Submittal Checksheet
�7.--�,
Project Development Plan
Application form and filing fee (plus .k cents for each APO label).
d Two lists of names and addresses of all owners of record of real property within at
least 500' of the property lines for the parcel of land for which the p sect is proposed,
exclusive of public right-of-way. (One list typed on mailing labels 33Lnames er sheet)
and the other list on a/eproducible copy of those labels.) f� �4s, ►�•�d�
2Certification of Type I or Type II review. WVaVQQ t�-eC � — Tym %S
Lite plan drawings (30 copies). (Refer to the submittal requirements which outline
rmation to be presented on the site plan.)
Subdivision Plat (23 copies).
Architectural elevations (6 copies).
C /Landscape Plan (20 copies). (Refer to the submittal requirements which outline
information to be presented on the landscape plan.)
v'/Statement of planning objectives (26 copies).
�dT ansportation Impact Analysis (TIA) (6 copies).
f ity plans (12 copies).
Vinage and erosion control report (4 copies).
[cos report (2 copies).
ntext diagram (5 copies).
Lighting Plan (5 copies).
Hazardous Materials Impact Analysis (4 copies). Pff t 1CA%LE
�[Y Existing and proposed utility systems (12 copies).
street cross section schematics. (a Cc�- )
❑ Other information Director may require.
_Natural area or environmental study
Continued on the following page.
Submittal Checksheet
Project Development Plan'`rT
opy of applicable conceptual letter and explanation of how issues have been addressed.
( LJ Xpgal description of the site.
/L7 Name and address of each owner of property within the boundaries of the
Ell
plan area.
E/ C, t•� e� ��-'
List of names of all general and limited partners and/or officers involved as either
applicants or owners. l� &� �
9 Development phasing schedu
Ek EECplanation of any variance request(s).
2 ED Siigned letters of intent indicated that all required off -site easements and off -site
rights -of -way can be negotiated in time for final development plan submittal.