Loading...
HomeMy WebLinkAboutWELLS FARGO PARKING LOT AND ATMS - FDP200016 - SUBMITTAL DOCUMENTS - ROUND 2 - SUPPORTING DOCUMENTATION (2)DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/16/06) For City use only: Application Number: ________ Application Date:________________ Permit application fee: $ 400.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): _____________________________________________________________ Project A.K.A. (Marketing name if different from Project Name): __________________________________________________________________ Project Location: ____________________________________________________________________ _____________________________________________________________________________ Property Owner(At the time of this permit issuance): Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Permittee (Person who is to sign the Development Construction Permit): Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as-constructed plans): Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Professional License Number:_______________ Architect/Planner (The person responsible for the site design of this project) Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement–add additional names below): Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Utility contractor: Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Concrete contractor for flat work: Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Concrete contractor for structures: Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Paving contractor: Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Landscape contractor: Individual Name: Company Name : Address: Phone number(s): Office: ___________________________ Cell phone: ________________________ Fax number: _______________________ Email: __________________________________ Other contractors and parties involved in the project: ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ __________________________________________ SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"x11" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked):  Traffic control plan(s) for the project  Proposed haul routes shown on a City map  Shop drawings  Other __________________________________________________ ________________________________________________________ CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) . People to Attend: List the people’s names and titles for those who will attend the pre- construction meeting: Name Title _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $__________________________ Private infrastructure, estimated cost: $__________________________ I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature:__________________________________Date:_______________________ Brad Schlagbaum Wells Fargo Sr. Project Mgr. Ramsey Pickard Civil Engineer Jonathon Chades Architect Anthony Whealton General Contractor 09/22/2020 FO VB S (OHP) (OHP) (OHP) (OHP) (OHP) (FO) (GAS) (FO) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (FO) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (GAS) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) Project Name: Well Fargo Parking Lot/ATM's DESCRIPTION UNITS OF ESTIMATED QUANTITY TOTAL (LIST ALL PUBLIC AND APPLICABLE MEASURE (PROVIDED BY THE INSPECTION *PRIVATE IMPROVEMENTS) PROJECT ENGINEER) (SET BY THE CITY) FEE (COST ESTMATE APPROVED BY THE CITY) Sanitary Sewer System Sanitary Sewer Main L.F. 0 $0.00 $0.00 $0.70 $0.00 Manhole EACH 0 $0.00 $0.00 $103.00 $0.00 Sewer Service Line Stub EACH 0 $0.00 $0.00 $70.00 $0.00 Sewer Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00 Sanitary Sewer Inspection Fees $0.00 Water System Water Main L.F. 0 $0.00 $0.00 $0.70 $0.00 Water Service Line Stub EACH 0 $0.00 $0.00 $70.00 $0.00 Fire Hydrant EACH 0 $0.00 $0.00 $70.00 $0.00 Valves EACH 0 $0.00 $0.00 $70.00 $0.00 Meter Pit (3/4" ) EACH 0 $0.00 $0.00 $35.00 $0.00 Meter Pit (1 1/2") EACH 0 $0.00 $0.00 $35.00 $0.00 Meter Pit (3" ) EACH 0 $0.00 $0.00 $35.00 $0.00 Water Main (Fire Line)* L.F. 0 $0.00 $0.00 $0.70 $0.00 Fireline Fitting ( Bend, Tee, Cross ) EACH 0 $0.00 $0.00 $35.00 $0.00 Water Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00 Water Inspection Fees $0.00 Public Storm Sewer System Reinforced Concrete Pipe L.F. 0 $0.00 $0.00 $0.70 $0.00 Concrete Headwall L.F. 0 $0.00 $0.00 $3.50 $0.00 Water Quality Outlet Structure C.Y. 0 $0.00 $0.00 $3.50 $0.00 All Inlet Types EACH 0 $0.00 $0.00 $103.00 $0.00 Manhole EACH 0 $0.00 $0.00 $103.00 $0.00 Public Storm Inspection Fees $0.00 Street System/ Trench Grading L.S. 0 $0.00 $0.00 Pavement SY 200 $40.00 $8,000.00 $0.45 $103.00 Curb & Gutter L.F. 125 $17.00 $2,125.00 $1.00 $145.00 Detached Sidewalk ** (6') L.F. 275 $12.00 $3,300.00 $1.00 $295.00 Pedestrian Ramps L.F. 25 $60.00 $1,500.00 $1.00 $70.00 Apron S.Y. 0 $12.00 $0.00 $0.45 $0.00 Gutter Pan S.Y. 0 $0.00 $0.00 $0.45 $0.00 Drive Approach S.Y. 85 $20.00 $1,700.00 $0.45 $103.00 Storm Trench L.F. 0 $0.00 $0.00 $0.70 $0.00 SewerTrench L.F. 0 $0.00 $0.00 $0.70 $0.00 Water Trench L.F. 0 $0.00 $0.00 $0.70 $0.00 Street System Inspection Fees $716.00 Excavation Permit Application L.S. 0 $30.00 Pavement S.Y. 0 $40.00 $0.00 $0.45 $0.00 Potholing E.A. 0 $0.00 $0.00 $10.00 $0.00 Pavement Impact Fees 6 S.F. 0 $0.00 Pavement age Excavation Permit Fees $30.00 TOTAL INSPECTION FEES $746.00 TOTAL PUBLIC INFRASTRUCTURE COST $16,625.00 * PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING. ** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5' INFRASTRUCTURE CONSTRUCTION COST PER UNIT OF MEASURE TOTAL ESTIMATED INFASTRUCTURE ID Task Mode Task Name Duration Start Finish 1 WF Fort Collins Parking Lot 127 days? Thu 7/2/20 Wed 12/23/20 2 BID & CONTRACT PHASE 63 days Thu 7/2/20 Fri 9/25/20 3 SCC recieves RFP invitation 1 day Thu 7/2/20 Thu 7/2/20 4 Spartan bids project 28 days Thu 7/2/20 Fri 8/7/20 5 Spartan submits RFP docs 1 day Fri 8/7/20 Fri 8/7/20 6 WF to review bids 20 days Fri 8/7/20 Thu 9/3/20 7 WF award bid 3 days Fri 9/4/20 Tue 9/8/20 8 WF to issue PO/NTP 3 days Wed 9/9/20 Fri 9/11/20 9 SCC to award and subcontract out vendors 10 days Mon 9/14/20 Fri 9/25/20 10 SUBMITTALS 29 days Tue 9/8/20 Fri 10/16/20 11 SCC to receive and review submittals from sub‐vendors 10 days Mon 9/28/20 Fri 10/9/20 12 Architect/Engineer review of submittals 5 days Mon 10/12/20 Fri 10/16/20 13 LONG LEAD ITEMS 68 days Wed 8/26/20 Thu 11/26/20 14 In for Permitting 33 days Wed 8/26/20 Fri 10/9/20 15 Permit Issued 1 day Fri 10/9/20 Fri 10/9/20 16 Site Lighting 6 wks Mon 10/19/20 Thu 11/26/20 17 MOBILIZATION 4 days? Mon 10/12/20 Thu 10/15/20 18 Mobilize to site 1 day Mon 10/12/20 Mon 10/12/20 19 Order dumpster/porta‐john/storage trailer/fence/ etc. 1 day Tue 10/13/20 Tue 10/13/20 20 Pre‐Construction Meeting 1 day Wed 10/14/20 Wed 10/14/20 21 Construction Start 1 day Thu 10/15/20 Thu 10/15/20 22 CONSTRUCTION 71 days Mon 9/14/20 Fri 12/18/20 23 Construction Start 1 day Mon 10/19/20 Mon 10/19/20 24 Demo of exisiting parking lot, wheel stops, concrete sidewalks, etc. 5 days Tue 10/20/20 Mon 10/26/20 25 Surveying, site testing if applicable 3 days Tue 10/27/20 Thu 10/29/20 26 Underground utilities, grading as required 10 days Fri 10/30/20 Thu 11/12/20 27 Electrical rough in for ATMs 5 days Fri 11/13/20 Wed 11/18/20 28 Install concrete forms for all curbs, sidewalks, and ATM pads 5 days Thu 11/19/20 Wed 11/25/20 29 Pour all concrete 2 days Thu 11/26/20 Fri 11/27/20 30 Install asphalt 2 days Mon 11/30/20 Tue 12/1/20 31 Install pavers 5 days Wed 12/2/20 Tue 12/8/20 32 Striping of parking lot 1 day Wed 12/9/20 Wed 12/9/20 33 Install landscaping 2 days Thu 12/10/20 Fri 12/11/20 34 Install ATMs/Lighting 2 days Mon 12/14/20 Tue 12/15/20 35 Internal punch items 1 day Wed 12/16/20 Wed 12/16/20 36 Pressure wash parking lot 1 day Thu 12/17/20 Thu 12/17/20 37 Transition to closeout 1 day Fri 12/18/20 Fri 12/18/20 38 CLOSEOUT 6 days Wed 12/16/20 Wed 12/23/20 39 Substantial Completion 1 day Wed 12/16/20 Wed 12/16/20 40 Owner Punch Walk 1 day Thu 12/17/20 Thu 12/17/20 41 Punch Items 3 days Fri 12/18/20 Tue 12/22/20 42 Final Completion/ Spartan De‐Mobilize From Site 1 day Wed 12/23/20 Wed 12/23/20 W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F , '20 Jul 5, '20 Jul 12, '20 Jul 19, '20 Jul 26, '20 Aug 2, '20 Aug 9, '20 Aug 16, '20 Aug 23, '20 Aug 30, '20 Sep 6, '20 Sep 13, '20 Sep 20, '20 Sep 27, '20 Oct 4, '20 Oct 11, '20 Oct 18, '20 Oct 25, '20 Nov 1, '20 Nov 8, '20 Nov 15, '20 Nov 22, '20 Nov 29, '20 Dec 6, '20 Dec 13, '20 Dec 20, '20 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Page 1 WF College & Magnolia Drive Up COST INSPECTION FEE PER UNIT (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) (UP) SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W EXISTING BUILDING 5 11.5' 20.0' ROW 5.0' 18.81' 6 4 4 2 L1 C1 L2 L5 C2 C3 C4 C5 C6 C9 C10 C11 C12 C14 C15 C16 C17 C13 C19 C18 L3 L4 L6 L7 L8 L9 L10 L11 L12 L13 L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 6 E E E E E E E 22.5' 53.5' 2.00' 6.0' 26.4' 9.0' 5.0' 18.2' 2.00' 19.17' 15.0' UTILITY EASEMENT 8.0' UTILITY EASEMENT 20.0' ROW 18.81' ACCESS RAMP WITH TRUNCATED DOMES (TYP) PROPERTY LINE/ROW EXISTING LIGHT POLE TO BE REMOVED EXISTING STORM INLET PROPERTY LINE/ROW PROPOSED ATMS LANDSCAPE SETBACK PROPOSED CURB PROPOSED STREET CUT PROPOSED EXISTING SIGN STREET CUT TO BE RELOCATED PROPERTY LINE/ROW EXISTING HYDRANT PROPERTY LINE PROPERTY LINE/ROW PROPOSED STOP SIGN S 89°53'41" E, 190.00' N 00°06'19" E, 100.00' N 89°53'41" W, 190.00' S 00°06'19" W, 100.00' MAGNOLIA STREET COLLEGE AVENUE S 4.5' PROPOSED SIDEWALK CHASE PROPOSED 36" DRY WELL PROPOSED 2' U-CHANNEL PROPOSED 2' U-CHANNEL 24.0' 8.00' 9.0' 19.0' 9.0' 19.0' 9.0' 19.0' 11.0' 8.00' 10.0' 18.00' 9.0' 19.0' 5.0' 5.00' 12.0' 5.0' 11.00' 12.00' 24.00' 44.0' ONE WAY DO NOT ENTER SIGN ONE WAY DO NOT ENTER SIGN ONE WAY DO NOT ENTER SIGN 24.00' PROPOSED 3 4" IRRIGATION METER PROPOSED 3 4" IRRIGATION WITH TAPPING SADDLE CURB STOP 9.0' 24.0' 3.54' 3.59' 12.00' 12.00' PROPOSED 2' U-CHANNEL PROPOSED STREET CUT PROPOSED CURB C/O UNDERDRAIN INV: 93.89' C/O UNDERDRAIN INV: 93.96' C/O UNDERDRAIN INV: 93.63' C/O UNDERDRAIN INV: 94.49' C/O UNDERDRAIN INV: 94.49' C/O UNDERDRAIN INV: 93.19' C/O UNDERDRAIN INV: 94.66' C/O UNDERDRAIN INV: 93.40' C/O UNDERDRAIN C/O UNDERDRAIN INV: 93.89' INV: 93.68' C/O UNDERDRAIN INV: 94.83' C/O UNDERDRAIN INV: 93.82 C/O UNDERDRAIN INV: 93.82' 10.7 LF OF 4" PVC @12.1% 6.0 LF OF 6" PVC @1.0% 6.0 LF OF 6" PVC @0.5% PROPOSED BIKE RACK FORT COLLINS MODERATE RISK FLOODPLAIN FORT COLLINS 100-YR FLOOD FRINGE FORT COLLINS MODERATE RISK FLOODPLAIN FORT COLLINS 100-YEAR FLOOD FRINGE PROPOSED 6' SW EXISTING 6' SW EXISTING FIBER EXISTING GAS EXISTING ELECTRIC LINE EXISTING 8" WATER MAIN EXISTING ALLEY TO BE REPAVED WITH CONCRETE FORT COLLINS 100-YEAR FLOODWAY FORT COLLINS 100-YEAR FLOOD FRINGE FORT COLLINS 100-YR FLOODWAY FORT COLLINS 100-YR FLOOD FRINGE FORT COLLINS 100-YEAR FLOODWAY FORT COLLINS 100-YEAR FLOOD FRINGE EXISTING 4" WATERLINE EXISTING 6" SANITARY SEWER LANDSCAPING AREA 32.5 LF OF 3/4" TYPE K COPPER PIPE 30.8 LF OF 4" PERFORATED PVC PIPE 55.9 LF OF 4" PERFORATED PVC PIPE 12.6 LF OF 4" PERFORATED PVC PIPE @ 1.3% 38.6 LF OF 4" PERFORATED PVC PIPE 42.4 LF OF 4" PVC @ 0.5% 45.9 LF OF 4" PVC @ 0.5% 24.5 LF OF 4" PVC @ 0.8% 9.9 LF OF 4" PVC @ 0.5% 27.0 LF OF 4" PVC @ 4.6% 13.6 LF OF 4" PVC @ 0.5% 29.9 LF OF 4" PERFORATED PVC PIPE @ 0.9% PROPOSED SCREEN WALL RE: LANDSCAPING PLANS PROPOSED SWALE PROPOSED STOP SIGN PROPOSED DIRECTIONAL SIGNAGE PER WELLS FARGO STANDARDS 5.0' ACCESS RAMP WITH TRUNCATED DOMES (TYP) ACCESS RAMP WITH TRUNCATED DOMES (TYP) 6.00 6.0' 6.0' 21.0' 9.0' 9.0' UTILITY EASEMENT PROPOSED TRANSFORMER PROPOSED ELECTRIC METER EXISTING TREE TO BE REMOVED PROPOSED 6" HEADWALL LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 BEARING N35°42'16"W N89°59'58"E N00°00'00"E S00°00'44"E N90°00'00"W N90°00'00"W N00°00'00"E S89°59'39"W N00°00'00"E N90°00'00"E N90°00'00"W S00°00'00"E S89°59'51"W DISTANCE 3.96 177.16 12.00 48.00 17.00 36.00 18.50 25.50 36.00 16.45 15.45 44.11 38.75 LINE TABLE LINE # L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 L27 BEARING S00°08'42"W N90°00'00"E S00°00'00"E N90°00'00"W S89°55'58"E N63°52'47"E N00°06'17"E N89°59'39"E S00°00'00"E N90°00'00"W N00°00'00"E N90°00'00"E N00°00'00"E DISTANCE 24.01 17.02 45.00 17.00 14.42 5.10 97.94 17.49 16.01 5.00 5.00 16.99 17.99 LINE TABLE LINE # L28 L29 L30 L31 L32 L33 L34 BEARING S89°58'31"W S00°00'00"E N00°00'00"E S89°26'03"W N00°18'00"E N03°48'42"E N00°08'29"W DISTANCE 16.49 20.00 20.00 28.98 8.21 1.59 6.17 CURVE TABLE CURVE # C1 C2 C3 C4 C5 C6 C9 C10 C11 C12 C13 C14 C15 LENGTH 4.738 3.142 0.784 7.854 7.854 14.949 23.545 3.147 3.142 4.712 7.877 7.865 22.638 RADIUS 5.000 2.000 0.499 2.500 5.000 10.000 15.000 2.000 2.000 3.000 2.507 5.007 14.884 DELTA 054.2961 090.0000 090.0000 180.0000 090.0000 085.6518 089.9341 090.1448 090.0000 090.0000 180.0047 090.0000 087.1449 CURVE TABLE CURVE # C16 C17 C18 C19 LENGTH 7.865 3.153 6.283 6.283 RADIUS 5.007 2.007 2.000 2.000 DELTA 090.0000 090.0000 180.0000 180.0000 HORIZONTAL CONTROL AND UTILITY PLAN C3.0 10' SCALE: 1" = 10' 0 20' N NOTE: 1.) ALL LINE AND CURVE TAGS ARE MEASURED AS THE FLOWLINE UNLESS OTHERWISE NOTED 112 W. MAGNOLIA ST. PARKING 112 WEST MAGNOLIA STREET FORT COLLINS CO, 80525 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R UTILITY NOTES SYMBOL LEGEND G G G G (UP) (UP) (UT) (UT) SS SS X X WS WS WS WS WS SS R/W WS WS WS W W R/W R/W (OHP) (OHP) 10.00 2.05% W W FS E E E 11 FLOODPLAIN NOTES ENGINEERING & SURVEYING 4045 St. Cloud Drive, Suite 180 Loveland, CO 80538 [P] 970-622-2095 [F] 970-461-4469 SITE TABULATION ZONING SITE ACREAGE: GROSS 0.436 ACRES=18,992 SF NET 0.436 ACRES=18.992 SF LAND USE COMMERCIAL/RETAIL -TYPE 2 SQUARE FOOTAGE: EXISTING GRAVEL PARKING 18,922 SF -100% EXISTING WELLS FARGO BANK 26,923 SF PROPOSED PERMEABLE PAVERS 3,391 SF -17.8% PROPOSED ASPHALT 8,712 SF -45.8% PROPOSED ON-SITE LANDSCAPING 6,869 SF -36.4% OVERALL PERCENT IMPERVIOUS 66% PARKING SPACES: OFF STREET 19 ACCESSIBLE 2 EXISTING WELLS FARGO BANK PARKING 48 TOTAL 69 OPEN SPACE FEMA FLOODPLAIN N/A FORT COLLINS FLOODPLAIN: HIGH RISK CITY FLOOD FRINGE 11,114 SF MODERATE RISK 7.886 SF NEW MONUMENT SIGN PER WELLS FARGO STANDARDS