Loading...
HomeMy WebLinkAbout1516 REMINGTON ST FRATERNITY SORORITY APU - PDP200017 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSWest Elevation 1/8" = 1'-0" South Elevation 1/8" = 1'-0" North Elevation 1/8" = 1'-0" East Elevation 1/8" = 1'-0" SYMBOL KEY 1 1 1 1 3 1 STUCCO SYSTEM - TEXTURE MEDIUM - STO - COLOR: FROST TO MATCH EXISTING BRICK TO MATCH EXISTING CASEMENT WINDOW SYSTEM - DARK BRONZE TO MATCH EXISTING WINDOW COLOR. CLEAR GLASING NEW WOOD DOOR TO REPLICATED THE ORIGINAL DESIGN HOLLOW METAL DOOR AND FRAME PAINT DARK BRONZE TO MATCH EXISTING COLOR CONCRETE FILLED PIPE BOLLARD PAINT-DARK BRONZE BRICK BANDING TO MATCH EXISTING NEW OR REFURBISHED WINDOWS TO DUPLICATE THE ORIGNIAL HOME DESIGN NEW ROLLUP DOOR FOR SECURE BIKE STORAGE - COLOR TO MATCH STUCCO 1 2 3 4 5 6 1 TRASH ENCLOSURE 1/4" = 1'-0" 3 1 7 1 2 ADD NEW BRICK TO MATCH EXISTING NEW CONCRETE STAIR EXISTING METAL STAIR EXISTING METAL STAIR EXISTING METAL STAIR 6 MEATL GATE PAINT - DARK BRONZE 15'-0" 6'-0" 6'-0" METAL CAP FLASHING 6 1 2 4 8 5 20'-6" 21'-4" 2 REFURBISH EXISTING CANOPY EXISTING CHIMNEY 2 5 3 2 8 5 EXISTING CHIMNEY EXISTING CHIMNEY 8 2 STUCCO - FROST (TO MATCH EXISTING) 7'-0" OVER 8" CMU 3'-0" METAL DOOR - COLOR TO MATCH EXSTING BRONZE 7 7 7 7 7 7 13'-0" 8 9'-6" 10'-4" 8'-0" 8'-0" 9'-6" 5'-10" 9 9 1 5'-6" Seal: DRC SD SUBMITTAL Issued For SD: Issued For DD: Issued For Permit: Issued For Construction: 00/00/2020 00/00/2020 Revision Number Revision Date Plot Date: 20025 October 28, 2020 A-1 ELEVATIONS SIGMA CHI RESIDENCE 1516 REMINGTON, FORT COLLINS, CO 00/00/2020 00/00/2020 206 East 4th Street, Loveland, Colorado 80537 ARCHITECTS infusion