Loading...
HomeMy WebLinkAboutFCLWD GOLDEN CURRANT WATER LINE - FDP200026 - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPORTING DOCUMENTATIONPage 1 Golden Currant Engineer's Cost Estimate Item No. Description Unit Est. Qty. Bid Unit Price Bid Price 1 Mobilization/Demobilization LS 1 $ 15,000 $ 15,000 2 Traffic Control DAY 7 $ 5,000 $ 35,000 3 Pre/Post Const. Survey and Stake Out LS 1 $ 5,000 $ 5,000 4 Permits and Fees LS 1 $ 10,000 $ 10,000 5 Erosion and Sediment Control LS 1 $ 36,000 $ 36,000 6 Clearing and Grubbing LS 1 $ 20,000 $ 20,000 7 Dewatering LS 1 $ 5,000 $ 5,000 8 Grading and General Earthwork LS 1 $ 50,000 $ 50,000 9 Rock Excavation Force Acct. LS 1 $ 50,000 $ 50,000 10 Demolition and Abandonment LS 1 $ 10,000 $ 10,000 11 Geotechnical Testing LS 1 $ 10,000 $ 10,000 12 Road Repair SY 950 $ 60 $ 57,000 13 Site Restoration LS 1 $ 25,000 $ 25,000 14 Curb, Gutter, and Pan Repair LF 50 $ 75 $ 3,750 15 Sidewalk Repair (4'-wide) SF 200 $ 40 $ 8,000 16 Water System Pressure Testing and Disinfection LS 1 $ 7,500 $ 7,500 17 Owner Allowance/General Force Account LS 1 $ 100,000 $ 100,000 $ 447,250 18 Unrestrained 20" C905 PVC Waterline Installation LF 3561 $ 105 $ 373,905 19 Restrained 20" C905 PVC Waterline Installation LF 1704 $ 130 $ 221,520 20 Unrestrained 8" C900 PVC Waterline Installation LF 100 $ 45 $ 4,500 21 STA 24+03.88 Service Connection LS 1 $ 5,000 $ 5,000 22 36" x 20" Tee w/ RJ EA 1 $ 7,000 $ 7,000 23 20" x 8" Tee w/ RJ EA 1 $ 1,600 $ 1,600 24 20" 11.25° Bend w/ RJ EA 19 $ 1,250 $ 23,750 25 20" 22.5° Bend w/ RJ EA 12 $ 1,300 $ 15,600 26 20" 45° Bend w/ RJ EA 5 $ 1,250 $ 6,250 27 20" 90° Bend w/ RJ EA 2 $ 2,000 $ 4,000 28 8" PVC to 6" DIP Reducer EA 1 $ 150 $ 150 29 20" PVC to 16" DIP Reducer w/ RJ EA 1 $ 900 $ 900 30 20" Butterfly Valve w/ Box EA 5 $ 6,000 $ 30,000 31 8" Gate Valve w/ Box EA 1 $ 1,500 $ 1,500 32 3" Air/Vac Valve Assembly w/ Vault EA 5 $ 6,000 $ 30,000 33 3" Blowoff Assembly EA 4 $ 3,000 $ 12,000 34 Dixon Canal Crossing LS 1 $ 10,000 $ 10,000 $ 747,675 Total - ALL SCHEDULES $ 1,194,925 Total - SCHEDULE A: GENERAL PROJECT ITEMS SCHEDULE A: GENERAL PROJECT ITEMS SCHEDULE B: WATERLINE PHASE 1 Total - SCHEDULE B: WATERLINE PHASE 1