HomeMy WebLinkAboutOVERLAND HILLS SUBDIVISION 2ND FILING FINAL - 38 90C - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTS (2)Utility . _vices
Stormwater
City of Fort Collins
January 16, 1991
Mr. Dick Rutherford
Stewart and Associates
214 North Howes
Fort Collins, Colorado 80521
RE: Overland Hills First and Second Filings
Dear Dick:
Per our telephone conversation today, I am documenting the additional
information I need in the HEC-2 analysis for the subject property.
Please have RCI provide the following:
1. Modify the HEC-2 analysis for the future conditions, (Horsetooth Road
and Overland Trail extended), such that the 100-yr floodplain does not
encroach into the Overland Trail (extended) right-of-way.
2. Show this floodplain on Figure 2 of RCI's report along with the
floodway delineation.
3. Revise the text of the report and Figure 2 to reflect this change and
submit a revised report to the Stormwater Utility.
As we discussed, RCI's estimate to do this work is $490.00. The Stormwater
Utility agrees to reimburse RCI for the additional work at a not to exceed
cost of $490.00.
Please consider this letter your Notice To Proceed. The requested
information must be received in my office no later than 8:30 AM on Tuesday,
January 22, 1991. If this deadline is not met the project may be in
jeopardy of being pulled off the January P&Z Board agenda.
If you have any questions please call me at 221-6589.
Sincerely,
A4M?f�
Susan L. Duba Hayes, P.E.
Civil Engineer II
cc: Mike Herzig, Engineering
"Steve Olt, —Planning_ )
235 Mathews • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6589