HomeMy WebLinkAboutSPLIT RAIL MANOR GROUP HOME PUD PRELIMINARY AND FINAL - 27 90 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSJune 21, 1990
Mr. and Mrs. Paul Boone
1109 Greenbrier Drive
Fort Collins, CO 80524
Dear Mr. and Mrs. $gone,
City Staff has reviewed your submittal for Split Rail Manor, the proposed
Board and Care at 3223, Taft Hill Road, and offers the following comments:
1. Water service is presently provided by the Fort Collins -Loveland Water
District. When a City ua.ter main is built in Primrose Lane the owner
will have to connect to the City's main.
2. The house is on a sewage septic system at this time. At such time that the
septic system fails, the owner, will be required to connect to the City's
sanitary sewer main in Taft Hill Road.
3. Please make the following changes to the site plan:
a. indicate existing curb cuts on Taft Hill Road.
b. indicate all existing landscaping, indicate areas that .are grass,
gravel, dirt, cement, or otherwis. paved. Please be as specific as
possible about the types of trees, shrubs, etc. which you intend
to retain on the site. Please indicate which trees and shrubs
you intend to remove from the site.
C. indicate existing sidewalks.
d. indicate proposed curb cuts. The City Engineering Department
has requested that no additional access be taken off of Taft
Hill Road.
e. indicate all proposed new landscaping sucri as trees, shrubs,
and grass. Please be specific about the types of trees, shrubs,
etc.
f. label Primrose Lane and Taft Hill Road on the site plan.
g. indicate where fencing is existing or proposed.
h. please add arrows to show how water runoff drains off of the
site.
4. If additional paving is going to be done, a storm drainage anal*isis by an
engineer must be done. If there will be no additional paving, please
submit a letter stating that you will not be changing the impervious
surface of the site, nor will you be changing the site's drainage pattern.
5. The P.U.D. should state the exact ntaxinium number of clients on the pla�q,
0
6. Please clarify on theplan the proposed number of employees and the
number of residents who are not clients. Please explain in a little more
detail, on the plan, who you anticipate your clients to be. For example,
are they ambulatory, handicapped, or otherwise disabled? Do they drive?
7. Please submit a detailed floor plan indicating how you propose to provide
living quarters for 15 residents. Please clearly label sleeping quarters,
bathrooms, kitchen facilities, and other living areas available to the clients.
This floor plan should be to scale, or at least show the dimensions of the
rooms and floor area.
8. Show the location of fire hydrant(s) on the plan. A fire hydrant must be
within 400 feet of the building, and on the West Side of Taft. Hill Road.
Water pressure must be 1000 gpm or better. Fire apparatus must have
access to a siamese connection for the fire sprinkler system. Show on the
site plan the hydrant and siamese connection.
9. Similar proposals for this structure have shown the need to have a complete
fire sprinkler system installed. If a sprinkler system is required for this
proposal, please indicate on the plan that the structure will have an
at;&omatic fire sprinkler system.
l`
10.Parking spaces must be at least 12' in width to accommodate handicapped
clients, visitors, or employees. Identify and number the parking spaces on
the plan.
11. An additional 10 feet of right-of=way would have to be dedicated along
Taft Hill Road. Adjacent to this right-of-way; a 15 foot wide utility
easement would have to be dedicated. Please indicate these dedications on
the plan.
12. Please prepare and submit a deed of dedication for the above mentioned
dedications.
13. At the time of future expansion of Taft Hill Road, the owners would be
responsible for paying the local street portion of the cost of these public
improvements. Please indicate this with a note on the P.U.D. plan, The
wording should be something to the effect that you agree to pay for the
local street portion of the public improvements associated with this P.U:D.
at such time that the City constructs these improvements.
14. The City Engineering_ Department has requested that the owners reconstruct
the sidewalk along Primrose Lane where it has fallen into disrepair and
poses a safety hazard to the residents and clients. Please indicate this on
the plan. The area where the sidewalk crosses the driveway off of
Primrose Lane should be paved.
15. All
access
for the group home
by clients, employees, visitors, and ser-
vice
vehicles
should be taken off of Primrose Lane. One private access
driveway
off of Taft Hill may
be retained for private use by the own-
ers.
The
City's Transportation
Engineer has requested that the north-
ern
most
curb cut on Taft Hill
be closed off to traffic associated with
the
group
home. Please indicate
these requests on the plan.
This concludes Staff comments at this time. In order to stay on schedule
for the July 23, 1990 Planning and Zoning Board hearing; please note the
following deadlines:
Plan revisions are due July 5, 1990 by 12:00 noon.
PMT's, colored renderings, 10 prints are due July 16, 1990.
Final mylars and site covenants are due July 19, 1990, by 12:00 noon.
I suggest that we meet to discuss these comments at your earliest convenience.
Please contact the Planning Department to set up a meeting in the near future.
Sincerely,
Kirsten A. Whetstone
City Planner
\ KW/cm
V cc: file
S,20uP 6MEs
ZONING, ANNEXATION AND DEVELOPMENT OF LAND
Sec.. 296475..Group, home regulations; special.
review. a
(a) Group homes shall conform to the lot area
and separation requirements as specified in the
following table:
Maximum
Minimum
number of Additional
separation
residents lot area
Maximum requirement
erelu iuw for each,
permigsibli between
supervisors, additional
residents, any other
for minimum resident '
escluding group home
Zone lot sift (square feet)
supervisors (feet)
R-E, RF 3 2,000 8 1,500
R-L_ 3_'' _.,.1y50_0 - _8'_ _1,5oo
R-M 6 750 15 1,000
R-H 6 500 20 700
B-G 6 500 20 700
(b) With respect to group homes which require
special review, the following regulations shall apply:
(1) Before any group home shall be approved
in the'R-E, R-F, or R-L zone (or any other
zone with permitted uses referenced to the.
R-E, R-F, or R L zone), the Planning and
Zoning Board shall first conduct a special
review hearing for the purpose of approv-
ing, denying, or approving with conditions
the application for a group home use in
such zone. If approved, the board shall, with
such approval, establish the type of group
home permitted and the maximum num-
ber of residents allowed in such group home.
Said hearing shall be open to the public,
and the decision of the Planning and Zon-
ing Board may be appealed to the City Coun-
cil pursuant to the provisions of § 2-46 et
seq.
(2) The issues for consideration by the Plan-
ning and Zoning Board at the special re-
view hearing shall include an analysis of
the following:
a. Building height;
b. Building setbacks;
c. Building coverage of the lot;
d. External signage;
e. Traffic and parking,
f. Compatibility of architectural design
With the character of the surrounding
neighborhood;
Supp. No. 2
129475
g. Whether the types of treatment activi-
ties or the rendering of services pro-
posed to be conducted upon the prem-
ises is in a manner substantially incon-
sistent with the activities otherwise
permitted in the zoning district; and
h. Such other requirements for group homes
as are established in this Chapter.
(c) A group home may be located without con-
sideration to the minimum separation requirements
as established in (a) of this Section if the group
home is separated from other group homes within
the area of the aforesaid minimum separation
requirement by a substantial natural or man-made
physical barrier, including, but not limited to, an
arterial street, a state or federal highway, rail-
road tracks, river, or commercial/business district.
Such reduction in the separation requirement shall
be allowed only after the Planning and Zoning
Board has conducted a special review hearing to
determine that the barrier and resulting separa-
tion distance are adequate to protect the city from
the detrimental impact of an excessive concentra-
tion of group homes in any one vicinity.
(d) No permanent certificate of occupancy will
be issued by the city for a group home until the
person applying for the group home has submit-
ted
a valid license, or other appropriate authori-
zation, or copy thereof, from a governmental agency
having jurisdiction.
(e) If active and continuous operations are not
carried on in a group home which was approved
pursuant to the special review provisions contained
in this Section for a period of twelve (12) consecu-
tive months, the group home use shall be consid-
ered to have been abandoned. The group home
use can be reinstated only after obtaining approval
from the Planning and Zoning Board as outlined
in the special review provisions of this Section.
(f) A notice of any group home permit granted
by the city, and any conditions imposed upon such
group home, -shall be duly recorded by the city
with the county Clerk and Recorder, showing the
description of the property upon which such group
home is permitted.
(Code 1972, § 118-82(F); Ord. No. 183, 1087, § 4,
12-1-87)
2015