HomeMy WebLinkAboutOVERLAND HILLS WEST RF SITE PLAN REVIEW - 38 90D - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 12
MEETING DATE 1125193
STAFF Steve Olt
PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Overland Hills West, R-F Site Plan Review - #38-90D
APPLICANT: Jim Gefroh
Gefroh-Hattman Inc.
145 West Swallow Road
Fort collins, CO. 80526
OWNER: Kim Stuart
2100 Nicasio Valley Road
Nicasio, CA. 94946
PROJECT DESCRIPTION:
This is a request for 63 single family lots on 63.09 acres. The
lots range in size from 7,320 square feet to 15,225 square feet.
The development is in the R-F, Foothills Residential Zoning
District and is located west of the proposed Overland Trail
extension, south of West Horsetooth Road, and north of County Road
38E. The City of Fort Collins Pine Ridge Open Space is to the west.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This is a request for Final approval of a two -phased Cluster
Development Site and Landscape Plan for 63 single family lots on
22.80 acres, 24.81 acres of "permanent" private open space, and
15.48 acres of dedicated public open space on a total of 63.09
acres; and Preliminary approval of the Subdivision Plat, Utility
Plans, Drainage and Grading Plans for the entire 63.09 acre site.
Final plans for both phases must be submitted to the City for
review and approved by the Planning and Zoning Board prior to
recording of plans. No permits will be issued by the City until
plats are recorded. The plans conform to the requirements of
Section 29-111: R-F, Foothills Residential Zoning District of the
City Code. This development has been designed to minimize the
impacts of the streets and residential lots on the existing
terrain. Two neighborhood meetings have been held for this request:
the first meeting being on July 22, 1992, with 18 people in
attendance; and the second meeting being on October 22, 1992, with
15 people in attendance. Overland Trail, shown as a major arterial
on the Master Street Plan, will serve as the primary access route.
The internal streets are to be standard local streets, 36' wide in
a 54' right-of-way, and dedicated to the public.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
13. COMMENT: We (the neighborhood) need a meeting with all persons
that have any real decision -making ability to participate in
another meeting on these issues. (It was then stated that
representatives from City Transportation and the Poudre R-1
School District should definitely be involved.)
14. COMMENT: The City appears to be setting in concrete the
location and design of Overland Trail extension.
15. QUESTION: Will you notify us personally of any additional
meeting to discuss our concerns?
ANSWER: Yes, a letter similar to the one that was sent for
notification of this meeting will be sent to the original list
of Affected Property Owners as well as all present tonight.
16. COMMENT: The construction traffic in the area is already a
real problem for the children going to Olander Elementary
School.
17. COMMENT: There appears to be real mis-communication within the
City concerning the information being conveyed to the
developers and property owners about the location and timing
for Overland Trail extension.
18. QUESTION: If there is a Spring Creek floodplain that would
disallow development to the north of Overland Hills, would the
City build Overland Trail anyway?
ANSWER: Floodplains, unlike floodways, can be modified to
allow certain types of development to occur within the
established floodplain limits.
19. QUESTION: Did the City tell you (Mr. Gefroh) how big the
bridge had to be over Spring Creek?
ANSWER: Yes, they have indicated generally how the design of
the bridge has to be done to accommodate the potential
stormwater flooding in Spring Creek.
20. QUESTION: How will the stormwater be directed and will any on -
site detention be provided?
ANSWER: Natural surface water drainage will flow to the east
to Spring Creek. Crossing of the creek, over or under, will
have to be provided for with this development. Possible on -
site detention has not yet been addressed but will have to be
with the preliminary Planned Unit Development submittal.
21. COMMENT: The City was afraid to open Pandora's Box with the
1st & 2nd Filings of Overland Hills. Now it has to happen with
this request (Mr. Gefroh).
22. QUESTION: If the City takes the stance that Overland Trail
will have to be built in the location that is proposed, will
you, as the developer's representative, take a position on the
status of the street?
23. COMMENT: People who will be permanently affected will not
favor the construction of Overland Trail.
24. QUESTION: Where will your water and sanitary sewer services
come from?
ANSWER: Water service is provided by the Fort Collins -Loveland
Water District and is presently in the area. Sanitary sewer
will be City of Fort Collins services by main lines that will
have to be extended south from the Quail Hollow area.
25. QUESTION: What type of homes are you proposing, from a size
and cost standpoint?
ANSWER: We really haven't thought about that yet.
26. QUESTION: Will you take these concerns to your client:
* Safety,
* Wildlife,
* Environment; and,
will he be sensitive to the strong concerns about the human
side of this proposal?
27. QUESTION: Will the applicant be responsible for the trail
connection through the development and open space?
ANSWER: The question of the need for a trail and who will be
responsible for the construction of that trail will be
determined during the formal City review process.
28. COMMENT: What we are saying here is that if the access street
to this development is constructed as a local street and we
get a bicycle trail, then we will be happy!
29. COMMENT: We think that residents of Quail Hollow, a Poudre R-1
School District representative, and someone from Larimer
County should be at the next meeting on these issues.
30. COMMENT: The street lighting in Overland Hills 1st & 2nd
Filings is atrocious.
RESPONSE: Overland Hills 1st Filing is still under
construction and I'm (Mr. Olt) not sure that the street
lighting in the 1st Filing is activated yet. The 2nd Filing is
approved but not yet recorded; therefore, no construction (and
that includes street lighting) is under way in this
development.
31. QUESTION: Why does overland Trail have to be a 4 lane arterial
rather than a 2 lane local street?
ANSWER: The status of this street was established in 1981 with
the adoption of the City's Master Street Plan. The need for
arterial streets on the periphery of development to move
concentrated traffic north -south and east -west, quickly and
efficiently, is a clearly defined planning principal. When the
Street Master Plan was originally adopted the need for a
future arterial street in this location was identified. The
plan is now in the process of being reviewed and conceivably
revised.
32. QUESTION: Have you considered the types of homes and covenants
as part of the review process?
ANSWER: Those considerations have not been made yet. The
proposal is currently not in the review process and the types
of homes and associated covenants on the project would be
private issues, not the City's primary concerns.
Minutes of a
NEIGHBORHOOD MEETING
Date: October 22, 1992
Project: Overland Hills West
Applicant: Jim Gefroh
Gefroh-Hattman, Architects
145 West Swallow Road
Fort Collins, CO. 80526
City Planner: Stephen Olt
This was a second neighborhood meeting held to discuss a
development proposal with the residents in this area. Mr. Jim
Gefroh, the property owner's local representative, presented a
conceptual plan to the respondents that proposes 63 single family
residential lots on 63.09 acres in the RF, Foothills Residential
Zoning District. This property is located at the west end of West
Horsetooth Road and north of County Road 38E. The potential
Overland Trail extension is within the property boundaries,
essentially at the east end of the development.
The following questions & answers, comments & responses, and
concerns were expressed at this meeting:
1.
Question: My understanding of the City's street design
standards require construction of streets, curb & gutter, and
sidewalks with the development. Why is the street going to
develop only on the west side at this time?
Answer: The City is not requiring the entire width of
Overland Trail to be built with Overland Hills West because
the traffic generated with this development alone does not
warrant a larger street. The City is in the process of
reviewing the Master Street Plan and -the determination of the
ultimate width of Overland Trail is part of this review.
2. Question: When will the Overland Trail extension continue to
County Road 38E?
Answer: That has not been decided at this time. Future
development will drive that need.
3. Comment: I don't want to see only one side of the street
built at this time.
4. Question: Will the landscaping be done on the east side of
the street at this time?
Answer: Yes, the street trees as shown on the Site &
Landscape Plan will have to be installed with the First Phase.
5. Question: Who determined where the Overland Trail location
will be?
Answer: The City is responsible for determining the location
of Overland Trail.
6. Question: Why aren't the developers who developed the First
and Second Filings of Overland Hills putting up the money to
complete Overland Trail?
Answer: Mr. Kim Stuart, the developer for Overland Hills
First and Second Filings, is responsible for the cost of
construction of the local street portions on both sides of
Overland Trail.
7. Question: How far away, time -wise, is a park in this area?
Answer: It is difficult to say at this time. Residential
development is a driving force in the construction of City
parks. Cottonwood Glen neighborhood park, east of Quail
Hollow, is anticipated to be under construction in about 5
years, again dependent on development.
8. Question: What is the time frame for this development?
Answer: That is dependent on the economy and other factors.
9. Question: You are planning 2 phases. The area in the middle
represents the first ridge? What is your time table for
development?
Answer: if the -First Phase is--started-next-spr-ing., then the
Second Phase could conceivably occur a year or two after that.
10. Question: What are the building restrictions on the upper
tier of lots?
Answer: No part of any structure can exceed the 5250'
elevation.
11. Question: I have heard that the Loveland -Fort Collins Water
District will not serve above the 5200' elevation, is that
true?
Answer: No, that is not true.
12. Question: Is the alignment for Overland Trail yet defined
south of Overland Hills West to County Road 38E?
Answer: No, it is not.
13. Question: Could/would the city condemn property to the south
to gain street right-of-way for Overland Trail to connect to
County Road 38E?
Answer: That possibility is very unlikely.
14. Question: The open space covenants in this project will look
like what?
Answer: This part of the development will have to be kept in
a natural state as similar to the existing conditions as
possible.
15. Question: Will the sewer require an off -site easement on the
property to the north?
Answer: Yes, that is a requirement that is being negotiated
now.
16. Question: Are you going to have recorded covenants?
Answer: If Kim Stuart develops this property there will be
protective covenants.
17. Comment: We would like adequate signage in this area to
prevent people who have no reason for being here out of this
area and to prevent excess traffic on Platte Drive and
Highlands West.
18. Question: Do you plan any fence separations for the proposed
public access easement along the north property line?
Answer: No, not at this time.
19. Question: What plans are there for a cross -walk across West
Horsetooth Road at Auntie Stone Street for safe access for
children to the school?
Answer: There is an existing cross -walk in that location. You
should contact the Poudre R-1 School District with concerns
about the operation of the cross -walk.
20. Question: Will any of the existing cottonwoods in Spring
Creek be impacted?
Answer: Yes, some will be impacted with the construction of
the Horsetooth Road bridge crossing over Spring Creek.
i JP
44.
21 rQueJstIom *, Are pro i�ioi s being, planned .,to maintain
b'�icyc4l^e%kgedestrian access �a�long West H'o eto'o"th Road aid.
Overland Trail?
:Answer': Yes, adequate street `width. and walkways are being
r, provided.
I`
Overland Hills West - RF Site Plan Review, #38-90D
January 25, 1993 P & Z Meeting
Page 2
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
N: FA-1; undeveloped land in Larimer County
S: FA-1; large lot residential in Larimer County
E: RLP; existing single family residential (Overland Hills First
& Second Filings)
W: RF; existing public open space (Pine Ridge)
2. Land Use•
This is a request for:
* Final approval of the land use for a two -phased Cluster
Development Site and Landscape Plan for 63 single family lots
on 22.80 acres, 24.81 acres of "permanent" private open space,
and 15.48 acres of dedicated public open space on a total of
63.09 acres; and
* Preliminary approval of the Subdivision Plat, Utility Plans,
Drainage and Grading Plans for the entire 63.09 acre site.
Final plats and utility plans for the two phases must be
submitted to the City for review and approval by the Planning
and Zoning Board prior to recording of plats. No permits will
be issued by the City until plans are recorded.
The plans conform to the requirements of Section 29-111: R-F,
Foothills Residential Zoning District of the City Code, with
emphasis on the following sections:
Sec. 29-116(2) The overall gross density on the Cluster Development
Plan is not greater than one dwelling unit per acre. The proposal
is for 63 dwelling units on 63.09 acres, for a gross density of
1.00 DU/acre. The units are clustered together in the portion of
the property designated on the plan for residential use at a
density of three to five units per acre and the remainder of the
property is permanently preserved as open space through dedication
of ownership or placement of an appropriate easement granted to the
City with such restrictive provisions and future interests as may
be necessary to ensure the continuation of the open space use
intended. There will be 63 dwelling units on 22.80 acres, including
the 3.66 acres for the Overland Trail right-of-way in the clustered
residential portion of the development, for a gross density of 2.76
DU/acre. Without the Overland Trail ROW the net residential density
will be 3.29 DU/acre. The plans will dedicate 15.48 acres to the
City for public access and open space and preserve 24.81 acres as
"permanent" private open space.
Overland Hills West - RF Site Plan Review, #38-90D
January 25, 1993 P & Z Meeting
Page 3
3. Desian•
Layout:
Section 29-116(4) of City Code. The layout of the lots on the
Cluster Development Plan are designed to conform to terrain and
located so that grading and filling are kept to a minimum. Natural
features such as drainage swales, rock outcroppings and slopes are
retained. This development has been designed and laid out to
minimize the impacts of the streets and residential lots on the
existing terrain. The lots range in size from 7,320 square feet to
15,225 square feet. Overland Trail has been located at the bottom
of the ridge, parallel to Spring Creek, to keep the majority of the
vehicular traffic at a lower elevation for functional and visual
reasons. This also enables the development to provide large areas
of public and private open space with contiguity to one another and
the City's Pine Ridge Open Space, enhancing the opportunity for
wildlife movement and habitat in the area.
Section 29-116(9) of City Code. The Cluster Development Plan
addresses compatibility with existing and planned uses on adjacent
public and private property. Buffering of incompatible uses will be
required through landscaping and/or design and public access
through the Cluster Development Plan must be provided to public
recreational areas. A 30' wide public access corridor, flaring out
at the top of the ridge to access the large space to be dedicated
for public use, is being provided along the north property line.
The development will provide landscape buffers along Overland Trail
and substantial distance buffers, with the addition of the Spring
Creek drainageway, between Overland Hills West, the arterial
street, and the existing developments on the east side of Spring
Creek.
Architecture:
Section 29-114 of City Code. No elevation of any building built on
a lot in the R-F District shall extend above five thousand two
hundred fifty (5250) feet above mean sea level. The Site Plan
states that the maximum building height shall not exceed 40' and no
part of any building may exceed an elevation of 5250. The grading
plan shows the finish floor elevations of the homes on the upper
two tiers of lots to be at 5221.0 to 5224.0. This means that no
part of any of these homes can be higher than 26-29 feet above
finish floor. Any home with a finish floor elevation above 5210
will have elevation restrictions and will not be able to extend up
to the maximum 40' height allowed.
Overland Hills West - RF Site Plan Review, #38-90D
January 25, 1993 P & Z Meeting
Page 4
Landscaping:
Street trees will be provided at 701- 90' spacings along both sides
of Overland Trail. Entry features incorporating a sign element,
ornamental trees and shrubs will occur at the intersections of
Overland Trail and Lands Edge Road; and Overland Trail and Eden
Point Drive.
4. Neighborhood Compatibility:
Two neighborhood meetings have been held for this request: the
first meeting on July 22, 1992, with 18 people in attendance; and
the second meeting on October 22, 1992, with 15 people in
attendance. Three primary concerns were expressed at both meetings:
1) The construction of Overland Trail in this area; 2) The loss of
open space on the west side of Spring Creek; and (3) The visual
impacts on the foothills. Copies of the minutes of both meetings
are attached.
5. Transportation:
Overland Trail is shown as a major arterial on the Master Street
Plan, which is currently under review by the City Transportation
Division. The internal streets are to be standard local streets,
36' wide in a 54' right-of-way, and dedicated to the public. The
streets in this development function as a long cul-de-sac loop with
the closest single point of access being the intersection of West
Horsetooth Road and Platte Drive, approximately 2,000 feet away.
All the homes in Overland Hills West must be equipped with
automatic fire sprinkler systems unless a second point of access is
provided by connecting Overland Trail to the south.
6. Storm Drainage:
A stability study for Phases One and Two must be submitted to the
City's Stormwater Utility with the Final plats.
7. Resource Protection:
Section 29-116(8) of City Code. The Cluster Development Plan shows
consideration for wildlife habitats by leaving open large single
blocks of land. This plan preserves large blocks of land for public
and private open space. A large tract of land comprising the west
1/3 of the development, adjacent to the City's Pine Ridge Open
Space, will be dedicated to the City. Pockets of land at the
northeast corner and in the middle of the cluster development will
be preserved as "permanent" open space (privately owned).
Overland Hills West - RF Site Plan Review, #38-90D
January 25, 1993 P & Z Meeting
Page 5
RECOMMENDATION:
This request is in compliance with the R-F, Foothills Residential
Zoning District requirements; therefore, staff recommends approval
of the Overland Hills West, R-F Site Plan Review - #38-90D.
a
6
brae--460pGo\PIN
CITY LIMITS 1/91
STREETS 1/31/91
Addendum.
9
i
q II k
■amm■
OVERLAND HILLS WEST
ITEM: R-F SITE PLAN REVIEW
NUMBER: 38-90D
R—F = Foothills Residential Zoning District
mwa.•. tmxmn
II n .Tti nMl.ii r mr[v...n...ITl6'r-[]r�4: ti.T+Tia(:. n. M.e.... ....M•1 .....In[r.1�M r M LMrul �Y.n. r .rL r.rl.l!
r Llnu er,w. L•.m a ®nw n 6L.L,ni L•Pu,. r :nTOaon vn . n 1Y+ M .tEln ll,l wrtlw. Aw
- Ylrn � 1 [Mwl
' Y a _ Y11•. •.•i. IttIt131 „ _... 111., ,. `
1
\\
n
OVERLAP
_RF ZONEO• CLUSTERED
d.n. 4.11gs R
I
.I Lr.�l'.• Ynl.ile
4i011pI1L1111
..• •••��%
T; O
MOP����
��
_1•���I
Q
►pp
In
Y
y
f
lei
r �r •'
.(UIOCVW}GO) -
W HILLS WEST
sorE FLAN REVIEW •lao,N
lwY 1! .flm..
• � any �R.. Y.T i. '
Cj/1�L�Jj' O Rr1l JIS. -.wIE nE.
r�.1 nD,lxfw. ..n a.
TO ITITIT,
! _ r.1 COOrxnR uwP ..,. c ww R•�
!. tlUw.l
uf-11Pr�. ..I.Lu1r w m! Y p Tltlll
i t ..
w.l.U•.NKMIwITT
.R
!-we �Smw4 llR ITT n,
&.lImON11b 616N IQP,7bFtl
M pnwl; PbIS wrlr. P xLLlrnll M.I. 1. rl
R..lw l W I .! A. M LlY.MF➢ .Pllp. P M
MCRP.Y. YL CLNM1PLoIII. I, P
S. 1. I. IxIL..4.peMi 4L . YOCT t.T P M Yl PI.I110P].ILL w POIC..[O .N CII. P . .PC.Y'T 010..L/IF. .
.VILOIK .MILLR. w[ 1U[MIIIn A nJ. ..�
Mpn R M IT Lo- OL.LI 1 .1 1111. e1w111 LT.
I. ... oev.Lonr -. ITT TO.'. .v aL U.Illn .,
p. Yl ...1C. LINK. R CIr. !
.MP LIyM.Y.Y! nM � M lY1R Y LR YNK .NnM
TIOUT
IMP.Y. N.Y Lilw.l. .LL L➢.! Y. LpE.R! wLi
I. YM wwt LIR i IT w•
4 a[IR. 4r . C RII YP RYI-
pY M .I �W w Ypl..[O i A..pR
.Itlm. wa v ans w w... v.p..
I. 1!R 4nx Y.E. IMCI. YE Ln+.P Epn1.1 . Y
R .Y.II.R; . p. Pl. w. 11 nL1 L... OU.- .nM
TOYNKM1. CIr, I C0.LIM Pp ..P
LEr. YIrMIN NK N.OIL'1lIM W ..IMP EJIr IFp.A
..ol .tllr Ewu io M rn[tl rwrx,u..
s i w nnrulwlw r w� r r 1.[ on w IM wr.
N_.
� NwLI.MWIS9
- pM1O.SN.dA
M F1T ` .Vrr lll+ '
IT..ro1vN..nw nRr+P+wln[ nm !
j y . nnorr.' Mn 1<r
MI. PLIwx1.L1•
m 11L1, MW-�LN MLIII{1 1. . 11O. .IK
^� '\' o....u. rtl ou•u.wo n cwnucno- nLL NKw.Po Yo
NKrro.n. rM . ww. NK raLtr.
��-TTOOOi^
OTIMITTOTOO O TU4 [S
a::L.o. PIILnI .. ..s .M.P..r
1
I/�� � 1 Kl.n 1p_ 11.4 Y•.
piV..IrVIN S10[aum. 0
n
I mL� Is�rsr. !
L..N i,.•.,.. °.
1b _ R. .IMAS1 P n.+SA P,LLn1 9.Vn11 .M.wYi
eOCIE ` T M 11. .ILL Y+..... M .•RSir'M .n.,l. M ,. Y...
1 v .aaM. rL
.+M[i! .111. M'..wLC. YILL w
NK.
R .Il .Illy
'/ f �• li
=INKS. Yu n
•NKR! nL� w .v. x111 .1 .Ir.l ML
YrILITI ^L6. RMRn .lml.
1 G HerLAL NOM5
,tlL'°I
R,n a :I.. IRI RLI Ll..0
1 .ee .1 L. fG M1IeO WLL Ow p....wY TO
11. a
MLL In nI.Y.IW. Yrt n,Y+IS
.1 O �
V.✓1. 1-4 i . w.R IIw.[
ITT
ITIOT Or
/I .� ..0 ITOv...nn ..l o
L Iw[.Iw1A r Ildlr .e.f ww It: cv�o 1Y1"Lnoww.... TOIL YY..Itl. n .
p. i�..l. i .r.A •w[. * Y.1 x rl •av�wr IT. Mlluw v TO
Ir TO
Iy] Gllly. i,= x Iw nY MRK u 12:7-w..[ ].
I .r11 S •r 11' Ir ] _l np .11 •.n pun.TTITT IT
rtY.
Mnl. nlxu rrRl. 1..r.1... �"
. Sr1Y n r + wr OTTOla
...r Y+nl1-..xa...lw .E'n u�.Y.
f.Ifi INI .fir.°•ir a [it0.V4w w.lnn . nr.l.
TO
x ...n 1....�y.. x.a xr YN.[wlo-
if )Y i• [ (I.J I.
M P LI[e ,wall
I �. LINK :,I LLa[ ^I•:�.M I.: nM.
O l4 I x .lR r4f P ll.l! MJLnw.r •1
l YI.]i I..LYI M.I. f IP 11' (1- [ 1
r yr ] or M• v I .. o-.. M wn,. TO I.. w vim.. ,w:
.110.1 #.w 1... ILJLAM •..n.Ynn ITO.•I•LlL w Ow.LrLO.I M TU6%
w r .(..111. 1. sNl...ul�
. NK..In nr r ..rlr M..L ..r
rrn Ir. f r n• a^n.vw:c rr.a .,u w w n+. v rrr mar
p... llr x p. L.r. .s .
Yu. f ! Ir J• S AY.Y IM .1..
1 x JM r..lw n. YnY I
0.0
I.wY Y.. - w
I..LL.. ILp.1.1 nAY
ppl,C. r.QY .OIIM.O1. ILL
f I w NK➢ .M M CIM1
YY MIIwf I.Y4af. P[w�pllO �•
TTTTOT�IJ:
IO..
OTTOp.Y ....I.T.
UT .."CO II.IP OUTw..v n TO.w_c.. Z I.
v
City of Fort Collins
Date:
Project:
CommuD f Planning and Environmental . vices
Planning Department
Minutes of a
NEIGHBORHOOD MEETING
July 22, 1992
Overland Hills, Third Filing
(Overland Hills West)
Applicant: Jim Gefroh
Gefroh-Hattman, Architects
145 West Swallow Road
Fort Collins, CO. 80526
City Planner: Stephen Olt
This meeting was held to introduce a development proposal to the
residents in this area. Mr. Gefroh, the property owner's
representative, presented a conceptual plan to the respondents that
proposes approximately 60 single family residential lots on 60
acres in the RF, Foothills Residential Zoning District. This
property is located at the west end of West Horsetooth Road and
north of County Road 38E. The potential Overland Trail extension is
within the property boundaries.
The following questions & answers, comments & responses, and
concerns were expressed at this meeting:
1. QUESTION: Are any improvements to Horsetooth Road planned with
this development?
ANSWER: Horsetooth Road will be constructed to just west of
the entrance intersection to the approved Overland Hills,
Second Filing with that development. Overland Hills West will
construct Horsetooth Road to Overland Trail and the portion of
Overland Trail that will be on that property from the north to
south boundaries.
2. QUESTION: What are the projected dates for this development
and Overland Trail extension?
ANSWER: We will be submitting the Preliminary Plan as soon as
possible with construction beginning as early as August, 1993.
3. QUESTION: What street improvements will be needed for the two
streets in question?
ANSWER: Horsetooth Road will be built to a collector status,
Overland Trail will be built to a full width arterial.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
4. QUESTION: Is the arterial status for Overland Trail
inevitable?
ANSWER: No, it is not.
5. QUESTION: Then why plan for the full width and burden the
developer with the responsibility?
ANSWER: The ultimate status of Overland Trail will be
determined during the development review process in the City,
and the development will be responsible for its portion of
street construction.
6. COMMENT: It is now time for the City to solicit viewpoints
from the neighbors in the surrounding area and gain their
input as to what is really necessary and what will be the
outcome of development in this area.
7. COMMENT: We want a commitment from the City on the final
design and location of Overland Trail.
8. QUESTION: How will this affect your development if Overland
Trail is not required to be constructed to an arterial status?
ANSWER; The number of lots and the overall density would not
change; however, the street alignments possibly would change.
9. COMMENT: Because this development wants to occur here appears
to dictate the need to build Overland Trail.
10. QUESTION: What about access to the public open space from the
existing developments? Will a pedestrian and bicycle trail be
provided with this development?
ANSWER: That has not yet been determined.
11. COMMENT: This development as shown looks like any other
development. What makes this area and zoning district
different?
RESPONSE: There is an overall density cap, being 1 dwelling
unit per acre, that must be achieved in the RF District
whether you develop large residential lots or a residential
cluster development plan. The large lot option requires
minimum 2.29 acre lots, giving a more rural appearance to the
area. Cluster development must maintain a 3 to 5 dwelling
units per acre density, which will provide for at least a
third of the property to remain as open space integrated into
the development proposal.
12. COMMENT: Why can you, as a City Planner, not take our concerns
back to the City as an advocate of those concerns and promote
that this street should not be built as an arterial for good
planning reasons.