � Z �iT M C�GrFa.�. t V� `.. G`tt" L:C "iG G •�, .. p � •^, e'...�'�� 1 � Z SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: WEIR DATE: AUGUST HEAD HEAD TOTAL FLOW FLOW ELEV(FT) ERROR(FT) FLOW(CFS) ERROR(CFS) ERROR 4990.93 0.00 0 0 0.00 4991.49 0.00 2 0 0.00 4991.83 0.00 4 0 0.00 4991.96 0.00 5 0 0.00 4992.34 0.00 8 0 0.00 4992.68 0.00 10 0 0.00 4993.11 0.00 12 0 0.00 4993.62 0.00 14 0 0.00 _ 4993.80 -0.00 16 0 0.86 4993.87 4993.92 -0.00 18 -0.00 20 0 0.82 0 0.69 <1> TOLERANCE (FT) 0.010 <2> TOLERANCE M) = 1.000