Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS UTILITY SERVICE CENTER PDP AND PLAT - 16 90E - CORRESPONDENCE - STAFF'S PROJECT COMMENTSSTAFF PROJECT REVIEW City of Fort Collins LOUISE HERBERT Date: 8/28/2002 C/O VF RIPLEY ASSOCIATES 401 WEST MOUNTAIN AVE., SUITE 201 FORT COLLINS, CO 80524 Staff has reviewed your submittal for CITY OF FORT COLLINS UTILITY SERVICE CENTER PDP/REPLAT, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Ted Shepard Topic: Public Hearing 58 As soon as a Preble's Jumping Mouse Survey is submitted and found to be satisfactory, the PDP may be scheduled for an Administrative Public Hearing. Please contact Ted Shepard to coordinate the hearing date and time. Department: Engineering Issue Contact: Dave Stringer Topic: General 11 Is a signature block required for Griffin Drain ownership? No response was provided 13 Call out curb and gutter type, Elm Street and parking lot. No response provided 15 Will existing Fire hydrant on Elm need to be relocated? The valve may be in Gutter or curb head No response provided. 16 It appears that off -site easements are require for pond, retaining wall and trail. No response provided 17 How will the existing alley terminate at the North end? No response provided Department: Natural Resources Topic: General 51 No Issues. Issue Contact: Doug Moore Department: PFA Issue Contact: Michael Chavez Topic: General 38 After reviewing PFA has no comments pertaining to the surfacing of the storage yard. Department: Stormwater Utility Topic: Box Culvert Access 49 Issue Contact: Basil Harridan Page 1 Please coordinate the box culvert access with Maureen Scullion in order to make sure that the proposed details meet OSHA standards. Topic: Box Culvert Profile 50 Please show crossing of future ELCO waterline on the box culvert profile, Topic: Box Culvert Trash Rack 32 It seems that the box culvert is designed with a security rack at the downstream end. Please make sure that the grate is not anchored to the headwall as currently shown, but is secured with lockable and movable devices such as hinges and locks for maintenance access. Topic: Details 55 Please provide a construction detail of the water quality outlet box that would include all box size dimensions and all concrete and reinforcement construction detail. Please provide an opening slot on the downstream side of the water quality pond stilling basin for dewatering.. Topic: Erosion Control 56 Standard City erosion control notes need to be on the plan, they are still not shown on the current erosion control plan. The BMP's mentioned in the report versus those on the plan, versus those in the calculations do not match Please make it so. Project Schedule needs to be on the erosion control plan. What happens where with permanent revegetation? How are the swales and the new pond to be protected from erosion until vegetation Is established Topic: Floodplain 46 Any grading work in the Poudre River floodplain will require a floodplain use permit. Topic: Future Building 29 Please specify the Finish Floor elevation of the future proposed building and call out existing vehicle storage building elevation. Topic: Grading 45 The grading plan should clearly call out the locations of the proposed retaining walls. The line thickness for the proposed retaining walls should be changed so that it is clearly visible on the plans. Show existing trench drain around vehicle storage building Page 2 Topic: Griffin Drain Crossing 54 The crossing of the Griffin drain is now shown, however the elevation is not called out. It is recommended that the drain elevation be potholed prior to construction. Please add such a note to the plans. Topic: Proposed wetlands 47 Please provide a detail on the plan for the proposed buried riprap at the wetlands, Provide a low flow crossing of the bike path. Make sure this sheet is signed by the City Parks Department. Topic: Storm Pipe Profile 53 Please specify water -tight joints on the profile sheets for the storm lines where the HGL exceeds the crown of pipe. Topic: Trench Drain Detail 48 Please provide a detail on the plans for the proposed trench drain around'the transformer pad. Make sure that the specs are such that the drain can withstand heavy equipment loading, Topic: Utility corridor documentation 57 Please provide a copy of the utility corridor reservation for the drainage facilities proposed on the site. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General 19 Repeat Comment: Maintain 10 feet of separation between existing buildings and sanitary sewer trunks and proposed relocated ELCO water main. 20 Clearly define all aspects of existing and proposed water/ sewer services (Le, size, location, etc.).. 22 Will the existing 6" City of Fort Collins water main be abandoned with future building? Clearly define all aspects of future building impacts on existing water/sewer. Water mains and services may not extend under one building to serve another. 23 Provide all appropriate details on detail sheet (Le. water main lowering, meter pits, etc.). See site, landscape and utility plans for other comments. 41 Clearly define how grading will affect existing sanitary sewer manhole located at the south east corner of this site. Will the existring manhole need to be raised? 42 Provide separate water and sewer services for each individual building. Page 3 E 0 43 Will existing fire hydrant need to be relocated along Elm Street? Provide a feet minimum separation between back of curb/sidewalk and fire hydrant. 44 Curb stops and meter pits may not be placed in vehicle travel areas. 52 CLEARLY DEFINE WHAT IS TO BE CONSTRUCTED WITH THIS PROJECT. IF IT IS A CONCEPTUAL - DESIGN THEN GHOST IT OUT OR LABEL IT AS FOR INFORMATION ONLY. Department: Zoning Topic: zoning Issue Contact: Peter Barnes 2 REPEAT COMMENT: No new narative was submitted with this 2nd round, so it's still unclear as to what they mean by "security fence" on the PDP site plan. It must comply with 3.8.11(13), so they should clarify on the site plan with a note or detail describing what they mean by "security fence". Original comment: Their narative states that there will.be an 8'tall security fence to tie in with the existing. Will the fence have barbed wire? If it does, then theyll have to comply with the standards in 3.8.11(B). Please return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, TED SHEPARD Chief Planner Page 4