HomeMy WebLinkAboutWESTBROOKE PUD SECOND FILING FINAL - 3 90H - SUBMITTAL DOCUMENTS - ROUND 6 - ROUTING SHEETRevisions Routing, Sheet.-
' a
BLMLDINGINSPECTION
It aye
ADVANTNING
-
WATER CONSERVATION
mom
mmmmmmom
STATE HIGHWAY DEPARTMENT
Igo
RAU-ROAD: UP or BN/CS
REAIDOEIPRPA
iiiiii�iiiii�
mom
mmimm����
i
iii�®mmmm�mo
mmmmiiiii�mmm
Fier. 5-07-97
Project:
Planner:
Items 8equeiteQ
Site
land
Plat
Utili Main,
bwnetring
X
X
itormwater
x
Water/Wattewate
X
,�
,�_
77
TraMi Operations
X
>c,
Trani. Planning
X
Tranilbrt
x
UaNral 9tiourret
x
—
Park Planning
x
Totals
5
Other:
1ra[fic Operations: ��,> >r-�r��o,��
Iledlined Items Being Returned
Other Items Required bite I land I Plat I VON i nrafmcrA
we-tOtA� W
x
x
Date:
Other Items Being Returned
T
Note: All redlined items should be returned with the rttubmittal/ reWilont.