HomeMy WebLinkAboutBROTHERS BBQ - FDP200021 - SUBMITTAL DOCUMENTS - ROUND 1 - RESPONSE TO STAFF REVIEW COMMENTS (2)City of F6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134-fax fcgov. com/develo pmentrn view August 25, 2020 Chris O'Sullivan NCO REAL ESTATE COMPANY LLC & BROTHER'S BBQ 4645 W Colfax Ave Denver, CO 80204 RE: Brothers BBQ, PDP200005, Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Brothers BBQ. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Historic Preservation Contact: Maren Bzdek, 970-221-6206, mbzdek(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/16/2020 06/16/2020: INFORMATION: As noted in your conceptual review, this project isn't subject to historic review regarding the exterior alterations to the building because the survey form determined that the building, as is, does not qualify as a historic resource due to lack of integrity. Because your project constitutes a historic restoration project, generally speaking, it might be worth considering whether it would meet the historic character/integrity requirements for a local landmark once the project is complete. If we could establish that the answer is yes (through further evaluation with the Historic Preservation Division), AND if you wished to designate the property in order to take advantage of the state tax credit opportunities for historic properties, you would want to begin that dialogue with us before any significant work on the building exterior begins. If this is of interest to you, please contact me asap. Department: Engineering Development Review Contact: Spencer Smith, 970-221-6603, smsmith fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/15/2020 06/15/2020: FOR FINAL The demolition and relocation plan needs to contain more information and details for all demolition and relocation of existing infrastructure. See redlines for more details. Per conversation with Spence on 9/28, further clarification was provided regarding demolition information needed. This included information regarding the need for the demolition plan to include the extent and square footage of demo'd asphalt required for widened sidewalks and drive access. The revised demo site plan included in the FDP identifies the extent and square footage. Also, please note that the proposed location of new utilities and infrastructure is included on the site plan (sheet Al03), not the demolition plan. Comment Number: 3 Comment Originated: 06/15/2020 06/15/2020: FOR FINAL Identify specific curb type (vertical) for all proposed curb and gutter in the public right-of-way. Per conversation with Spence on 9/28 it was confirmed that this information is already on site plan and was missed in last review. Comment Number: 7 Comment Originated: 06/15/2020 08/03/2020: FOR FINAL Thank you for submitting the DA information form. A draft of the DA will be prepared and provided to you for review during the FDP stage of the approval process. Thank you for letting us know. The Brother's BBQ owners will look forward to receiving the Draft DA. 06/15/2020: FOR FINAL A Development Agreement will be required for this project. A draft of the agreement will be prepared by the City after the first final plan submittal. Prior to preparing the draft, I will need the development agreement information form to be completed by the developer. This form is available at: hftps://www.fcgov.com/engineering/devrev.php. This form can be submitted at any time. If the form is not submitted with the first final plan (FDP) submittal, it could delay preparation of the draft DA. See previous comment. Development agreement information form was previously submitted by owners. Comment Number: 8 Comment Originated: 06/15/2020 06/15/2020. INFORMATION ONLY All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the site, need to meet ADA standards. If they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. Comment Number: 9 Comment Originated: 06/15/2020 2 06/15/2020: INFORMATION ONLY A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. Comment Number: 11 Comment Originated: 08/03/2020 08/03/2020: FOR FINAL I am providing a copy of a utility plan for reference. Please use it as a guide in the level of design detail and information that should be on the utility plan sheets, demolition plan, etc. Thank you for providing this as a reference. Comment Number: 13 Comment Originated: 08/03/2020 08/03/2020: FOR FINAL The sheet titled "Grading Plan" is not a grading plan. The sheet should probably be renamed something more accurate. This drawing was created as a request from Matt Simpson to show a "simple grading plan" which in effect shows existing water flows on the site. However, I noticed the flow arrows layer was turned off and these are turned back on in the submitted FDP drawings. Also, Please note I have changed the title of this drawings to read "Site Plan With Drainage Arrows sHOWN" Comment Number: 14 Comment Originated: 08/03/2020 08/03/2020: FOR FINAL Please adjust leaders, callouts, text, etc. to avoid linework or text over text (see redlines for examples). I have done additional drawing coordination to improve leaders, callouts, text, etc. In the FDP submittal the notes and callouts have been moved to the margins where possible to improve the legibility of the site plan. Thank you! Comment Number: 15 Comment Originated: 08/03/2020 08/03/2020: FOR FINAL Per previous discussions, we will need to see what is proposed for the sidewalk connection at the southeast corner of the site. You should provide some sort of barricade, signage, etc. making it clear to cyclists and pedestrians that the sidewalk narrows to 4 foot at the property line. Per phone call with Spencer on 9/28, Spencer will follow up with other City Staff and let Nathan know what they would like to have done regarding this issue soon. In a follow up email on Oct. Nathan offered a couple of suggestions: For example, on Taft Hill, perhaps we should add a sign below the existing "Bike Lane" sign on the light pole announcing "Path Narrows"? On Mulberry St perhaps we should add a stand-alone sign in front of the fence also announcing "Path Narrows'? The project owners are happy to accommodate whatever the City feels ricis best as long as they can reasonably accommodate. We are still awaiting a response at this time. Comment Number: 16 08103/2020: FOR FINAL Detail 707.2 is not needed. applicable to this site. This detail has been removed. Comment Originated: 08/03/2020 The detail is for high volume driveways, which is not k, Comment Number: 17 Comment Originated: 08/25/2020 08/25/2020: FOR FINAL Please see redlines for additional comments to be addressed during the FDP process. The following note was included on engineering redlines: "FOR FINAL PLANS:- COLORED LINEWORK IS NOT GENERALLY PREFERRED. YOU MAY WANT TO USE A DIFFERENT LINETYPE FOR THE FLOODWAY/FLOOD FRINGE LINEWORK THIS IS IN GRAYSCALE-SOME OF THE DIMENSION TEXT IS ON THE SMALL SIDE. IF YOU CAN INCREASE THE FONT SIZE ON THE FINAL PLANS, THAT WOULD BE GREAT" Colored linework has been removed in the FDP. Dimension Text has been increased on the FDP. (Note: this was the only comment included on the redlines and comment has been addressed as described above). Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson(cDfcgov.com Topic: General Comment Number: 3 07/27/2020: no comments. Department: Erosion Control Contact: Basil Hamdan, 970-222-1801, Topic: Erosion Control Comment Number: 2 bhamdan@fcgov.com Comment Originated: 07/27/2020 Comment Originated: 06/12/2020 08/19/2020: FOR FINAL: 08/05/2020: Per discussions there might be a large amount of asphalt work. Any work that will disturb down to the sub -grade needs to be considered part of of the disturbed area. If this project disturbs greater then 10,000 square feet including parking areas erosion control materials will be required. Please verify the how the asphalt is going to be replaced or ground off and resealed so that we can make sure that the project does or doesn't require erosion control materials to be supplied. The following notes has been added to Sheets A101, A102 and A103 on the FDP: "RESURFACE AND RESEAL THE TOP LAYER OF ALL EXTG ASPHALT ON NORTH AND EAST SIDES OF THE BUILDING TO ACHIEVE A LEVEL AND SMOOTH SURFACE. MAINTAIN ALL EXISTING GRADES AND DO NOT DISTURB SUB -GRADE." In addition, a legend has been added to sheet A101 identifying those areas to be resurfaced without disturbing sub grade and those areas where complete removal is required. The total combined area of all resurfaced and completely removed areas, as noted on Sheet A101, is 9,817 SF. 07/20/2020: 06/12/2020. FOR INFORMATION: Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 3H:1V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now 4 apply, erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seem not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. Department: Water -Wastewater Engineering Contact: Matt Simpson, (970)416-2754, masimpson(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/08/2020 08/03/2020: FOR INFORMATION: Water service sizing memo accepted. Comment resolved. Thank you! 06/08/2020: FOR HEARING: Utilities will need confirmation that the existing 1/4-inch water service is sufficient for the proposed restaurant. This typically takes the form of a 1-page memo and supporting water demand calculations from the project mechanical engineer. This will be required with the Round 2 submittal. I encourage you to contact me with any questions at masimpson(d�fcgov.com See comment #1 above. Water sizing memo was accepted and comment has been resolved. Comment Number: 6 Comment Originated: 06/22/2020 08/03/2020: FOR FINAL: Please locate and show the curb stop (City water valve) on the site plan. Per phone conversation on 9/28, Matt will send city inspector to verify location of City Water Valve and get back to Nathan. Based on city records, Curb stop location (City Water Valve) is located 5' west of the west curb of Taft Hill Rd. We will add info to site plan as soon as available. In a follow up email sent of Oct. 5, Matt noted that we are working with Water Utilities to located the curb stop and will add this to plans in the future. 06/22/2020: FOR HEARING: On the site plans, please show and label the existing water meter and curb stop. Please see attached redlines for more information. This is the same comment as above. Per phone conversation on 9/28, Matt will send city inspector to verify location of City Water Valve and get back to Nathan. Based on city records, Curb stop location (City Water Valve) is located 5' west of the west curb of Taft Hill Rd. Nathan will add info to site plan as soon as available. Comment Number: 8 08/03/2020: FOR FINAL: Comment Originated: 08/03/2020 4� On the mechanical plans, the grease interceptor needs to be shown on the same location as on the site plan. During a phone conversation w/ Matt Simpson on 9/28/2020 it was confirmed that the location of the grease interceptor are consistent on the Site Plan and MEP drawings. Comment Number: 9 08/04/2020: FOR INFORMATION ONLY: Ready for Hearing Department: Environmental Planning Contact: Scott Benton, sbenton fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/04/2020 Comment Originated: 08/03/2020 08/03/2020: READY FOR HEARING: Thank you for addressing Round 1 comments, Environmental Planning is ready for hearing. Please keep me informed of the results of the search for the oil/water interceptor system - whether one is found and properly removed, or whether one is not found. Department: Forestry Contact: Molly Roche, 224-616-1992, mroche(a)fcgov.com Topic: General Comment Number: 8 Comment Originated: 08/07/2020 8/7/2020: FOR FINAL APPROVAL As required in the Land Use Code and General Landscape Notes, all trees and other landscaping on -site shall receive direct automatic irrigation. The street trees in grates shall be on their own irrigation zone. Please contact Eric Olson in Water Utilities to develop an adequate irrigation plan for this site. Forestry will provide Eric details for a double drip -ring assembly. Thank you! The submitted FDP notes drip irrigation for all new trees and plantings. Per phone call with Eric Olsen on 10/6/2020 the owner will need drip irrigation to all new trees and plantings before a building permit can be issued. I have added the inline pipe drip assembly detail from Eric (see detail #5 on sheet All 00. Also, see additional notes about irrigation plan requirements at the end of this document under "water Conservation' comments provided by Eric. Comment Number: 9 Comment Originated: 08/24/2020 8/24/2020: FOR FINAL APPROVAL Please add the new Kentucky Coffeetree 'Espresso' to the plant list. Kentucky Coffeetree has been added to the tree schedule. Please also note that per conditions of the Planning and Zoning Board approval of the PDP, a second Kentucky Coffeetree has been added near the NE corner of the building. In addition, we have added a Crimson Fire Columnar Oak to the schedule (to be placed on South Patio). There are now a total of 6 new trees included on the FDP site plan. Comment Number: 10 8/24/2020: FOR FINAL APPROVAL Comment Originated: 08/24/2020 R Please update the label on tree #5 to REMOVE. Currently, the status is still showing this tree to be preserved. Review Forestry redlines for further clarification. This has been updated on the FDP submittal. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler(a�poudre-fire.org Topic: General Comment Number: 5 Comment Originated: 07/31/2020 07/31 /2020: Prior PFA comments resolved. No new comments. Ready for hearing. Department: Building Services Contact: Katy Hand, khand(cDfcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 06/15/2020 06/15/2020: For Building Permit: Be aware that outdoor seasonal patio occupancy must now be included in the required plumbing fixture count. Please note the outdoor patios are both included in the required plumbing fixture count as reflected in the code analysis. Noted Contact: Russell Hovland, 970-416-2341, rhovland(cDfcgov.com Topic: Building Insp Plan Review Comment Number: 2 Comment Originated: 08/03/2020 08/03/2020: This is a change of occupancy and will require a building permit and require the building meet current code for the new restaurant occupancy. Department: Technical Services Contact: Jeff County, 970-221.6588, jcounty(cDfcgov.com Topic: General Comment Number: 2 Comment Originated: 06/09/2020 07/29/2020: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. 06/09/2020: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. Topic: Plat Comment Number: 3 Comment Originated: 07/29/2020 07/29/2020: FOR FINAL APPROVAL: Please make changes as marked. If changes are not made or you disagree rA with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Our surveyor/civil engineer has been in direct communication with Jeff County and John Von Nieda re: resolving outstanding ROW questions and received additional ROW documents that affect our site on 10/6. An updated Plat will be sent shortly. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolsonna.fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/21/2020 07/21/2020: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson fcgov.com Per phone call with Eric on 10/6/2020 the owner will need drip irrigation to all new trees and plantings before a building permit can be issued. Irrigation line sleeves are required to all new landscaped areas. These sleves should also extend to the southern edge of the property (if the extg trees there need to be irrigated at some point and future active irrigation is needed). Irrigation plan will need to specify a watering budget requirements (e.g., Kentucky Coffeetree has a moderate water budget requirement with exception of 111 two years to get it established). Landscape contractors in Fort Collins will typically provide the irrigation plan as part of their service, not the architect. N