Loading...
HomeMy WebLinkAboutOVERLAND HILLS SUBDIVISION FIRST FILING FINAL - 38 90B - CORRESPONDENCE - PROJECT SUBMITTAL AND RESUBMITTALDevelopm Services Planning Department City of Fort Collins April 2, 1992 Mr. Kim Stuart 2100 Nicasio valley Road Nicasio, CA 94946 RE: Overland Hills First and Second Filings Dear Kim: Per our telephone conversation on Monday, I am documenting the remaining items to be resolved to proceed with recording the final documents for the First Filing and the items we discussed pertaining to the Second Filing. The following items are required to complete the City's review and approval of Overland Hills First Filing: 1. Signed development agreement - including both your signature and all City signatures. A draft agreement has been faxed on April 2, 1992 for your review and comment. Please call me with any questions at 303-221-6750. When you are ready to sign the agreement, I will mail the original and 3 copies for your signature and you will then return all 4 to our office for City signatures. 2. Off -site drainage easements or recording of the Second Filing plat - as I have explained to you, in order to file the plat for the 2nd Filing and thus dedicate off -site drainage easements for the 1st Filing by plat, the development agreement for the 2nd Filing would need to be signed. We agreed that there are some issues on the 2nd Filing that may take some time to resolve to the point where you are ready to sign a development agreement and as a result may delay recording of the 2nd Filing plat. Therefore, you have the option to dedicate the off -site easements for the 1st Filing by separate document (deed). We will need to have the signed, attorney certified, deeds,in a form acceptable to the City, in hand prior to signing final utility plans. 3. Final Utility Plans - your engineer will need to submit final mylars for City approval after obtaining approval from the Fort Collins -Loveland Water District. The City Stormwater Utility will not approve plans until the off -site drainage easements have been dedicated and the final drainage report has been submitted and approved. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 ; 4. Construction easement/permission from adjacent property owner - the City Engineering Department has asked that either a construction easement or a letter of permission be obtained from the adjacent property owner for the construction of Platte Place and Platte Court. If this permission is not obtained, your engineer will need to verify and provide proof (construction details) that all construction can take place on your property without trespassing in any way on the adjacent property owner's land. Mike Herzig of the Engineering Department will need to accept and approve of the solution prior to signing of the final utility plans. 5. Final Plat - the final plat will be recorded when the development agreement has been executed, however construction cannot begin until final utility plans are approved subject to the conditions discussed above. The following items are required to complete the City's review of the overland Hills Second Filing: 1. Development Agreement - Mike Herzig and I will be preparing a draft agreement for your review. Due to our heavy workload at this time, some projects currently up for Planning and Zoning Board approval have priority, but we will be getting you a draft as soon as possible. As you are aware, Horsetooth Road needs to be improved off -site to the east along the Springfield Subdivision. Mike Herzig and I have both discussed this issue with Jim Gefroh. At this point, I do not believe the issue has been resolved to Jim's satisfaction, and further discussions will need to take place. Also, if a repay agreement becomes part of the process, additional time will be needed to draft and execute that agreement in addition to the Development Agreement. r/ Also, the agreement will address the obligation for Horsetooth improvements along Lot 1 to the west property line and other street improvement obligations being attached to Parcel "C" including overland Trail, Horsetooth Road, and the culvert crossing over Spring Creek on Horsetooth Road. 2. Final Utility Plans - Again, your engineer will need to submit mylars and a final drainage report for approval. The utility plans must be revised to show the drainage facilities for the 1st Filing and notes regarding maintenance must be added to the grading and drainage plan. In addition, the Development Agreement will contain language to define the obligation for maintenance of all drainage improvements. 3. Final Plat - The plat for the 2nd Filing needs to be revised to show any easements that are dedicated by separate document as well as all other easements and rights -of -way dedicated with the 2nd Filing. The plat will also need to have notes regarding maintenance of the drainage facilities, particularly those related to the 1st Filing, so it is clear to owners of _ M ' Lots 3 and 4 that they are responsible for maintenance of those facilities. If you have any questions or concerns about any of the items discussed above or the draft development agreement for the First Filing that has been forwarded to you, please call me or Mike Herzig at (303) 221-6750. Thank you. Sincerely, rao Jt� Kerrie Ashbeck Civil Engineer I cc: Susan Hayes, Stormwater Utility Steve Olt, Planning Jim Gefroh, Gefroh-Hattman, Inc. Dick Rutherford, Stewart and Associates