The requirement for a connection from the main entrance to public ROW is found throughout several code sections. City Staff
has identified the following sections as containing this requirement.
LUC 3.5.3(C)(1):
Where complete separation of pedestrians and vehicles and bicycles is not possible, potential hazards shall be
minimized by the use of techniques such as special paving, raised surfaces, pavement marking, signs or striping,
bollards, median refuge areas, traffic calming features, landscaping, lighting or other means to clearly delineate
pedestrian areas, for both day and night use.
LUC 3.2.2(5)(a):
Directness and Continuity. Walkways within the site shall be located and aligned to directly and continuously connect
areas or points of pedestrian origin and destination, and shall not be located and aligned solely based on the outline
of a parking lot configuration that does not provide such direct pedestrian access. Walkways shall be unobstructed by
vertical curbs, stairs, raised landscape islands, utility appurtenances or other elements that restrict access and shall link
street sidewalks with building entries through parking lots. Such walkways shall be raised or enhanced with a paved
surface not less than six (6) feet in width. Drive aisles leading to main entrances shall have walkways on both sides of the
drive aisle.
LUC 3.2.2(C)(6):
Direct On-Site Access to Pedestrian and Bicycle Destinations. The on-site pedestrian and bicycle circulation system
must be designed to provide, or allow for, direct connections to major pedestrian and bicycle destinations including,
but not limited to, trails, parks, schools, Neighborhood Centers, Neighborhood Commercial Districts and transit stops
that are located either within the development or adjacent to the development as required, to the maximum extent
feasible. The on-site pedestrian and bicycle circulation system must also provide, or allow for, on-site connections
to existing or planned off-site pedestrian and bicycle facilities at points necessary to provide direct and convenient
pedestrian and bicycle travel from the development to major pedestrian destinations located within the neighborhood.
In order to provide direct pedestrian connections to these destinations, additional sidewalks or walkways not associated
with a street, or the extension of street sidewalks, such as from the end of a cul-de-sac, or other walkways within
the development, to another street or walkway, may be required as necessary to provide for safety, efficiency and
convenience for bicycles and pedestrians both within the development and to and from surrounding areas.
LUC 3.2.2(C)(7):
Off-Site Access to Pedestrian and Bicycle Destinations. Off-site pedestrian or bicycle facility improvements may
be required in order to comply with the requirements of Section 3.2.2(E)(1) (Parking Lot Layout), Section 3.6.4
(Transportation Level of Service Requirements), or as necessary to provide for safety, efficiency and convenience for
bicycles and pedestrians both within the development and to and from surrounding areas.
MODIFICATION JUSTIFICATION:
by reason of exceptional physical conditions or other extraordinary and exceptional situations, unique to such property,
including, but not limited to, physical conditions such as exceptional narrowness, shallowness or topography, or physical
conditions which hinder the owner’s ability to install a solar energy system, the strict application of the standard sought
to be modified would result in unusual and exceptional practical difficulties, or exceptional or undue hardship upon
the owner of such property, provided that such difficulties or hardship are not caused by the act or omission of the
applicant;
The applicant and place of worship owner requested an access easement for installing a sidewalk connection to E
Prospect Road as shown in the attached sheets. This request was denied by the property owner of the parcel tot he
south. There are not any other viable options that would create a safe and intuitive connection from Prospect as noted
the email response and attached images.
MODIFICATION REQUESTED:
No direct R.O.W. sidewalk connection provided to public ROW. Additional pedestrian routes on the site have been
provided to improve circulation and safety for users across the property along the entire south side of the building
for pedestrians moving from the west to east. Additionally, a sidewalk connection to the trail spur has been added to
facilitate bike and pedestrians that are coming from and accessing the Spring Creek Trail.
Modification Requests
MOUNTAIN VIEW COMMUNITY CHURCH
UP
UP
UP
500 YEAR FLOODPLAIN
100 YEAR FLOODPLAIN
FLOODWAY
SPRING CREEK
SPRING CREEK TRAIL
WATER EDGE
EXISTING
WETLAND
BOUNDARY
100' SPRING CREEK/WETLAND BUFFER
MOUNTAIN
SAGE SCHOOL
EXISTING PARKING LOT
AND PLAYGROUND
EAST PROSPECT ROAD
MOUNTAIN VIEW
CHURCH BUILDING
TRI-LIFE
CATTAIL CHORUS
NATURAL AREA
NEW SIDEWALK
CONNECTION TO
EAST PROSPECT
ROAD R.O.W.
SIDEWALK
20'-0"
ACCESS
EASEMENT
6'-0"
ACCESS
EASEMENT
4" CONCRETE, SAWCUT JOINTS,
STANDARD GRAY, MEDIUM BROOM FINISH
CRUSHED LIMESTONE PAVEMENT
PROPERTY LINE
EASEMENT
FLOODWAY
100 YEAR FLOODPLAIN
500 YEAR FLOODPLAIN
WATER EDGE
WETLAND BOUNDARY
100' SPRING CREEK/WETLAND BUFFER
CONCRETE EDGER
BIKE RACK
PATIO TABLE
WALL MOUNT, POLE LIGHT
EXISTING TREES
EXISTING SHRUBS
SITE LEGEND:
30' 0 15' 30' 60' N O R T H
Sheet
Sheet Name
Checked By:
Drawn By:
Date:
CR
SL
From: Shelley Lamastra <slamastra@russellmillsstudios.com>
Subject: Re: Question about our project in the Seven Lakes Business Park
Date: April 17, 2020 at 9:15:29 AM MDT
To: Jason McConahy <jason@mvcchurch.org>
Cc: Jesse Struckhoff <jstruckhoff@orthohealth.com>
Hi Jesse,
I appreciate you taking the time to review the materials and request that we
submitted to you for the pedestrian connection to right-of-way.
We have explored other possible connection on the east side of the drive and
have determined along with City staff that we could not use that as a viable route
due to existing trees along the street that are much closer to the flowline on this
side than the west side. City forestry would not support the excavation for a
sidewalk due to the damage that would be caused to the root zone for the
concrete excavation. Additionally, there are several existing utility infrastructure at
both the north and south end of the drive on this side that would prevent a
sidewalk and ramps from being installed. (Please see attached photos). And last
the connection to the main entrance of the building would be less ideal as is
crosses more traffic lanes and would have to utilize the parking island as a
walkway which would remove parking lot landscaping that is required per land
use code.
We also explored a connection utilizing the sidewalk in front of the Mountain
Sage School. However, the sidewalk connection woudl be impossible due to two
rows of 6’ cedar fencing as well as grade changes to the south of the building.
Anytime a property is developed it is required to meet all Land Use Code
requirements, one of which is connection to the public right-of-way. (LUC 3.2.2(5)
(a), LUC 3.2.2(C)(7), LUC LUC 3.2.2(C)(6), LUC 3.5.3(C)(1).) We appreciate
your willingness to look at this and review the information.
We would be happy to continue discussions if you feel they are warranted. Thank
you again for your time.
Best regards,
Shelley La Mastra, RLA
Senior Landscape Architect
506 S College Ave, Unit A
Fort Collins, CO, 80524
visit russellmillsstudios.com
O 970.484.8855
D 970.682.6004
M 970.412.3474
On Apr 8, 2020, at 3:28 PM, Jason McConahy <jason@mvcchurch.org> wrote:
Thanks for getting back to us Jesse. We’ll take a look at this.
Jason
On Apr 8, 2020, at 12:27 PM, Jesse Struckhoff <jstruckhoff@orthohealth.com>
wrote:
Hello Jason,
We have reviewed your request. Due to the need to remain flexible with the use
of our land, we would not support an easement as it will run with the land. In
addition, it would have an impact on our current tenant and would be subject to
their approval. However, an option may exist on the east side of the drive. I
understand 7 lakes owns approx. 15 feet of land running along the east side of
the drive. This may be an option to pursue through the association.
Thank you,
Jesse Struckhoff, CHFM, PMP
Director of Property Management Services
Main: (970) 493-0112 | Direct: (970) 419-7006
<image001.png>
3 Colorado Locations:
2500 East Prospect Rd. 3470 East 15th St. 1900 16th St., 3rd Floor
Ft. Collins, CO 80525 Loveland, CO 80538 Greeley, CO 80631
From: Jason McConahy [mailto:jason@mvcchurch.org]
Sent: Thursday, April 02, 2020 2:50 PM
To: Jesse Struckhoff
Cc: Shelley Lamastra
Subject: Re: Question about our project in the Seven Lakes Business Park
Jesse, no worries. Thanks for the reply. I’m sure thinks are pretty hectic for you
all right now.
Jason
On Apr 2, 2020, at 1:43 PM, Jesse Struckhoff <jstruckhoff@orthohealth.com>
wrote:
Hello Jason,
Wanted to let you know I am not ignoring your email :) . I am reviewing your
request and will be in touch next week.
Thank you!
Jesse Struckhoff, CHFM, PMP
Director of Property Management Services
Main: (970) 493-0112 | Direct: (970) 419-7006
3 Colorado Locations:
2500 East Prospect Rd. 3470 East 15th St. 1900 16th St., 3rd Floor
Ft. Collins, CO 80525 Loveland, CO 80538 Greeley, CO 80631
-----Original Message-----
From: Jason McConahy [mailto:jason@mvcchurch.org]
Sent: Tuesday, March 31, 2020 12:58 PM
To: Jesse Struckhoff
Cc: Shelley Lamastra
Subject: Question about our project in the Seven Lakes Business Park
Hi Jesse,
Last year about this time you were working with me on our “parking agreement”
as we we seeking to purchase the building that Niner currently occupies in the
business park. Thank you for your partnership in that. It was very helpful.
We are currently in the design stage for renovating the property, and will be
entering into the zoning and entitlement process over the next several months.
One of the items we need to provide is pedestrian access all the way to our
building from Prospect Rd (to meet updated code requirements since the
business park was originally developed).
The most logical place to run the sidewalk would be along the property you own
on the west side of the entrance road (the property that the school leases from
you with the playground on it). Please see the attached plan from our landscape
architect.
This would require an access easement to be dedicated on your property. We
wanted to reach out and begin the dialogue about this. (I have cc’d our
landscape architect on this email so she can help answer questions you might
have)
Ultimately we would need a notarized letter confirming that you would be ok with
this. We would fully intend the language to indicate that the church would be
responsible for any maintenance and repairs to this access.
Could we discuss this at your earliest convenience?
Thank you!
Jason McConahy
Mountain View Community Church
970-219-1081
jason@mvcchurch.org
________________________________
PRIVACY NOTICE
This electronic message transmission, including all attachments, contains
information which may be proprietary, confidential or privileged. This may also
contain member Protected Health Information that cannot be released without
authorization from the member.
The information is intended to be for the use of the individual or entity named
above. If you received this in error or are not the intended recipient, please note
that federal law prohibits any disclosure, copying, distribution or use of the
contents of this information.
If you have received this electronic transmission in error, please notify the sender
immediately and destroy all electronic and hard copies of the communication and
its attachments.
Entrance Drive (North End) - Existing Utility Infrastructure adjacent to flowline as well as existing trees (~6’ from flowline
making sidewalk excavation problematic from forestry perspective) prevent sidewalk connection to Prospect R.O.W.
Entrance Drive (South End) - Existing Utility Infrastructure adjacent to flowline as well as existing trees (~6’ from flowline
making sidewalk excavation problematic from forestry perspective) prevent sidewalk connection to Prospect R.O.W.
Prospect Road
Prospect Road
intersection
Modification Requests
MOUNTAIN VIEW COMMUNITY CHURCH
South side of Mountain Sage Charter School (from Prospect Road- Existing grades and 6’ cedar fence prevent sidewalk
connection to public R.O.W.
South side of Mountain Sage Charter School (from interior parking lot - double row of 6’ cedar fence prevents sidewalk
connection to public R.O.W.
Modification Requests
MOUNTAIN VIEW COMMUNITY CHURCH
03.24.2020
MOUNTAIN VIEW
COMMUNITY CHURCH
PRELIMINARY
DEVELOPMENT
PLAN
LS100
OVERALL SITE PLAN
UP
UP
SPRING CREEK TRAIL
GE
UNDARY
100' SPRING CREEK/WETLAND BUFFER
EXISTING PARKING LOT
AND PLAYGROUND
EAST PROSPECT ROAD
UNTAIN VIEW
RCH BUILDING
TRI-LIFE
CATTAIL CHORUS
NATURAL AREA
NEW SIDEWALK
CONNECTION TO
EAST PROSPECT
ROAD R.O.W.
SIDEWALK
20'-0"
ACCESS
EASEMENT
6'-0"
ACCESS
EASEMENT
Sheet
Sheet Name
Checked By:
Drawn By:
Date:
CR
SL
03.24.2020
MOUNTAIN VIEW
COMMUNITY CHURCH
PRELIMINARY
DEVELOPMENT
PLAN
LS100
OVERALL SITE PLAN
THE FOLLOWING EXHIBIT WAS ATTACHED TO THE EASEMENT REQUEST EMAIL SENT ON MARCH
31, 2020
The area for the easement and associated sidewalk has been highlighted and enlarged for easier reading.