Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS UTILITY SERVICE CENTER 5TH FILING PDP AND FDP - 16 90C - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Planner: Engineer: I- ToCA Tralfiic Operations: Pbuv%4 u; ��GDate: �X Items Requested Site land Plat Utility Drainage Rpt Other Items Required Redlined Items Being Returned Site land Plat Utility Drainage Rpt Other Items Being Returned Engineering Stormwater i x 'Water/Wastewater I I X X Traffic Operations Trans, Planning Transfort Natural Resources Park Planning Ad Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions. 10