HomeMy WebLinkAbout3405 S TIMBERLINE RD WIRELESS TELECOMMUNICATIONS EQUIPMENT - BDR200014 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS,F�`ort_Collins
September 29, 2020
Jaclyn Levine
Nexius Solutions
7025 S Fulton St Suite 100
Centennial, CO 80112
RE: 3405 S Timberline Rd AT&T Wireless Telecommunications, BDR200014,
Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of 3405 S Timberline Rd AT&T Wireless Telecommunications.
If you have questions about any comments, you may contact the individual commenter or
direct your questions through your Development Review Coordinator, Tenae Beane via
phone at 970-224-6119 or via email at tbeane@fcgov.com.
Comment Summary:
Department: Light And Power
Contact: Rob Irish, 970.224-6167, rirish(cDfcgov.com
Topic: General
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 - fax
fcgov.com/deve/opmentreview
Comment Number: 1 Comment Originated: 09/14/2020
09/14/2020: Information Only: the existing property at 3405 S. Timberline is
currently a primary metered customer. Light & Power feeds primary to the
customers primary metered cubicle on the switchgear. Everything beyond this
point is customer owned. Will the applicant need a separate service or
transformer for this installation??
Comment Number: 2 Comment Originated: 09/28/2020
09/28/2020: For Hearing: If the applicant anticipates taking power directly from
COFC Light & Power, a dedicated transformer will need to be installed. The
nearest available power feed is a primary vault along Danfield Ct. or primary
running adjacent to this site along Timberline Rd. There were no utilities shown
on the plans, but depending on where the fiber is coming into the site, Light &
Power could do a joint trench to bring in a dedicated service to feed the WTF.
Power is to be pulled directly from property owner. AT&T will submeter off of their building power,
we will not need a new transformer from Light & Power.
Comment Number: 3 Comment Originated: 09/28/2020
09/28/2020: For Hearing: Any existing and/or proposed Light & Power electric
facilities that will remain within the limits of the project must be located within
public right-of-way or in a utility easement.
No changes to existing Light & Power electric facilities. Proposed project stays within private
property using existing electric facilities
Comment Number: 4 Comment Originated: 09/28/2020
09/28/2020: For Hearing: Any relocation or modification to existing electric
facilities will be at the expense of the owner/developer.
No relocation of electric facilities
Comment Number: 5 Comment Originated: 09/28/2020
09/28/2020: For Hearing: A One -line diagram will need to be submitted to Light
& Power for review.
One -line diagram added to plans for review.
Comment Number: 6
Comment Originated: 09/28/2020
09/28/2020: For Hearing: If the applicant anticipates having a transformer set,
a C-1 Form will need to be submitted and a transformer location will need to be
coordinated with Light & Power.
No Transformer Required
Comment Number: 7
Comment Originated: 09/30/2020
09/30/2020: For Final: Electric Capacity Fee, Building Site charges, and any
system modification charges necessary will apply to this development. Please
contact Light & Power Engineering at ElectdcProjectEngineedng@fcgov.com.
Please reference our Electric Service Standards, development charges and fee
estimator at the following link:
http://www.fcgov.com/utilities/business/bu ilders-and-developers/plant-investmen
t-development-fees
Department: Planning Services
Contact: Will Lindsey, wlindsey(a)fcgov.com
Topic: General
Comment Number:
Comment Originated: 09/28/2020
09/28/2020:
FOR APPROVAL: The antenna locations do not adequately address 3.8.13(C)
(3) which states, 'all wireless telecommunication equipment shall be located as
far from the edge of the roof as possible.'
What other design/roof location options have you considered?
The idea of turning the installation into an architectural feature could help
alleviate the required setback from the edge of the building.
Original designs submitted to the property owner were set back from the roof edges. Upon review,
the Property owner requested that we engage their architecture firm to create a design that would
enhance the exterior of the building. The final design proposal for the four sectors brought the
enclosures closer to the roof edge in order to create new architectural features to the building.
I%
Comment Number:
09/28/2020:
FOR APPROVAL:
Comment Originated: 09/28/2020
Updated - Upon further review of the site plan and the architectural renderings it
appears that there is a discrepnacy between the height of the Delta Tower
shroud. The site plan reflects that the height of the shroud is 15', but the
architectural rendering lists 20'. Please clarify the maximum intended height,
and ensure it is consistent across all plans for future submittals.
IF the current delta tower does exceed the maximum allowable 15' height for
WTE as specified in 3.8.13(C)(3) which states, "Whenever a wireless
telecommunication antenna is attached to a building roof, the height of the
antenna shall not be more than fifteen (15) feet over the height of the building."
than a modification of standard would be necessary for the project. For details
regarding the Modification of Standard process please consult Land Use Code
Division 2.8: https:Hlibrary.municode.com/co/fort_collins/codes4and_use?
node ld=ART2AD DIV2.8MOST
Regardless, as discussed previosly the height of the delta tower concealment
wall is out of scale with the existing architectural character and overall
aesthetics of the building. A reduction of height or an adjustment to the
proportionality of the shroud to match the buildings existing height will be
necessary to better integrate with the overall architecture.
Delta sector has been re -designed. The re -design includes lowering the sector 4-feet and expanding
the enclosure to resemble the other sectors. Additionally, the color palette has been updated
making it more compatible with the rest of the structure.
While this design brought Delta sector closer to the
roof edge, it has now become an architectural feature of the building.
Per additional discussions with planning, it was determined that the Delta sector height is permitted
to be 15-feet above the highest point of the building which stands at 30'-6". The updated
design is now 4-feet shorter than originally proposed. The need for the extra height for this
sector is due to the PRPA parking structures to the West of the building. These
parking structures have metal roofs which may cause interference issues with the antennas if they
are unable to transmit over those structures.
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573, dbetley(a?fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/24/2020
09/24/2020. The site does not seem to have any offsite improvements at this
time. Engineering has no comments. If any on site easements needed for
Emergency access, Engineering will help process the documents.
Comment Number: 2 Comment Originated: 09/24/2020
09/24/2020: If there are any improvements or street cuts needed for the right of
way, the plans will need to comply with the Larimer County Urban Area Street
standards. If additional information is needed, please feel free to contact me at
970-829-8882.
3
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen a(�fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/21/2020
09/21/2020: INFORMATION:
The proposed site changes shown in this submittal are not substantial enough
to trigger Stormwater requirements; therefore, no requirements apply at this
time. Please note: it is assumed based on the provided plans that the existing
grading and drainage patterns will be maintained.
If this assumption is incorrect or if future submittals include site or grading
changes that are not shown on these plans, please contact Dan Mogen at
(970)305-5989 or dmogen@fcgov.com to coordinate and determine what
requirements, if any, will apply.
Department: Water -Wastewater Engineering
Contact: Dan Mogen, 970-305-5989, dmo en fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/21/2020
09/21/2020: FOR APPROVAL:
Please clarify how fiber, and any other necessary connections, will be made -
that is, where is the connecting fiber being routed. If possible, please show
proposed alignment(s) and identify all crossings/conflicts with other utilities. If a
proposed alignment is not currently known, please show all water utilities (water,
wastewater, and stormwater - both public and private) on and adjacent to the
site.
Please contact me for a map showing schematic locations of these existing
utilities.
Fiber route has been incorporated into plans. The proposed route will not conflict with
Existing utilities according to the schematic map provided by Dan Mogen.
Comment Number: 2 Comment Originated: 09/21/2020
09/21/2020: INFORMATION:
It does not appear this project will cause a change to the existing water or sewer
services, adjacent City facilities, or the usage within the building. If this is
incorrect or if plans change, please contact me directly to discuss.
Please note that the existing water and fire services appear to come into the
building at or near the southeast corner of the building where Beta & Gamma
Sectors are proposed.
Department: Erosion Control
Contact: Basil Hamdan, 970-222.1801, bhamdanpfcgov.com
Topic: Erosion Control
Comment Number: 2
Comment Originated: 09/23/2020
09/23/2020: INFORMATION ONLY:
No Comment from Erosion and Sediment Control. Based on the submitted
planning materials it has been determined that this project, will disturb less than
10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes
(greater than 3H:1 V) within or adjacent to the project, and is not part of a larger
4
common development that will or is under construction. Therefore, no Erosion
and Sediment Control materials submittal is needed. If this project substantially
changes in size, scope or design where the above cited criteria would apply,
erosion and sediment control materials should be submitted. Though the project
at this time requires no erosion control and sediment materials submittal, the
project still must be swept and maintained to prevent dirt, saw cuttings, concrete
wash, trash debris, landscape materials and other pollutants from potentially
leaving the site and entering the storm sewer system at all times during the
project in accordance with Municipal Code Section 26498. If complaint driven
or site observation of the project show that there is any pollutant discharge, the
City may require the project to install erosion and sediment control measures.
Nearby inlets that may be impacted by the pollutants, in particular dirt, should be
protected as a good preventive practice and individual lots should be protected
from any material deposition on the sidewalk. If at building permit issuance any
issues arise please email erosion@fcgov.com to facilitate getting any permits
signed off.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a)poudre-fire.orq
Topic: General
Comment Number: 1
Comment Originated: 09/28/2020
09/28/2020: This building recently underwent fire code modifications relative to
redevelopment. The building is currently code compliant. So long as the
generator or other backup power remains on the ground, there are no fire
department comments specifically related to the proposed WTF install.
Comment Number: 2
Comment Originated: 09/28/2020
09/28/2020: ADDRESS POSTING
New and existing buildings shall have approved address numbers, building
numbers or approved building identification placed in a position that is plainly
legible, visible from the street or road fronting the property, and posted with a
minimum of eight -inch numerals on a contrasting background.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche ar7.fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/30/2020
9/30/2020, PRE -SUBMITTAL: Forestry Tree Inventory
If there are existing trees on -site, please schedule an field meeting with City
Forestry to obtain existing tree inventory and mitigation information. This
meeting should occur whether trees are planned to be protected or not. Existing
significant trees shall be preserved and protected to the extent reasonably feasible.
The proposal does not require any tree removal.
Comment Number: 2
Comment Originated: 09/30/2020
9/30/2020: FOR HEARING
If applicable, please provide a landscape plan that meets the Land Use Code
3.2.1 requirements. This should include the existing tree inventory, any
proposed tree removals with their locations clearly noted and any proposed tree
plantings (including species, size, quantity and method of transplant). The plans
5
should also include the following City of Fort Collins notes:
Landscape plan not required. All ground equipment will be enclosed within an existing fenced
Area behind the building
General Landscape Notes
Tree Protection Notes
Street Tree Permit Note, when applicable.
These notes are available from the City Planner or by following the link below
and clicking on Standard Plan Set Notes:
hftps://www.fcgov.com/developmentreview/applications.php
Required tree sizes and method of transplant:
Canopy Shade Tree: 2.0" caliper container or equivalent
Evergreen tree: 6.0' height container or equivalent
Ornamental tree: 2.0" caliper container or equivalent
Canopy Shade Tree as a street tree on a local or collector street only: 1.25"
caliper container or equivalent
Required mitigation tree sizes:
Canopy Shade Tree: 2.0" caliper balled and burlapped
Evergreen tree: 8.0' height balled and burlapped
Ornamental tree: 2.0" caliper balled and burlapped
Comment Number: 3
Comment Originated: 09/30/2020
9/30/2020: FOR HEARING
If applicable, please include locations of utilities on the landscape plan including
but not limited to water service/mains, sewer service/mains, gas, electric,
streetlights, and stop signs. Please adjust tree locations to provide for proper
tree/utility separation.
10' between trees and public water, sanitary, and storm sewer main lines
6' between trees and water or sewer service lines
4' between trees and gas lines
10' between trees and electric vaults
40' between canopy shade trees and streetlights
15' between ornamental trees and streetlights
For any trenching that may occur, please delineate the length and width of the
trench especially when in close proximity to trees.
Comment Number: 4 Comment Originated: 09/30/2020
9/30/20: INFORMATION ONLY FOR PDP
If applicable, please provide an "Existing Tree Removal Feasibility Letter" for
City Forestry staff to review. Proposals to remove significant existing trees must
provide a justification letter detailing the reason for tree removal. This is
required for all development projects proposing significant tree removal
regardless of the scale of the project. The purpose of this letter is to provide a
document of record with the project's approval and for the City to maintain a
record of all proposed significant tree removals and justifications. Existing
significant trees within the project's Limits of Disturbance (LOD) and within
natural area buffer zones shall be preserved to the extent reasonably feasible.
Streets, buildings and lot layouts shall be designed to minimize the disturbance
6
to significant existing trees.
(Extent reasonably feasible shall mean that, under the circumstances,
reasonable efforts have been undertaken to comply with the regulation, that the
costs of compliance clearly outweigh the potential benefits to the public or would
unreasonably burden the proposed project, and reasonable steps have been
undertaken to minimize any potential harm or adverse impacts resulting from
noncompliance with the regulation.) Where it is not feasible to protect and retain
significant existing tree(s) or to transplant them to another on -site location, the
applicant shall replace such tree(s) according to City mitigation requirements.
Department: Building Services
Contact: Russell Hovland, 970-416.2341, rhovland(a.fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
Comment Originated: 09/28/2020
09/28/2020:
Construction shall comply with adopted codes as amended. Current adopted
codes are:
2018 International Building Code (IBC) with local amendments.
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at
fcgov.com/building.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures): 140mph (Ultimate) exposure B
or Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
INFORMATIONAL ITEMS:
1. This new equipment must designed with attachments that meet the wind and
snow load and plans must be stamped be a CO lic architect or engineer.
2. A City licensed commercial general contractor is required to construct any
new commercial structure.
Department: Technical Services
Contact: Jeff County, 970.221-6588, jcounty(&fcgov.com
Topic: Building Elevations
Comment Number: 4
09/28/2020: All plan sheets are required to be 24"x36".
Comment Number: 5
09/28/2020: There are line over text issues. See redlines.
Topic: General
Comment Originated: 09/28/2020
Comment Originated: 09/28/2020
Comment Number: 1 Comment Originated:
09/28/2020: TELECOM SET: Some of the sheet titles & sheet numbers in the
sheet index do not match the noted sheets. See redlines.
Comment Number: 2 Comment Originated:
09/28/2020
09/28/2020
VA
09/28/2020: TELECOM SET: Please provide the following information for the
Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX'.
Comment Number: 3 Comment Originated: 09/28/2020
09/28/2020: TELECOM SET: There are line over text issues. See redlines.
Comment Number: 6 Comment Originated: 09/28/2020
09/28/2020: ROOF PLAN: All plan sheets are required to be 24"x36".
Comment Number: 7 Comment Originated: 09/28/2020
09/28/2020: ROOF PLAN: There are line over text issues. See redlines.
Comments addressed in updated plan sets.