Loading...
HomeMy WebLinkAboutOVERLAND HILLS SUBDIVISION 2ND FILING FINAL - 38 90C - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSUtility :vices Starmwate- January 31, 1991 Mr. Dave Frick Mr. Phil Graham Resource Consultants Inc. 402 West Mountain Avenue Fort Collins, Colorado 80521 RE: Overland Hills First and Second Filings Dear Dave and Phil: The purpose of this letter is to document' our meeting of January 29, 1991 during which we clarified the additional work required to complete the HEC-2 analysis for the Overland Hills project., Please provide the following: 1. Run a floodway analysis using the same input data as was used for the floodplain analysis included in Appendix C of your .January 18, 1991 report. Include the revised runs in the report. It was agreed that you will use the floodway limits established in Appendix B of the January 18, 1991 report and shown on Figure 2 as "Hypothetical Future Conditions 100 year Floodway". 2. Eliminate the HEC-2 runs included in Appendix B of the January 18, 1991 report. 3. Modify Table 2, Spring Creek Floodway Data for 100-Year Full Develop- ment Discharges. Include the existing channel conditions only. This data will be used as the base flood condition. The future channel condi- tions information will be eliminated. 4. Modify Table 3, Spring Creek Floodplain Elevations for 100-Year Full Development Discharges. The columns shall be retitled as follows: "Existing" to "Existing Base Flood Elevation" "w/Overland Tr." to "w/Overland Tr. and Channelization, Floodplain" Add two additional columns to the table, titled: "w/Overland Tr. and Channelization, Floodway" "Change" (between floodway elevation and base flood elevation) 5. Modify the text of the report as necessary to reflect the changes. 6. Figure 2 should not require any additional changes since the future conditions floodway is already shown. � 5 Vlath����s P.O. Buy DSO Fort Ci�llins, CO 50�=2-0=011 - (3p3) 7. Figures 4 and 6 will be modified so consistent symbols are used to represent existing and proposed conditions. 8. Submit a copy of the all the input data and output on a floppy disk. Your estimate to do this work is $400.00. The Stormwater Utility agrees to reimburse you for this additional work at a not to exceed cost of $400.00. Please consider this letter your Notice to Proceed. If you have a differ- ent interpretation of our meeting please let me know as soon as you receive this letter. If I do not hear from you I will assume that you agree with the requirements stated herein. I will be away from the office from February 14 through February 25, 1991. If possible, please submit the revised report by February 11, 1991 so that I can review it prior to my departure. If this is not possible, please let me know so that we can agree on another submittal date. You can contact me at 221-6589. Sincerely, Susan L. Dubs. Hayes, P.E. Civil Engineer II cc: Dick Rutherford, Stewart and Associates Mike Herzig, Engineering Steve Olt, Planning ' 0