HomeMy WebLinkAboutCITY OF FORT COLLINS UTILITY SERVICE CENTER PDP AND PLAT - 16 90E - CORRESPONDENCE - STAFF'S PROJECT COMMENTSSTAFF PROJECT REVIEW
City of Fort Collins
LOUISE HERBERT Date: 8/28/2002
C/O VF RIPLEY ASSOCIATES
401 WEST MOUNTAIN AVE., SUITE 201
FORT COLLINS, CO 80524
Staff has reviewed your submittal for CITY OF FORT COLLINS UTILITY SERVICE CENTER
PDP/REPLAT, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Ted Shepard
Topic: Public Hearing
58
As soon as a Preble's Jumping Mouse Survey is submitted and found to be satisfactory, the
PDP may be scheduled for an Administrative Public Hearing. Please contact Ted Shepard to
coordinate the hearing date and time.
Department: Engineering Issue Contact: Dave Stringer
Topic: General
11
Is a signature block required for Griffin Drain ownership? No response was provided
13
Call out curb and gutter type, Elm Street and parking lot. No response provided
15
Will existing Fire hydrant on Elm need to be relocated? The valve may be in Gutter or curb
head No response provided.
16
It appears that off -site easements are require for pond, retaining wall and trail. No response
provided
17
How will the existing alley terminate at the North end? No response provided
Department: Natural Resources
Topic: General
51
No Issues.
Issue Contact: Doug Moore
Department: PFA Issue Contact: Michael Chavez
Topic: General
38
After reviewing PFA has no comments pertaining to the surfacing of the storage yard.
Department: Stormwater Utility
Topic: Box Culvert Access
49
Issue Contact: Basil Harridan
Page 1
Please coordinate the box culvert access with Maureen Scullion in order to make sure that
the proposed details meet OSHA standards.
Topic: Box Culvert Profile
50
Please show crossing of future ELCO waterline on the box culvert profile,
Topic: Box Culvert Trash Rack
32
It seems that the box culvert is designed with a security rack at the downstream end. Please
make sure that the grate is not anchored to the headwall as currently shown, but is secured
with lockable and movable devices such as hinges and locks for maintenance access.
Topic: Details
55
Please provide a construction detail of the water quality outlet box that would include all box size dimensions
and all concrete and reinforcement construction detail.
Please provide an opening slot on the downstream side of the water quality pond stilling basin for
dewatering..
Topic: Erosion Control
56
Standard City erosion control notes need to be on the plan, they are still not shown on the current erosion
control plan.
The BMP's mentioned in the report versus those on the plan, versus those in the calculations do not match
Please make it so.
Project Schedule needs to be on the erosion control plan.
What happens where with permanent revegetation? How are the swales and the new pond to be
protected from erosion until vegetation Is established
Topic: Floodplain
46
Any grading work in the Poudre River floodplain will require a floodplain use permit.
Topic: Future Building
29
Please specify the Finish Floor elevation of the future proposed building and call out existing
vehicle storage building elevation.
Topic: Grading
45
The grading plan should clearly call out the locations of the proposed retaining walls. The line thickness for
the proposed retaining walls should be changed so that it is clearly visible on the plans.
Show existing trench drain around vehicle storage building
Page 2
Topic: Griffin Drain Crossing
54
The crossing of the Griffin drain is now shown, however the elevation is not called out. It is
recommended that the drain elevation be potholed prior to construction. Please add such
a note to the plans.
Topic: Proposed wetlands
47
Please provide a detail on the plan for the proposed buried riprap at the wetlands, Provide
a low flow crossing of the bike path. Make sure this sheet is signed by the City Parks
Department.
Topic: Storm Pipe Profile
53
Please specify water -tight joints on the profile sheets for the storm lines where the HGL
exceeds the crown of pipe.
Topic: Trench Drain Detail
48
Please provide a detail on the plans for the proposed trench drain around'the transformer
pad. Make sure that the specs are such that the drain can withstand heavy equipment
loading,
Topic: Utility corridor documentation
57
Please provide a copy of the utility corridor reservation for the drainage facilities proposed
on the site.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
19
Repeat Comment: Maintain 10 feet of separation between existing buildings and sanitary
sewer trunks and proposed relocated ELCO water main.
20
Clearly define all aspects of existing and proposed water/ sewer services (Le, size, location,
etc.)..
22
Will the existing 6" City of Fort Collins water main be abandoned with future building? Clearly
define all aspects of future building impacts on existing water/sewer. Water mains and
services may not extend under one building to serve another.
23
Provide all appropriate details on detail sheet (Le. water main lowering, meter pits, etc.).
See site, landscape and utility plans for other comments.
41
Clearly define how grading will affect existing sanitary sewer manhole located at the south
east corner of this site. Will the existring manhole need to be raised?
42
Provide separate water and sewer services for each individual building.
Page 3
E
0
43
Will existing fire hydrant need to be relocated along Elm Street? Provide a feet minimum
separation between back of curb/sidewalk and fire hydrant.
44
Curb stops and meter pits may not be placed in vehicle travel areas.
52
CLEARLY DEFINE WHAT IS TO BE CONSTRUCTED WITH THIS PROJECT. IF IT IS A CONCEPTUAL -
DESIGN THEN GHOST IT OUT OR LABEL IT AS FOR INFORMATION ONLY.
Department: Zoning
Topic: zoning
Issue Contact: Peter Barnes
2
REPEAT COMMENT: No new narative was submitted with this 2nd round, so it's still unclear as to what they
mean by "security fence" on the PDP site plan. It must comply with 3.8.11(13), so they should clarify on the site
plan with a note or detail describing what they mean by "security fence".
Original comment: Their narative states that there will.be an 8'tall security fence to tie in with the existing. Will
the fence have barbed wire? If it does, then theyll have to comply with the standards in 3.8.11(B).
Please return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
TED SHEPARD
Chief Planner
Page 4