Loading...
HomeMy WebLinkAboutOVERLAND HILLS 2ND FILING PRELIMINARY - 38 90A - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDevelo^;_ _:,it Servi::es Planning Departmeni >7f' fdsgti "'> bi Citv of Fort Collins August 13, 1990 Fredric J. Hattman Gefroh-Hattman, Inc. 145 West Swallow Drive Fort Collins, CO 80525 Dear Ric: For your information, attached is a copy of the Staff's comments concerning the Overland Hills, Second Filing, which was presented before the Conceptual Review Team on August 6, 1990. The comments are offered informally by Staff to assist you in. preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerelv, Steph' n Olt Project Planner aulrJL Attachment xc: Tom Peterson, Director of Planning Kerrie Ashbeck, Civil Engineer I Project Planner File CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: August 6, 1990 ITEM: Overland Hills, Second Filing APPLICANT: Fredric J. Hattman, Gefroh-Hattman Inc., 135 West Swallow Road, Fort Collins CO. 80525 LAND USE DATA: Request for a Four Lot Subdivision on 9.19 acres. COMMENTS: 1. This property is currently zoned R-L-P and the request is a "use -by- right" in accordance with the Zoning Regulations for the City of Fort Collins. It may be submitted and reviewed as a Minor Subdivision. 2. The property is located west of the existing Platte Drive, east of .proposed Overland Trail extension, and is south of and adjacent to the Horsetooth Road extension. 3. This property is served by the Fort Collins -Loveland Water District. If and when Horsetooth Road is extended to the west the City will want to extend a 20" waterline to Overland Trail extension and continue that line south along the extension. 4. Sanitary service will be provided by on -site septic systems. The requirements for these systems would be regulated by Larimer County. The City will require a firm commitment to the ability to serve this development with septic systems prior to review of any request. 5. There is a single "point of access" to this site for fire and emergency protection. That point is at the intersection of West Horsetooth Road and _Platte Drive. Lots 1, 3, and 4 are in excess of the 660' maximum distance for fire protection; therefore, automatic—sprinkler—systems—w-ill—be—required in these homes when they are constructed. Lot 2 does fall within the maximum distance; however, placement of the house and development of this lot will determine the ability to provide emergency service. 6. The plat should extend west to the centerline of the Overland Trail extension at this time. The area outside of the defined lots could be platted as a tract, parcel, easement, or open space but not likely as residential lots. Access will not be permitted from Overland Trail. Please consider the future limitations of this area due to the access restriction. 7. It will be the responsibility of the developer to construct the local street portion of both West Horsetooth Road and Overland Trail extensions along their street Crontage. Also, the bridge required to cross Spring Creck on West Horsetooth will be the responsibility of the developer. 61 21 8. The standard street oversizing fee of $584/unit will be assessed at the time of issuance of building permits. 9. A drainage report and grading plan will be required. Erosion control will be necessary during construction. An on -site drainage/detention facility will become the responsibility of the City for maintenance. 10. The drainage master plan for Spring Creek extends north only to the intersection of West Horsetooth Road; therefore, the upstream flows from Spring Creek Dam will need to be verified. There is not a clear drainage channel for Spring Creek on the property to the north. This situation will need to be investigated. 11. Electric service is presently along the north side of West Horsetooth Road as far as Platte Drive. When that street is extended Light & Power would extend their service as well. The City would like to work with the developer to create a permanent alignment for power now, enabling that service to be undergrounded at the time of development, rather than having to provide temporary overhead service. 12. The charges for electric power will be based on lot size and, since -these lots are larger than standard lots, the charge will be approximately $1,000/acre. 13. A bicycle/pedestrian trail easement will be dedicated along Spring Creek <to be in conformance with the adopted City of Fort Collins Parks and Recreation Master Plan. 14. The parcel of ground between Spring Creek and the Overland Trail extension alignment could possibly be identified as a part of the City's Open Space system. 15. There will be a Parkland Fee of $625/unit for residential development, to be assessed at the time of issuance of building permits. 16. A 15' utility easement outside of the ROW along the east side of Overland Trail Extension will be required. E