Loading...
HomeMy WebLinkAboutSPRING CREEK CENTER PUD PRELIMINARY - 17 90C - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)February 5, 1997 Mr. Mike Ludwig Community Planning and Environmental Services City of Fort Collins PO Box 580 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Spring Creek Center PUD Preliminary Response to City Comments Dear Mike, This letter is in response to the comments regarding engineering issues Northern Engineering Services Inc. (NES) received regarding Spring Creek Center- PUD Preliminary. Other items related to planning and landscaping will be addressed under separate cover by other consultants. Primarily, our response will be to comments posed by City Water and Wastewater, Stormwater, and Engineering. Response to comments from your letter dated December 20, 1996 1 a-d This will be coordinated at time of Final design. 2 b. A sketch of possible improvements along Timberline Road has been included with the resubmittal. 3 This will be checked by Landstar Surveying 4 a-c This will be coordinated with Public Service at time of Final design. 7 This will be coordinated at time of final design. It is the opinion of Northern Engineering that a Utility coordination meeting be held after the initial submittal of the final utility plans. 8a-e These items will be included as a part of the Final Utility plans and Final Plat. Again, it is the intent of the project planner and Northern Engineering to request a utility coordination meeting as a part of the Final Utility plan process. 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159 r U 10 Additional comments from Stormwater Utility: It does appear from the contours that this spill does occur farther to the south than the Master plan indicates. At Lime of final design, the exact extent of the spill will be delineated and routed through the site. A drainage easement will be sized Lo accommodate this flow. Cross sections will be provided to adequately show this. 2. These culverts do exist, however, they appear to have been abandoned for some time. They are completely filled with sill. and trash, and should be removed as a part of this project. We do not believe that any upstream runoff enters this site from these culverts. 3. Agreed 4. Agreed 5. The floodplain will be delineated on the final submittal. The owner will also be advised as to the issue of ownership of the floodplain area. 11. Additional comments from Engineering: A proposed sketch of possible improvements to Timberline Road has been included with this resubmittal. Sidewalk widths will be discussed by the project planner. 15' Utility easements along Timberline and Prospect as well as 9' easements along Midpoint and Specht Point Drive will be provided. Please feel free to call if you have any questions regarding this letter, or have any other questions regarding this project. Revised Preliminary Utility plans or Preliminary Drainage study will not be resubmitted with this letter. Roger A. urtiss P.E. = s 27362 cc: Eldon Ward, Cityscape i �Ss*04 ; Rick Woodruff — WW Reynolds CompaoN nf �n ON Kerrie Ashbeck, City of Fort Collins till Basil Hamden, City of Fort Collins Roger Buffington, City of Fort Collins