Loading...
HomeMy WebLinkAboutEAST PARK DISTRICT MAINTENANCE FACILITY - MJA200003 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTNovember 4, 2020 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR East Park District Maintenance Facility Fort Collins, Colorado Prepared for: City of Fort Collins Attn: Matt Schaefer PO Box 580 Fort Collins, Colorado 80522 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1748-002  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is necessary, we recommend double-sided printing. November 4, 2020 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for East Park District Maintenance Facility Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan (PDP) submittal for the proposed East Park District Maintenance Facility development. This report has been prepared in accordance with Fort Collins Stormwater Criteria Manual (FCSCM) and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, Northern Engineering Services, Inc. Carlos Ortiz García Shane Ritchie, PE Project Engineer Project Manager East Park District Maintenance Facility Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ........................................................................ 1 A. Location................................................................................................................... 1 B. Description of Property ............................................................................................... 2 C. Floodplain ................................................................................................................ 3 II. DRAINAGE BASIN AND SUB-BASIN ................................................................................ 4 A. Major Basin Description ............................................................................................. 4 B. Sub-Basin Description ............................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ........................................................................................ 5 A. Regulations .............................................................................................................. 5 B. Hydrological Criteria .................................................................................................. 5 C. Hydraulic Criteria ...................................................................................................... 5 D. Modifications of Criteria ............................................................................................. 5 IV. DRAINAGE FACILITY DESIGN ......................................................................................... 5 A. General Concept ....................................................................................................... 5 B. Specific Details ......................................................................................................... 6 V. CONCLUSIONS ............................................................................................................. 7 A. Compliance with Standards ........................................................................................ 7 VI. REFERENCES ............................................................................................................... 8 APPENDICES APPENDIX A – Hydrologic Computations APPENDIX B – Detention Pond Computation APPENDIX C – Erosion Control Report APPENDIX D – Preliminary LID Design Information LIST OF FIGURES Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2 – Proposed Site Plan ............................................................................................... 3 Figure 3 – Area Floodplain Mapping ...................................................................................... 4 MAP POCKET Proposed Drainage Exhibit East Park District Maintenance Facility Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in the Southeast ¼ of Section 20, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located just north of Environmental Drive and south of the Great Western Railroad. 4. The East Park District Maintenance Facility is located on the southeast side of Detention Pond 215. An existing storm drain runs along the east boundary of the site, directing water out of Detention Pond 215. This pond conveys runoff from the existing Bucking Horse Filings 1-4 and was intended to also convey runoff from the current site. 5. Offsite flows are minimal, and they enter the site from the west. Refer to the Drainage Exhibit for offsite basins location. East Park District Maintenance Facility Preliminary Drainage Report 2 B. Description of Property 1. The project area is roughly 3.60 acres. Figure 1 – Aerial Photograph 2. The subject property is an undeveloped parcel with native ground cover. The existing ground slopes in three different directions; the north side of the site slope with a mild to moderate grade (i.e., 1 - 3±%) through the interior to the northeast, and the south middle portion of the site slope with a mild to moderate grade (i.e., 1 – 2.5±%) through the interior to a low point located at the southeast corner of the site and, a small portion of area on the south side of the site slope south with a mild to moderate grade (i.e., 1 – 2±%). General topography slopes from the west to the northeast, southeast, and south. 3. A soils report (Project No. FC09344-125) was completed by CTL Thompson, Inc. on May 4, 2020. The report contains the results of a complete geotechnical subsurface exploration as well as pertinent geotechnical recommendations. 4. The proposed project site plan is composed of one building, parking areas, and open spaces. Please see Figure 2, on the following page, showing the proposed site plan. East Park District Maintenance Facility Preliminary Drainage Report 3 Figure 2 – Proposed Site Plan 5. There are existing Utility Easements crossing the property at a northeast bearing on the east one-third side of the site. C. Floodplain 1. The East Park District Maintenance Facility is located within a FEMA Moderate Risk Flood Hazard Area for the Cache la Poudre River. This area is designated as Zone X on Firm Panel 0992G, Revised May 2, 2012. Therefore, it falls outside of the regulated 100-year floodway and floodplain fringe. Chapter 10 of the City of Fort Collins Municipal Code does regulate critical facilities within this Moderated Risk Flood Hazard Zone. However, no critical facilities are proposed. It should be noted that FEMA is remapping the Cache Poudre River in the next one to two years in a process that may affect this property. Discussions with City staff have indicated that the existing elevations on the project site could place the project within the updated 100-year floodplain. To ensure that the proposed building remains out of the updated floodplain, the finished floor of the building, and all ductwork, heating, ventilation, electrical systems, etc. will be elevated 24 inches above the Base Flood Elevation (BFE). This elevation is known as the Regulatory Flood Protection Elevation (RFPE). RFPE = BFE + 24 inches. Preliminary results from the new modeling indicate the BFE will be 4885.1 and the RFPE would be 4887.1 East Park District Maintenance Facility Preliminary Drainage Report 4 Figure 3 – Area Floodplain Mapping 2. While the area referenced above currently falls outside of the current 100-year floodplain, it should be noted that the subject property is protected from the 1% annual chance or greater flood hazard by a levee system. Overtopping or failure of any levee system is possible. Current and future landowners should check with the local floodplain administrator at the City of Fort Collins to obtain more information, such as the estimated level of protection provided (which may exceed the 1% annual chance level) and the Emergency Action Plan, on the levee system(s) protecting this area. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website. II. DRAINAGE BASIN AND SUB-BASIN A. Major Basin Description 1. The East Park District Maintenance Facility lays in Basin 57 of the Foothills Drainage Basin. According to the updated Foothills Master Drainage Plan by Anderson Consulting Engineers, (ACE) dated July 15, 1999, the project site was was limited to a 100-year developed discharge of 85 CFS, which equated to the 2-yr historic rate. B. Sub-Basin Description The subject property is located within the Bucking Horse development, and has historically drained overland from west to northeast, southeast, and south. The property was included in the Pond 215 design, and had both detention and water quality accounted for. Because of the grade differential between the Detention Pond 215 water surface elevation and East Park District Maintenance Facility Preliminary Drainage Report 5 existing site topography, we believe it is not practical for this site to drain to Detention Pond 215. As such, the project site is proposed to follow the existing drainage pattern to the southeast and be released into the existing storm drain along the east side of the property. A more detailed description of the project drainage patterns follows in Section IV.A., below. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor” or “Initial” Storm, which has a two-year recurrence interval. The second event considered is the “Major” Storm, which has a 100-year recurrence interval. 4. No other assumptions or calculation methods have been used with this development that are not referenced by the current City of Fort Collins criteria. C. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with the criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As previously mentioned, this project is not subject to any floodplain regulations. D. Modifications of Criteria No modifications are requested at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns and to ensure no adverse impacts to any adjacent properties. 2. Onsite detention and water quality treatment will be provided within the detention pond located at the southeast corner of the project. The pond will treat the majority of developed runoff prior to discharge into the existing storm pipe. 3. The site has been broken into four onsite sub-basins for preliminary design purposes. Anticipated drainage patterns for proposed drainage basins are described below. East Park District Maintenance Facility Preliminary Drainage Report 6 Basin 1 Basin 1 consists of concrete, gravel, landscape areas, and a portion of the building area. This basin will generally drain via overland flow to a concrete pan and into a rain garden and will then drain via storm drain and inlets into the proposed detention pond located on the southeast corner of the project. The proposed detention pond will release to an existing storm drain pipe designed with Bucking Horse Filing One located along the east boundary of the property. Basin 2 Basin 2 consists of asphalt and landscape areas and a portion of the building area. This basin will generally drain via overland flow across the parking lot to a curb cut and into a rain garden and will then drain via storm drain and inlets into the proposed detention pond on the southeast corner of the project. The proposed detention pond will release to an existing storm drain pipe designed with Bucking Horse Filing One located along the east boundary of the property. Basin 3 Basin 3 consists primarily of open space. This basin will generally drain via overland flow to the northeast and will not be detained. Basin 4 Basin 4 consists primarily of open space and concrete walks areas. This basin will generally drain via overland flow to Environmental Drive and will then drain via curb and gutter to existing drainage facilities to the south and will not be detained. Basins OS1 and OS2 Basins OS1 and OS2, as shown on the Drainage Exhibit, consist of open space and concrete walks along the east side of Detention Pond 215 that drain onto the current site. Some of OS1 runoff will not receive LID treatment, and the detention will pass this flow over the spillway. OS2 runoff will receive LID Treatment, and the detention will pass this flow over the spillway. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. The detention pond volume of 0.55 AC-FT was calculated using the FAA Method. The requirements for this basin are to detain the difference between the 100-year developed inflow rate and the historic two-year release rate. A historic two-year release rate of 1.64 CFS was calculated for the overall East Park District Maintenance Facility site (3.6 acres). 2. City code requires LID treatment for all projects, and this project is proposing to meet the requirement using rain gardens. The rain gardens are situated towards the bottom of the paved areas and will treat stormwater prior to it entering the detention facility. This configuration will treat 96.2% of the onsite impervious area, far exceeding the City requirement to treat more than 75% of the site. 3. Water quality for the project will be provided by the rain gardens. A water quality volume of 0.07 AC-FT was calculated using the Mile High Flood District method for Rain Garden sizing and then by adding 20% to that volume. 4. The allowable release rate from the entire Bucking Horse project was identified by Anderson Consulting Engineers (ACE) in their original report dated July 15, 1999 as 85 East Park District Maintenance Facility Preliminary Drainage Report 7 cfs. Bucking Horse Filing Two used a release rate of 83 CFS, leaving 2 cfs of available release from the basin without exceeding the original design. The proposed release rate for the project is less, therefore the project is in conformance with the previous designs. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual, as well as previous drainage studies from which downstream stormwater infrastructure was constructed 2. The drainage design proposed with this project complies with requirements for the Foothills Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. 4. Additional information and detail will be provided with future submittals, as is customary during the Final Plan review and approval process. East Park District Maintenance Facility Preliminary Drainage Report 8 VI. REFERENCES 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. 6. Preliminary Geotechnical Exploration Report, Bucking Horse Development - Southeast (Johnson Farm, Working Farm, Urban Estate), Fort Collins, Colorado, July 19, 2012, Earth Engineering Consultants, Inc. (EEC Project No. 1122025C) 7. Final Drainage Report Bucking Horse Filing One, Dated September 19, 2012, by Northern Engineering. 8. Final Drainage Report Bucking Horse Filing Two, Dated December 17, 2012, by Northern Engineering APPENDIX A Hydrologic Computations APPENDIX B WATER Detention Pond Computation APPENDIX C Erosion Control Report APPENDIX D Preliminary LID Design Information MAP POCKET DRAINAGE EXHIBITS East Park District Maintenance Facility Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed, or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways, and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing the said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX A Hydrologic Computations CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 1748-002 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: COG Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 100% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.50 40% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 2% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 2% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawn, Rain Garden, or Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Historic Basins: H1 43021 0.99 0.00 0.00 0.00 0.00 0.99 0.25 0.25 0.31 2.0% H2 113859 2.61 0.00 0.00 0.00 0.00 2.61 0.25 0.25 0.31 2.0% Developed Basins: 1 77380 1.78 0.00 1.07 0.09 0.22 0.40 0.74 0.74 0.92 70.1% 2 67113 1.54 0.29 0.13 0.06 0.00 1.06 0.47 0.47 0.58 31.9% 3 8526 0.20 0.00 0.00 0.00 0.00 0.20 0.25 0.25 0.31 2.0% 4 3860 0.09 0.00 0.00 0.00 0.00 0.08 0.28 0.28 0.35 6.1% OS1 4040 0.09 0.00 0.05 0.00 0.00 0.04 0.62 0.62 0.78 54.4% OS2 5002 0.11 0.00 0.03 0.00 0.00 0.08 0.44 0.44 0.55 28.6% Overland Flow, Time of Concentration: Project: 1748-002 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, Rational Method Equation: Project: 1748-002 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: Historic Basins: H1 H1 0.99 5 14 13 0.25 0.25 0.31 2.85 3.29 6.92 0.70 0.81 2.14 0.35 H2 H2 2.61 25 25 23 0.25 0.25 0.31 1.45 2.47 5.20 0.94 1.61 4.25 0.47 3.60 Developed Basins: 1 1 1.78 5 5 5 0.74 0.74 0.92 2.85 4.87 9.95 3.73 6.38 16.30 1.87 2 2 1.54 5 5 5 0.47 0.47 0.58 2.85 4.87 9.95 2.05 3.50 8.94 1.02 3 3 0.20 5 5 5 0.25 0.25 0.31 2.85 4.87 9.95 0.14 0.24 0.61 0.07 4 4 0.09 5 5 5 0.28 0.28 0.35 2.85 4.87 9.95 0.07 0.12 0.31 0.04 OS1 OS1 0.09 5 5 5 0.62 0.62 0.78 2.85 4.87 9.95 0.16 0.28 0.72 0.08 OS2 OS2 0.11 5 5 5 0.44 0.44 0.55 2.85 4.87 9.95 0.14 0.25 0.63 0.07 3.601 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) WQ Flow (cfs) RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) COG November 3, 2020 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Q = C f ( C )( i )( A ) APPENDIX B WATER Detention Pond Computation COG Pond No : South 100-yr 0.73 Area (A)= 3.60 acres 23008 ft 3 Max Release Rate = 1.64 cfs 0.53 ac-ft Time Time 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 9.950 26.15 7845 492.0 7352.6 10 600 7.720 20.29 12173 984.0 11188.9 15 900 6.520 17.13 15421 1476.0 13945.1 20 1200 5.600 14.72 17660 1968.0 15692.2 25 1500 4.980 13.09 19631 2460.0 17171.2 30 1800 4.520 11.88 21381 2952.0 18429.4 35 2100 4.080 10.72 22517 3444.0 19072.7 40 2400 3.740 9.83 23589 3936.0 19652.9 45 2700 3.460 9.09 24551 4428.0 20122.8 50 3000 3.230 8.49 25465 4920.0 20545.3 55 3300 3.030 7.96 26277 5412.0 20865.4 60 3600 2.860 7.52 27058 5904.0 21153.9 65 3900 2.720 7.15 27878 6396.0 21481.8 70 4200 2.590 6.81 28587 6888.0 21699.4 75 4500 2.480 6.52 29328 7380.0 21948.5 80 4800 2.380 6.25 30022 7872.0 22150.3 85 5100 2.290 6.02 30692 8364.0 22328.4 90 5400 2.210 5.81 31363 8856.0 22506.6 95 5700 2.130 5.60 31907 9348.0 22558.5 100 6000 2.060 5.41 32482 9840.0 22642.1 105 6300 2.000 5.26 33113 10332.0 22780.8 110 6600 1.940 5.10 33649 10824.0 22824.9 115 6900 1.890 4.97 34272 11316.0 22955.7 120 7200 1.840 4.84 34816 11808.0 23007.7 Developed "C" = 1.35 Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume DETENTION POND CALCULATION; FAA METHOD Project Number : 1748-002 Date : November 3, 2020 WATER QUALITY CAPTURE VOLUME DESIGN CALCULATIONS 40-Hour Extended Detention Project: 1748-002 By: COG Date: 09/17/20 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 3.600 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 48.51 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.49 <-- CALCULATED WQCV (watershed inches) = 0.202 <-- CALCULATED from USDCM Vol.3, Figure 3-2 WQCV (ac-ft) = 0.073 <-- CALCULATED from USDCM Vol.3, EQ 3-3 WQ Depth (ft) = 3.000 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in2) = 0.205 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 4/8 <-- INPUT from Figure 5 n = 9 <-- INPUT from Figure 5 t (in) = 1/4 <-- INPUT from Figure 5 number of rows = 1 <-- CALCULATED from WQ Depth and row spacing APPENDIX C Erosion Control Report East Park District Maintenance Facility Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs APPENDIX D Preliminary LID Design Information Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 70.1 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.701 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.22 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 77,380 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,421 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 5.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 1085 sq ft D) Actual Flat Surface Area AActual = 1236 sq ft E) Area at Design Depth (Top Surface Area) ATop = 2005 sq ft F) Rain Garden Total Volume VT= 1,621 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Carlos Ortiz Northern Engineering October 26, 2020 East Park District Maintenance Facility North Rain Garden UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 1748-002_RG-North_UD-BMP_v3.06.xlsm, RG 10/26/2020, 5:04 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Carlos Ortiz Northern Engineering October 26, 2020 East Park District Maintenance Facility North Rain Garden Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 1748-002_RG-North_UD-BMP_v3.06.xlsm, RG 10/26/2020, 5:04 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 33.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.337 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.13 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 56,411 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 611 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 380 sq ft D) Actual Flat Surface Area AActual = 892 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1612 sq ft F) Rain Garden Total Volume VT= 1,252 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) C. Ortiz Northern Engineering October 26, 2020 East Park District Maintenance Facility South Rain Garden UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 1748-002_RG-South_UD-BMP_v3.06.xlsm, RG 10/26/2020, 5:07 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) C. Ortiz Northern Engineering October 26, 2020 East Park District Maintenance Facility South Rain Garden Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 1748-002_RG-South_UD-BMP_v3.06.xlsm, RG 10/26/2020, 5:07 PM SD SD SD SD SD X X X X X X X X X X X NORTH RAIN GARDEN REQUIRED VOLUME: 1,611 CU. FT. MINIMUM FLAT AREA: 1193 SF PROVIDED VOLUME: 1,621 CU. FT. PROVIDED FLAT AREA: 1,236 SF TREATMENT AREA: 59,666 SF SOUTH RAIN GARDEN REQUIRED VOLUME: 627 CU. FT. MINIMUM FLAT AREA: 344 SF PROVIDED VOLUME: 1,252 CU. FT. PROVIDED FLAT AREA: 892 SF TREATMENT AREA: 17,166 SF EAST PARK DISTRICT MAINTENANCE FACILITY SHEET NO: P:\1748-002\DWG\DRNG\1748-002_LID.DWG 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DRAWING REFERENCE: LID TREATMENT EXHIBIT A. Reese 1 in = 80 ft September 23, 2020 LID-1 DRAWN BY: SCALE: ISSUED: ( IN FEET ) 0 1 INCH = 80 FEET 80 80 LEGEND UNTREATED AREA PERMEABLE PAVER AREA PAVER TREATMENT AREA East Park District Maintenance On-Site LID Treatment Project Summary Total Impervious Area 79,864 sf Target Treatment Percentage 75% Minimum Area to be Treated by LID measures 59,898.00 sf Rain Garden Rain Garden Treatment Area 76,832 sf Total Treatment Area 76,832 sf Percent Total Project Area Treated 96.2% MAP POCKET DRAINAGE EXHIBITS ENVIRONMENTAL DRIVE UD UD UD UD UD UD E E E E X X SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X TF EM 60' ROW 100' ROW GREAT WESTERN RAIL ROAD EXISTING DETENTION POND 215 DETENTION POND: DETENTION VOLUME = 0.53 AC-FT WQCV. VOLUME = 0.07 AC-FT TOTAL VOLUME REQUIRED = 0.60 AC-FT MAXIMUM RELEASE RATE, 2-Yr. HISTORIC = 1.64 CFS. GREAT WESTERN RAILROAD OWNER SIDE HILL RESIDENTIAL ASSOCIATION OWNER AGGEREGATE INDUSTRIES-WCR INC OS2 OS2 0.11 ac 4 0.09 ac 1 1.78 ac OS1 0.09 ac 2 1 OS1 FFE=88.00 NYLOPLAST INLET BASIN NYLOPLAST INLET BASIN NYLOPLAST INLET BASIN NYLOPLAST INLET BASIN CONCRETE WEIR CONCRETE WEIR 2 1.54 ac PROPOSED AREA DRAIN SOUTH RAIN GARDEN EXISTING 36"x96" STORM DRAIN CONNECT TO EXISTING STORM PROPOSED OUTLET STRUCTURE PROPOSED CONCRETE PAN PROPOSED POND OUTLET PROPOSED CURB OPENING NORTH RAIN GARDEN 3 0.20 ac DRAINAGE EASEMENT PROPOSED AREA DRAIN PROPOSED AREA DRAIN EXISTING WETLAND BOUNDARY APPROXIMATE TOP OF DITCH BANK 10' PROPOSED DRAINAGE EASEMENT 10' PROPOSED DRAINAGE EASEMENT 3 4 PROPERTY BOUNDARY SLOPE PROTECTION (SCOUR-STOP) SLOPE PROTECTION (SCOUR-STOP) Sheet EAST PARK DISTRICT MAINTENANCE FACILITY These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 11 DR1 PRELIMINARY DRAINAGE EXHIBIT 11 NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 NOTES: 1. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR EAST PARK DISTRICT MAINTENANCE FACILITY, DATED NOVEMBER 4TH, 2020 FOR ADDITIONAL INFORMATION. 2. THIS PROPERTY IS LOCATED IN THE FEMA_REGULATED, 500_YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 3. ESSENTIAL SERVICES CRITICAL FACILITIES AND AT_RISK POPULATION CRITICAL FACILITIES ARE PROHIBITED IN THE 500_YEAR FLOODPLAIN. DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) Historic Basins: H1 H1 0.99 0.25 0.31 5.0 13.1 0.70 2.14 H2 H2 2.61 0.25 0.31 24.7 23.0 0.94 4.25 Developed Basins: 1 1 1.78 0.74 0.92 5.0 5.0 3.73 16.30 2 2 1.54 0.47 0.58 5.0 5.0 2.05 8.94 3 3 0.20 0.25 0.31 5.0 5.0 0.14 0.61 4 4 0.09 0.28 0.35 5.0 5.0 0.07 0.31 OS1 OS1 0.09 0.62 0.78 5.0 5.0 0.16 0.72 OS2 OS2 0.11 0.44 0.55 5.0 5.0 0.14 0.63 LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET DESIGN POINT A FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 B2 1.45 ac BASIN DESIGNATION BASIN AREA (AC) CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R P:\1748-002\Dwg\Drng\1748-002_LID.dwg, 9/23/2020 9:37:13 AM, 1:1 Project Location : Fort Collins, CO. S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Historic Basins: H1 H1 No 0.25 0.25 0.31 89 1.45% 1.2 13.2 12.3 132 2.00% 2.83 0.8 0 0.00% N/A N/A 5 14 13 H2 H2 No 0.25 0.25 0.31 270 1.65% 22.1 22.1 20.5 304 1.00% 2.00 2.5 0 0.00% N/A N/A 25 25 23 Developed Basins: 1 1 No 0.95 0.95 1.00 26 5.57% 0.8 0.8 0.5 403 0.91% 1.91 3.5 0 0.00% N/A N/A 5 5 5 2 2 No 0.95 0.95 1.00 14 8.03% 0.5 0.5 0.3 192 1.55% 2.49 1.3 0 0.00% N/A N/A 5 5 5 3 3 No 0.25 0.25 0.31 25 6.04% 4.3 4.3 4.0 28 4.85% 4.40 0.1 0 0.00% N/A N/A 5 5 5 4 4 No 0.25 0.25 0.31 10 2.00% 4.0 4.0 3.7 10 2.00% 2.83 0.1 0 0.00% N/A N/A 5 5 5 OS1 OS1 No 0.25 0.25 0.31 10 2.00% 4.0 4.0 3.7 10 2.00% 2.83 0.1 0 0.00% N/A N/A 5 5 5 OS2 OS2 No 0.25 0.25 0.31 10 2.00% 4.0 4.0 3.7 10 2.00% 2.83 0.1 0 0.00% N/A N/A 5 5 5 TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow COG November 3, 2020 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 November 3, 2020