Loading...
HomeMy WebLinkAboutOVERLAND HILLS 2ND FILING PRELIMINARY - 38 90A - CORRESPONDENCE - MEETING COMMUNICATIONcis GEFROH HATTMAN INC. ARCHITECTS/PLANNERS CONSTRUCTION MANAGEMENT 135 West Swallow Road Fort Collins, CO 80525 (303) 223-7335 September 13, 1990 Mr. Stephen Olt Planning and Development City of Fort Collins Box 580 Fort Collins, CO 80522 RE: OVERLAND HILLS SUBDIVISION FILING TWO PROJECT #90-558 Dear Steve: The following is a summary of our meeting of September 12, 1990, in your office regarding this project. 1. Due to locational considerations, and site specific characteristics, the lower density can be justified for this development. 2. A copy of the agreement from this property owner giving the Sixth Filing of Springfield the ability to transport water across this site will be provided by Final. 3. A copy of the agreement with the property owner to the north accepting storm runoff from the Springfield Subdivision detention pond prior to Final. 4. The R.O.W. for the Overland Trail-Horsetooth Road intersection would be dedicated at Final. 5. A preliminary level of design for the Overland Trail-Horsetooth Road intersection including the bridge at Spring Creek will be provided prior to Final. 6. The floodway of Spring Creek will be placed in a tract and dedicated to the City. 7. Data is available as to the upstream hydrology for Spring Creek. 8. At Final a computer run hydrology study is required. 9. A preliminary profile design for Overland Trail is available from engineering. 10. Minor adjustments to the drainage study will be directed to the Engineer. 11. With these conditions, the Staff can support a recommendation to the Board at the Preliminary level for the project. Sincerely yours, yyoours, Fredric J. Hattman