Loading...
HomeMy WebLinkAboutWESTBROOKE PUD SECOND FILING FINAL - 3 90H - CORRESPONDENCE - CORRESPONDENCE-HEARINGand Environmental Current Planning City of Fort Collins Jeff Couch Landmark Engineering 3521 West Eisenhower Loveland, CO 80537 Dear Jeff: 12, 1998 On March 20, 1998 you were sent a letter requesting documentation that you were actively pursuing the Westbrooke PUD, 2nd Filing, I have reviewed your response with other development review staff and determined that there has not. been sufficient activity related to this project. Therefore, we will be taking this project to the Planning and Zoning Board with a recommendation of denial. Note that the Board meeting is scheduled for June 4, 1998, not indicated in the original letter. Should you desire, you will have address the Board to explain the status of this project. As with Zoning Board decision, you have the ability to appeal their deci Council. Should you have any question& regarding this process, please (970)221-6750. Sincerely, 3o"L TL -�'J Robert E. Blanchard Current Planning Director cc: Steve Olt mr May 21, 1998 as the opportunity to any Planning and Pion to the City me at 281 North College Avenue 0 P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6i 50 • FAX (970) 416-2020 05/01/98 09:09 0970 667 6298 C Q 002/006 WC Landmark n ENGINEERING Ltd. April 29,1998 ProjectNo. CBR4-7L1C-01-304 Mr. Robert E. Blanchard Current Planning Director City of Fort Collins 281 N. College Avenue Fort Collins, CO 90522 RE; Westbrooke P.U.D. 2°d Filing Dear Bob: S�§L� s .— AL � .1 Suez. -s a q tJ�^ �1 f iaavw , -U-to - -tea.., + b .�: t �- •�-P�'�-`t k'L if ibis letter is in response to your correspondence dated March 20, 1998 relating to the status of the Westbrooke P.U.D. 21 Filing within the Fort Collins Planing Process. Your letter indicates that a final P.U.D. application was submitted on May 28,1997 and City review comments were available on June 25, 1997. You indicate that further revisions have not been submitted to substantiate that this is an active project. We emphatically disagree with this analysis and offer the following documentation which indicates that Westbrooke P_U.D. 2 d Filing should be considered an active project. This 41 lot phase is the final piece of the Westbrooke P.U.D. approved in 1991. Formal resubmittal has not been completed at this time for ONE reason - lack of a northerly traffic connection to Horsetooth Road or Shields Street. We stave made several attempts to address this perceived traffic deficiency, including proposal of a temporary connection, submittal of updated traffic information, investigation of Troutman right-of-way and ultimately coordination with offsite property owners relating to the pending construction of Seneca Street. A summary of these attempts follows: Ac •vily Date Meeting with water staff to review continents of July 35, I997 June 25, 1997 i Meeting with staff to review traffic requirements July 21, 1997 • Staff response from Engineer (letter attached) July 24, 1997 Meeting with Engineering staff to review tratiic requirements based on an update of Seneca construction schedule August 13, 1997 wi West Bisenhowa Blvd. Date D. Oihausen. P.E. & Ls. Loveland, Colorado 90537 President EN yagEM • ARCi TrWrS a PLANNERS • SURVEYORS Ov, Loveland (970) 667.6296 FAX (970) 6676298 Dcavu (303) 629-7124 05/01/98 08:10 0970 667 6298 LANDMARK ENG. Ik Mr. Robert Blanchard project No. CBIN-7L7C-01-304 April 30, 1998 Page 2 Wabash intersection design proposal forwarded to Tim Blandford December 12, 1997 Submittal of updated traffic analysis by Matt Delieh January' 7, 1998 Meeting with Faic Brake, David Stringer, Tun Blandford t o review progressJanuary 8,1998 IM003/006 In addition, several attempts have been made to segue right-of-way for the TroLwan Parkway alignment. Several contacts have been made with Shear Engineering (Briar+ Shear) and Land Development Services (Dennis Donovan) to review progress of plans for incorporation by reference with Westbrooke plans. The latest Seneca Street plan sets were received on April 27,1998, and indications we that Seneca Street from Troutman Parkway to Horsetooth Road will be built this year. While we understand the impacts of offshe traffic issues; no changes to the planning concept or interior infrast ucdue design have been contemplated since 1991. Roadway connection points, outfall storm sewer, and sanitary sewer location dictate this existing plan. Modifying the planning approval process at this point would yield no usefiil changes. We request the following consideration for the Westlrooke P:U. D. god Filing: 1. As an active project, it be allowed to continue through the LDGS process. 2. This project ve removed from the May 21, 1998 P&Z Board Agenda 3. Restrictions placed on this project as outlined in Tim Blanford's letter of 7-2497 be removed.. We look forward to your response. Please contact me at 667-6286, extension 228, if you have additional questions. Sinoerely, Ltd. Jwel Enclosures cc: P & B Partnership, Chuck Betters