October 06, 2020
Johnathon Huynh
2908 Crusader St
Fort Collins, CO 80524
RE: 738 Campfire Dr Extra Occupancy, FDP200018, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of 738 Campfire Dr Extra Occupancy. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Tenae Beane via phone at 970-224-6119
or via email at tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Will Lindsey, wlindsey@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/06/2020
10/05/2020: Please provide outlines and call-outs on the site plan for the three
required parking spaces which shows that they all meet the 9' x19' stall
dimension required.
The outlines and call outs have been added to the site plans.
Comment Number: 2 Comment Originated: 10/06/2020
10/05/2020: Please add the number of required and provided bicycle parking
spaces to the Land Use Data table on the site plan. Additionally, please provide
some information and/or pictures of the proposed bicycle parking rack system.
3 bicycle parking spaces are required and provided. The requirements have been added to the site plan.
The proposed system consists of hooks that are fixed to the wooden struts across a 2.5’ x 5.5 ft’ area in the garage, also allowing for
at least 5.5’ of maneuvering space. The bikes are attached by their wheels to the hooks and stay fastened to the wall. Photos are
attached with this document.
2
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/06/2020
10/06/2020: INFORMATION:
It does not appear any exterior changes are proposed or required, I don't have
any comments/concerns as a result.
We understand, thank you.
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 2 Comment Originated: 10/01/2020
10/01/2020: INFORMATION ONLY:
No Comment from Erosion Control. Based upon the submitted Planning
Materials it has been determined that this project; will disturb less than 10,000
sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater
than 3H:1V) within or adjacent to the project, and is not part of a larger common
development that will or is under construction. Therefore, no Erosion Control
Material submittal is needed. If this project substantially changes in size or
design where the above criteria now apply, erosion control materials should be
submitted. Though the project at this time requires no erosion control material
submittal, the project still must be swept and maintained to prevent dirt, saw
cuttings, concrete wash, trash debris, landscape materials and other pollutants
from the potential of leaving the site and entering the storm sewer at all times
during the project in accordance with City Code 26-498. If a complaint driven or
a site observation of the project seem not to prevent the pollutant discharge the
City may require the project to install erosion and sediment control measures.
Nearby inlets that may be impacted by the pollutants, in particular dirt, should be
protected as a good preventative practice and individual lots should be
protected from material escaping onto the sidewalk. If at building permit
issuance any issues arise please email erosion@fcgov.com to help facilitate
getting these permits signed off.
WE understand, thank you.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/30/2020
09/30/2020: INFORMATION:
No proposed site changes were shown in this submittal; therefore, no
requirements apply at this time. If future submittals include site changes that are
not shown on these plans, please contact Dan Mogen in Water Utilities
Engineering at (970)305-5989 or dmogen@fcgov.com to coordinate and
determine what requirements, if any, will apply.
3
We understand, thank you.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/06/2020
10/06/2020: INFORMATION:
If an increase in electric capacity is needed as part of this project, please
contact me to discuss fees.
No increase in electric capacity is needed.
Comment Number: 2 Comment Originated: 10/06/2020
10/06/2020: INFORMATION:
Please contact Tyler Siegmund with Light & Power Engineering if you have any
questions at 970.416.2772 Please reference our policies, construction
practices, development charge processes, electric service standards, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
We understand, thank you.
Department: Forestry
Contact: Nils Saha, nsaha@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/06/2020
10/06/2020: INFORMATION ONLY
No comments.
Thank you.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 09/30/2020
09/30/2020: No further comment from Poudre Fire Authority.
Thank you.
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 10/05/2020
10/05/2020: This house was built in 2013 as a 3 bedroom house. A 2016
4
basement finish permit did not include finishing/creating any additional
bedrooms. If the additional 4th bedroom has been finished, an after-the-fact
permit must be obtained to approve that space as habitable.
As part of the Extra-occupancy approval process, a rental inspection is
required. Details from the rental inspection may require code upgrades prior to
occupancy.
No additional 4th bedroom has been finished and no permit is requested. We will schedule the rental inspection as soon as we are
able to.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 10/05/2020
10/05/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
The issue has been resolved in the site plan.
Comment Number: 5 Comment Originated: 10/05/2020
10/05/2020: FOR FINAL APPROVAL:
There are text over text issues. See redlines.
The issue has been resolved in the site plan.
Topic: General
Comment Number: 1 Comment Originated: 10/05/2020
10/05/2020: FOR FINAL APPROVAL:
All plan sheets are required to be 24"x36".
The issue has been resolved in the site plan.
Topic: Site Plan
Comment Number: 2 Comment Originated: 10/05/2020
10/05/2020: FOR FINAL APPROVAL:
Abbreviated legal descriptions are not acceptable.
The issue has been resolved in the site plan.
Comment Number: 3 Comment Originated: 10/05/2020
10/05/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
The issue has been resolved in the site plan.