PROJECT: Fire Station #10 P.U.D. - Preliminary and Final,
#58-92
APPLICANT: Vaught -Frye Architects
1113 Stoney Hill Drive
Fort Collins, CO. 80525
OWNER: Poudre Fire Authority
102 Remington Street
Fort Collins. CO. 80524
PROJECT DESCRIPTION:
This is a request for a new 9,600 square foot (on two levels) fire
station on a 27,182 square foot lot (0.624 acre) located at the
southwest corner of Timberline Road and Vermont Drive. The property
is in the RH, High Density Residential Zoning District.
RECOMMENDATION: Approval with conditions
EXECUTIVE SUMMARY:
This is a request for a 9,600 square foot fire station on a 0.62
acre site. The proposal meets the applicable All Development
Criteria of the Land Development Guidance System and is considered
to be compatible with the surrounding area with respect to the land
use and architectural intent. Landscaping and berming in a generous
setback from Timberline Road will provide adequate visual buffer to
the site.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
Planning Objectives Fire Station 10 P.U.D.
Fire Station No. 10 will be located at the intersection of Vermont Drive and Timberline
Road. The site is currently an undeveloped lot, adjacent to Timberline Plaza P.U.D.
The proposed building will be a prototype for Poudre Fire Authority. The facility will
contain storage space for three pieces of apparatus and living space for four firemen.
Primary vehicular access to the site will be from Vermont Drive. A parking area
containing 12 spaces is provided on the east side of the building. The access driveway
serving the parking lot is located approximately 75 feet west of Timberline. The
maximum vehicle load is eight cars, only twice per day during shift changes.
In order to provide timely response to an. emergency call, a traffic signal with priority
control for PFA vehicles will be installed at the intersection of Vermont Drive and
Timberline Road. Code requires that parking lots in the RH Zone be set back from the
street a distance equal to or greater than the building setback. However, the overhead
garage doors need to be located as far away from the intersection as possible in order
to avoid conflict with other vehicles. Therefore, the parking tot must be located east
of the building and the garage bays on the west side. This also allows the building to
be set back from Timberline Road, creating a extensive landscape buffer. Setbacks
from Timberline are generous allowing for plant material buffers of parking lot and
building. South and west exposures are buffered with planting; however minimum tree
and shrub planting is used on the north to eliminate 'Blind spot" for drivers of
emergency vehicles.
The building will have earth tone colored brick, synthetic stucco interior walls and
composite shingles with simulated shake appearance.
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion opplicable9
Will the criterion
be soflsfied7
If no, please explain
Yes No
NEIGHBORHOOD COMPATABILITY
1. Social Compatability
2. Neighborhood Character
3. Land Use Conflicts
4. Adverse Traffic Impact,
PLANS AND POLICIES
5. Comprehensive. Plan
PUBLIC FACILITIES&SAFETY
6. Street Capacity
7. Utility Capacity
--
-
8. Design Standards
✓
-
9. Emergency Access_
10. Security Lighting
11. Water Hazards
RESOURCE PROTECTION
12. Soils & Slope Hazard
13. Significant Vegetation
✓
14. Wildlife Habitat
-
_ 15. Historical Landmark
1'6. Mineral Deposit
17. Eco-Sensitive Areas
18. Agricultural Lands
ENVIRONMENTAL STANDARDS
19. Air Quality
✓
20. Water Quality
✓
21. Noise
22. Glare & Heat
23. Vibrations
24.:Eztenor Lightlrig._ _-
25. Sewages & Wastes
SITE DESIGN
26. Community Organizotion
27. Site Organization
✓
28. Natural Features
_29._Energy Conservation -
_
30.-.Shadows
✓
31. Solar Access
32. Privacy
33. Open Space Arrangement
34: Building- Height
35. Vehicular Movement
I/
36. Vehicular Design
37. Parking
v_
38. Active Recreational Areas
39. Private Outdoor Areas
40. Pedestrian Convenience
41. Pedestrian Conflicts
42. Landscaping/Open Areas
43. Land scapingiBuildings__
44. Landscaping/Screening
45. Public Access
46. Signs
12-
0 •
Fire Station #10 P.U.D. - Preliminary & Final, #58-92
December 17, 1992 P & Z Meeting
Page 2
COMMENTS:
1. Background•
The surrounding zoning and land uses are as follows:
N: RLP; existing office uses and residential (Timberline
Apartments P.U.D.)
S: RH; existing office uses (Timberline Plaza P.U.D.)
E: BP; undeveloped
W: RH; existing office uses (timberline Plaza P.U.D.)
This property was annexed into the City with the Nelson Second
Annexation in June, 1977.
The property was platted with the Fire Station No. 10 Subdivision
and approved by the Director of Planning in August, 1990.
A variance request by the Poudre Fire Authority that would allow
the parking lot for the new Fire Station #10 to be located between
the building and Timberline Road was denied by the Zoning Board of
Appeals on October 8, 1992. City Code requires that parking lots in
the RH zone must be set back from the street a distance equal to or
greater than the building setback. The P.F.A. was left with the
option of going through the P.U.D. process to review the
building/parking lot orientation.
2. Land Use•
This is a request for a 9,600 square foot (two levels) fire station
on a 27,182 square foot lot (0.624 acre). This proposal was
evaluated against the applicable All Development Criteria of the
Land Development Guidance System. This use is not addressed by any
of the Land Use Activity point charts in the LDGS and, therefore,
no point chart was used to evaluate this request; however, the
proposed use is considered to be centrally located to and
compatible with existing and proposed uses, thereby providing good
access to the surrounding area.
3. Design:
Architecture:
The building will be a maximum of 30' in height (being the garage
portion for indoor parking for fire vehicle, or approximately 45%
of the structure) and provide 9,600 square feet of inhabitable area
inside on two levels, the ground floor and basement. The ground
floor level is 6,726 square feet and the basement is 2,874 square
feet. The exterior building materials will consist of dark brown
•
Fire Station #10 P.U.D. - Preliminary & Final, #58-92
December 17, 1992 P & Z Meeting
Page 3
brick veneer from the ground up to 7' above grade and a composition
shingle roof (a wood blend color). The exception will be a band of
tan synthetic stucco on all four sides of the garage portion of the
building, between the brick and bottom of roof line, with the band
varying from 3.5' to 9' in width. Three garage doors, each 12' wide
x 14' high, access the indoor parking spaces on the north elevation
at the northwest corner of the building. These doors will be an
earth tone color in accordance with the rest of the building.
Landscaping:
The landscaping consists of:
* deciduous trees as street trees along Timberline Road and
accent shade trees at the corners of the parking lot,
* ornamental trees along the south side of the building,
* deciduous and ornamental shrubs as foundation plantings on
all four sides of the building and as buffering for the
parking lot,
* evergreen trees along the south side of the parking lot and
trash enclosure for a mass screening affect, and
* 30" high berming along the Timberline Road street frontage
as understory for the street trees, providing visual
screening.
Minimal landscaping has been provided on the north side of the
building and no street trees are to be provided on Vermont Drive.
It is essential for the fire trucks and emergency vehicles to be
able to make quick exits from the site without concerns about
safety issues that could be jeopardized by excessive or
inappropriate plant materials.
Parking:
There is a parking lot for 12 automobiles on the east side of the
building, accessed from Vermont Drive, and parking for at least
three fire trucks or emergency vehicles inside the building, with
this access also from Vermont Drive. The proposed setback, back of
curb to back of curb, is 55' from Timberline Road. Significant
landscaping, including berming, is being provided as a visual
buffer from the street. The parking lot location, setback from the
street, and buffer treatment is similar to the NCR facility, Platte
River Power Authority, and other existing uses in the area.
•
Fire Station #10 P.U.D. - Preliminary & Final, #58-92
December 17, 1992 P & Z Meeting
Page 4
Poudre Fire Authority has identified the importance of the building
being at the west end of the lot (with the parking lot to the
east), thereby giving adequate separation between Timberline Road
and the emergency vehicle access to/from the site. Staff feels that
the circumstances concerning this lot, being of a linear east -west
orientation and with all access to the site required to be from
Vermont Drive, do justify the proposed parking lot to building
orientation.
4. Neighborhood Compatibility:
A neighborhood meeting was not held for this request. All affected
property owners within 500' were notified by mail about the Minor
Subdivision hearing in August, 1990. There was no known opposition
to the plan at that time and no one but the applicant for the Minor
Subdivision request was present at the administrative hearing. The
proposed fire station has no contiguity with residential
development. This request is considered to be compatible with the
surrounding uses.
5. Transportation:
The fire station will gain all direct access from Vermont Drive,
identified by the City to be reclassified as a collector street.
The station will be located at the corner of Vermont Drive and
Timberline Road, with the emergency vehicles leaving the site and
feeding immediately into Timberline Road, a major arterial street.
This intersection will be signalized with the opening of the fire
station for operation.
6. Storm Drainage:
off -site drainage easements are required as part of this request,
and these easements have not yet been received, reviewed and
approved by the City. Therefore, a condition of approval is being
recommended as follows:
"The final P.U.D. documents may not be recorded and no
building permits can be issued until all documents related to
necessary off -site drainage easements for Fire Station #10
P.U.D. are approved by the City."
RECOMMENDATION:
This request meets the applicable All Development Criteria of the
Land Development Guidance System and is considered to be compatible
with the existing uses in the surrounding area; therefore, staff
recommends approval of the Fire Station #10 P.U.D. - Preliminary
and Final, #58-92 with the following conditions:
Fire Station #10 P.U.D. - Preliminary & Final, #58-92
December 17, 1992 P & Z Meeting
Page 5
1. "The final P.U.D. documents may not be recorded and no
building permits can be issued until all documents related to
necessary off -site drainage easements for Fire Station #10
P.U.D. are approved by the City."
2. The Planning and Zoning Board approves this planned unit
development final plan upon the condition that the final
utility plans and final P.U.D. plans for the planned unit
development be negotiated between the developer and City staff
and executed by the developer prior to the second monthly
meeting (February 22, 1993) of the Planning and Zoning Board
following the meeting at which this planned unit development
final plan was conditionally approved; or, if not so executed,
that the developer, at said subsequent monthly meeting, apply
to the Board for an extension of time. The Board shall not
grant any such extension of time unless it shall first find
that there exists with respect to said planned unit
development final plan certain specific unique and
extraordinary circumstances which require the granting of the
extension in order to prevent exceptional and unique hardship
upon the owner or developer of such property and provided that
such extension can be granted without substantial detriment to
the public good.
If this condition is not met within the time established
herein (or as extended, as applicable), then the final
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for this
planned unit development shall be deemed to be the date that
the condition is met, for purposes of determining the vesting
of rights. For purposes of calculating the running of time for
the filing of an appeal pursuant to Chapter 2, Article II,
Division 3, of the City Code, the "final decision" of the
Board shall be deemed to have been made at the time of this
conditional approval.
e : �II!o►p-�
OWNWEENEIIIIIII
SITE
/ yy Tntl4�InC
Q ■ P Pv
n I■� New�Vp
M� A�ISH�R
1 W
o y�c STER Z NOUgT W
s J, tt is
tl COA
tY QX r p
lip
one WjI711OX17
a4� � 2/
IR.JRT 3 o
HORSETOOTH RD
11 1 W 31 113Z
v Al
tiV
�
op
RsE � °gyp �5 � " k
h�� ' Nr\�oPE\�
ITEM• FIRES ATION #10 PUD North
NUMBER: 5 8 9 2
0
VERMONT DRIVE
WK
R A
MILK �¢9II
M�E � � �uyl ExNiM°W9LK-�f
I M4EI M1LCFp ny i�
M' GC1LL.
r-4.YIn{T. 1
$ I II a
L r�Daaaw \e•xon.[EM. C ��° I= O
1-- I ercN CaI+cE1F )!
- I Q
Propossd �`re Station ;__ rui
Im
---------------
I m lr• w � \���raw II 1 i � i �
i
AE
BOA APP/NOVAO HeE EI n w Fyn
OWNER'8 SMATURE
OWNEWS CERTFICATION
r A B
y
uu
r 'a 1
Inn
i
AuUwrlW-
LW
L
Fire Station 10 P.U.D
PRELMNARV / F L 8RE PLAN
FORT COLLN,B. COLORAOO
I •I
I •I
I
o�
�►:
_--
1-FA 2 AT 9-PN
PLANTING NOTES PlAl/7lmST
FIRE STATION NO. 1
FORT COLLINS, COLORADO
0
i
in a wr1.
�
v
r rr
- r' rrrr
r
�r rt IN r a r M."r
rr r
rIII III. ..M.NM�MFMIr
r�€o���r®
frrr
PMI
bm '��11
WO
.fr r r. rrr Er,
rr
NMMMMI:r
rrrr ., a ..rr:rrrr.,r.?.r ,.. r.?. ... r . t.
_.1.r
rrNVIEW
h
yr �........ .. 1
`\
r
-
_
...�
-_ -