Loading...
HomeMy WebLinkAboutWESTBROOKE PUD SECOND FILING FINAL - 3 90H - CORRESPONDENCE - DRAINAGE RELATED DOCUMENTRedpeak Enguzeering 906 Richmond Drive, Unit #2 Fort Collins, Colorado 80S26-S973 (970) 207-1910 May 28, 1997 Mr. Willis Smith, President Pleasant Valley and Lake Canal Company First Tower, 10th Floor 215 West Oak Street P.O. Drawer J Fort Collins, CO 80522 RE: Westbrooke P.U.D. Second Filing Dear Mr. Smith: We are submitting these construction plans and drain. Westbrooke P.U.D. Second Filing foryour review and approval. report for the The concepts we have used to design this project are similar to those used in the design of the 70 lots in the First Filing immediately to the south of this property as follows: 1. The majority of all historical flows are diverted away from the Pleasant Valley and Lake Canal via storm sewer. 2. One overflow swale is proposed to drain into the canal. This.swale will be utilized only if the proposed storm sewer (designed for a 100 year event) becomes plugged. 3. Inlets at the end of Troutman Parkway will collect. street flows before they enter the canal. 4. Only flows from grassed backyards adjacent to the canal are allowed to discharge into the canal. These flows are estimated to be leis than 2 oft in the 100 year event. Please review this information and contact me at 207-1970 if you have additional questions or concerns. E. cc: Chuck Betters, P & B Partnership_