Loading...
HomeMy WebLinkAboutSPRING CREEK CENTER PUD FINAL - 17 90D - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPORTING DOCUMENTATIONSPRING CREEK CENTER FINAL PUD LAND USE BREAKDOWN SEPTEMBER 18, 1997 ZONING AREA COVERAGE , ESTIMATED AREAS FLOOR AREA PARKING PROVIDED E (EMPLOYMENT) GROSS 505301 sciSt. ilb AC NET 505301 sq.ft. 11.6 AG BUILDINGS LOT I t2,e00 sq.ft. .559. LOT 2 14,400 sciSt. .8190 LOT 3 t5,500 scl.ft. 1.889. LOT 4 t1,200 sq.ft., 1.5C3% LOT 5 t2,500 "St. .500/0 LOT Co 115,400 sq.ft. 3.6496 LOT 1 118,400 scl.ft., 3.64% TOTAL BUILDINGS !64,000 sq.ft. 12.61% TRACT A S6,999 sq.ft. IS.113% PARKING t DRIVES 1513,584 sq.ft. 31.52% LANDSCAPING t154,118 sq.ft. 30.62% t92,500 sq.ft. STANDARD 215 spaces LONG TERM IIl spaces HANDICAPPED 15 spaces SUBTOTAL 414- spaces (4.48 /1,000 S.F.) BICYCLES 42 spaces (6 per rack) TOTAL VEHICLES 456 spaces 64.w /1,000 S.F.) MAXIMUM BUILDING HEIGHT 40 ft.