October 30, 2020
Chris O'Sullivan
NCO Real Estate & Brothers BBQ
4645 W Colfax Ave
Denver, CO 80204
RE: Brothers BBQ, FDP200021, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Brothers BBQ. If you have questions about any comments,
you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Brothers BBQ Review Comments Dated Oct 30, 2020 and Architect Responses Nov. 3,
202J
KEY:
City comments in BLACK font
Nathan Hall, Architect responses in RED font
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes(a>.fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/27/2020
10/27/2020: South edge: 1 don't see a fence and ground treatment clearly
designed. Also I would like to ask again if some 5' wide unpaved landscape
perimeter could be left if you are removing and replacing paving, vs. paving
clear to the property line.
See Sheet A103 for fence and 5' wide landscaped strip call -out
Comment Number: 2
Comment Originated: 10/27/2020
10/27/2020: Street comer planter area: For the meeting, if there's time wanted
to ask about removal of the existing planter, and reconsider the planting that's
shown there in any case.
See Sheet Al03 for new N E corner planter area
Comment Number: 3
Comment Originated: 10/27/2020
10/27/2020: Thank you for the response to the Board hearing with the
crosswalks.
Department: Engineering Development Review
Contact: Spencer Smith, 970-221.6603, smsmith fcgov.com
Noted
Noted
Topic: General
Comment Number: 1
Comment Originated: 10/27/2020
10/27/2020: FOR DCP
A Development Construction Permit (DCP) will need to be obtained prior to
starting any work on the site. Please visit the City Engineering web site for
more information about the DCP permitting process at:
hftps://www.fcqov.com/engineering/devrev.ph
Comment Number: 2
Comment Originated: 10/27/2020
10/27/2020: FOR APPROVAL
A draft of the Development Agreement (DA) is being prepared by City staff.
Once complete, it will be sent to the City Attorney for review. Once we have
addressed the attorney's comments and revised the agreement, a draft will be
sent to you for review.
Comment Number: 3
Comment Originated: 10/27/2020
10/27/2020: INFORMATION ONLY
There has been talk about a proposed fence being constructed along the south
property line. This is not shown on the plans. Please keep in mind that the
fence will need to teminate at least 2 feet behind the back of the proposed walk.
See Sheet Al03 — fence is now indicated; see also fence termination call -out on same sheet
2
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist(�fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/27/2020
10/27/2020: FOR INFORMATION:
We will need design details in regard to the elevation of the base of the traffic
signal pole and how it will tie into the expansion of the sidewalk. This will need
to be ADA compliant for access to the pedestrian crossing buttons, and not
create a tripping hazard within the sidewalk.
See detail 5 on Sheet A1OO and call -out on Sheet A1O3
Department: Erosion Control
Contact: Basil Harridan, 970.222-1801, bhamdan(cDfcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 10/22/2020
10/22/2020:
As long as the total proposed disturbance (which includes any parking lot
improvements that gets down to the sub -base) does not exceed 10,000 square
feet, no Erosion and Sediment Control materials are required as noted on sheet
A101.
Even in the absence of Erosion and Sediment Control requirements, the
contractor must maintain good housekeeping practices at all times during site
construction. To that end, please add a note on sheet Al01 stating that the site
still will be swept and maintained regularly to prevent dirt, saw cuttings, concrete
wash, trash, debris, landscape materials or other pollutants from leaving the site
and entering the storm drain system at all times during site construction, in
accordance with FC Municipal Code Section 26-498. Please note, this is a
complaint or site observation driven process. If the City finds that the contractor
is not complying with that code section, the City may later require the project to
install to install erosion and sediment control measures.
See erosion control note added to bottom left corner of Sheet Al01
Department: Floodplain
Contact: Claudia Quezada, (970)416-2494, cquezada d( fcgov.com
Topic: Floodplain
Comment Number: 3 Comment Originated: 10/26/2020
10/26/2020: FOR APPROVAL:
Please add flood fringe boundary to drawing A101.
Flood frinqe boundary line has been added to Sheet Al01
Comment Number: 4 Comment Originated: 10/26/2020
3
10/26/2020: FOR APPROVAL:
Please include flood fringe and floodway boundaries on plat.
Flood frinae and floodwav boundary lines have been added to the Plat
Department: Water -Wastewater Engineering
Contact: Matt Simpson, (970)416.2754, masimpson(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/23/2020
10/23/2020: FOR APPROVAL:
The existing water service appears to be drawn in the wrong location on the
plans. Our records show this is located approx. 66-ft south of the Mulberry curb.
Please have this re -located and added to the plans.
The curb stop is located 5-ft west of the Taft Hill Rd curb. I have provided a
picture of this with the redlines. Please contact me to discuss if you have any
questions.
The correct location is now indicated on sheets A101. A102, A103, & P-201
Comment Number: 2
Comment Originated: 10/23/2020
10/23/2020: FOR APPROVAL:
The interior water meter will need to have an electric conduit provided for the
antenna, which should be on the exterior of the building. Please add this to your
electric and mechanical plans. Please add Water Detail 14 to the Architectural
Plans. It is available here:
https://citydocs,fcgov.com/?
dn=UTILITIES&vid=189&dt=DETAIL+DRAWINGS&cmd=showdt
The conduit and antenna is now shown on Sheet E4. Water Detail 14 is now shown on Sheet
A105 with call -out for antenna and detail on sheet A102 & A103.
Comment Number: 3
10/23/2020: FOR APPROVAL:
See included redlines for minor comments.
Comment Number: 4
Comment Originated: 10/23/2020
Comment Originated: 10/23/2020
10/23/2020: FOR INFORMATION:
Please note that all City of Fort Collins Utility Customers are subject to City
Code requirements for wastewater. These requirements include Section
26-306 Wastewater Discharge Permit Requirements and Section 26-332
Prohibitive Discharge Standards. A permit may be required depending on
activities on the site, however, discharge standards apply to every customer,
both large and small, regardless of what activities take place on the site.
Please contact Industrial Pretreatment, Industrial_Pretreatment@fcgov.com or
(970)221-6900, to discuss these requirements and how they apply to this
development.
Department: Stormwater Engineering
n
Contact: Matt Simpson, (970)416-2754, masimpson(cDfcgov.com
Topic: General
Comment Number: 2
10/23/2020: FOR INFORMATION ONLY:
No Comment.
Department: Forestry
Contact: Molly Roche, 224.616.1992, mroche(c�fcgov.com
Topic: General
Street tree
Comment Originated: 10/23/2020
Comment Number: 11 Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL
Please include the Street Tree Permit note on all landscape sheets. This note
should be placed in a box to emphasize importance.
it note has been added to all landscape sheets
Comment Number: 12 Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL
Is it feasible to increase the dimensions of the planting bed south of the building
to be at least 5 by 5 feet? Increasing the planting bed will allow healthy, long
term root growth.
This has been enlarged to 5'x5'. See sheet A1O3
Comment Number: 13 Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL
Please center the Kentucky Coffeetree in the planting bed north of the trash
enclosure.
The tree is now centered. See sheet A1O3
Comment Number: 14 Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL
Please include all utilities (both existing and proposed) on the site and
landscape plan. The following separations must be met:
10' between trees and public water, sanitary, and storm sewer main lines
6' between trees and water or sewer service lines
4' between trees and gas lines
10' between trees and electric vaults
Utilities are included on landscape plan. See sheet A1O3
I�
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL:
Please revise the legal description as marked. See redlines.
al description has been revised See sheet AOO1
Comment Number: 2 Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL:
Some of the sheet titles & sheet numbers in the sheet index do not match the
noted sheets. See redlines.
Sheet index has been revised See sheet AO01
Comment Number: 3
10/26/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Line over text issues have been fixed on all sheets
Comment Originated: 10/26/2020
Comment Number: 4
Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Text masking issues have been fixed on all sheets
Comment Number: 5
Comment Originated: 10/26/2020
10/26/2020: FOR FINAL APPROVAL:
There are text over text issues. See redlines.
Text over text issues have been fixed on all sheets
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovlandna,fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 10/26/2020
10/26/2020: Please visit our website for a list of current adopted building
codes and local amendments for building permit submittal:
9
https://www.fcgov.com/buiIding/codes.php
This is a change of occupancy and will require a building permit and require the
building meet current code for the new restaurant occupancy
Restroom fixture count (toilets, urinals, sinks) must include the exterior patio
occupant load.
Due to change of occupancy and potential increase in energy usage, the
building must comply with current energy code.
Noted. Please see code analysis on sheet A001. Please also see comcheck energy
compliance information on Sheet A501 and also on Electrical engineering and Mechanical
enqineerinq drawings.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a)poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 10/26/2020
10/26/2020: NO COMMENT
Prior comments resolved. No further comments.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, ririshRfcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/22/2020
10/22/2020: Light & Power does not have any comments for FDP. Please
contact Rob Irish @ 970-224-6167 to coordinate the replacement of the
single-phase transformer with the new 3-phase transformer. Applicant will need
to sign a work request prior to this work.
Noted
Department: Environmental Planning
Contact: Scott Benton, sbenton(6fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/19/2020
10/19/2020. FOR FINAL APPROVAL: Environmental Planning is ready for final
approval.