RE: Wells Fargo Parking Lot & ATMs, FDP200016, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Wells Fargo Parking Lot & ATMs. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Tenae Beane via phone at 970-224-6119
or via email at tbeane@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Tenae Beane, 970-224-6119, tbeane(a)fcgov.com
Topic: General
Comment Number: 1
970.221.6689
970.224.6134 - fax
fcgov.com/deve/opmentreview
Comment Originated: 09/15/2020
09/15/2020. INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process.
If you have any questions, need additional meetings with the project reviewers,
or need assistance throughout the process, please let me know and I can assist
you and your team.
Please include me in all email correspondence with other reviewers and keep
me informed of any phone conversations. Thank you!
Comment Number: 2
Comment Originated: 09/15/2020
09/15/2020: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format.
Please use this document to insert responses to each comment for your
submittal, using a different font color. When replying to the comment letter please
be detailed in your responses, as all comments should be thoroughly addressed.
Provide reference to specific project plans or explanations of why comments
have not been addressed, when applicable.
Please avoid using acknowledged, noted, or other non -descriptive replies.
Comment Number: 3
Comment Originated: 09/15/2020
09/15/2020: INFORMATION ONLY:
When you are ready to resubmit, please let me know at least 24 hours in
advance. Submittals are accepted any day of the week, with Wednesday at
noon being the cut off for routing the same week.
Department: Planning Services
Contact: Meaghan Overton, 970.416-2283, moverton(a)_tcgov.com
Topic: General
Comment Number: 1 Comment Originated
09/14/2020: FOR FINAL APPROVAL: Please add the following note to the site
plan: "At the hearing for this Major Amendment, the decision maker approved a
request for a modification to the 5 foot minimum alley setback requirement in
Section 4.16(B)(1) to permit a setback of 3 feet along the alley."
Note added.
Comment Number: 2 Comment Originated
09/14/2020: FOR FINAL APPROVAL: Please add the following note to the site
plan: "At the hearing for this Major Amendment, the decision maker approved a
request for an Addition of Permitted Use to allow two (2) drive-in ATMs on this
site. The approval of this Addition of Permitted Use shall be specific to the
proposed project and shall not be considered for a text amendment under
Section 1.3.4(D). Any changes to the use or to its location, size and design, in a
manner that changes the predominant character of or increases the negative
impact upon the surrounding area, will require the approval of a new Addition of
Permitted Use."
Note added.
Comment Number: 3
09/14/2020
09/14/2020
Comment Originated: 09/14/2020
09/14/2020: FOR FINAL APPROVAL: Please add the colors and materials
exhibit as a sheet in the site plan set as sheet A2.2 or similar.
Sheetadded.
Comment Number: 4
Comment Originated: 09/14/2020
09/14/2020: FOR FINAL APPROVAL: Some of the sheets from the utility set
are duplicated in the site plan set (C3.0 and C4.0). Please remove utility sheets
from the site plan set - we only need these in one place. The landscape plan
and photometric plan/detail can stay with the site plan set.
Sheets removed.
Comment Number: 5
Comment Originated: 09/15/2020
09/15/2020: FOR FINAL APPROVAL: Noted here area couple of typos to be
corrected.
- Index Sheet GN-1.0, parking table: please correct "handycap parking" and
replace with "handicap" or "accessible" parking. Please also add a line for the
compact spaces on the west side of the site.
- Index Sheet GN-1.0, site plan notes: These need to be edited. Some notes
that are "if applicable" (9 and 10) do not need to be included, and the first note
appears to be missing some words. In note 15, correct "accessable" to
"accessible."
- Sheet C3.0, site tabulation: Please remove the Magnolia Street parking, as
on -street parking does not count toward total parking calculations.
Magnolia Street Parking removed.
Department: Engineering Development Review
Contact: Morgan Stroud, 970-4164344, mstroud(a.fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/15/2020
09/15/2020: For Approval:
Thank you for the signed and stamped legal exhibits for the utility easement
dedication. I did not see the signed and executed deed of dedication that
accompanies the legal exhibits. The template for the deed can be found at this
link: https:l/www.fcgov.com/engineering/pdf/GeneralDeed.doc?1568214756
Utility Easement Dedication will be provided before final approval.
Comment Number: 2
Comment Originated: 09/15/2020
09/15/2020: For Approval:
The profile of the western edge of the alleyway in the utility plan set does not
show a proposed grade line and does not meet our requirements for grade
breaks up to the existing sidewalk. Please adjust this with the next submittal.
The western edge of the alleyway is the tie in point where proposed matches existing elevations.
Comment Number: 3
Comment Originated: 09/15/2020
09/15/2020: For Approval:
There are two different details shown for the chase on the Magnolia Street on
sheet 11 of the utility plan set. Please remove one of the details and keep the
one that is intended to be used.
Sidewalk chase detail removed.
Comment Number: 4
Comment Originated: 09/15/2020
09/15/2020: Development Agreement:
Thank you for the information sheet with this submittal. Once all contributing
departments have their comments resolved, I will be able to put a draft together.
Acknowledged.
3
Comment Number: 5
Comment Originated: 09/15/2020
09/15/2020: Development Construction Permit:
This project will require a Development Construction Permit "DCP" before
construction can begin. For the application, cost and quantity estimates, and
more information about this permit please follow this link:
hftps://www.fcqov.com/engineering/devrev.php
Development Construction Permit included in submittal.
Comment Number: 6
Comment Originated: 09/16/2020
09/16/2020: For Approval:
The applicant needs to submit the approved CDOT access permit for closing
the driveway on S. College Ave prior to final approval.
CDOT access permit included in the submittal.
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson aofcgov.com
Topic: General
Comment Number: 3 Comment Originated: 09/14/2020
09/14/2020: FOR APPROVAL:
See the redlined plans for minor comments including: Small headwall for pipe
outlet, sidewalk flare for chase, and questions about standard details.
Small headwall added to plans.
Comment Number: 4 Comment Originated: 09/14/2020
09/14/2020: FOR APPROVAL:
Please submit a spec sheet for the dry well pipe and a description of the
installation methods (drilled, driven etc).
Spec for perforated pipe added to Detail Sheet.
Comment Number: 5
09/14/2020: FOR APPROVAL:
Please submit a copy of the boring results for the dry well.
Boring Report included in submittal.
Comment Number: 6
Comment Originated: 09/14/2020
Comment Originated: 09/14/2020
09114/2020: FOR APPROVAL:
In the drainage report please explain the site's water quality and LID
requirements and provide more documentation for how the project meets these
requirements. See the drainage report redlines for more information
Water quality and LID requirements have been added to the Drainage Report.
4
Comment Number: 7
Comment Originated: 09/14/2020
09/14/2020: FOR INFORMATION:
There will be requirements in the development agreement to maintain the
permeable pavers (stormwater quality facility). We will provide a draft DA with
Standard Operating Procedure (SOP) information for your review.
Acknowledged
Department: Water -Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/14/2020
09/14/2020: FOR APPROVAL:
We would like the curb stop, for the irrigation service, relocated as close to the
curb on Magnolia Street as possible.
The review meeting discussion was to shift the irrigation service about 32-feet
east, midway between the proposed trees. Please review and let me know if
this will not work for your site plan. Please see both the utility plan and
landscape plan redlines. Please contact me with any questions.
Irrigation service shifted 32' to the east.
Comment Number: 2
Comment Originated: 09/14/2020
09/14/2020: FOR INFORMATION:
There will be water fees for the irrigation tap. These will be due with the building
permit for the ATM.
Acknowledged
Department: Erosion Control
Contact: Basil Harridan, 970-222-1801, bhamdan fc ov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/10/2020
09/10/2020: No comments from Erosion and Sediment Control (ESC) on the
FDP, all outstanding ESC comments were addressed through the Major
Amendment submittal.
Acknowledged.
Department: Floodplain
Contact: Claudia Quezada, (970)416-2494, cquezada cDfcgov.com
Topic: Floodplain
Comment Number: 2
Comment Originated: 09/14/2020
09/14/2020: Please see floodplain redlines. Since ATMs are shown out of the
100-year floodplain, many of the floodproofing notes can be removed.
Redlines Addressed.
5
Department: Environmental Planning
Contact: Scott Benton, sbenton(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/14/2020
09/14/2020: FOR FINAL APPROVAL: Site lighting as proposed in the Final
Development Plan (Sheet E-2.0) does not meet multiple code requirements
outlined in LUC 3.2.4. Please adjust appropriately, making sure that the
following points are addressed:
LUC 3.2.4.(C) and (D)(7): Site lighting, except for loading/unloading platforms
and under fuel canopies, shall not exceed 10 foot-candles. Measurements of
>20 foot-candles are shown on the current lighting plan in multiple locations.
LUC 3.2.4.(D)(8): Light levels measured 20 feet from the property line shall not
exceed 0.1 foot-candles. The current lighting plan does not show lighting levels
20 feet from the property boundary.
LUC 3.2.4.(D)(11): All lighting must have a correlated color temperature (CCT)
of 3000K or less. The cut sheet currently indicates that 4000K is used.
Acknowledged.
Department: Parks
Contact: Aaron Wagner,
Topic: General
aawaanera fcgov.com
Comment Number: 1
Comment Originated: 09/14/2020
09/14/2020: FOR INFORMATION
Parks Department Planning staff can help with any questions you may have
regarding these comments. Please contact Jill Wuertz (jwuertz@fcgov.com),
970-416-2062, or Parks Planning Technician, Aaron Wagner
(aawagner@fcgov.com) 970-416-8083, 413 S. Bryan Ave, Fort Collins, CO
80521 regarding the Parks' Department's interest
Acknowledged.
Comment Number: 2
Comment Originated: 09/14/2020
09/14/2020: FOR APPROVAL
Parks maintains the streetscape landscaping and has existing irrigation along
College Ave and a portion of Magnolia Street to the first existing curb cut. See
redlines for highlighted areas noting locations of city maintained landscape and
irrigation. Parks does not want any changes to the streetscape landscaping or
irrigation. Please show existing landscaping and irrigation infrastructure on
Demo, Site, and Landscape Plans and label "Existing landscape and irrigation
to remain and be protected in place throughout construction activities." Please
coordinate with the Parks dept. on irrigation disruptions with:
a. The dates of disruption,
R
b. Anticipated length of time for the disruption
c. Any impacts to the irrigation infrastructure (i.e. main line cut, valve box
removal/relocation, controller disconnection etc.)
Leaders have been added and legend revised and notes added.
Comment Number: 3
Comment Originated: 09/14/2020
09/14/2020: FOR APPROVAL
Be advised, there is a city owned irrigation mainline that feeds tree lawns,
medians and planters in the tree lawn along College Ave. from this location,
north to Olive St. Please add the following note to the Landscape, Site and
Demo Plans: "Any irrigation components damaged during construction are the
responsibility of the contractor to repair or replace at no cost to the city."
Note section added.
Comment Number: 4
Comment Originated: 09/14/2020
09/14/2020: FOR APPROVAL
Please coordinate with Parks on any irrigation repair/replacement plans.
Please include the note: "Repair/replace irrigation in areas disturbed by
construction"
Note section added.
Comment Number: 5
Comment Originated: 09/14/2020
09/14/2020: FOR INFORMATION
Parks has no plans to take over the proposed new tree lawn from the beginning
of the diagonal parking west (see redlines, green highlighted area). This area
will be the responsibility of the property owner. Please coordinate with Parks
for the extents of existing irrigation.
Note added to legend.
Comment Number: 6
Comment Originated: 09/14/2020
09/14/2020: FOR INFORMATION
Please confirm the existing driveway and curb cut at the northeast of the site will
be demo'd and replaced with sod. The driveway appears on the site plan, but
is not labeled for demolition on the demolition plan. The drive does not appear
on the grading plan or landscape plan either.
The existing driveway and curb cut will be demo'd and replaced with sod. See Utility Plan Demo Plan.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mrocheMcgov.com
Topic: General
Comment Number: 18
7
Comment Originated: 09/15/2020
9/15/2020: FOR FINAL APPROVAL
Please include the following note to the demolition plan and landscape plan
near the access on N College Ave:
Please contact City Forestry prior to removal of the driveway access on College
Ave. Forestry would like to meet with the demolition contractor to ensure tree
and root protection measures are taken while removing the existing driveway.
Note added.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty cDfcgov.com
Topic: Construction Drawings
Comment Number: 5
09/14/2020: FOR FINAL APPROVAL:
All Benchmark Statements must match on all sheets.
Benchmark statements match on all sheets.
Topic: Landscape Plans
Comment Number: 2
09/1412020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Removed, information not needed.
Comment Originated: 09/14/2020
Comment Originated: 09/14/2020
Comment Number: 3 Comment Originated: 09/14/2020
09/14/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Removed, information not needed.
Topic: Lighting Plan
Comment Number: 4 Comment Originated: 09/14/2020
09/14/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Line over text resolved.
Topic: Site Plan
Comment Number: 1 Comment Originated: 09/14/2020
09/14/2020: FOR FINAL APPROVAL:
Some of the sheet titles & sheet numbers in the sheet index do not match the
noted sheets. See redlines.
Sheet index and sheet titles now match.
Department: Light And Power
9
Contact: Cody Snowdon, 970.416.2306, csnowdon@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/16/2020
09/16/2020: FOR INFORMATION:
Light & Power has no further comments with the current plan.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler .poudreā¢fire.org
Topic: General
Comment Number: 1
09/14/2020: Poudre Fire Authority has no comment.
Department: Building Services
Contact: Russell Hovland, 970-416-2341,
Topic: Building Insp Plan Review
Comment Number: 1
09/14/2020: No comments
rhovland(@fcgov.com
Comment Originated: 09/14/2020
Comment Originated: 09/14/2020
01