Loading...
HomeMy WebLinkAboutOVERLAND HILLS SUBDIVISION 2ND FILING FINAL - 38 90C - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTS (2)Utility . _vices Stormwater City of Fort Collins January 16, 1991 Mr. Dick Rutherford Stewart and Associates 214 North Howes Fort Collins, Colorado 80521 RE: Overland Hills First and Second Filings Dear Dick: Per our telephone conversation today, I am documenting the additional information I need in the HEC-2 analysis for the subject property. Please have RCI provide the following: 1. Modify the HEC-2 analysis for the future conditions, (Horsetooth Road and Overland Trail extended), such that the 100-yr floodplain does not encroach into the Overland Trail (extended) right-of-way. 2. Show this floodplain on Figure 2 of RCI's report along with the floodway delineation. 3. Revise the text of the report and Figure 2 to reflect this change and submit a revised report to the Stormwater Utility. As we discussed, RCI's estimate to do this work is $490.00. The Stormwater Utility agrees to reimburse RCI for the additional work at a not to exceed cost of $490.00. Please consider this letter your Notice To Proceed. The requested information must be received in my office no later than 8:30 AM on Tuesday, January 22, 1991. If this deadline is not met the project may be in jeopardy of being pulled off the January P&Z Board agenda. If you have any questions please call me at 221-6589. Sincerely, A4M?f� Susan L. Duba Hayes, P.E. Civil Engineer II cc: Mike Herzig, Engineering "Steve Olt, —Planning_ ) 235 Mathews • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6589