Planning Department
City of Fort Collins
August 20, 1992
Jim Gefroh
Gefroh-Hattman Architects
145 West Swallow Road
Fort Collins, CO. 80526
Dear Jim,
Staff has reviewed your submittal for the Overland Hills West, RF
Cluster Development Plan Review and has the following comments to
offer:
1. Public Service Company has stated that the final plat must
dedicate 8' minimum width utility easements adjoining the
right-of-way lines on both sides of all residential streets.
Fifteen foot minimum width utility easements must be dedicated
on both sides of Overland Trail.
Provisions to accommodate a 4' gas line must be included in
the design of the Spring Creek bridge. This portion of the
bridge design must be approved by PSC.
2'. The plat must include the following utility easements for U.S.
West telephone service:
* across the swale between the rear of Lots 37 & 38.
* across the swale between Lots 6 & 56.
* across the open space between the east corner of Lot 63 and
the -rear of-Lot-11: -
* along the north side of Plains View from Overland Trail to
Lot 1.
* along the north side of Lands Edge from Overland Trail to
Lot 25.
* along the west side of Overland Trail from the south edge
of the project to the north side of Plains View.
The comment sheet from U.S. West is attached to these
comments.
3. City Light & Power has stated that single phase power is
available from a temporary system located at. the northeast
corner of Overland Hills, Second filing.A permanent system
will not be installed until the north half of Horsetooth Road
is constructed.The developer will be responsible for
additional cost of extending any temporary system to serve
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
m
this new development. A permanent system will be installed
inside of the subdivision. Standard Light & Power development
and building site charges will apply to this portion of the
construction.
Additional development charges will apply if unusual ground
conditions are encountered during construction.
4. Water service to this development will be provided by the Fort
Collins -Loveland Water District. Your plan review for water
service should be coordinated with the district.
5. The developer will be required to obtain sanitary sewer
service from the City. The nearest sewer main, however, is
nearly 3/4 of a mile north of the site. The developer will be
responsible for extending a sewer main from this development
to the existing sewer main. The cost of this extension will be
the responsibility of the developer, but the City will
establish reimbursement agreements and assist him in
collecting for the off -site sewer costs whenever someone
connects to and uses the off -site sewer main. Extensive
planning and right-of-way acquisition will be necessary in
order to complete the off -site sewer main.
In addition, red -lined comments are on the attached
preliminary plat and utilities layout.
6. Stormwater Utility comments are attached to these comments.
Sufficient drainage and erosion control information for a
preliminary submittal was not received on August 3rd. We are
now 2-1/2 weeks into the 7 week review process and information
has still not been provided. This request does not appear to
be ready to go to the Planning and Zoning Board on September
28, 1992.
7. Poudre Fire Authority is concerned by the fact that there is
not a second point of access to this development with the plan
that was submitted. The entire development is greater than
660' from a single point of access. Individual residential
fire sprinkler systems can alleviate the need for a second
access. The water supply system must provide 1,000 g.p.m. at
20 p.s.i. residual pressure beyond domestic use. It is
possible that a wildland interface fire evaluation may be
necessary, dependent on the layout of the lots in relationship
to the open space areas.
8. The Plains View Street name conflicts with an existing Plains
Court in the City.
9. A full traffic impact analysis is required with the
preliminary submittal for this request. The analysis has not
yet been received.
10. With lots planned to be platted right up to the south property
line, off -site easements for drainage and grading are likely
to be needed from the neighboring property to the south.
li. Off -site improvements are needed on West Horsetooth Road to
connect this street to the Overland Hills Subdivision, Second
Filing or to Springfield Subdivision if improvements for the
Overland Hills, Second are not completed.
12. Overland Trail should be constructed on -the east side of the
Overland trail right-of-way and constructed to a width, from
the flowline.of the gutter to the edge of asphalt, that
fulfills the developer's full obligation for local street
improvements (both east and west sides). The full arterial
street (or major arterial or collector) is not needed at this
time.
13. Overall, this is a good plan that is much more sensitive to
the site than the plan presented at conceptual review.
However, with some minor adjustments the plan could be even
better. The applicant should meet with representatives from
the City Planning, Natural Resources, Parks & Recreation
Departments and Stormwater Utility to walk the site and look
at how this development can interface with existing and
proposed open spaces, taking into consideration the natural
areas and vegetation on site.
14. There are some questions on how the open space will be
managed. What are the plans for ownership and maintenance?
15. The design for the trail underpass'at Spring Creek and West
Horsetooth Road should be coordinated with Craig Foreman of
Parks & Recreation.
16. The master planned Spring Creek Trail should be shown on the
overall site plan.
17.
The last sentence'in Item 2 of the PLANNING STATEMENT —is
unclear. What is the intent of that sentence?
18. The homeowners will be responsible for the maintenance of the
common area landscaping, including the public right-of-way on
Overland Trail.
19. Trees and shrubs planted in the native open space areas should
be taken from the attached list. Greater design definition and
detail is needed for the thickets, ie. what specific plants,
spacing, size, etc. Use the attached planting details for non -
irrigated areas.
20. Street trees (minimum 2" caliper in size) are needed along
Overland Trail. The City has a list of approved street trees
that is available from Tim Buchanan of Parks & Recreation or
from the Planning Department.
21. The plan indicates filling of the natural swale in the center
of the development and cut to accommodate the new drainage
pattern. This may be a problem for habitat and natural
resource preservation as outlined in City Ordinance #29-
116.(4) attached.
22. Public access easements need to be provided from Horsetooth
Road and Overland Trail to the City's Pineridge Open Space.
Also, the open space in this development should be dedicated
or restrictions put on the property to provide continuation of
the open space. See City Ordinance #29-116.(2)(9) attached.
23. The plan must address in detail the intent to allow farm
animals in the development. See City Ordinances #29-115 and
#29-116. (10) . There are specific restrictions relating to farm
animals in the RF zone.
24. Additional buffering at the east edge of this development may
be required to screen and buffer Overland Trail and the
cluster development from Overland Hills 1st & 2nd Filings and
the single family lot as shown on the site plan.
25. A vicinity map is required on the site plan.
26. City Ordinance #29-114 (attached) defines the maximum
topographic limitation of development in the RF zone. That
elevation is 5,250 (any part of any building). The last tier
of lots on the west end of the development are on the 5,230
contour elevation, which will significantly limit the height
of any home in this area. The plan will have to definitively
address the site grading and structures to be built on these
lots.
27. Lots of coordination between the Stormwater Utility and
Natural Resources will be required due to the significance of
the natural areas and detention areas on -site.
28. This request is not ready to go to the Planning and Zoning
Board on September 28th due to the lack of information on
utilities, storm drainage, and traffic impacts. It is being
suggested that this item be'continued to the October hearing
to allow time for the information to .be submitted and
sufficiently rerviewed.
This completes the review comments at this time. Additional
comments may be forthcoming as the various departments and
reviewing agencies continue to review this request. Please be aware
of the following dates and deadlines to assure your ability to stay
on the agenda for the September 28, 1992 Planning and Zoning Board
hearing:
Plan revisions are due September 2, 1992 by 12:00 noon. Please
contact me for the number of revisions required for each document.
PMTIs, renderings, and 8 copies of 'final revisions (for the
Planning and Zoning Board packets) are due September 21, 1992.
Final documents (including the signed development agreement,
applicable mylars and utility plans) are due September 24, 1992 by
12:00 noon.
Please contact me at 221-6750 if you have questions or concerns
related to these comments. I would like to schedule a meeting with
you as soon as possible, if necessary, to discuss these comments.
A.Sely,
g.,.7
Project Planner