SPRING CREEK CENTER
SITE ACCESS STUDY
FORT COLLINS, COLORADO
NOVEMBER 1996
Prepared for:
W. W. Reynolds Companies
1600 Specht Point Drive
Fort Collins, CO 80525
Prepared by;
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 60538
Phone: 970 669-2061
FAX: 970-669-5034
TRIP DISTRIBUTION FOR
NOWPASSBY TRIPS
N
NO SCALE
Figure 4
counted in the adjacent street traffic. Pass -by assumptions' were
45% for the fast food restaurants, and 60% for convenience/gas
stores. The directional split was based upon the current counts.
The procedure used to account for both pass -by traffic and
primary destination traffic is as follows:
Estimate the trip generation rate as is currently done and
determine the total number, of trips forecast to occur, based
on the size of the development.
Estimate the percentage of pass -by trips, and split the total
number of trips into two components, one for pass --by trips and
one for new trips.
Estimate the trip distributions for the two individual
components. The distribution of pass -by tr"ips must reflect
the predominant commuting direct -ions on adjacent and nearby
roadway facilities. Most peak period pass -by trips are an
intermediate link in a work trip.
Conduct two separate trip assignments, one for pass -by trips
and one for new trips. The distribution for pass -by trips
will require that trips be subtracted from some intersection
approaches and added back to others:. Typically, this will
involve reducing through. -roadway volumes and increasing
certain turning movements.
Combine the assigned trips to yield the total link loadings,
and proceed with capacity analysis as normally done.
Background Traffic Projections
Background traffic projections for the short range and long
range future horizons were obtained by reviewing the NFRRTP and
various traffic studies prepared for other developments in this
area of Fort Collins. Background traffic projections reflect the
Timberline Road extension to the north.
'This pass -by factor was obtained by averaging pass -by factors
from the following sources:
1. Transportation Engineering Design Standards, City of Lakewood,
June 1985.
2. Development and Application of Trip Generation Rates, FHWA/
USDOT, January 1985.
3. A Methodology for Consideration of Pass -by Trips in Traffic
Impact Analyses for Shopping Centers," Smith, S., ITE Journal,
August 1986, Pg.37.
4. Trip Generation, 5th Edition, ITE and 1995 Update.
4
Trip Assignment
Trip assignment is how the -generated and distributed trips are
expected to be loaded on the street system. The assigned trips are
the resultant of the trip distribution process. The City of Fort
Collins desired that the Timberline/Midpoint intersection become
a right-in/right-out intersection. This will definitely happen by
the long rang future; however, it is not certain if it will happen
by the short range future. Therefore, it was evaluated under two
access scenarios in the short range future. Figure 5 shows the
morning and afternoon peak hour site generated traffic with full
build -out of Spring Creek Center, assuming full movement at the
Timberline/Midpoint intersection. Figure 6 shows the morning and
afternoon peak hour site generated traffic, assuming right -in/
right -out access at the Timberline/Midpoint intersection. Figure
7 shows the total (site plus background traffic) short range peak
hour traffic, assuming full movement at the Timberline/Midpoint
intersection. Figure 8 shows the total short range peak hour
traffic, assuming right-in/night-out access at the Timberline/
Midpoint intersection.. Figure 9 shows the total long range peak
hour traffic, assuming right-in/right-out access at the Timberline/
Midpoint intersection.
Signal Warrants
As a matter of policy, traffic signals are not installed at
any location unless warrants are met according to the Manual -.on
Uniform Traffic Control Devices. However, it is possible to
determine whether traffic signal warrants are likely to be met
based upon estimated peak hour traffic forecasted in this study.
Using the peak hour traffic volumes shown in Figure 8, it is likely
that traffic signal warrants will be met at the Timberline/
Midpoint intersection. However, since the City of Fort Collins
wants this intersection modified to provide right-in/right-out
access in the future, signalization of this intersection is not
recommended. A signal is also warranted at the Prospect/Specht
Point intersection. However, since A signal will be installed at
the Prospect/Prospect Parkway intersection shortly, the Specht
Point Drive signal was not given further consideration.
Operation Analysis
Capacity analyses were performed on key intersections adjacent
to Spring Creek Center. The operations analyses were conducted
for the short range future and the long range future.
Using the traffic volumes shown in Figure 1, the affected
intersections operate in the short range condition as indicated in
Table 3. Calculation forms for these analyses are provided in
Appendix D. Using the traffic volumes shown in Figure 8, the key
5
3
i
N
W
i
AM / PM
SITE GENERATED TRAFFIC
WITH FULL MOVEMENT AT THE
TIMBERLINE / MIDPOINT INTERSECTION -F-guru-5
i
N
LU
AM / PM PEAK KOOR,.
SITE GENERATED TRAFFIC
WITH RIGHT -IN / RIGHT -OUT AT THE
TIMBERLINE / MIDPOINT INTERSECTION Figure 6
�-- 270/310
- 705 020
o
r 446/580
PROSPECT ROAD
5073
`110/2�0
_
610/620--
135/65
r
225/220
-�
I
o�
470/440
LO
350/435
o
F
M M N
Z
Site a-
LO
��
coLO
L �"-
�*-- 125/170
L
r- 80/185
� N
O Oto
CE a00 M
W
Z
J
m
Lu
m
g
f= AM / PM
Rounded to the Nearest
5 Vehicles.
SHORT RANGE TOTAL PEAK HOUR TRAFFIC
WITH FULL MOVEMENT AT THE
TIMBERLINE / MIDPOINT INTERSECTION
I
� � O
c
�- 270/310
t! LO
:Lo
�- 440/580
180A/385
225/220
J I
530/470 —
c
290/405
c
o o
M M N
O
a
LO
to
125/170
Lo N
O OLr)
720 985
T ROAD 50 35
Ain lAm "%L
L�
N
Z
Site a
z
U
W
a
AM / PM
Rounded to the Nearest
5 Vehicles..
SHORT RANGE TOTAL PEAK HOUR TRAFFIC
WITH RIGHT -IN / RIGHT -OUT AT THE
TIMBERLINE / MIDPOINT INTERSECTION
Figure 8
000
3
�—
N
455/510
135/965
N
275//585
380/370 —�
815/755 —
Ln Ln
455/675--�
M
c u
m
�130/185
c
N�
o�
�o
IL
Ln
N
N
W
Z
Q
LU
m
g
F=
Site
1055/1080
1370/1810
W— 55/40
N
o�r
e
AM / PM
Rounded to the Nearest.
5 Vehicles.
LONG RANGE TOTAL PEAK HOUR TRAFFIC Figure 9
Table 3
Short Range Peak Hour Operation
(Full Movement at Timberline/Midpoint)
Level of Service
Intersection AM PM
Prospect/Timberline (signal) D D
Prospect/Specht Point (stop sign)
11B LT D F
NB RT A A
WB LT A A
Timberline/Midpoint (stop sign)
WB LT F F
WB RT C C
SB LT D B
Table 4
Short Range Peak Hour Operation
(Right-in/Right-out at Timberline/Midpoint)
Intersection
Prospect/Timberline (signal)
Prospect/Specht Point (stop sign)
NB LT
NB RT
WB LT
Timberline/Midpoint (stop sign)
WB RT
Level
of Service
674
AM
PM
C
D
D D
D
E
F F
A
A
A A
A
B
A A
6
C
6 C
intersections operate in the short range condition as indicated in
Table 4. Calculation forms for these analyses are provided in
Appendix E. All movements at these intersections operate
acceptably, with the exception of the westbound left turn at the
Timberline/Midpoint intersection, as shown in Table 3. The
analysis indicated poor operation at the Prospect/Specht Point and
Timberline/Midpoint intersections. A queuing analysis indicated
that the northbound left turns approaching Prospect Road, -would
conflict with the souihbound left turns approaching Midpoint Drive.
It is recommended that ..this intersection: be`modified to- _a_:right=
in/right-out during the course of. he development of Spring Creek
Center. The City of Fort Collins plans to install a traffic signal
at the Prospect/Prospect Parkway intersection, which provides
access to the commercial uses mentioned earlier. This signalized
intersection, located approximately 0.3 miles east of
Prospect/Timberline, will provide motorists with a safe alternative
to leaving this area. It was also assumed that this signal would
! attract a significant number of the northbound left turns from
Specht Point Drive to Prospect Road. The Prospect/Timberline
intersection will operate acceptably during the peak hours with the
geometry indicated in Figure 1.0. Based upon forecasted traffic
1 volumes, an eastbound right -turn lane is shown on Prospect Road
approaching Specht Point Drive. Due to the existing bridge, a full
i lane may not be possible. An alternative to a full lane is a taper
Jand increased radius. With good signal progression on Prospect
Road, there will be gaps in the eastbound traffic that are not
accounted for in the analysis technique. The actual operation will
be better than indicated in Table 4.
Using the traffic volumes shown in Figure 9 and recommended
geometrics, the intersections operate in the long range condition
as indicated in Table 5. Calculation forms for these analyses are
provided in Appendix F. All movements at these intersections
operate acceptably, with the exception of the northbound left turn
at the Prospect/Specht Point intersection. This is normal for
minor street le-ft-turning movements along arterials during peak.
hour conditions. The long -range geometry is shown in Figure 11.
At the Prospect/Timberline intersection, Timberline is changed to
a four lane facility, plus turn lanes. The Fort Collins Master
Street Plan indicates Timberline Road as a six lane facility.
However, analysis shows that Timberline operates acceptably as a
four lane facility. Timberline may, however, require widening to
six lanes after the year 2015. Traffic volumes should be monitored
along Timberline Road and Prospect Road to determine when the
widening to six lanes should occur. Provision of dual left -turn
lanes for Prospect at Timberline, as indicated in Figure 11, is
necessary to achieve acceptable operation at this location.
The overall Prospect Business Park extends to the southeast
to within 0.5 miles of Drake Road. Consideration should be given
to providing a local street or collector street connection in this
area. This will require crossing City owned land. A connection
M
x
I. INTRODUCTION
This site access study addresses the capacity, geometric, and
control requirements at and near a proposed commercial development
known hereinafter as Spring Creek Center. It is located near the
intersection of Prospect Road and Timberline Road.in Fort Collins,
Colorado.
During the course of the analysis, numerous contacts were made
i with the project planning consultant (Cityscape Urban Design) and
I the Fort Collins Traffic Engineering Division. This study
generally conforms to the format set forth in typical traffic
impact study guidelines. The study involved the following steps:
� c
- Collect physical, traffic and development data;
Perform trip generation, trip distribution, and trip
assignment;
Determine peak hour traffic volumes;
Conduct capacity and operational level of service analyses on
key intersections;
Analyze signal warrants,
II. EXISTING CONDITIONS
The location of Spring Creek Center is shown in Figure 1. It
is important that a thorough understanding of the existing
conditions be presented.
Land Use
Land uses in the area are primarily commercial. Commercial
development exists all around the site. There are office buildings
located to the north (across Prospect Road) and to the east (across
Specht Point Drive). There is a beverage distribution center to
the south (across Midpoint Drive). The lot to the west (across
Timberline Road) contains four silos and an "agricultural truck"
scale. There is a "proposed development" sign on this site. The
Spring Creek Center site itself is vacant. Land in the immediate
area is flat. There is an increase in elevation to the south and
west, away from the key intersections. The center of Fort Collins
lies to the northwest of Spring Creek Center. There aresidewalks
around the site along Prospec wand and part of Timberline -Road.
Trere are 3cycle lanes located along the e shoulder lder of T m e=13ne
Road.
1
SHORT RANGE GEOMETRY
Figure 10
N
LONG RANGE GEOMETRY Figure 11
Table 5
Long Rarige Peak Hour Operation
Level of Service
Intersection AM PM
Prospect/Timberline (signal) D D
Prospect/Specht Point (stop sign)
NB LT F F
NB RT A A
WB LT C B
Timberli.n..e/Midpoint (stop sign)
WB RT C B
of this type will provide an additional outlet from the business
park to the south. It has the potential of reducing selected
movements shown in Figure 9, thereby improving the operation at key
intersections. This suggestion is a system -wide improvement and
should be pursued as part of a capital improvement program.
IV. CONCLUSIONS
This study assessed ,.the impacts of the Spring Creek Center
commercial development on the short range and long range street
system in the vicinity of the proposed development. As a result
of this analysis, the following is concluded:
The development of Spring Creek Center- is feasible from a
traffic engineering standpoint. At full development, as proposed;
approximately 6200 trip ends will be generated at this site daily.
Some of these trip ends will be from background traffic already on
the adjacent streets. There may also be some multi -purpose trip
ends not reflected in the daily trip end estimate.
Current operation at the Prospect/Timberline signalized
intersection is acceptable. The stop sign controlled intersections
j along the arterial streets operate normally.
11 - `In the short range future all keyintersections will
I operate accey a v, provided that the Timberline/Midpoint
intersections modified to a right-in/fight-out access. The short
range geometry is shown in Figure 10.
- In the long range future, key intersections will operate
acceptably during the peak hours, with the exception of the
northbound left -turn movement at the Prospect/Specht Point
intersection. If Midpoint Drive is extended south to meet Drake
Road, a system wide improvement will be made. The long range
geometry is shown in Figure 11.
- Sidewalks and bicycle lanes should be built and linked to
the existing system, per City of Fort Collins standard.
With the recommended control geomet.rics, the accident rate
should be at an acceptable level for typical urban conditions.
7
|° ^
APPENDIX A
TABULAR SUMMARY OF TURNING MOVEMENT COUNTS
Observer: John M. Sever Date: 9/23/96 Day: Monday
INTERSECTION OF: Prospect Road & Timberline Road Weather: AM: Suns
Betdnnin2
r
City: Fort Collins
PM: Mostly Cloudy
Time
NB
R I T L Total
SB
R I T I L Total
EB
R T I L; Total
WB
R I T, L Total'
Total
' NB/SB
Total
EB/WB
Total
All
7:30
701
5
13111
206
11
11
1
3
83
1511
91
243
31
1761
72
25111
209
494
703
7:45
891
4
141,
234,
11
21
0
3
88
1941
51
277
11
180
63
2531
237
530
767
8:00
64'
1
101'
166
6
31
1
10
90
1631
51
258,
41
154
44
2021
176
46011
636
8` 15
94
2
60
156
; 2
31
1
6
97
137
2
236
1
126
47
174
162
410
572
4.30
65;
2
95
162
3
4
1
8
113
151
1
265
2
195
75
272
170
537
707
4:45
73;
3
791
155,
3
2
2
7
118
1,52
6
276
0
185,
81
266
162
.542
704
5:00
69
1
981
168
5
4
2
11
135
143
2
280
4,
247
8$,
336
179
616
795
5:15
71
1
101
173'
51
5
i
111
127
166
01
293'
0,
208
871
2951
194
.588
772
AM
Totals =>
317
12
433
762
10
9
3
22
358
635
21
1014
9
645
226
880
784
1894
2678
PM
Totals —>
278
7
373
658
16,
15
6
37
493
612
9
1-114
6
835
328
1169
6951
T28-31
2978
Grand Total —> 5656
TABULAR SUMMARY OF TURNING MOVEMENT COUNTS
Observer: John M. Sever Date: 90/96 & 9/18/96 Day: Tuesday & Wednesday
11MRSECTION OF: Timberline Road & Midpoint Drive Weather: Rainy & Raiiry
Bezinnin¢
City: Fort Collins
Time
NB
R T L Total
SB
R I T I L Total ;I
EB
R I T L Total
WB
R I T L Total
Total
I NB/SB
Total
, EB/WB
Total
All
7730
89
314
X
403
X
1 1831
10
193'
. X
X
X
0
41
X
3
71
596
7
603
T45
72
161
X ;'
233
X
107'
25
132'
X
X
X
0
91
X
11
20
365,
20
385
8:00
51'.
160
X
2,11
X
114
li 10
124
X
X
X
0
5
X
4
9
335
9
344
8:15
44
136
X
180
X
96
10
1061
X
X
X
0
8
X
17
25
286125.
311
16:30
19
138
X
157
X
175
3
178
X
X
X
! 0
12,
X
29
41
335
41
376
16A5
20
145
X
l65•
X 1
200
1
201
X
X
X •'
0
7
X
371
44
366
44
410
17:00
19
148
X
167:
X 1
2171
5
222
X
X
X
0
261
X
32
58
389
58
447
17:1,5
23
1:72
X
195,
X 1
254
8
262
X
X
X
0
23
X
33
56;
457
56
513
I
AM
Totals =>
256
771
X
1027
• X
500
55
555
X
X
X
0
26
X
35
61
1582
61
1643
PM.
Totals =>
81
603
X
684
X
846
17
863
X
X
X
0
68
X
131
199
1547
1991
1746
Grand Total —> 3389
PPRA 1
Observer: John M. Sever
INTERSECTION OF:
Beginning
TABULAR SUMMARY OF TURNING MOVEMENT COUNTS
Date: 9/18/96 & 9tl9/96 Day: Wednesday & Thursday City: Fort Collins
Prospect Road & Specht'Point Drive. Weather: Overcast.light rain & Sunny
Time
NB
R I T L f Total
SB
R T L Total
EB
I R T 1,L Total
WB
R T L I Total
Total
NBA SB
Total
1EB1WB
Total
All
730
3
X
7
10
X
X
X
01
15
2381
X
253'
X
231
41
235
101
488
498
7:45
31
X
12
IS
X
X
X
01
35.
2381
X
27.3
X
201
71
208
15
481
496
8:00
31
X
9
•, 12
' X
X
X
0
14
184
X
198
X
191
41
1,95
12
393
405
8:15
61
X
6
1211
X
X
X
0
12
179
X
191
X
1,80
6
186
12
377
399
4:30
4
X
91
13'
X
I X,
X
6
9
224:
X
233'
X
283
011
283
13
516
529
4A5
2
X
12
14
X
X
'X
61
3
1951,X
198
X
223
IT
224,
14
422
436
500
2
X
26
28
X
X
X
01
6
2301
X
236
X
278
2'
28Q,
28
516
544
5:15
7
.X
28
35'
X
X
X
0
10
2261
X
236
X
262
31
265,
35
501'
536
AM
Totals =>
15
0
34
49
0
0
0
0
76
839
0
915
0
803
21
824
49
1739
1788
PM
Totals =>
15
0
75
90
0
0
0
0
28
875
0
903
0
1046
6
1052
90
1955
2045
(Grand Total => 3833
L
Pans t
APPENDIX B
HCS: Unsignali2ed Intersections Release 2.1c PROSP_OS.HCO Pagel
vvaaav v eaa a aava as vas aaa avaava a aav a vvvaaaavvaaaaaaaaaavavava aavvvvvvaa
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
asavaaavavavvavavavvavvaaavaaaaaaaavv. a avaaaaaaaaaaaaveaavvvavevaav
Streets:: (N-S) Timberline Road (E-W) Midpoint Drive
Major Street Direction.... NS
Length of Time Analyzed..... 60 (min)
Analyst:.. ....,.. JMS Engineering
Date of Analysi's........... 9/17/9&
Other Information ......... Current AMPeakHour
Two-way Stop -controlled Intersection
v ............. aa aa a aaaav anaaaaaaavavevava a avaavvaaavvavaa
Northbound Southbound Eastbound Westbound
L T R I L T R I L T R I L T R
No. Lanes 0 1 C 0 0 >" 1 0 0 0 0 1 1 0 1
Stop/Yield N, N
Volumes 771 256 55" 500
PHF .9 .9 .9 .9
Grade 0 0
MC's W
;SU/RV's (4)
CV's (t)
PCE''s " 1.10
--------------------------------------------------------
Adjustment Factors
35 26
.9 .9
0
1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
----------------------------------------------------------------`-
Gap (tg)
Time (tf)
Left Turn,Major Road
"5.00
2-.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release"2.Sc PROSP_03.HC0 Page 2
aavaaaaavavvvavava.aaaaaavaaaavaaaaaaavvvavaaav a vaavasavavav a vvaavavava
Worksheet.for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows: (vph)
999
Potential Capacity: (pcph)
432
Movement Capacity: (pcph)
432
Prob. of Queue -Free State:
------------------------------"--------------------------
0.93
Step 2: IT from Major Street
SB IHE
--------------------------------------------------------
Conflicting Flows: (vph)
1141
Potential Capacity: (pcph)
490
Movement Capacity: (pcph)
490
Prob. of Queue -Free State:
0..86
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State.:,
0.80
--------------------------------------------------------
Step 4: IT from Minor Street
WB EB
----------------------`--------------------------`------
Conflicting Flows.:" (vph)
1616
Potential Capacity: (pcph)
123
'Major IT, Minor TH
Impedance Factor.:
0.80
Adjusted Impedance Factor:
0..80
Capacity Adjustment Factor
due to Impeding Movements
0.80
Movement Capacity;: (pcph)
--------------------------------------------------------
98
Intersection Performance Summary
Flow
Move
Shared Total
Rate
Cap
Cap Delay
Movement
--------
(pcph)
------
(pcph)
------
(pcph)(sec/veh)
------
WB L
43
98
-------
64.7
WE R
32
432
9.0
SB L
67
490
8•.5
95t
Queue Approach
Length LOS Delay
(veh) (sec/veh)
---
2.2 F
40.9
0.1 B
0.5 B 0.8
Intersection Delay a 1.,8 sec/veh
HCS: Unsignalized Intersections Release 2.1c PROSP_04.HC0 Page 1
LLaaaaaaaa.LLaaaaaaa.aaaaaavaaa.Laa.LL... a.Laaaaa aaaa.Caaa...Laaaaaaaa
Center For Microcomputers In. Transportation
University of Florida
512 Weil Hall
Gainesville, £L 32611-2083
Ph: (904) 392-0378
aaaaaaaaavaavaavaaaaaaaavavaava.Laaavvv aavavavvava ....................
Streets: (N-S) Timberline Road (E-W) Midpoint Drive
Major Street .Direction .... NS
Length of Time Analyzed ... 60 (min)
Analyst ................... JMS Engineering
Date of Analysis ...........9/17/96
Other Information ......... Current PM Peak Hour
Two-way Stop -controlled Intersection
vavvvvvvvL
IIIIII
v aaaavvavvvv v avavavvvavv v evvaaaavaaaavvnc
alLNorthboundd laLSouthbound ( LEastToundR I LWestboundR
NO. Lanes 0 1 e 0 0 > 1 0 0 0 0 1 0 1
Stop/Yield N :N
Volumes 603 81 17 846 131 68
PHF .9 .9 .9 .9 .9 .9
Grade 0 0 0
MCI W
SU/RV's (t)
CV's :(k)
PCE's 1..10 1.10 1.101
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1c PROSP_04.HC0 Page 2
vvvava aavvvvvavaaaavvaavavavvvvvava aaaa vaaaa va avvaaa. a avvvaaaavvva
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1:.RTfrom Minor Street WB EB
Conflicting Flows: (vph)
715
Potential Capacity: (pcph)
601
Movement Capacity: (pcph)
601
Prob. of Queue -Free State:
0.86
--------------------------------------------------------
Step 2.: LTfrom .Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
760
Potential Capacity:, (pcph)
745'
Movement Capacity: (pcph)
745
Prob. of Queue -Free -State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major IT Shared Lane Prob.
of Queue -:Free State:
0.94
--------------------------------------------------------
Step 4: LT:from Minor Street
WB
EB
--------------------------------------------------------.
Conflicting Flows: (vph)
1674
Potential Capacity::: (pcph)
114
Major LT, Minor TH
ImpedanceFactor:
0.94
Adjusted.Impedance Factor::
0..94
Capacity Adjustment Factor
due to Impeding Movements
0.94
Movement Capacity: (pcph)
__7 -----------------------------------------------------
107
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
--------
(sec/veh)
------ ------ ------ -------
WB L 161 107 •
------- -----
31.7 P
---------
682.5
WB R 84 601 7.0
0.5 B
SB L 21 745 5.0
0.0 A
0.1
Intersection Delay L
77.1 sec/veh
• The calculated value was greater than 999.9.
N
' u `9eo
.1522
.5
paSubsta _
ui
; rl, 6u
r
Ir, f'
1 ` 'r,;J j
' �= sue...
i
1 ��C, rr,.,, �
n 1 /
-... ' t -I :•.A
y`
JI�r
i
,
rNort h Yards
RAUO - [;1 OL tek Holl ^ n
ry Junction
a 46
\�4
B 9 ;Sinn_ard 1p
IL = y
`_ —
Y
'"
7.
►\.� IIryI;.
r
_ntown
rt ComnS. - • coioiuioo
Alrpark _3r.. Gravel Pit • .I —
-
I - Si
Dr
tLot,
�� ' \ S' a,
e _ A', ,�.+ I
. III Rosel
'k :. Cem oahencl
sal ... STATE HIGHWAY
14
•�� �� 1N{(I
p
s,o I'
_ F)M C954
hPk-
III S • v o
u ■ p �•
C4
��„�
Tf\Sim ■$. t■
sr '4
N1VER IT ']+j -
r 1 -,P=1• �
1fJN71Lj�II1tpI�ll\
_ILN 1LAAx :..
1C1 3Ls� 1II
1�
kkk RRRRJ•L_ Jl
.e _-�`
tl
It�
r(lp5 tea. �
\j. ....0 `�''.. W
17��f 16 a t 5
f N
.. '- '. a IY.
u
]1iI
QQ��
W
Gravel Pit : 2 F
-
aOSPECT
I
.lf
f, .Y i r"_
L� �
'" ; S
Rnj ?
t
^r o . IRarlin
I_.' ..
_ c, f,,;,,�
`,' w SPRING CREEK
T--•-_1— 4- _.
(aa -
23, a
Elt
-O.
Z
Iheat .:
�Ip
,^ -- :�
0
W
'`� CENTER I It ,
20 t L _ 21
111.E 1, 1
�9
z
p iiJ 1(•'
`• )51 akes
AK DR E ROAD
A
n
_
R : m
__ . r•. _... _
L
�•BM48I4 'I \ ',29
VI
1C
it.
26
(
II 1 u;.g p�O :.i •,
1
j
. u I M
r
((� Ome bat
— J I
i5
S 36 <99, 5..,
i 31 °a
32 l3� u a
Me Clellancks
�C
11al-mony
f 0=1r3:_. '-a.-✓a _ C _ G
asioit
I
50,0
NO SCALE
SITE LOCATION Figure 1
HCM: SIGNALIZE[) INTERSECTION SUMMARY Version 2.4d 11-2_-1996
Center For Microcomputers In Transportation
____________________________________________________________
Streets: (E-W) prosoect (N-S) timberline
Analyst: Matt File Name:
Area l,v,oe: Other 11-2;-96 an: am
Comment: 07yu short Iona full rinyrou.
EastbOUnd Westbound Northbound Southbound
L T R L T R L T R •1 L T k
---- ---- ----'I---- --------'---- ---- ---- ---- ----
No. Lanes 1 -< 1 2< > 1 T > 1
Volumes 1 21 635 358; 226 645 9', 433 12 311; 9 10
PHF or PK1510.90 0.90 0.90'•10.90 0.90 0.90:�O.90 0-.90 0.90.10.90 0.90 0.90
Lane W (ft); 12.0 12.0 ;12.0 12.0 12.0 12..0; 12.0
Grade 0 0 0 0
% Heavy Veh; 2 2 2.; 2 2 2; 2 2 2 2
Parking I(Y/N) N I(Y/N) N ;(Y/N,l N �;(Y/N) N
Bus Stops 01 0! 0;. 0
Con. Peas 0: 0; 0,; 0
Ped 'Button ;(YIN) Y 1.1.5 s.;(Y/N) Y 8.5 s;(Y/N) Y 17.5 s1(Y/N) Y 17.5
Arr Type 3 3 3 3 3 3i 3
RTOR Vols 011 0: 0? 0
Lost Time ;3.00 3.00 3.00-:3.00 3.00 3.00:3.00 3.00 3.00!;3.00 3.00 3.00
Prop. Share;
Prop. Prot.! •; ; ,
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * INB Left '
Thru i Thru
Right ' ; Right
Peas * Peds
WB Left " * ;SB Left
Thru ' Thru
Right * Right
Peds * Peds
NB Right IE6 Right
SB Right ;Wb Right
Green 14.OA 41.OA ;Green 31.OA
Yellow/AR 4.0 5.0 lYel)ow/AR 5.0
Cycle 'Length: 100 secs Phase combination order` #1 #2 #5
----------------------------------------------------------------- --
-Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 104 243 U.220 0.430 11.6 6 17.2 C
TR 1515 3524 0.765 0.430 17.3 C
WB L 340 1770 0.738 0.610 21.6 C 15.8 C
TR 1599 3718 - 0.477 0.430 13.4 EB
NB LT 520 1575 0.950 0.330 41.2 E 32.6 0
R 522 1583 0.674 0.330 21.0 C
SB LTR 444 1346 0.054 0.330 14..6 B 14.8 6
Intersection Delay = 20%9 sec/veh Intersection LOS = C
Lost Time/Cycle. L = 9.0 sec Critical v/c4xl = 0.662
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMAPI Version 2.4d 11-23-1996
Center- For Microcomputers In Transportation
Streets: (E-W) prospect (N-S) timberline
Analyst: Matt FileName:
Area Type: Other 11-23-96 am pm
Comment: 1. 9C short Iona full rin/rout
------------------------ -------
Eastbound Westbound Northbound Southbound
L T k 1 L T R 1 L T R L I R
---- ----'---- ----
No. Lanes 1 2< 1 2> 1 i ;• > 1 <
Volumes 9 612 4931 328 835 6; 373 7 278.; 6 15 16
PHF or PK15 I0.90 0..90 0-.90:0.90 0.90 0..90,;0-.90 0.90 0.9010.90 0.90 0.90
Lane W (ft);12.0 12.0 :12.0 12.0 12.0 12.0; 12.0
Grade 0 i_ 0 1 0 0
Heavy Veh; 2 2 2' 2 2 2! 2 2 21 2 2 2
Parking ;(Y/N) N I(Y/N) N !(Y/N.) N :(Y/N).N
bus Stops ; 0'.I 0; OI 0
Con. Peds i 0; 0; 0
Ped button ;(Y/N) Y 11.5 s1(Y/N) Y 8.5 _s;(Y/N) Y 17.5 s;(Y/N) Y 17.5
Arr Type 3 3 3 ? 3 3; 3
RTOP Vols OR 01 0; 0
Lost Time ;.3.00 3.00 3.00-13.00 3.00 3.00t;3.00 3.00 3.0.0;3.00 3.00 3.00
Prop-. Share;
Prop. Prot.;
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2a, 4 5 6 7 8
EB Left * ;NB Left
Thru ' Thru
Right * Right
Peds * Peds '
WB Left * * ;'SB Left
Thru " Thru
Right * Right
Peds * Peds
NB Riaht ;EB Right
SB Right ;WS Right
Green 18.OA 47.OA ;Green 31.OA
Yellow/AR 4..0 5..6 ;Yellow/AR 5.0
Cycle Length: 110 secs Phase combination order: #1 #2 #5
----------------------------------------------------------------------
Intersection Performance Summary _
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 68 152 0.148 0.445 11.8. 0 20.2 C
TR 1548 3476 0.832 0.445 20.2 C
Wb L 373 1770 0.976 0.645 52.3 E 25.3 D
TR 1658 3721 0.592 0.445 15.3 C
NB LT 420 1400 1.005 0.300 59.9 E 44.6 E
R 475 1563 0-.651 0.300 23.:8 C
SB LTR 360 1:268 0.110 0.300 18.0 C 18.0 C
Intersection Delay - 27.4 sec/veh Intersection LOS = D
Lost Time/Cycle. L = 6.0 sec Critical v/c(x) = 0.931
----------------------------------------------------------------------
e
HCS: Unsignali-zed Intersection=. Release 2.1d
Page i
HCS: Unsionalized Intersections
Release 2.Id
Pape 2
Center For Microcomputers In Transportation
University of Florida
Worksheet for TWSC Intersection
512 Weil Hall
________________________________________________
Gainesville, FL 32611-2063
Step 1: RT from Minor Street
NB
S8
Ph:: (904) 392-O"78
----------------------------------------------------
ConflirBing Flows: (vph)
322
Streets: (N-S) specht point drive
(E-W) prospect
Potential Capacity: (pcph)
951
Major Street Direction.... EW
Movement Capacity: (pcph)
951
Length of lime Analyzed... 60 (min)
Prob. of Queue -Free State:
0.98
Analyst................... mjd
--_-__________-_-_--__--_------------__________-__
Date of Analysis.......... 1.1123/
Other Information......... 1996 short
/
long ram pm ful
Step 2: Ll from Major 'Street
--------------------------------------------------------
WB
EB
I rin/rout
Conflicting Flows: (vph)
643
Two-way Stop-contro lied Intersection
Potential Capacity: (pcph)
774
---------`- ------------=---=--------'__=_________=___`=
Movement Capacity: (pcph)
774
Eastbound , Westbound I Northbound
; Southbound
Prob. of Oueue-Free State:
0.97
L 7. k L T k I L
1" k L 1 k
--------------------------------------------------
Step 4: LT from Minor Street
NB
SB
No. Lanes 1 0 2 <. 0; 1 2. 0 I 1
0 1 1 0- 0 0
___._____________________________________________________
Stop/Yield N; N;
Conflicting Flows: (vph)
1160
Volumes 503 76:; 21 482 34
151
Potential Capacity: tpcph)
1�92
PHF .9 .9; .9 .9 ..9
.9;
Major LT, Minor TH
Grade 0 0
0
impedance factor•:
0.97
MC's (%) I
Adjusted Impedance Factor:
0.97
SU/RY's (%); 1
Capacity Adjustment Factor
CV's (%) ; ;
due to Impeding Movements
0.97
PCE's ; :1.1.0 :1.10
-------`--------------------------------------------------------------
1.10:
Movement Capacity: (pcph)
--------------------------------------------------------
186
Intersection
Performance Summary
Adjustment Factors
Avg.. 95%
Flow Move Shared
Total. Queue
Approach
Vehicle - Critical
Follow-up
Rate Cap Cap
Delay Length LOS.
Delay
Maneuver Gap (tg)
Time (tf)
Movement (pcph) (pcph) (Pcph)(,sec/veh)
(veh)
(sec/veh)
------------------------------------------------------------------
Left Turn Major Road 5.50
2.10
-------- ------ ------ ------
BNB L 42 186
------- ------- -----
25.0 1.0 D
---------
Right Turn Minor Road 5.50
2.60
18.5
Through Traffic Minor Road 6.50
3.30
NB k 19 951
3.9 0.0 A
Left Turn Minor Road 7.00
3.40
WB L 25 774
4.8 0.0 A
0.2
Intersection Delay
= 0.9sec/veh
- -
HCS: Unsignalized Intersections Release 2.18
Page 1
--------------------
Center For Microcomputers In Transportation
------------------------
HCS: Unsignali�zed Intersections Release 2.1d
Page 2
Universitv of Florida
5l2 Weil Hall
Worksheet for TWSC Intersection
Gainesville. FL 32611-2083
Ph: .(904) 392-0378
Step 1: kl from Minor Street
NB
SB
Streets: fN-5) specht point drive
(E-W) Prospect
Conflicting Flows: (vph)
307
Major Street Direction.... EW
Potential Capacity:(pcph)
968
Length of Time Anal!yzed... 60 (min)
Movement Capacity: (pcph)
966
Analyst; .................. mjd
Prob. of Queue -Free State:
0_98
Date.of Analysis.......... 11/23�U
—
--------------------------------------------------------
Other Information......... C1 96short
long am Pm ful
Step 2: LT from Major Street
WB
Eb
T rin/rout
Two-way Stop -controlled Intersection
Conflicting Flows: (vphi)
614
Potential Capacity: (pcph)
803
Eastbound Westbound 1 Northbound Southbound
Movement Capacity: (pcph)
803
L T R! L T R! L
!---- --- ----!---- ---- ----I----
T k L T k
----
Prob. of Queue -Free State:
0.99
No, Lanes 0 2< 0 1 2 0 !. 1
0 i! 0 0 0
Step 4: LT from Minor Street
NB
Stop/Yield ! N! N;.
:!
-----------------------------------------------------SB
Volumes ! 525 28! 6 628 -75
15!
Conflicting Flows.: (vph)
1304
PHF ! 9 .9! .9 .9 i .9
.9f
Potential Capacity: (pcph)
155
Grade 0 0
0
Major LT, Minor TH
MC'-s (%) ! !
!
Impedance Factor:
0..99
SU/kV's (%)! ;
Adjusted Impedance Factor:
01,99
CV's (%) !!
Capacity Adjustment Factor
PCE's !1.10 !1.10
1. 1'0'i!
due to Impeding Movements
0.99
-------------------------------------------------------------`---------
Movement Capacity: ('pcph)
153
Intersection Performance Summary
Adjustment Factors
Avg.
95%
Vehicle Critical
Follow-up
Flow Move Shared Total
Queue
Approach
Maneuver Gap (tg)
Time (tf)
_----------
Rate Cap Cap Delay
Length LOS
Delay
-------------------------------------------------
o-----
Movement (pcph) (pcph) (Pcph)(sec/veh) (veh)
(sec/veh)
Left Turn Major Road 5.50
2:10
________ ______ ______ ______ _______
_______ _
kight Turn Minor Road _ 5.50
2.60
NB L 91 153 56.6
3.9 F
ThroughTrafficMinor Road 6.50
3.30
-
-
47 8
Left Turn Minor koad 7..00
3.40
NB k 19 968 -J.8
0.0 A
WB L 8 803 - 4.5
0.0 A
0.0
Intersection Delay =
3.4 sec/veh
APPENDIX C
i L V
UNSIGNALIZE® INTERSECTIONS
I
I
Intersection Total Delay = (Vehicle Total Delay x Volume) _
1Uolume
I
I
a
Level -of -Service (Intersection) =
Level -of -Service
Average Total Delay,
sec/veh
A
55
B
>5and 510
c
> 10and520
D
>20and 530
E
> 30 and 5 45
P
> 45
" Level of Service for Signalized Intersections
Level of service. for signalized inlersections is defined in terms
of delay, which is a measure of driver discomfort and frustration,
fuel consumption, and lost travel time. Specifically,'level-of-
service (LOS) criteria are stated in terms of (lie average stopped
delay per vehicle for a 15-min an period. The criteria are
given in Table 9-1. Delay may be measured in the field or estimated
using procedurespresented later in this chapter. Delay is a complex
measure and is dependent upon a number of variables, including
the quality of progression, the cycle length, the green ratio, and
the Mc ratio for the lane group in question.
LOS A describes operations wi(itth very low delay, up to 5 sec per
vehicle. This level or service occurs when progression is extremely
favorable and most vehicles arrive during the green phase. Most
vehicles do not stop at all. Short cycle lengths may also contribute
to low delay,
LOS B describes operations with delay greater than 5 and up to
15 sec per Vehicle. This level generally occurs with good progres-
Sion, short cycle lengths, or both. More vehicles stop than with
LOS A, causing higher levels of average delay.
LOS C describes operations with delay greater than 15 and tip
to 25 see per vehicle. These higher delays may result from fair
progression, longer cycle lengths, or both. individual cycle faiinres
may begin to appear at this level. The number of vehicles stopping
is signiticant at this level, though many still pass through the
intersection without stopping.
LOS D describes operations with delay prenter than 25 and up
to 40 sec per vehicle. At level D, the influence of congestion
becomes more not ceahle. Longer delays may result frorn some
combination or unfavorable progression, long cycle lengths, or
high Mc ratios. Many vehicles stop, and the proportion of vehicles
no( stopping declines. Individual cycle failures are noticeable.
LOS F. describes operations with delay greater Ihan 40 and up
to 60 sec per vehicle. This level is considered by many agencies to
be the limit of acceptable delay. These high delay values generally
indicate poor progression, long cycle lengths, and high Mc ratios.
Individual cycle failures are frequent occurrences.
LOS F describes operations with delay in excess of 60 sec per
vehicle. This level, considered to be unacceptable to most drivers,
often occurs with oversaturation, that is, when arrival flow rates
exceed the capacity of life intersection. It may also occur at high
Me ratios below 1.0 with many individual cycle failures. Poor
progression and long cycle lengths may also be major contributing
causes to such delay levels.
TABLE 9-1. LEVEL -OF -SERVICE CRITERIA FOR SIONAIAZED
IN1FRSECTIONS
LEVEL OF SERVICE
STOPPED DELAY PER VEHICLE (SEC)
A
_55.0
B
>5.0 and 5 15.0
C
> 15.0 and S 25.0
D
>25.0 and 5 40.0
E
>40.0 and 5 60.0
F
>60.0
APPENDIX. D
- - ---- ------ --_. I. -..
HCS: Unsignali,zed Intersections Release 2.1d
image 1
HCS: Unsionalized l�ntersections
_
kelease 2. 1tl
Tape.
Center,For- Microcomputers In Transportation
University of Floride
5''1,2 Well Hall
Worksheet for T.WSC Intersection
Gainesville. FL 3261,1-2083
--------------------------------------------------------
Ph:: (904.) 392-03,78
,Step 1: RT from Minor Street
WS
ES
Streetsc (N-S) timberline
(E-W) midpoint
------------------ ------------------------------------
Conflicting Flows: (vph)
956
Major Street Direction.-... NS
Potential Capacity: (pcph)
454
Length of Time Analyzed .._. 60 (min)
Movement Capacity: (pcph)
454
Analyst .................... mjd
Prob. of Queue -Free State:
0.66
Date of"Analvsis........... 11/23/96
Other Information ........... 1996
short long
am Pm ful
--------------------------------------------------------
,Step 2: LT from Major Street
SB
NB
1 rin/rout
---- ____________________________________________________
Two-way Stop -controlled :Intersection
Conflicting Flows: (vph)
1328
,Potential Capacity: (pcph)
399
Northbound •I Southbound
Eastbound
I Westbound
'Movement Capacity: (pcph)
399
L T R; L T
R L T R
L T •R
Prob. of Queue -Free State:
0.40
---- ---- ----'I---- ----
No. Lanes 0 1 1 '1 1
----'---- ---- ----f----
0 0 0. 0
---- ----
1, 0 1
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
Stop/Yield ; N'!
N1
_____________________________________________________
Volumes ; 860 33.5:: 195 595
;
80 125
Conflicting Flows: (vph)
1834
PHF ; .�9 .9; .9 .9"
.9 .9
Potential Capacity: (pcph)
92,
"
Grade 0 i 0
0
Major Lt. Minor TH
MC's (%)
I
Impedance Factor:
0.40
SU/RV-'s (%:); ;
1
;
Adjusted Impedance Factor:
0.40
CV's (%)
Capacity Adjustment Factor
PCE's ;1.. 110
;
1,1. TO 1.10
.due to Impeding Movements.
0.40
_______________________________________________________________________
Movement Capacity: (pcph)
_-_______________________________________________________
37
,Intersection 'Performance
Summary
Adjustment Factors
Avg. 95%
Vehicle
Critical
Follow-up
Flow Move Shared
Total Oueue
Approach
Maneuver
Gap (tg)
Time (tf)
Rate Cap Cap
Delay Length LOS
Delay
___._______________________________________________________________
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
Left Turn Major Road
5.00
2.1.0
-------- ------ ------ ------
-------------- -----
---------
Right Turn Minor 'koad
5.150
2_60
WB L 98 37
" 32�.1 F
Through Traffic'Minor Road
6.00
3.30
'
Left Turn Minor Road
6:50
3.40
W6 R. 1153 454
11.�9 1.7 C
SP. L 239 399
22.3 4.4 D
5.5
Intersection Delay
= 120.1. sec/veh
* The calculated value was areater than 9.99.:9:.
HCS: Unsignalized Intersections Release 2.ld Page
Center For Microcomputers Fn Transportation
University of Florida
5.1, Weil Hall
Gainesville. FL 32611-208S
Ph: (904-) 392-0378
Streets: (N-S) timberline (E-W) midpoint
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analvst................... mjd
Date of Analysis.......... 11/23/96
Other- Intormation:......: 1996 -short , long am pm �ful
1 rin/ro
Two-way Stop -controlled Intersection
Northbound ;-Soutnbound Eastbound Westbound
L T R ; L T R L T R L T R
---- ---- ----I---- ---- ----I:---- --------'---- ---- ----
No. Lanes 0 1 1 ; 1 1 0 ; 0 0 0 1 0 1
Stop/Yield N; N
Volumes ; 715 120: 95 955 1185 170
PHF .9 .9; .9 .9 .9.9
Grade 0 ; 0 0
MC's (%)
SU/RV's (%);
CV's (%)
PCE's :1.10 11.10 1.10
----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.-60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.,40
HCS: Unsignalized Intersections Release 2.1d
Work sheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street Wb EB
Conflictinc• Flows: (vph)
794
Potential Capacity: (pcph.)
548
.
Movement Capacity: (pcph)
548
Prob. of Oueue-Free State:
0.62
iorStreet
Stepz_LTfrom Ma_
SB
NB
--- - ------------------------
Conflicting Flows: (vph)
927
Potential Capacity: (pcph)
620
Movement Capacity: (pcph)
620
Prob. of Oueue-Free Stater
0.81
--------------------------------------------------------
Step 4: LT from Minor Street
W8
EB
--------------------------------------------------------
Conflictina Flows: (vph)
1962
Potential Capacity: (pcph)
77
Major LT. Minor TH
Impedance Factor:
0.81
Adjusted Impedance Factor:
0.81
Capacity Adjustment Factor
due to Impeding Movements
0.81
Movement Capacity: (pcph)
--------------------------------------------------------
62
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Oueue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------- ------- -----
(sec/veh)
---------
-------- ------ ------ ------
WE L 227 62, *
63.6 F
WB R 208 548 10.6
2-.0 C
58 L 117 620 7.2
0-.8 B
0..6
Intersection Delay =
408-.0 sec%veh
* The calculated value was greater than 999.9.
E
Page 2
HCM: SIGNALIZED IN.TERSECIION SUMMARY Version 2.4d 11-23-1996
Center For Microcomputers In iransportation
Streets: (E-W) prospect (N-5) timberline
Analyst: Matt File Name:
Area Type: Other - �- 11-23-96 am om
Comment: 1996 short long (full rin/rout
Eastbound I Westbound I Northbound I Southbound
1 L T R: L T R I L T R L T R
--------:---- --------F---- ---- ---- I ---- ---- ----
No. Lanes 1 1 2 < 1 1 2 < 1 2 1 1 1 1 1 1
Volumes 1 225 470 3501• 110 440 2701 390 370 2101 110 370 140
PHF or PK15:0.90 0.90 0.,901.0_.90 0.90 0.90:0.90 0.90 0.90!0.90 0.90 0.90
Lane W (ft)112.0 12.0 1,12.0 12.0 112..0 12.0 12.0:12.0 1.2.0 12.0
Grade 1 0 1 0 1 0 0
% Heavy Veh1 2 2 21 2 2 2': 2 2 2! 2 2 2
Parking !(Y/N) N I(Y./N) N 1(Y/N) N I(Y/N) N
bus Stops 1 0: 011 01 0
Con. Peds 1 0: 01 01 0
Ped Button 1(Y/N) Y 17.5 s:(Y/N) Y 14..5 s;(Y/N) Y 1�7.5 s:(Y/N) Y 17.5
Arr Type 1 3 -.3 1 3 3 ! 3 3 3! 3 3 3
RTOR Vols 1 0: 0i 0: 0
Lost Time 13.00 3.00 3.0013.00 3.00 3.00:3:00 3.00 3.00:3.•00 3.00 3.00
Prop. Share: 1
Prop. Prot..! 1 1 :
Signal Operations
Phase Combination 1 2 3 4 1 5 6 -7 8
EB Left * * 1ND Left
Thru * I Thru
Right * : Right
Peds * Peds
W6 Left * * 158 Left
Thru I Thru
Right I Right
Peds * Peds
NB Right !EB Right
:SB Right :WB kiaht
Green 13.OA 27.OA :Green 14.OA 26.OP
Yellow/AR 4.0 5.0 :Yellow/AR 4.0 5-.0
Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6
----------------------------------------------------------------
Intersection Performance Summary
`Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delav LOS Delay LOS
----- ---- ------- ----- ----- ----' --- ----- ---
EB L 3.22 1770 0.776 0.460 21.8 C 32.1 D
TR 1011 3487 0.946 0.290 34._8 D
WB L 322 1770 0.379 0.460 12.9 B 23.4 C
TR 1'.019 3513 0.813 0.290 24_9 C
NB L 531 3539 0.840 0. 150 34.7 D 27.3 D
T 559 1863 0.735 0-.300 23.8. C
R 475 1583 0.491 0•.300 19:.2 C
SB L 340 1,770 0.359 0.480 11.4 6 20.2 C
7 559 1863 0•. 7350•: 300 23.8 C
R 475 f583 0.328 0.300 17.7 C
Intersection Delay = 26..6 sec./veh Intersection LOS = D
Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.-865
MCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 11-23-1996
Center For Microcomputers In Transportation
Streets: (E-W) prospect f.N-S) timberline
Analyst: Matt File Name:
Area Type: Other 11-23-96 am pm
Comment: 1996 short. long fu1T rin/rout
Eastbound Westbound ' Northbound I Southbound
: L T R : L T k I L T k : L T k
I'---- ---- ----1---- - ---- ---- '----
No. Lances 1 1 I
I < 1 2< 2 1 1 1 1 1 1
Volumes. 220 440 435: 210 580 310: 350 355 1701 80 385 185
PHF or PY,15:-0.90 0.90 0.9010.90 0.90 0.90:0.90 0.90 0.90:10.90 0.90 0.90
Lane W (ft):1.2.0 12.0 :12.0 12.0 112.,0 1.2..0 12.011,2.0 1.2.0 12.0
Grade 1 U 0 1 0 0
% Heavy Veh; 2 2 21 2 2 2: 2 2 2' 2 2 2
Parking :(YIN) N 1(Y/N) N 1-(Y/N) N 1(Y/N) N
bus Stops 0: 0: 01 0
Con, Peds 1 0: 0: 0: 0
Ped Button 1(Y/N) Y 1•.7.5' s:(Y/N) Y 14.15 s;(Y,/N) Y 17.5 si(Y/N) Y 17.5
Arr •Type 3 3 3 3 1 3 3 31 3 3 3
RTOR Vols 0: 0! . 0.1 0
Lost Time !3.,00 3.00 3.00-:3.00 3.00 3.00 P3.00 3.00 3-.0013.00 3.00 3.00
Prop. Share: :
Prop. Prot.: :
-----------------------------------------------------------------------
S,ianal Operations
Phase Combination 1 2 3 4 1 5 6
EB Left * * IND Left
Thru * I Thru '*
Right * 1 Right
Peds * Peds
WB Left * :SB Left
Thru I Thru
Riaht * : Right
Peds * I Peds
NB Right :EB Right
Sb Right :NB Right
Green 12.OA 31.OA :Green 12.OA 27.OP
Yellow/AR 4.0 5_0 :Yellow/Ak 4.0 5.0
Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ---
E8 L 305 1770 0.800• 0.490 24.7 C 27.0 D
TR 1136 3448 0.897 0.330 27.5 D
WB L 305 1770 0.764 0.490 21.8 C 25.9 D
TR 1165 3531' 0.890 0.330 26.6 D
NB L 460 3539 0.872 0.130 39.1 D 29,.2 D
T 540 1863 0.729 0.290 24.1 C
k 459 11583 0.412 0.290 L8.8 C�
SB L 305 1770 0.292 0..456 11...9 B 22.7 C
T 540 1863 0.792 0.290 26.6 10
R 459 1583 0.449• 0.290 T9.2 C
Intersection Delay = 26..4 sec/veh Intersection LOS = D
Lost Time/Cvcle. L = 1:2.0 sec Critical v/:c(.x) = 0.674
-----------------------------------------------------------------------
I
Roads
The primary streets near Spring Creek Center are Prospect
Road, Timberline Road, Midpoint Drive, and Specht Point Drive.
Prospect Road borders Spring Creek Center on the north. It is an
east -west street designated as an arterial in the "North Front
Range Regional Transportation Plan," (NFRRTP) 10/94 and the Fort
Collins Master Street Plan. Prospect Road has a four lane cross
section with a concrete median west of Timberline and a painted
median east of Timberline. The existing speed limit in this area
is 35 mph.
Timberline Road is west of Spring Creek Center. It is a
north -south street designated as a major arterial on the Fort
Collins Master Street Plan. It is a two lane road that terminates
several hundred feet north of Prospect. The Prospect/Timberline
intersection has signal control.
Midpoint Drive and Specht
provide access to the Spring
commercial uses located south
intersection.
Existing Traffic
Point Drive are local streets that
Creek Center site and the other
and east of the Prospect/Timberline
Recent peak hour turning movements at the Prospect/Timberline,
Prospect/Specht Point, and Timberline/Midpoint intersections are
shown in Figure 2. Raw traffic count data is provided in Appendix
A. These counts were obtained in September, 1996.
Existing Operation
The Prospect/Timberline, Prospect/Specht Point, and
Timberline/Midpoint intersections were evaluated. The peak hour
operation is shown in Table 1. The calculation forms are provided
in Appendix B. Appendix C describes level of service for
signalized and unsignalized intersections from the 1994 Highway
Ca ap city Manual. All movements at these intersections operate
acceptably, with the exception of the westbound left turns at the.
Timberline/Midpoint intersection and the northbound left turns at
the Prospect/Specht Point intersection. These operate at level of
service F. This is normal for minor street left -turn movements
along arterials during the peak hours. Acceptable operation during
the peak hours is defined as level of service D or better.
Experience indicates that if level of service D can be achieved
during the peak hours, operation will be at level of service C or
better for 20-22 hours of an average weekday.
2
HCS,: Unsignalized Intersections Release 2.1d .Pace i
as a=aaaaa aaccaaaaaacananaaaaaavaaaaavvaaavaaaaaava�aavaavvacvevavaaa
Center For Microcomputers In Transportation
University .of Florida
51'2 Neil 'Nall
Gainesville, 'FL 32611-2083
Ph: (�904) 392-0378
caavcaaa=aaaavavaaaa=aaaavaacaa==aacaaaaaaaoaccaaac=aaaaacaaasacavcaaa
(Streets; a (N-S) specht point drive (E-N) prospect
Major Street Direction..... EN
Length of Time Analyzed... 60 (min)
Analyst ......:.::......... mjd
Date of Analysis.......... 11/24/96
Other Information.......,.. 1996 ( short long .-am pm full
rin
Two-way Stop -controlled Intersection
ccccaavaaaaavavvavaacnavvnaaavvvavacavavaaaaavavvaavavvaavavaaaaaaaa=aa
Eastbound Westbound I Northbound 1 Southbound
L T R 1 L. T R I L T R L T R
'I---- --------1---- ---- ----I--- ---- ---- ----
-No. Lanes 0 2 1 : 1 2 0 1 1 0 1 'r. 0 0 0
Stop/Yield : NI W
Volumes 366 135: 50 423 70 130:�
PHF 1 .9 .91 ..9 .9 .9 .9;
Grade i 0 i 0 0
MC's ($)
SU/RV's ($):1 I
CV's (%) I
PCE's - I1.10 :1.10 1.10:
F
HCSI: Unsignall.ized Intersections Release 2,.1d Page 2
ava=cva aaaaaacaacvacaava anevnavvanvnaannanannnnvvvnvvaaaaaaccacaa
Norksheet for TNSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows,:
(vph)
204
Potential Capacity;:.
(pcph)
1091
Movement Capacity:
(pcph)
1091
Prob. of Queue -Free
State:
0.86
--------------------------------------------------------
Step 2: LT -from Major
-------------------------------------------------
Street
NB EB
---
Conflicting Flows:
(vph)
557
Potential Capacity:
(pcph)
661
Movement. Capacity:
(pcph)
861
Prob. of Queue -Free
------------------------------------
State:
-- 0.93
-------------
Step 4 LT from Minor Street
------------
NB---------- 9B
----------------------------
Conflicting Flows:;
(vph)
933
Potential Capacity:
(pcph)
268
Major LT, Minor TH
Impedance Factor:
0.93
Adjusted Impedance
Factor:
0.93
Capacity Adjustment
Factor
due to Impeding Movements
0.93
Movement Capacity:
(pcph)
:249
Intersection Performance Summary
Adjustment Factors
Avg.
95$
Vehicle
Critical
Follow-up
Flow
Move Shared Total
Queue
Approach
Maneuver
Gap (tg)
Time (tf)
Rate
Cap Cap. Delay
Length LOS
Delay
----------- -------------------------------
----------------------
Movement
(pcph)
(pcph) (pcph )(sec/veh)
(veh)
(sec/veh)
Left Turn Major Road
5.50
2.10
---�---
NB L
------
86
------ ------------------
249 22_0
--�-
1.7 D
--�-W-
Right Turn Minor Road
5.50
-2.60
10.2
Through Traffic Minor
Road 6.50
3.30
NB R
158
1091 3.9
0.5 A
Left Turn Minor Road
7.00
3.40
RB L
62
061 4,.5
0.1 A
0.5
Intersection Delay -
1.9 sec/veh
r,
k
HCS: Unsianalized Intersections Release 2.1d
Page 1
----""--"""'--""'-' ""-"--"----
"""'----'------
H(:,: Unsionalized Intersections Release Z.Id
Pao-_
Center For Microcomputers In Transportation
=--------------------------------------------------------
------------- --------------
----_-
University of Florida
512 Well Hall
Worksheet for TWSC Intersection
Gainesville, FL 32611-2083
---------------------------------_______________________
Ph: (904) 392-0378
Step I: RT from Minor Street
NP
SE
Streets: (N-S) specht point drive
(E-W) prospect
__--_-_--_________-___________________________________-
Conflicting Flows: (vph.)
206
Major Street 01rection.... £W
Potential Capacity: (pcph)
1089
l
Lenath of Time Analyzed... 60 (min)
Movement Capacity: 1pcph)
1089
Analyst ................... mjd
Prob. of Queue -Free State:
0_95
Date of Analysis.......... 11/24/96
Other lntormation......... 1996
//-- �—
short long am (pm lfull
--------------------------------------------------------
Step 2: LT from Major Street--_-________
WB_______-___EB
rinrou
____________________________
Two-way Stop -controlled Intersection
Conflicting Flows: (vph)
485
Potential Capacity: (pcph)
941
Eastbound ; Westbound Northbound I
Southbound
Movement Capacity:- (pcph)
941
L T R! L T
--------!---- ----
R! L T R
----I---- --------!----
L T R
Prob. of Queue -Free State:
0.95
!----
No. Lanes ! 0 2 1! 1 2
0 1 0 1!
0 0 0
Step 4: LT from Minor Street
NB
SB
Stop/Yield ! NA
N.:
-------- -----------------------------------------------
Volumes ; 372 65'.: 35. 552
! 130 45;
Conflictina Flows: tvph)
1065
PHF .9 .9I .9 .9
.9 .S;
Potential Capacity,: (pcph)
221
Grade 0 0
! 0
Major LT, Minor TH
MC's (%) !
!
impedance Factor:
0.95
SU/RV's (%); ;
!
Adjusted Impedance Factor:
0.95
CV's (%) !
';
Capacity Adjustment Factor
PCE's !1.10
!1.10 1.10:
due to Impeding Movements
0.95
_______________________________________________________________________
Movement Capacity: (pcph.)
________________________________________________________
211
'Intersection Performance Summary
Adjustment Factors
Avg.
95%
Vehicle
Critical
Follow-up
Flow Move Shared Total
Queue
Approach
Maneuver
Gap (tg)
Time (tf)
Rate Cap cap Delay
Length LOS
Delay
------------------------------------------------`---------------
(veh)(veh)
Movement ----
(sec/veh)
Left Turn Major Road
5.50
2 10
---- ---- ------
-----
Right Turn Minor Road
5.50
2:60
NB L 158 211 63.2
6.9 F
Throuah Traffic Minor Road
6.50
3.30
47.9
Left Turn Minor Road
7.00
3.40
N8 'R 55 1089 3.5
0.0 A
WO L 43 941 4.0
0.0 A
0.2
Intersection Delay =
7.1 sec/veh
1ti
APPENDIX E
HCS: Unsignalized Intersections 'Releas,e 2.ld Page
Center- For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
'Ph: (904) 392-0378
Streets (N-S) timberline (E=W) midpoint
Major Street Direction.... NS
Length of lime Anallyzeo..,.. 60 (min)
Analyst-. ..... :* .......... mjd
Date of Analysis............ 11/2'1/96 _
Other Information ... ,...... .. 1996 short long am pm ful
7 r in/rou
Two-way Stop -controlled Intersection
Northbound Southbound I Eastbound Westbound
L T. R '; L T R L T R L T.R
---- ----'I---- ---- ---- ----I---- ---- ----
No.Lanes 0 1 1 0 1 0; 0 0 0 0 0 1
Stop/Yield N;; N; ;
Volumes i 860 335: 675 125
PHF. .9 ,9:; .9 i .9
Grade 0 ; 0 I 0
MC's (%) P
SU/RV's
CV's (%•) ;
PCE's ; 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehi cle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2-10
Right Turn Minor Road 5.50 2-.60
Through Traffic !Minor Road 6.00 '-30
Left Burn Minor Road 6...50 3.40
HCS: Unsionalized intersections Release 2.1d Page 2
Worksheet for TWSC Intersection
Step I: RT from Minor- Street W0 E8
Conflicting Flows: (vph) 956
.Potential Capacity: (pcph). 454
Movement Capacity: (pcph) 454
Prob. of Queue -Free State: 0..66
-------------------- ----------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
------ ------ ------ - ------- -----
11.9
WE R 153 454 11_9 1.7 C
Intersection Delay = 0.7 sec/veh
HCS: Unsiana)ized intersections Release 2.lo Page
Center For- Microcomputers In Transportation
University of Florida
5,12 Weil Hall
Gainesville, FL 326.11-2083
Ph: (904) 39.2-0..76
Streets: (M-5) timberline (E-W) miapoint
Major Street Direction.... NS
Length of lime Analyzed.... 60 (min)
Analyst.: ........... ..... mid
Date of Analysis.......... 11/23/96
Other Information......... 1996 snort long am pm ful
1 rin/.rout
Two-way Stop -controlled lntersectio
Northbound Southbound Eastbound Westbound
L T R L T R L T R L 1 R
--- ----L--- ---- ----i---- ---- ----
No. Lanes ; 0 1 1 0 1 0 0 0 0 U 0 1
Stop/Yield ; N; N;
Volumes 715 1,20-.: 1140 170
VHF .9 .9; .9 i .9
Grade 0 0 0
MC's (%)
SU/RV's
CV's (%)
PCE's l.le
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (t9)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
koad
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2..1d Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step I: RT from Minor Street WB EB
Conflicting flows: (vph) 794
Potential Capacity: (pcph) 546
Movement Capacity: (pcph) 548
Prob. of Queue -free State: 0.62
--------------------------------------------------------
Intersection Performance Summary
Avg., 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ ------ ------- ------- ----- ---------
10.6
Wb k 206 546 1.0.6 2.0 C
Intersection Delay = 0.6 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 11-"t4-1:996
Center For Microcomputers In Transportation
Streets (E W) prospect (N S) timberline
Analyst: Matt File Name
11
Area. Type Other��a� ��-- 11 24-96`J pni
Comment i956 short long rinir ou.
--------- ------' -----'---_______=-
Eastbound Westbound Northbound Soutnbound
L T R ; L T R L T R L T k
---- ----I---- ---- ----'---- ---- --- ---- ----
No. Lanes 1 �
_ I 2 1 1 1 1 1
Volumes 225 530, 290: 180 440270: 390 370 710:1 165 315 140
PHF or PK15;0.90 0.90 0-9010.90 0_90 0.,9010.-90 0.90 0.90;0.90 0.90 0.90
Lane W (ft); 1,2.0 12.0 ;12.0. 12.0 :,12.0 12.0 13.0: 12,.0 12.0 1,2.0
Grade I 0 0 0 0
Heavy Veh; 2 2 2:; 2 2 .2b 2 T! 2 2 2
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N'
Bus Stops 0': 0; 0; 0
Con. Peds i 0.: 0; 0; 0
Ped Button (Y/N) Y 17.-5 s:;(Y/N) Y 14.5 s;(Y/N) Y 17.5 s;(Y/N) Y 17.5
Arr Type ; 3 3 ; 3 3 3 3 31 3 3 3
RTOR Vo-Is 0�i '0; 0; 0
Lost Time 13.00 3.00 3..00;3.00 3.00'3.0013.00 3.00, 3:0013.00 3.00: 3.00
Prop. Share; I'
Prop. Prot.; I
----------------------------------------------------------------------
Signal.Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * * ;NB Left
Thru * Thru
Right * Right
Peds * Peds
WB Left * ;SB Left
Thru * Thru
Riaht * 'Right '
Peds i Peds
NB Right :EB Right
SB Right ;WB Right
Green 13.OA 27.OA ;Green 14.OA 28.OP
Yellow/AR 4.0 5.0 :Yellow/AR 4.0 5.0
Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach::
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ----------- ----- ----- ----- --- ----- ---
EB L 322 1770- 0.776 0.460 21.8 C 30.9 D
TR 1.023 3528 0.935 0.290 33.3 D
WB L 3.22 1770 0.621 0.460 15.:8 C 23.1 C
Tk 101.9 3513- 0.813 0.290 24.9 C
NB L '531 3539 0.040 0. 1.50 34.7 D 27.3 D
T - 559 1863 0.735 0.300 23 .B C
R 475 1583 0.491 0.300 19.2 C
58 L 340 1770 0.536 0.480 13.1 B 16.2 C
T 559 1863 0.626, 0.300 21.1 C
R 475 1583 0.326 0.300 17.7 C
Intersection Delay = 25.8 sec/veh Intersection LOS = D
Lost Time/Cycle. L. = 12.0 sec Critical v/c(x) = 0-.661
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 11-24-1996
Center .For Microcomputers In Transportation
Streets: (E-W) prospect (N-S) timberline
Analyst:. Matt File Name: /•
Area Type. Other - - L1zL?.4 46 am !pm
Comment: 1996 ' hort long rin/rou
----- -------------------
Eastbound Westbound Northbound Southbound
L T k L T R L T k L T R
---- --------(---- ---- ---- ---- ---- --- ---- ---- ----
No. Lanes ; 1 2 < 1 2 < 2 1 1 1 1 1
Volumes 1220 470405: 365 580 310: 350 355 170: 1.10 355 185
PHF- or PK151-0.90 0.90 0.90,: 0.90 0.90 0.90;0.90 0.90 0.go: :0.90 0.90 0.90
Lane W ('ft)I12-.0 12..0 I12.0 1,2.0 :12-.0 12.0 12.0: 12..0 12.0 12..0
Grade 0 ; 0 ; 0 ( 0
a Heavy Veh I; 2 21 2 2-I 2 2 2; 2 2 2
Parking (1/N) N (Y/N) N 1(Y/N) N ;(Y/N) N
E•us Stops 0; 0; 0; 0
Con. Peds 01 01 01 0
Ped Button I(Y/N) Y 17.5 s;(Y/N) Y' 14.5 s;(Y/N) Y 17.5 s;(Y/N) Y 11.5
Arr Type _ 3 3 3 1 3 3 3: 3 3 3
RTOR Vols 0; 0;: Di 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00:3.60 3_00 3.00
Prop. Share;
Prop. Prot.; 1
Signal Operations
Phase Combination 1 2 3 .4 I 5 6 7 6
E8 Left * * ;NB Left
Thru * ; Thru
Right * kight
Peds * ; Peds
WB Left * * 1SB Left
Thru * lhru
Riaht * Right
Reds * ! Peds
NB Right :EB Right
SB Right :WB Right
GreenI8.0A 29.OA Grreen 12.OA 23.OP
Yellow/AR 4.0 5..0 )Yellow/AR 4.0 5.0
Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane
Group:
Adj Sat
v/c
g/C
-
-Approach:
Mvmts
Cep
Flow
Ratio
Ratio
Delay
LOS
Delay
LOS
EB
----
L
----
411
-------
1770
-----
0.594
-----
0.530
-----
14.3
---
B
-----
30.3
---
D
TR
1075
3467
0_950
0.310
34.1
D
W8
L
411
1770
1.041
0.530
65.5
F
42.9
E
Tk
1095
3531
0.947
0.310
33.6
D
NB
L
460
3539
0.872
0.130
39.1
D
33.0
0
T
466
1863
0_846
6.250
32.4
D
R
396.
1583
0.478
0.250
21.3
C-
SB
L
305
1770
0.400
0.410
14.2
8
26..3
D
T
466
1863
0.846
0.250
32.4
D
R
396
1583
0.-521
0.250
21.9
C
Intersection
Delay =
34.4 sec/veh Intersection
LOS
= D
Lost
-----------------------------------------------------------------------
Time/Cycle. L
= 9.0
sec Critical v/c(a)
= 1.027
HCS: Unsion,',lized Intersections ke,iease .ld
Page l
-------------------'-"" " "`-
HCS.: Unsionalized Intersections
Release Z.ld
Paoe
Center For Microcomputers In Transportation
University of Floripa
512 Weil Hall
Worksheet for TWSC Intersection
Gainesville. FL 3261.1-2063
________________________________________________________
Ph: (904) 392-0378
Step 1: RT from Minor Street
NB
SB
Streets: (N-S) specht point drive (E-W) prospect
--------------------------------------------------------
Conflicting Flows: (vph)
204
Major- Street Direction.... EW
Potential Capacity: (pcph)
1091
Lenoth of Time Analyzed... 60 (min)
Movement Capacity: (pcph)
1'091
Analvst................... mid
Prob. of Queue -Free State:
0.96
Date of Analysis............ 11/24/96
--`----_____-----`-------------`--`------`--------------
Other Information......... 1996,rt long
(aI pm full
Step 2: Ll from Major Street
WB
E6
Pin/rou
__________________________________________--_______-___-
Two-way Stop -controlled Intersection
Conflicting Flows: (vph)
751
-
Potential Capacity: (pcph)
678
Eastbound Westbound 1 Northbound
I Southbound
Movement Capacity: (pcph)
676
L T R L T R ;L T R
L T R
Prob. of Queue -Free State:
0.91
'--- --__ ----{---- ---` ----- !---- -`-- ---`1----
--`- ----
--------------------------
No. Lanes 1 0 2 1 1 2 0 1 1 0 1
0 0 0
Step 4: LT from Minor Street
NB
SB
Stop/Yield ; N: N,I
,
------'-`-------------------`-"`-----------------------
Volumes ; 366 3101 50 432 125
35,;
Cohfl•icting Flows: (vph)
943
PHF .9 .9; .9 .9 .9
.91
Potential Capacity: (pcph)
264
Grade 0 0 i 0
i
Maior LT, Minor TH
-
MC's (%) {
1
impedance Factor:
0.91
SU/RV's(%); I 1
1
Adjusted Impedance Factor:
0.91
CV's (%) I
1
Capacity Adjustment Factor
PCE's 11.10 •I1.10 1.10!
due to Impeding Movements
0.91
_______________________________________________________________________
Movement Capacity: (Pcph)
240
Intersection
Performance Summary
Adjustment Factors
Avg. 95%
Vehicle Critical
Follow-up
flow Move Shared
Total Queue
Approach
Maneuver Gap (tg)
Time (tf)
kate Cap Cap
Delay Length LO_`•
Delay
--------------------------- _--------------- _----------------------
Movement (pcph) (pcph) fpcph)(sec/veh)
(veh)
(sec/veh)
Left Turn Major Road 5.50
2-.10
________ ______ ______ ______
_______ _______ _____
---------
Right Turn Minor Road 5.50
2.60
NB L 153 240
40.4 4.6 E
Through Traffic Minor Road 6.50
3.30
32.3
Left Turn Minor Road 7..00
3.40
NB R 43 1091
3.4 0.0 A
Wb L 62 678
5.8 0.2 B
0.6
Intersection Delay
= 4.1 sec/veh
HCS: Unsional.izecf Intersections Release 2.Id Paae 1
Center For Microcomputers In Transportation
Universitv of Flor I da
512 Well Hall
Gainesville, FL 3269'1-2083
Ph: (904) 392-0376
Streets (N-S) specht point drive (E-W) pro-pect
Major Street Direction.... EW
Length of Time Analyzed... 60 (min•)
Analyst ..................... mjd
Date of Analysis.......... 11/2496
/
Other information......... 99E long am pm full
rin/rout
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T k L T R 1 L T k L T k
.No. Lanes 0 2 1 1 1, 2 0 1 0 1 0 0 0
Stop/Yield N,; N
Volumes 372 155: 35 591 240 45:
PHF .9 . 9 : . 9 .9 - ; .9 . 9,;
Grade 0 ; 0 ; 0 ;
MC's (%)
SU/RV's (%)p '
CV's (%)
PCE's :.1. 10 :1.10 1.10:
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Maneuver
-----'--------------------
Left Turn Major Road
Right.Turn Minor- Road
Through. Traffic Minor Road
Left Turn Minor Road
Critical Follow-up
Gap (tg) Time (tf)
----------------------------
5.50 2.10
5.50 2.60
6.50 3.30
7.00 3.40
HCS: Unsiona Tized Intersections Release 2.Id Page 2
Worksheet for TWSC Intersection
----------------------------- ___________________________
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
206
Potential Capacity:
(pcph)
1089
Movement Capacity:
(pcph)
1089
Prob. of Uueue-Free
State:
0.95
--------------------------------------------------------
Step 2: LT from Major
Street
WB-------_-_-EB
-------------------------------------------
Conflicting Flows:
(vph)
585
Potential Capacity:
(pcph)
832
Movement Capacity:
(pcph)
832
Prob. of Queue -Free
State:
0.95
-------------------------------------------------------
Step 4: LT from Minor
Street
NB SB
--------------------------------------------------------
Conflicting Flows:
(vph)
1109
Potential Capacity:
(pcph)
207
Major LT. Minor TH
Impedance Factor.:
0.95
Adjusted Impedance
Factor:
0.95
Capacity Adjustment
Factor
due to Impeding Movements
0.95
Movement Capacity:
---------------------------------------------------
(pcph)
196
Movement
NB L
NB k
WB L
Intersection Performance Summary
Avg.
Flow Move Shared Total
Rate Cap Cap Delay
(pcph) (pcph) (pcph)(sec/veh)
------ --- -- -------------
294 1.96 970.5
55 1089
43 832
3.5
95%
Queue Approach
Length LOS Delay
(veh) (sec/veh)
-54-2- ----- ---------
817.8
0.0 A
4.6 0.0 A 0.3
Intersection Delay = 162.,2 sec/veh
APPENDIX F
I
G
HCS: Unsignali:zed i'ntersectiens Release 2.1d
Page r
Center For Microcomputers In lransportation
University of Florida
5t2 Weil Hall
Gainesville, FL 3261)-2063
Ph: (904) 392-0376
Streets: (0-5) t-imberlin
(E-W) midpoint
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst....- ....:........... mjd
Date of Analysis.......... 11/24/96
Other Information.....,_... 1�996
( l�ng' am pm full
rin/rout
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound
Westbound
L T R L T R , L
T R ! L T R
!__-_ _-_----_---_ ____ __-_----
No. Lanes ! 0 1 ! 0 2- 0 ! 0
____ ________ ___- ----
0 0 ! 0 0 1
Stop/Yield ! N! N!
Volumes 1520. 450I• 1,210 !
130
PHF ; .9 A: .9 !
! .9
Grade ! 0 ! 0 !
0
MC's (%)
SU./RV's
CV's {%)
PCE's !
-----------------------------------------------------------------------
1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.50
2.10
Right Turn Minor
koad
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor-
Road
7.00
3.40
HCS: Uhsionalized Intersections Release 2.1d
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1:RT from Minor Street W8 E8
Conflicting Flows: (vph) 844
Potential Capacity: (pcph) 51.7
Movement. Capacity: (pcph) 517
rrob._of Queue -Free State: 0.69
________________________________________________________
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Oueue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ -------
10.0
WS R 158 517 10.0 1.5 C
Intersection Delay = 0.4 sec/veh
P aar
!u
6
F- AM / PM
1996 PEAK HOUR TRAFFIC Figure 2
HCS: Unsiona:lized Intersections kelease Z.ld
Page 1
Genter For Microcomputers In Transportation
University of Flcridn
512 Weil Hall
Uainesville:, FL 32611-2083
Ph: (904) 392-037h
Streets: (N-S) timberlin (E-W) midpoint
•Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mid
uate of Analysis.......... 11/24/96 �-
Other Information......... 1996, sh rt l long
am pm full
rin/rout
Two-way Stop -controlled lntersecti0
Northbound ' Southbound 1 Eastbound
Westbound
L T R ; L T R L T R
'
L T R
-------- ---- ----i---- --------''----
No. Lanes 0 2 1 1 0 2 0 ; 0 0 0
---- ----
0 0 1
Stop/Yield N; N;
-;
Volumes 1245 140: 1.830
185
PHF �; .9 ,9; .9
; .9
Grade 0 ; 0;
0
MC's (%)
SU/RV's (%).; I
;
CV's (%)
PCE's ;
-----------------------------------------------------------------------
1.10
Adjustment Factors
Vehicle
Critical
Fol low -up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5,50
2. 10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d
Worksheet for TWSC Intersection
-------------------------------------------------------
Step I:RT from Minor Street W8 EB
Conflicting Flows: (vph) 692
Potential Capacity: (pcph) 616
Movement Capacity: (pcph) 618
Prob. of Oueue-Free State: 0.63
--------------------------------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh
-------- ------ ------ ------ ------- -------
9.2
W8 .R 227 618 9.2 1.9 8
Intersection Delay = 0.5 sec/veh
Page==
I
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 11-24-1996
Center For Microcomputer=. In Transportation
Streets: (E-W) prospect (N-S) timberline
Ana"Pyst: Matt File Name:
Area Type: Other --� : �, ,�- .24-96� PM
Comment: 1996 short long rin/rout
Eastbound 1 Westbound Northbound Southbound
L T k L T R p L T R L T R
---- ____ ____---- ------____-- --__---____ _
No. Lanes 2 2 1 2 1; 2 2 1 1- -2 - -1-
Volumes 1380 615 455.; 275 735 455! 605 590 320' 250 520 240
PHF or PK15;D.90 Q.90 0-.90;0•.90 0.90 0.90:0.90 0.90 0.90;0.90 0.90 0.90
Lane W (ft);12.0 1'2.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0
Grade 0 0 0 0
%'Heavy Veh! 2 2 2; 2 2; 2 2 D' 2 2 2
Parking P(Y/N) N ;(Y/N') N ;,(Y/N) N: ;(Y/N) N
Bus Stops 0; 01 0; 0
Con. 'Peds i 0: 0; 0, 0
Bed Button I(Y/N) Y 23.5 s.;(Y/N9 Y 20.5 s;(Y/N') Y 23.5 s;"(Y/N) Y 23.5
Arr Type 1 3 3 3; 3 3 3; 3 5 3; 3 5 S
RTOR VVTs 0; 0; . 0: .0
Lost Time 1•3.00 3.00 3.00:3_00 3.00 3.00:3.-00 3.00 3.00L3.00 3.00 3.00
Prop. Share; ;
Prop. Prot.; 42: 42: 40: 40
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 e
EB -Left * ;NB Left
Thru * Thru
Right * ; Right
"Peds * ; Peds
WB Left * :SB Left
Thru * ; Thru
Right * Right
Peds * ; Peds
NB Right * ;Eft Right
SB Right * :WE Right
Green 13.0A 28.OA ;Green 18.OA 23.OP
Yellow/AR 4.0 5.0 ;Yellow/AR 4.0 5.0
Cycle Length: 100 secs Phase combination order: 81 #1 N5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c 9/c Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay .LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 495 3539 0.878 0.140 43.5 E 26.6 D
T 11118 3725 0.851 0..300 29.6 D
R 823 1583 0.615 0_520 13.9 B
WE L 495 3539 0_636 0.140 32.8 D 23.9 C
T 1lie 3725 0.766 0.300 26.5 D
R 623 1583 D.6 IS 0.520 13.9 8
NB L 672 3539 1.029 0.190 65.3 F 38.1 D
T 931 3725 0.740 0•:250 21.5 C
R 665 1583 0.535 0.420 17.2 C
SB L 411 1770 0.676 0.470 16.1 C 1,6..6 C
T 931 3725 0.652 0.250 20.4 C
R 665 1583 0.402 0-.420 1�5.6 C
Intersection Delay = 28.1.sec/veh Intersection 1_0• = D
Lost Time/Cycle, L = 12.0 sec Critical v/c(,x) = 0.862
-------------------------------
HCM: SIGNALIZED -INTERSECTION SUMMARY Version 2.4d 11-24-199f•
Center- For Microcomputers In Transportation
Si:reets: (E-W) prospect (N-S) timberline
Analyst: Matt File Name:
Area Type: Other 11-24-96 am pm
Comment: T996 short _long rin/rou.
Eastbound ; Westbound ; Northbound Southbound
L T k L T R L T R 1 L T R
---- ____ ________ ____---- ____ ____
---- ---'---- ---- i.
No. Lanes 2 2 1 ; 2 2 1 2 2 'I , 1 2 1
Volumes 370 755 6751 585 965 510: 525 555 275;. 170 605 310
PHF or PK15;0.-90 0.90 0.90.10.90 0.90 0.90;0.90 0.90 0.90:0.90 0.90 0.90
Lane W (ft)112".0 12.0 12.0111.•0 12.0 12-._Oil 1.2.0 12.0 12.0:12.0 12.0 12.0
Grade 0 0 0 ; -0
Heavy Veh, 2 2 2i 2 12.I 2 2 2: 2 2 2
Parking ;.(Y/N) N ;(Y/N) N ,:(Y/N) N• ;(Y/N) N
Bus Stops 01 0; 0; 0
Con. Peds 0; 0; 0; 0
Ped Button ;(Y/N) Y 23.5 s;(Y/N) Y 2Q.:5 s:(Y/N) Y 23.•5 s;.(Y/N) Y 23.5
Arr Type 3 3 3; 3 3 3; 3 5 3; 3 5 3
RTOR Vols 0; 0�1 0: 0
Lost Time 3.00 3.00 3_0013.00 3..00 3.00„3.00 3,.00 3..00:3.00 3.00 3.00
Prop. Share; I
Prop. Prot.; 42I 42-; 40: 40
-----------------------------------------------------------------------
,Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * iNB Left
Thru * Thru
Right * ; Right
Peds * ; Peds
WE Left * ;TSB Left
Thru * ; Thru
Right * Right
Peds * Peds
NB Right * ;Eb Right
SB Right * :WB Right
Green 21..0A 32.OA ;Green 18.OA 21.OP
Yellow/Ak 4.0 5.0 :4ellow/AR 4.0 5.0
Cycle Length: 110 secs Phase combination order: #1 #2 85 k6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c 9/C Approach:-
•Mv,mts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 708 3539 0.598 0.200 31.4 D 30.2 D
T 1.151• 3725 0.-765 0.309 28.3 D
R 806 1583 0.931 0.509 31.6 D
WB L 708 3539 0.945 0.200 48.6 E 39.3 D
T 1151: 3725 0.978 0.309 44.6 E
k 806 1583 0.704 0.509 17.6 C
NB L 611 3539 0.982 0. 1:73 58.3 E 37.9 D
T 779 3725 •0.832 0.209 28.9 D
R 691 1583 0.443 0.436 16.8 C
SB L 374 1770 0.505 0.409 18-.7 C 26.2 D
T 779 3725. 0.906 0.209 32.4 D
R 691 1583 0.49e 0.436 17.5 C
Intersection Delay = 34.1 sec/veh.Intersection LOS = D
Lost Time/Cycle. L = 9.0 sec Critical v/c(y.) = 0.926
r
HC5i Unsignalized Intersections Release 2.1d Pape
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph (904) 392-0378
Streets: (N-S) specht point drive (E-W)"prospect
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst......................... mjd
Date of Analysis.......... 1.1/24/96
Other Information...... 1996 lon9 (am pm full
rin/rout
Two-way Stop -controlled Intersection
Eastbound 1 Westbound I Northbound Southbound
L IT R ;" L T R ; L T R L T R
�_-__ --__ ____--__ ____ __-- ---- ____ ___- -_-- __ ----
No. Lanes a 2 1 11 2 0 1 0 1 0 0 0
Stop/Yield'; N; N;
Volumes 633 4001" 55 822 130 40:
PHF .9 .,9; ._9 .9 .9 .9;
Grade 0 ; 0 0
MC'-s (%) 1
SU/RV's
CV's (%) i
PCE's ;1.10 I1.10 1.10;
----------- ------
Adjustment Factors
Vehicle
Critical
- Follow-up
ManeuverManeuver
Gap (tg)
Time (tf)
--------------------------------"'----__-------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road"
6.50
3.30
Left Turn Minor Road
7.00
3.40
r
HCS: Unsignalized Intersections Release 2.1d Pape 2
--__WorAsheet-for_TWSC Intersection
------' -'-------------'-----------
Step 1: RT from Minor Street NO 58
Conflicting Flows: (vph)
352
Potential Capacity: (pcph)
918
Movement Capacity: (pcph)
918
Prob. of Queue -Free State:
0.95
--------------------------------------------------------
Step 2: LT from Major Street
WB_-_________EB
--------------- ____________________________
Conflicting Flows:" (vph)
1147
Potential Capacity: (pcph)
415
Movement Capacity:. (pcph)
415
Prob. of Queue -Free State:
0_04
_________________
---------------------------------------
Step 41: LT from Minor Street
NO
58
--------------------------------------------------------
Conflictino Flows: (vph)
16T7
Potential Capacity:" (pcph)
90
Major LT, Minor TH
Impedance Factor:
0.-84
Adjusted Impedance Factor':
0.84
Capacity Adjustment Factor -
due to Impeding Movements
0.84
Movement Capacity: (pcph)
--------------------------------------------------------
-75
Intersection Performance Summary
" Avg..
95%
Flow Move Shared Total
'Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-----'- -----
(sec/veh) ,
------
-------- ------ ------ ------ -------
NE.- L 156 75 '
43.9 F
NB R 46 918 4.1
0.0 A
WB L 67 415 10.3
0.6 C
0�.6
Intersection Delay =
133.3"sec/veh
* The calculated value was greater than 999.9.
HCS: Unsignalized Intersections Release 2.1d Pane
Center For Microcomputers In Transportation
University of Florida
512 Weil hall
Gainesville. FL 32611-2063
Ph: (:904) 392-0376
Streets (N-S) specht point drive (E-W) prospect
Major Street Direction . EW
Length of Time Analyzed 60 (min)
Anal,yst....................... mjd
Date of Analysis .......... 11/24/96
Other Information.....::.. 1996 ort lon_ am pm full
rin/nou
Two-way Stop -controlled Intersection
Eastbound ; Westbound I Northbound ; Southbound
L T k L T R L T R L T R
---- --------f---- --------R--- ---- ----I---- ---- ----
No. Lanes 0 2 1 1 .2 0 1 0 1 0 0 0
Stop/Yield N; N; ;
Volumes :; 648 245; 40 1086 245 50';
PHF .9 .9; .9 .9 .9 .9�:
Grade 0 0 { 0
MC's (%) i
SU/RV's (%),: ;
CV's M
PCE's ;1.10 ;1.10 T-:10''
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
'.Maneuver
Left Turn Major Road
Right Turn Minor- Road
Through Traffic Minor Road:
Left Turn Minor Road
Critical
Follow-up
Gap (tg)
----------------------------
Time (tf)
5.50
2.10
5.50
2.�60
6.50
3.30
7.00
3.40
_ _.._. _._u. ____ I
HCS.: Unsionalized Intersections ''Release 2-ld Page 2
ec=ee==cccee==c==v=e=vc=cac=c==n==escn==c===c==e=ee=ce===c==cvc====e==v
Worksheet for TWSC-Intersection
--------------------------------------------------------
Step I: kT from Minor Street
NE
SB
-- ------ ---- -----------------------------------
'Conflictinc Flows: (voh)
360
Potential Capacity (pcph)
910
Movement Capacity: (pcph)
910
'Prob. of Oueue-Free State:
0.93
------------------------------------------------------
Step 2. LT from Major Street
WE,
E6
-- ----.------------ ---------------
Conflicting Flows-: (vph)
---------
992
'Potential Capacity: (pcph)
503
:Movement Capacity,: (pcph)
503
Prob. of Queue -Free State:
0.90
--------------------------------------------------------
-Step 4: LT from Minor Street
--------------------------------------------------------
NB
S8
.Conflicting Flows: (vph)
1971
Potential Capacity: (pcph)
58
!Major LT. Minor TH
Impedance Factor:
0.90
Adjusted Impedance Factor:
0.90
Capacity Adjustment Factor
due to Impeding Movements.
0.190
Movement Capacity:: (pcph)
--------------------------------------------------------
52
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
.Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pdph)(sec/veh) (veh)
-------- ------ ------ ------ --------------
(.sec/veh')
NB L 299 52 *
-----
124.1 F
---------
NB �R 62 - 910 4..2
0, 1 A
WB -L 48 503 7.;9
0.3 8
0.3
Intersection 'Delay =
921.6 sec/veh
The calculated value was greater than 999.9.
%/
r
Table 1
1996 Peak Hour Operation
Level of Service
Intersection AM PM
Prospect/Timberline (signal) C D
Prospect/Specht Point (stop sign)
NB LT D F
NB RT A A
WB LT A A
Timberline/Midpoint (stop sign)
WB LT F F
WB RT B B
SB LT B A
III. PROPOSED DEVELOPMENT
Spring Creek Center is a proposed mixed use commercial
development, located at the intersection of Prospect Road and
Timberline Road in Fort Collins. Figure 3 shows a schematic of the
site plan of Spring Creek Center. At the present time, definitive
users have not been determined. Lots 1 and 6 are shown to have
convenience/gas stores. Lot 2 is shown as a fast food restaurant.
The remaining uses will be a mix of retail and office. Since
Spring Creek Center is in a business park, land use code 770
(Business Park) was used to estimatethe trip generation. The
short range future is assumed to be the year 1999. For analysis
purposes, full build -out of the site was assumed to be completed
by the short range future. The long range future analysis is for
the year 2015..The site plan shows two accesses from Midpoint
Drive and two accesses from Specht Point Drive. All four are full
movement accesses. Driveway accesses to/from local streets are
generally not analyzed. The key intersections that were analyzed
were those listed earlier.
Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street
system. A compilation of trip generation information contained in
Trip Generation, 5th Edition, I.TE and the 1995 Update was used to
estimate trips that would be generated by the proposed/expected
uses at this site. Table 2 shows the expected trip generation on
a daily and peak hour basis.
Trip Distribution
Directional distribution of the generated trips was determined
for Spring Creek Center. Future year data was obtained from the
NFRRTP and other traffic studies. This data accounts for the
proposed extension of Timberline Road from Prospect Road, north to
SH14. Figure 4 shows the trip distributions used.
Several land use generators, such as shopping centers, drive-
in (fast food) restaurants, high turn -over restaurant, service
stations, convenience markets, and other support services (banks,
etc.), capture trips from the normal traffic passing by the site.
For many of these trips, the stop at the site is a secondary part
of a linked trip such as from work to shopping center to home. In
all of these cases, the driveway volumes at the site are higher
than the actual amount of traffic added to the adjacent street
system, since some of the site generated traffic was already
3
I
SITE PLAN
■
NO SCALE
Figure 3
.1
Table
2
Trip Generation
Daily
A.M.
Peak
P.M.
Peak.
Land Use
Trips
Trips
Trips
Trips
Trips
in
out
in
but
Lot 1
'ZOCpsf}Gas /C-store with 8�pum s i
1170
44
43
50
50
Lot 2
Fast -Food Restaurant -
2130%7,°tcr 85
82
57
53
3.0 KS 4,400 4,N x,10 =
� cam- i,oaosr.
AI ZA ?
/fs
All
? Lot
Business Park - V-.-* KSF
100 %
10
2
2
8
1 8.5
? Lot 4
° Business Park - V-0- KSF
100 %
1.0
2
2
8
la-0
Lot S
JA00�a s/C-store with 12 Rump
1750
66
64
74
74
? Lot
° Business Park - 31.2 KSF
450
43
7
10
36
° Business Park - 31.2 KSF
450
43
7
10
36
TOTAL
i
6240
309
208
207
272