HomeMy WebLinkAboutWELLS FARGO PARKING LOT AND ATMS - FDP200016 - SUBMITTAL DOCUMENTS - ROUND 2 - SUPPORTING DOCUMENTATION (2)DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/16/06)
For City use only: Application Number: ________ Application Date:________________
Permit application fee: $ 400.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, , at 221-6605.
3. Submit the Application and pay the Application Fee at the Engineering counter at 281 N. College
Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
_____________________________________________________________
Project A.K.A. (Marketing name if different from Project Name):
__________________________________________________________________
Project Location: ____________________________________________________________________
_____________________________________________________________________________
Property Owner(At the time of this permit issuance):
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Permittee (Person who is to sign the Development Construction Permit):
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as-constructed plans):
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Professional License Number:_______________
Architect/Planner (The person responsible for the site design of this project)
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement–add additional names below):
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
If you have no General Contractor, list all other contractors below.
Grading contractor:
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Utility contractor:
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Concrete contractor for flat work:
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Concrete contractor for structures:
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Paving contractor:
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Landscape contractor:
Individual Name:
Company Name :
Address:
Phone number(s):
Office: ___________________________
Cell phone: ________________________
Fax number: _______________________
Email: __________________________________
Other contractors and parties involved in the project:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
__________________________________________
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"x11" copy of the Site Plan
• Proposed Project Schedule
• Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
Traffic control plan(s) for the project
Proposed haul routes shown on a City map
Shop drawings
Other __________________________________________________
________________________________________________________
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project, is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and General Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
.
People to Attend: List the people’s names and titles for those who will attend the pre-
construction meeting:
Name Title
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $__________________________
Private infrastructure, estimated cost: $__________________________
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required work.
Applicant Signature:__________________________________Date:_______________________
Brad Schlagbaum Wells Fargo Sr. Project Mgr.
Ramsey Pickard Civil Engineer
Jonathon Chades Architect
Anthony Whealton General Contractor
09/22/2020
FO
VB
S
(OHP)
(OHP)
(OHP) (OHP)
(OHP)
(FO)
(GAS)
(FO)
(GAS)
(GAS)
(GAS)
(GAS) (GAS) (GAS)
(GAS)
(GAS)
(GAS) (GAS)
(GAS)
(GAS) (GAS)
(GAS)
(GAS)
(GAS)
(GAS)
(GAS)
(GAS) (GAS)
(GAS)
(FO) (FO)
(FO)
(FO) (FO)
(FO)
(FO)
(FO)
(FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO)
(FO) (FO) (FO)
(FO)
(FO) (FO) (FO) (FO)
(FO) (FO)
(FO) (FO) (FO)
(FO)
(GAS)
(GAS) (GAS)
(GAS)
(GAS) (GAS) (GAS)
(GAS)
(GAS) (GAS) (GAS) (GAS)
(GAS)
(UP) (UP)
(UP)
(UP) (UP) (UP)
(UP)
(UP)
(UP)
(UP)
(UP) (UP) (UP) (UP)
(UP)
(UP)
(UP) (UP)
(UP)
(UP) (UP)
(UP)
Project Name: Well Fargo Parking Lot/ATM's
DESCRIPTION UNITS OF ESTIMATED QUANTITY TOTAL
(LIST ALL PUBLIC AND APPLICABLE MEASURE (PROVIDED BY THE INSPECTION
*PRIVATE IMPROVEMENTS) PROJECT ENGINEER) (SET BY THE CITY) FEE
(COST ESTMATE
APPROVED BY THE CITY)
Sanitary Sewer System
Sanitary Sewer Main L.F. 0 $0.00 $0.00 $0.70 $0.00
Manhole EACH 0 $0.00 $0.00 $103.00 $0.00
Sewer Service Line Stub EACH 0 $0.00 $0.00 $70.00 $0.00
Sewer Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00
Sanitary Sewer Inspection Fees $0.00
Water System
Water Main L.F. 0 $0.00 $0.00 $0.70 $0.00
Water Service Line Stub EACH 0 $0.00 $0.00 $70.00 $0.00
Fire Hydrant EACH 0 $0.00 $0.00 $70.00 $0.00
Valves EACH 0 $0.00 $0.00 $70.00 $0.00
Meter Pit (3/4" ) EACH 0 $0.00 $0.00 $35.00 $0.00
Meter Pit (1 1/2") EACH 0 $0.00 $0.00 $35.00 $0.00
Meter Pit (3" ) EACH 0 $0.00 $0.00 $35.00 $0.00
Water Main (Fire Line)* L.F. 0 $0.00 $0.00 $0.70 $0.00
Fireline Fitting ( Bend, Tee, Cross ) EACH 0 $0.00 $0.00 $35.00 $0.00
Water Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00
Water Inspection Fees $0.00
Public Storm Sewer System
Reinforced Concrete Pipe L.F. 0 $0.00 $0.00 $0.70 $0.00
Concrete Headwall L.F. 0 $0.00 $0.00 $3.50 $0.00
Water Quality Outlet Structure C.Y. 0 $0.00 $0.00 $3.50 $0.00
All Inlet Types EACH 0 $0.00 $0.00 $103.00 $0.00
Manhole EACH 0 $0.00 $0.00 $103.00 $0.00
Public Storm Inspection Fees $0.00
Street System/ Trench
Grading L.S. 0 $0.00 $0.00
Pavement SY 200 $40.00 $8,000.00 $0.45 $103.00
Curb & Gutter L.F. 125 $17.00 $2,125.00 $1.00 $145.00
Detached Sidewalk ** (6') L.F. 275 $12.00 $3,300.00 $1.00 $295.00
Pedestrian Ramps L.F. 25 $60.00 $1,500.00 $1.00 $70.00
Apron S.Y. 0 $12.00 $0.00 $0.45 $0.00
Gutter Pan S.Y. 0 $0.00 $0.00 $0.45 $0.00
Drive Approach S.Y. 85 $20.00 $1,700.00 $0.45 $103.00
Storm Trench L.F. 0 $0.00 $0.00 $0.70 $0.00
SewerTrench L.F. 0 $0.00 $0.00 $0.70 $0.00
Water Trench L.F. 0 $0.00 $0.00 $0.70 $0.00
Street System Inspection Fees $716.00
Excavation Permit
Application L.S. 0 $30.00
Pavement S.Y. 0 $40.00 $0.00 $0.45 $0.00
Potholing E.A. 0 $0.00 $0.00 $10.00 $0.00
Pavement Impact Fees 6 S.F. 0 $0.00
Pavement age Excavation Permit Fees $30.00
TOTAL INSPECTION FEES $746.00
TOTAL PUBLIC INFRASTRUCTURE COST $16,625.00
* PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED
IN THE TOTAL INFRASTRUCTURE COST FOR BONDING.
** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5'
INFRASTRUCTURE
CONSTRUCTION COST PER
UNIT OF MEASURE
TOTAL ESTIMATED
INFASTRUCTURE
ID Task
Mode
Task Name Duration Start Finish
1 WF Fort Collins Parking Lot 127 days? Thu 7/2/20 Wed 12/23/20
2 BID & CONTRACT PHASE 63 days Thu 7/2/20 Fri 9/25/20
3 SCC recieves RFP invitation 1 day Thu 7/2/20 Thu 7/2/20
4 Spartan bids project 28 days Thu 7/2/20 Fri 8/7/20
5 Spartan submits RFP docs 1 day Fri 8/7/20 Fri 8/7/20
6 WF to review bids 20 days Fri 8/7/20 Thu 9/3/20
7 WF award bid 3 days Fri 9/4/20 Tue 9/8/20
8 WF to issue PO/NTP 3 days Wed 9/9/20 Fri 9/11/20
9 SCC to award and subcontract out vendors 10 days Mon 9/14/20 Fri 9/25/20
10 SUBMITTALS 29 days Tue 9/8/20 Fri 10/16/20
11 SCC to receive and review submittals from sub‐vendors 10 days Mon 9/28/20 Fri 10/9/20
12 Architect/Engineer review of submittals 5 days Mon 10/12/20 Fri 10/16/20
13 LONG LEAD ITEMS 68 days Wed 8/26/20 Thu 11/26/20
14 In for Permitting 33 days Wed 8/26/20 Fri 10/9/20
15 Permit Issued 1 day Fri 10/9/20 Fri 10/9/20
16 Site Lighting 6 wks Mon 10/19/20 Thu 11/26/20
17 MOBILIZATION 4 days? Mon 10/12/20 Thu 10/15/20
18 Mobilize to site 1 day Mon 10/12/20 Mon 10/12/20
19 Order dumpster/porta‐john/storage trailer/fence/ etc. 1 day Tue 10/13/20 Tue 10/13/20
20 Pre‐Construction Meeting 1 day Wed 10/14/20 Wed 10/14/20
21 Construction Start 1 day Thu 10/15/20 Thu 10/15/20
22 CONSTRUCTION 71 days Mon 9/14/20 Fri 12/18/20
23 Construction Start 1 day Mon 10/19/20 Mon 10/19/20
24 Demo of exisiting parking lot, wheel stops, concrete
sidewalks, etc.
5 days Tue 10/20/20 Mon 10/26/20
25 Surveying, site testing if applicable 3 days Tue 10/27/20 Thu 10/29/20
26 Underground utilities, grading as required 10 days Fri 10/30/20 Thu 11/12/20
27 Electrical rough in for ATMs 5 days Fri 11/13/20 Wed 11/18/20
28 Install concrete forms for all curbs, sidewalks, and ATM pads 5 days Thu 11/19/20 Wed 11/25/20
29 Pour all concrete 2 days Thu 11/26/20 Fri 11/27/20
30 Install asphalt 2 days Mon 11/30/20 Tue 12/1/20
31 Install pavers 5 days Wed 12/2/20 Tue 12/8/20
32 Striping of parking lot 1 day Wed 12/9/20 Wed 12/9/20
33 Install landscaping 2 days Thu 12/10/20 Fri 12/11/20
34 Install ATMs/Lighting 2 days Mon 12/14/20 Tue 12/15/20
35 Internal punch items 1 day Wed 12/16/20 Wed 12/16/20
36 Pressure wash parking lot 1 day Thu 12/17/20 Thu 12/17/20
37 Transition to closeout 1 day Fri 12/18/20 Fri 12/18/20
38 CLOSEOUT 6 days Wed 12/16/20 Wed 12/23/20
39 Substantial Completion 1 day Wed 12/16/20 Wed 12/16/20
40 Owner Punch Walk 1 day Thu 12/17/20 Thu 12/17/20
41 Punch Items 3 days Fri 12/18/20 Tue 12/22/20
42 Final Completion/ Spartan De‐Mobilize From Site 1 day Wed 12/23/20 Wed 12/23/20
W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T
W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
, '20 Jul 5, '20 Jul 12, '20 Jul 19, '20 Jul 26, '20 Aug 2, '20 Aug 9, '20 Aug 16, '20 Aug 23, '20 Aug 30, '20 Sep 6, '20 Sep 13, '20 Sep 20, '20 Sep 27, '20 Oct 4, '20 Oct 11, '20 Oct
18, '20 Oct 25, '20 Nov 1, '20 Nov 8, '20 Nov 15, '20 Nov 22, '20 Nov 29, '20 Dec 6, '20 Dec 13, '20 Dec 20, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress
Page 1
WF College & Magnolia Drive Up
COST
INSPECTION FEE PER
UNIT
(UP)
(UP)
(UP)
(UP)
(UP) (UP) (UP) (UP) (UP)
(UP)
(UP)
(UP)
(UP) (UP) (UP)
(UP)
(UP)
(UP)
(UP)
(UP)
(UP)
(UP) (UP)
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
W W W W W
W
W W W W
W
W
W
W W W W
W
W
W W
W
W
W
W W W W W W W
W W
EXISTING BUILDING
5
11.5'
20.0' ROW 5.0'
18.81'
6
4
4
2
L1
C1
L2
L5
C2
C3
C4
C5
C6
C9
C10
C11
C12
C14
C15
C16
C17
C13
C19
C18
L3
L4
L6
L7
L8
L9
L10
L11
L12
L13
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
L27
L28
L29
L30
L31
L32
L33
L34
6
E
E
E E E E
E
22.5'
53.5'
2.00'
6.0'
26.4'
9.0'
5.0'
18.2'
2.00'
19.17'
15.0' UTILITY
EASEMENT
8.0' UTILITY
EASEMENT
20.0' ROW
18.81'
ACCESS RAMP WITH
TRUNCATED DOMES (TYP)
PROPERTY LINE/ROW
EXISTING LIGHT POLE
TO BE REMOVED
EXISTING STORM INLET
PROPERTY LINE/ROW
PROPOSED ATMS
LANDSCAPE
SETBACK
PROPOSED CURB
PROPOSED
STREET CUT
PROPOSED
EXISTING SIGN STREET CUT
TO BE RELOCATED
PROPERTY LINE/ROW
EXISTING HYDRANT
PROPERTY LINE
PROPERTY LINE/ROW
PROPOSED
STOP SIGN
S 89°53'41" E, 190.00'
N 00°06'19" E, 100.00'
N 89°53'41" W, 190.00'
S 00°06'19" W, 100.00'
MAGNOLIA STREET
COLLEGE AVENUE
S
4.5'
PROPOSED
SIDEWALK
CHASE
PROPOSED
36" DRY WELL
PROPOSED 2' U-CHANNEL
PROPOSED 2' U-CHANNEL
24.0'
8.00'
9.0'
19.0'
9.0'
19.0'
9.0'
19.0'
11.0'
8.00'
10.0'
18.00'
9.0'
19.0'
5.0'
5.00' 12.0'
5.0'
11.00'
12.00'
24.00' 44.0'
ONE WAY DO NOT ENTER SIGN
ONE WAY DO NOT ENTER SIGN
ONE WAY DO NOT
ENTER SIGN
24.00'
PROPOSED 3
4" IRRIGATION METER
PROPOSED 3
4" IRRIGATION
WITH TAPPING SADDLE
CURB STOP
9.0'
24.0'
3.54'
3.59'
12.00'
12.00'
PROPOSED 2' U-CHANNEL
PROPOSED
STREET CUT
PROPOSED
CURB
C/O UNDERDRAIN
INV: 93.89'
C/O UNDERDRAIN
INV: 93.96'
C/O UNDERDRAIN
INV: 93.63'
C/O UNDERDRAIN
INV: 94.49'
C/O UNDERDRAIN
INV: 94.49'
C/O UNDERDRAIN
INV: 93.19'
C/O UNDERDRAIN
INV: 94.66'
C/O UNDERDRAIN
INV: 93.40'
C/O UNDERDRAIN
C/O UNDERDRAIN INV: 93.89'
INV: 93.68'
C/O UNDERDRAIN
INV: 94.83'
C/O UNDERDRAIN
INV: 93.82
C/O UNDERDRAIN
INV: 93.82'
10.7 LF OF 4" PVC @12.1%
6.0 LF OF 6" PVC @1.0%
6.0 LF OF 6" PVC @0.5%
PROPOSED BIKE RACK
FORT COLLINS MODERATE RISK FLOODPLAIN
FORT COLLINS 100-YR FLOOD FRINGE
FORT COLLINS MODERATE RISK FLOODPLAIN
FORT COLLINS 100-YEAR FLOOD FRINGE
PROPOSED 6' SW
EXISTING 6' SW
EXISTING FIBER
EXISTING GAS
EXISTING ELECTRIC LINE
EXISTING 8" WATER MAIN
EXISTING ALLEY
TO BE REPAVED
WITH CONCRETE
FORT COLLINS 100-YEAR FLOODWAY
FORT COLLINS 100-YEAR FLOOD FRINGE
FORT COLLINS 100-YR FLOODWAY
FORT COLLINS 100-YR FLOOD FRINGE
FORT COLLINS 100-YEAR FLOODWAY
FORT COLLINS 100-YEAR FLOOD FRINGE
EXISTING 4" WATERLINE
EXISTING 6" SANITARY SEWER
LANDSCAPING AREA
32.5 LF OF 3/4" TYPE K COPPER PIPE
30.8 LF OF 4" PERFORATED PVC PIPE
55.9 LF OF 4" PERFORATED PVC PIPE
12.6 LF OF 4" PERFORATED PVC PIPE @ 1.3%
38.6 LF OF 4" PERFORATED PVC PIPE
42.4 LF OF 4" PVC @ 0.5%
45.9 LF OF 4" PVC @ 0.5%
24.5 LF OF 4" PVC @ 0.8%
9.9 LF OF 4" PVC @ 0.5%
27.0 LF OF 4" PVC @ 4.6%
13.6 LF OF 4" PVC @ 0.5%
29.9 LF OF 4" PERFORATED PVC PIPE @ 0.9%
PROPOSED
SCREEN WALL
RE: LANDSCAPING
PLANS
PROPOSED SWALE
PROPOSED
STOP SIGN
PROPOSED DIRECTIONAL
SIGNAGE PER WELLS FARGO
STANDARDS
5.0'
ACCESS RAMP WITH
TRUNCATED DOMES (TYP)
ACCESS RAMP WITH
TRUNCATED DOMES (TYP)
6.00
6.0'
6.0'
21.0'
9.0'
9.0' UTILITY
EASEMENT
PROPOSED TRANSFORMER
PROPOSED ELECTRIC METER
EXISTING TREE
TO BE REMOVED
PROPOSED 6" HEADWALL
LINE TABLE
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
BEARING
N35°42'16"W
N89°59'58"E
N00°00'00"E
S00°00'44"E
N90°00'00"W
N90°00'00"W
N00°00'00"E
S89°59'39"W
N00°00'00"E
N90°00'00"E
N90°00'00"W
S00°00'00"E
S89°59'51"W
DISTANCE
3.96
177.16
12.00
48.00
17.00
36.00
18.50
25.50
36.00
16.45
15.45
44.11
38.75
LINE TABLE
LINE #
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
L27
BEARING
S00°08'42"W
N90°00'00"E
S00°00'00"E
N90°00'00"W
S89°55'58"E
N63°52'47"E
N00°06'17"E
N89°59'39"E
S00°00'00"E
N90°00'00"W
N00°00'00"E
N90°00'00"E
N00°00'00"E
DISTANCE
24.01
17.02
45.00
17.00
14.42
5.10
97.94
17.49
16.01
5.00
5.00
16.99
17.99
LINE TABLE
LINE #
L28
L29
L30
L31
L32
L33
L34
BEARING
S89°58'31"W
S00°00'00"E
N00°00'00"E
S89°26'03"W
N00°18'00"E
N03°48'42"E
N00°08'29"W
DISTANCE
16.49
20.00
20.00
28.98
8.21
1.59
6.17
CURVE TABLE
CURVE #
C1
C2
C3
C4
C5
C6
C9
C10
C11
C12
C13
C14
C15
LENGTH
4.738
3.142
0.784
7.854
7.854
14.949
23.545
3.147
3.142
4.712
7.877
7.865
22.638
RADIUS
5.000
2.000
0.499
2.500
5.000
10.000
15.000
2.000
2.000
3.000
2.507
5.007
14.884
DELTA
054.2961
090.0000
090.0000
180.0000
090.0000
085.6518
089.9341
090.1448
090.0000
090.0000
180.0047
090.0000
087.1449
CURVE TABLE
CURVE #
C16
C17
C18
C19
LENGTH
7.865
3.153
6.283
6.283
RADIUS
5.007
2.007
2.000
2.000
DELTA
090.0000
090.0000
180.0000
180.0000
HORIZONTAL CONTROL AND UTILITY PLAN
C3.0
10'
SCALE: 1" = 10'
0 20'
N
NOTE:
1.) ALL LINE AND CURVE TAGS ARE
MEASURED AS THE FLOWLINE UNLESS
OTHERWISE NOTED
112 W. MAGNOLIA ST. PARKING
112 WEST MAGNOLIA STREET
FORT COLLINS CO, 80525
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
UTILITY NOTES
SYMBOL LEGEND
G G G G
(UP) (UP)
(UT) (UT)
SS SS
X X
WS WS WS WS WS
SS
R/W
WS WS WS
W W
R/W R/W
(OHP) (OHP)
10.00
2.05%
W W
FS
E E E
11
FLOODPLAIN NOTES
ENGINEERING & SURVEYING
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
[P] 970-622-2095 [F] 970-461-4469
SITE TABULATION
ZONING
SITE ACREAGE:
GROSS 0.436 ACRES=18,992 SF
NET 0.436 ACRES=18.992 SF
LAND USE COMMERCIAL/RETAIL -TYPE 2
SQUARE FOOTAGE:
EXISTING GRAVEL PARKING 18,922 SF -100%
EXISTING WELLS FARGO BANK 26,923 SF
PROPOSED PERMEABLE PAVERS 3,391 SF -17.8%
PROPOSED ASPHALT 8,712 SF -45.8%
PROPOSED ON-SITE LANDSCAPING 6,869 SF -36.4%
OVERALL PERCENT IMPERVIOUS 66%
PARKING SPACES:
OFF STREET 19
ACCESSIBLE 2
EXISTING WELLS FARGO BANK PARKING 48
TOTAL 69
OPEN SPACE
FEMA FLOODPLAIN N/A
FORT COLLINS FLOODPLAIN:
HIGH RISK CITY FLOOD FRINGE 11,114 SF
MODERATE RISK 7.886 SF
NEW MONUMENT
SIGN PER WELLS
FARGO STANDARDS