Loading...
HomeMy WebLinkAboutWELLS FARGO PARKING LOT AND ATMS - FDP200016 - SUBMITTAL DOCUMENTS - ROUND 1 - RESPONSE TO STAFF REVIEW COMMENTSCity of F6rt Collins May 15, 2020 Brad Schlagbaum Wells Fargo NA 9780 S MEddian Blvd Englewood, CO 80112 RE: Wells Fargo Parking Lot & ATMs, MJA190003, Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Wells Fargo Parking Lot & ATMs. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email at tbeane@fcgov.com. Comment Summary: Department: Planning Services Contact: Meaghan Overton, 970-416-2283, moverton a()fcgov.com Comment Number: 19 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov. com/developmentre view Comment Originated: 03/02/2020 03102/2020: FOR FINAL PLAN: Please add the standard site plan notes. I can provide these if needed. In particular, note that signage must be approved by separate sign permit. The plan set cover or index sheet may also need to be updated to meet City standards (for example, there is no signature block). I will provide more details about required elements. Acknowledged. Comment Number: 22 Comment Originated: 05/12/2020 05/12/2020: READY FOR HEARING: Planning is ready for hearing. Thank you for addressing comments from the last round of review. Department: Engineering Development Review Contact: Morgan Stroud, 970-416-4344, mstroud(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/17/2019 05/08/2020: For Final Approval - Updated: The legal descriptions provided meet our requirements. However, a current surveyor with King Surveyors will need to prepare and stamp the legal exhibits before it is recorded. The next step in this process is for the applicant team to execute the deed template that was provided in the 2nd round redlines, this template can also be found at this address: https://www.fcgov.com/engineering/pdf/GeneralDeed.doc?l568214756 . After this step is complete, we can calculate recording fees and get the document recorded. Updated legal exhibits signed by a current King Surveyors employee. 12/17/2019: For Final Approval: Please continue to work with me and Technical Services to get the utility easements dedicated. Comment Number: 3 Comment Originated: 12/17/2019 12/17/2019: Development Construction Permit: This project will require a Development Construction Permit "DCP" before construction can begin. For the application, cost and quantity estimates, and more information about this permit please follow this link: hfti)s://www.fcqov.com/engineering/devrev.php Acknowledged. Comment Number: 4 Comment Originated: 12/17/2019 12/17/2019: Development Agreement: This project will require a Development Agreement. Once all contributing departments have their comments resolved, I will be able to put a draft together. I have provided the "Information for Development Agreement' form in our redlines. Please fill this out and return it back to me. Acknowledged. Comment Number: 5 Comment Originated: 05/13/2020 05/13/2020: For Final Approval: If the 30 inch diameter Green Ash tree adjacent to the alleyway is going to be removed with this project, please show a continuous curb and gutter along the alleyway. Previously we allowed for a gap in the curb and gutter to allow for less disturbance to the tree. Acknowledged. Department: Stormwater Engineering Contact: Claudia Quezada, (970)416-2494, cc uezadaMcQov.com Topic: Floodplain Comment Number: 24 Comment Originated: 05/08/2020 05/08/2020: FOR FINAL PLAN: Since both ATMs are shown out of the 100-year floodplain, can remove: -Note #4 under "floodplain notes" (pg. 5 of site plan, "Proposed Plan") -BFE and RFPE elevations (pg. 6 of site plan, "ATM Details"). Note removed. Contact: Matt Simpson, (970)416-2754, masimpson &fcaov.com Topic: General Comment Number: 17 Comment Originated: 12/17/2019 05/11/2020: FOR FINAL PLAN: r. Thank you for providing this profile. Please meet with us before Final Plan to discuss design of the 36-inch dry well. Coffey Engineering met with CFC Stormwater meet on 6/19/2020 to discuss dry well design. 12/17/2019: FOR FINAL PLAN: Please show a pipe profile through the dry well — include 1 pipe upstream and downstream of the drywell. Provide confirmation that the pipe hydraulics through this section will work. What flow rate and design frequency is this pipe designed for? Comment Number: 19 Comment Originated: 12/17/2019 05/11/2020: FOR INFORMATION: Please contact us for an estimate of development fees and PIFs. Acknowledged. 12/17/2019: FOR INFORMATION: If this project does not require a building permit (I am unclear if ATM machines will require a building permit), please note that stormwater PIF's (and water fees for irrigation) will need to be paid prior to us signing mylars on this project. If there is to be a building permit, then the fees will be paid at the time of building permit Acknowledged. Comment Number: 21 Comment Originated: 03/09/2020 05/11/2020: STORMWATER IS READY FOR HEARING. 03/09/2020: STORMWATER IS READY FOR HEARING. Department: Water -Wastewater Engineering Contact: Matt Simpson, (970)416-2754, masimpson(&fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/18/2019 05/11/2020: FOR INFORMATION: Please contact us for an estimate of development fees and PIFs Acknowledged. 12118/2019: FOR INFORMATION: If this project does not require a building permit (I am unclear if ATM machines will require a building permit), please note that water fees for irrigation(and stormwater fees) will need to be paid prior to us signing mylars on this project. If there is to be a building permit, then the fees will be paid at the time of building permit Comment Number: 2 Comment Originated: 03/09/2020 03/09/2020: READY FOR HEARING. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreaaer(a)fc4ov.com Topic: General Comment Number: 13 Comment Originated: 05/12/2020 05/12/2020: FOR HEARING: The new transformer location is still located within a public utility easement along right of way. This is not preferable, but if this is the only location that will work, we can consider it. Please make changes to your landscape plan to 3 reflect the transformer location. The transformer must have a 3 foot clearance from any bushes that could interfere with the maintenance of the transformer. Landscape Plans updated with transformer location. Contact: Cody Snowdon, 970-416-2306, csnowdon(a).fc4ov.com Topic: General Comment Number: 2 03/10/2020: 12/16/2019 FOR HEARING: Comment Originated: 12/16/2019 Please show the primary and secondary routing of the electric line on the Utility Plans to show adequate separation from other utilities. The primary line feeding the proposed transformer will come from the existing oval located west of the existing alley. Acknowledged. Comment Number: 3 Comment Originated: 12/16/2019 03/10/2020: 12/16/2019 FOR HEARING: The electric service to the site will need to be metered separately with an address associated with that meter. Meter location will need to be coordinated with Light and Power. Please show proposed meter location on the utility plan. Reference Section 8 of our Electdc Service Standards for electric metering standards. A link has been provided below. https://www.fcgov.com/utilitiesAmg/site_specific/uploads/ElectricServiceStanda rds_FI NAL_18November2016_Amendment.pdf Acknowledged. Comment Number: 5 Comment Originated: 12/16/2019 03/10/2020: 12/16/2019 FOR INFORMATION: There is an existing 400W HPS floodlight on the North side of the property. If this light is to be removed please contact Light & Power to have this structure removed prior to any demolition. Acknowledged. Comment Number: 7 Comment Originated: 12/16/2019 03/10/2020: 12/16/2019 FOR INFORMATION: Service to the building is considered a commercial service; therefore, the service is required to be installed, owned and maintained by the property owner. Acknowledged. Comment Number: 8 Comment Originated: 12/16/2019 03/10/2020: FOR FINAL: Thank you for submitting a one -line diagram. Please submit a C-1 form that matches the one -line diagram. 12/16/2019 FOR FINAL: 4 A commercial service information form (C-1 form) and a one -line diagram for all commercial meters will need to be completed and submitted to Light & Power Engineering for review prior to Final Plan. A link to the C-1 form is below: http://zeus.fcgov.com/utils-procedures/files/EngWikiMikiPdfs/C/C-1 Form.pdf Acknowledged. Comment Number: 9 Comment Originated: 12/16/2019 12/16/2019 FOR INFORMATION: Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov.com/utilities/businesslbuilders-and-developers/plant-investmen t-development-fees Acknowledged. Comment Number: 10 Comment Originated: 12/16/2019 12/16/2019 FOR INFORMATION: Light & Power will require AutoCAD files of the Site Plan, Utility Plans, and Landscape Plans prior to the Entitlement Process approval. Acknowledged. Comment Number: 11 Comment Originated: 12/16/2019 12/16/2019 FOR INFORMATION: Please reference our policies, construction practices, development charge processes, electric services standards, and fee estimator at : http://www.fcaov.com/uti l ities/busi ness/bu i lders-and-developers. Acknowledged Department: Forestry Contact: Molly Roche, 224-616-1992, mrochecDfcgov.com Topic: General Comment Number: 14 Comment Originated: 05/13/2020 5/13/2020: FOR FINAL APPROVAL Due to the placement of the storm sewer main within the critical root zone of tree #1, the overall health of the tree canopy, and considering the future presence of EAB in Fort Collins, City Forestry recommends removing and mitigating this tree. Mitigation in the form of placing mitigation trees on -site or providing a payment in lieu are acceptable. Acknowledged. Comment Number: 15 Comment Originated: 05/13/2020 5/13/2020: FOR FINAL APPROVAL Texas Red Oak and Shumard Oak are very similar species (nearly identical). Forestry recommend replacing one of these species with another type of canopy shade tree such as Choice City Elm, Chinkapin Oak, or Hackberry. Acknowledged. Comment Number: 16 Comment Originated: 05/13/2020 5/13/2020: FOR FINAL APPROVAL Please place the Street Tree Permit Note on sheet LS 2. Acknowledged. Comment Number: 17 Comment Originated: 05/13/2020 5113/2020: FOR FINAL APPROVAL Redlines are provided to the Development Review Coordinator. Please review and update the following items on the site/landscape plan: - Label mitigation trees on the plans, next to the tree symbols, and in the plant list - Show Tree #1 to be removed with a X over the symbol - Update the tree inventory and mitigation table to show Tree #1 to be removed. - Update information below tree inventory and mitigation table: o UPDATE INFORMATION IN THIS BOX: o TREES TO BE REMOVED: 1 o TREES TO BE PRESERVED AND PROTECTED: 6 o MITIGATION REQUIRED: 3 Acknowledged. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak(a)fcgov.com Topic: General Comment Number: 1 12/17/2019: No comments. Department: PFA Comment Originated: 12/17/2019 Contact: Jim Lynxwiler, 970-416.2869, llynxwiler(a)poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 12/16/2019 12/16/2019: Poudre Fire Authority has no comment. Department: Technical Services Contact: Jeff County, 970-221.6588, icunty(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/13/2019 05/08/2020: INFORMATION ONLY: Unless required during MJA, a complete review of all plans will be done at FDP. 03/09/2020: INFORMATION ONLY: Unless required during MJA, a complete review of all plans will be done at FDP. 12/13/2019: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. 11