Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TIMBERLINE INTERNATIONAL APU - PDP200014 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLAN
HCS SSV GLST MAX. HT. 23' - 0" HCS SSV PFM GLST GLST HCS SSV HCS GLST HCS SSV PFM HCS HCS SSV SSV HCS SSV PR. 3'-0"X 5' H.M. DOORS PAINTED STEEL POSTS 6" CONC SLAB STL. COLUMN CORNERS BOLLARDS DN. DN. OPN'G 3' - 0" 16' - 0" RC RC 9' - 0" 4X4 STEEL ANGLE AT INTERIOR PERIMETER PAINTED STEEL 3' - 0" 3' - 0" 8" HC STUCCO ON METAL STUDS 6' - 0" BOLLARDS, TYP. OPENING 3' - 0" P.F. METAL CAP FLASHING STONE VENEER ON CMU SCREEN WALL FORT COLLINS, COLORADO 5833DRIVE 5833 BIG CANYON DRIVE (207(970) 207--0000444422224444 FORT80528 FORT COLLINS, CO. 80528 TIMBERLINE - INTERNATIONAL APU PL1.2 09/03/2020 BUILDING ELEVATIONS FR HOLDINGS LTD. 125 S. HOWES ST. FL 2 FORT COLLINS, CO 80521 MATERIALS PL1.2 1/8" = 1'-0" 1 RETAIL NORTH ELEVATION PL1.2 1/8" = 1'-0" 2 EAST ELEVATION PL1.2 1/8" = 1'-0" 3 RETAIL SOUTH ELEVATION PL1.2 1/8" = 1'-0" 5 WEST ELEVATION PL1.2 1/8" = 1'-0" 4 DRIVE-DRIVE -UP NORTH ELEVATION PL1.2 1/8" = 1'-0" 6 DRIVE-DRIVE -UP SOUTH ELEVATION TIMBERLINE PERSPECTIVE HCS - HARD-COAT STUCCO TO BE SW 7522 MEADOWLARK (FIELD COLOR) SW 9183 DARK CLOVE & SW 6085 SIMPLY BEIGE (ACCENTS) SSV - SYNTHETIC STONE VENEER TO BE ELDORADO MOUNTAIN LEDGE IN BUCKSKIN PFM - GALVANIZED METAL SIDING GLST - INSULATED GLAZING IN DARK BRONZE ALUMINUM STOREFRONT PL1.2 1/4" = 1'-0" 7 TRASH ENCLOSURE PLAN PL1.2 1/4" = 1'-0" 8 TRASH ENCLOSURE -FRONT PL1.2 1/4" = 1'-0" 9 TRASH ENCLOSURE -SIDE